London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 13059

Received: 15/05/2009

Respondent: London Southend Airport

Representation Summary:

Section 1.7 invites views on the preferred option document. Following the launch of the JAAP Preferred Option consultation, the Airport delivered 40,000 copies of its community newsletter - 'Take off' - to homes in Leigh, Westcliff, parts of Southend, Thorpe Bay, Eastwood, Rochford and Canvey Island. We also launched a website www.flysouthend2012.com and had an information display at the Airport, a local college, supermarket, shopping centre and theatre.

Opinions were invited by a response card in the newsletter, on the website and directly to our staff at the exhibition. Over 4,000 responses were received, some 80% being positive.

Full text:

Following on from Rochford and Southend Councils' Joint Area Action Plan (JAAP) Issues and Options consultation in Summer 2008, the Councils announced their Preferred Option for further consultation in February 2009. This Preferred Option was the subject of consultation until 15 May 2009. During the consultation period the Airport carried out various activities to gauge public opinion on the development of the Airport.

At the start of the consultation, an edition of the Airport's community newsletter - 'Take off' was delivered to around 40,000 homes around the Airport. The areas delivered to included, Leigh, Westcliff, parts of Southend, Thorpe Bay, Eastwood, Rochford and Canvey Island. The newsletter aimed to update stakeholders about proposed developments and future plans at the Airport giving the public clear, concise facts. The newsletter included a pre-paid response card, which invited the recipient to make their comments and provide us with their opinions on the future of the Airport.

A new website - www.flysouthend2012.com - was launched in March 2009. This was designed to keep the public up to date on the progress of various Phase One and Two projects. The website also offered visitors the chance to share their opinions on the JAAP consultation by filling in an online comment form.

An information stand, again clearly stating the main facts associated with the development, was on display within the Airport terminal building, along with external venues including the local college, supermarket, shopping centre and theatre. The stand was manned by airport staff, able to answer questions and provide information on the proposals. The staff gave the public the opportunity to fill out comment cards with their opinions on the JAAP and the future of the Airport.

From the start of the consultation to 12 May 2009 a total of 4,207 responses were received. Of these 3,468 were positive and supported the Council's Preferred Option in the JAAP consultation with 739 objecting to the Council's Preferred Option. The cards are available for review by the Councils.

The level of support (circa 82%) is consistent with past independent polls, which in summer 2008 showed support for airport development of over 80%.

Where there was public support, the key themes were:

• Bringing much needed employment to the town
• Improving the economy of Southend
• Easier access to travel abroad

Some of the comments given in support of the Airport reminisced about the Airport in its heyday and want it brought back into full operation again.

'Having lived here for over 30 years, I cannot wait for the expansion at last - Well done Mr Stobart and Good Luck'

'Any improvement to this under used resource is great. We used the airport once upon a time - now go to Stansted, Gatwick or Heathrow - not only will it bring employment but cut traffic to the above airports - Brilliant'

'I think its been nothing short of criminal the way the airport has been left to fend for itself and I amongst many friends can't wait for Stobart's to come in and make a go of it'

'I have lived in Rochford, a stones throw from the airport, all my life and I welcome the growth of the airport - it has and should remain a working airport - we need it'

Many comments merely said 'good luck' and 'Hurry and get on with it!!!'

Where comments did not support the Councils' Preferred Option there were a number of consistent themes. These were:

• Pollution
• Congestion
• Noise / night flights and
• Concerns over freight

The Airport would like to work with Rochford and Southend Councils and would need to address the comments noted as part of any planning application. Initial comments on these subjects are listed below.

Pollution / Climate Change
Any Environmental Impact Assessment would need to take account of pollution matters, in particular the effect on levels of Nitrogen Dioxide (NO2) and Particulate Matter (PM10), compared against the national air quality standards for these pollutants. In terms of climate change, it is Government policy that aviation should be included in emissions trading such that expanding aviation does not lead to increased Carbon Dioxide (CO2) emissions. The Secretary of State for Transport has said that any expansion would have to live within the tight caps proposed by the EU and any growth in aviation emissions would be fully offset by a reduction in emissions elsewhere. In addition, today there are around 500,000 flights per year taken to Europe by people living in Southend and Rochford. These people typically drive to Stansted or Gatwick for their flights so flying from their local airport may, in fact, reduce pollution.

Traffic and Transport
The effects on road traffic would be modelled as part of any planning application but an estimate is that the Airport - at 2 million passengers (10-15 years in the future) - could result in around 240 passenger related peak hour road movements in each direction. Due to scheduling by airlines, these peaks generally do not coincide with the morning and evening peak hours on the local road network.

Putting the expected traffic movements for a 2 million passenger airport into context, it is expected that the traffic movements at peak times would be around the number associated at peak times with a typical supermarket - and significantly less than a major superstore.

In addition, £12 million is being invested to deliver a new rail station, a very significant improvement in public transport services to the Airport.

Aircraft Noise
A key incentive for the extension to the airport runway is the ability to accommodate modern efficient aircraft currently using most regional airports today. With the current runway, Southend would still grow and evolve from where it is today however it would be constrained by relying on older, noisier and less fuel efficient aircraft running very short haul flights in the UK and northern Europe.

Newer aircraft require an extended runway to operate, take off and climb significantly more quietly and more steeply than commercial aircraft using the Airport today. On landing new instrumentation would increase the angle of approach ensuring that commercial aircraft would generally be higher over Southend and Leigh than today. Elsewhere in the Airport's formal response to the JAAP, the latest noise forecasts for the Airport are summarised. These show a comparison of noise impacts for the Airport today against predicted future impacts that would arise from the Airport operating with the longer runway.

Night Flying
Currently more than 900 flights per month are permitted to take place at night. The Airport fully accepts the need to work with the Councils and commit to controls and reductions for night flights if broader support is to be gained.

Cargo
Air cargo in the UK today is predominantly transported in long haul passenger aircraft or dedicated wide bodied freighters. This size of aircraft would not be able to use Southend Airport with or without an extended runway. The niche cargo that is flown in and out of Southend Airport today is low volume, high value goods such as aircraft parts, high tech machine parts and urgent medical supplies. This is a small part of the overall operation of the Airport and it is proposed to continue these activities.

Rumours relating to intentions to develop a general goods depot at the Airport are unfounded. The concept is not commercially viable and there is no intention of doing this.

That said, the Airport would be prepared to volunteer a cargo cap at the airport to reassure local residents that air cargo operations will be limited at the airport in the future.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 13245

Received: 15/05/2009

Respondent: Mr Peter Churchill

Representation Summary:

A vision for me is something that provides hope and a better future. As I weigh up the benefits/problems the expansion will give. I have come to the view that no extension should be the preferred option, and the Council should have the teeth to stop detrimental impact to the culture and environment. Back to the drawing board, would have been my preference, but the petard was hosted when the new owners appeared, and it was fasttracked to completion. I beleive the general opinion is a mistrust from the public of both the Councils' and Stobart's intentions.

Full text:

A vision for me is something that provides hope and a better future. As I weigh up the benefits/problems the expansion will give. I have come to the view that no extension should be the preferred option, and the Council should have the teeth to stop detrimental impact to the culture and environment. Back to the drawing board, would have been my preference, but the petard was hosted when the new owners appeared, and it was fasttracked to completion. I beleive the general opinion is a mistrust from the public of both the Councils' and Stobart's intentions.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 13274

Received: 15/05/2009

Respondent: Mr Richard Postlethwaite

Representation Summary:

The entire consultation process appears to be deliberately difficult for the majority of residents to access. If the proposal to extend the runway is allowed to proceed then it will inevitably lead to lengthy and expensive legal action to stop it.

Full text:

The entire consultation process appears to be deliberately difficult for the majority of residents to access. If the proposal to extend the runway is allowed to proceed then it will inevitably lead to lengthy and expensive legal action to stop it.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 13326

Received: 15/05/2009

Respondent: K Price

Representation Summary:

Object on global environmental grounds to all aspects related to an increase in flights.

Consultation should reconsider the flawed nature of the 2003 White Paper which is cited in support of the JAAP.

The small number of jobs *possibly* achieved at the airport are not sufficient to justify adverse impacts on the lives of local residents.

Two JAAPs should be created after this stage - separate absolutely clearly the potential job creation of the industrial park from the expansion of the airport.

Full text:

I object to all the aspects of the "Preferred Options"proposal which relate to expansion of the airport and an increase in flights.

My objections are on global environmental grounds. Given what we now know about the science of climate change - which is much more, and generally more alarming, than we knew when the 'Future of Air Transport' White Paper was published in 2003 - I think it irresponsible of our Councils to volunteer a local contribution to an increase in the number of flights worldwide. By choosing to accelerate our local contribution to global warming I believe the Councils are failing in a duty of care to the long-term wellbeing (and in some cases, existence) of communities worldwide. Ironically, there appears to be an increasing risk of this very area becoming threatened by sea level rise.

Incidentally, that 2003 White Paper has been heavily criticised by the House of Commons Environmental Audit Committee, in 2003 and again in 2006. I think this consultation is unbalanced to present alignment with the White Paper as part justification for the JAAP (1.6, para 2) without touching on the many and serious criticisms the White Paper has attracted.

Not all local authorities are so unthinking in their acceptance of the White Paper's projections of demand for passenger air travel, nor the unrealistic assumptions for low oil prices, nor the unacceptable balance between the recipients of benefits and those (i.e. local residents) paying the price in their daily lives. Please look at the "Conclusions" in the Management Summary of a Review in 2005 by the South East England Regional Assembly, here:
"http://www.southeast-ra.gov.uk/documents/transport/final_aviation_report-exec_summary.pdf"

I don't understand why the aspiration for local job creation (the vast majority of jobs) are being tied to a significant expansion of numbers of flights (which may lead to a much smaller number of jobs) within a single JAAP. It creates the impression that one cannot object to airport expansion without costing jobs. This is an unnecessary and undesirable complication to the consultation process. It is clear from comments on this consultation site that the vast majority of objectors care only about the adverse impacts of airport expansion. I believe the issues here would be simplified enormously by separating this whole consultation into two separate JAAPs before taking either to the next stage of any process.



Locally, I do not believe the suggested "benefits" (airport-related job creation, ease of flying abroad for local people) outweigh the long-term distress from health and noise pollution that would necessarily be visited inescapably - due to blighted property values - upon the lives of local residents.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 13329

Received: 15/05/2009

Respondent: Mrs Debbie Postlethwaite

Representation Summary:

The entire process is ill-considered and fails to consider properly the needs and wishes of the residents of the electorate. The proposals will result in excessive pollution in many forms, overstate limited economic benefits and ignore the reality of falling air traffic at other regional airports. The runway extension is not long enough to accommodate the less noisy modern passenger jets at full payload being only a smokescreen to get in noisy polluting cargo flights all through the night.

Full text:

The entire process is ill-considered and fails to consider properly the needs and wishes of the residents of the electorate. The proposals will result in excessive pollution in many forms, overstate limited economic benefits and ignore the reality of falling air traffic at other regional airports. The runway extension is not long enough to accommodate the less noisy modern passenger jets at full payload being only a smokescreen to get in noisy polluting cargo flights all through the night.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 13487

Received: 20/05/2009

Respondent: Historic England

Representation Summary:

The stated scope of the AAP in para 1.4 is to provide the framework for the regeneration and expansion of London Southend Airport and its environs. We assume from this that the proposed extension of the existing runway (shown shaded on the Proposals Map) is an integral part of the AAP. This being the case, we would expect the direct and indirect impacts of the runway extension to be fully assessed and considered within the plan.

Full text:

The stated scope of the AAP in para 1.4 is to provide the framework for the regeneration and expansion of London Southend Airport and its environs. We assume from this that the proposed extension of the existing runway (shown shaded on the Proposals Map) is an integral part of the AAP. This being the case, we would expect the direct and indirect impacts of the runway extension to be fully assessed and considered within the plan.

The Church of St Laurence and All Saints, listed grade I, lies some metres from the south-west end of the existing runway. English Heritage is pleased that the recent proposal to demolish the church has been withdrawn. The extension of the runway will, nevertheless, affect its setting, both visually, and in terms of the level of noise generated by aircraft. It is therefore vital that the AAP addresses these matters. It is of fundamental importance that none of the proposals would prejudice the future use of the church.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14096

Received: 01/06/2009

Respondent: Mr J C Gibb

Representation Summary:

At 1.6 'There is a need to find a sustainable way forward with respect to air travel' In reality if carbon emissions are to be reduced significantly then this can only be done by limiting flights and the easiest way (and probably the only way) is to stop any further airport expansion.
There is no point arguing this point. If this council is commited to cutting emissions the it must reject this project
Any reference to the Olympics mut be taken in context with the fact that this is a two week event in 2012 not a continuing undertaking.

Full text:

The land proposal involves building a million square feet of buildings mostly on Green Belt Land. It also involves increasing flights from the Airport which will increase carbon dioxide emissions. If the airport does not expand those emissions will not take place. It is an absolute nonsense to waste reams of paper and time not to mention resources discussing putting in cycle paths if any possible benefit is totally eclipsed by new aircraft movements and increased pollution from grid locked vehicles on our local roads.
The consultation fails totally to deal with the increased road traffic which will be generated not only by some two million extra passengers but also by the extra freight movements and vehicle movements involved with the new industrial space. The suggestion that a road will be provided to the A127 is a joke bearing in mind that the road is already at saturation point much for the day and now restricted to a maximum of 50 miles an hour as far as Basildon. There is no commitment to upgrade the A127.
Clearly the other surrounding roads cannot cope and are not capable of handling the increased traffic. Whilst the new train station will go a little way towards accommodating some passenger traffic it will do nothing for freight and only serve a proportion of passenger traffic.
This will increase carbon emissions in two ways firstly from the increase in vehicle movements and secondly from the increase in congestiion which will lead to further emissions from the existing level of traffic. Any suggestion that public transport will cater for the new industrial areas is pie in the sky as at present there are railway stations in the borough without peak bus services. If these are not viable it is certain that ones serving these areas will not be. Cycling as a solution is a red herring as it only applies applies to a very limited number of people in good weather. In addition were it to be used more widely the effects on traffic congestion on the main roads would be counter productive as cycles slow down and impede vehicle traffic. One cannot do a major shop on bicycle nor take the children to school or comfortably undertake most journeys. In fact there now seems to be a trend towards increased road journeys. In fact there now seems to be a trend towards increased road journeys to access attractive areas in which to cycle!

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14131

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

Part 1.4 (para i)
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14132

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

1.4 (para ii)
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14133

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

1.4 (para iii)
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14134

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

Part 1.5 (para i)
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14135

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para ii)
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14136

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

Part 1.6 (para ii)
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14137

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para iii)
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14138

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para iv)
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14139

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para v)
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14140

Received: 01/06/2009

Respondent: K Theobald

Representation Summary:

(para vi)
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.

Full text:

Comments and Objections
The regeneration of London Southend Airport cannot be achieved by building a business park. Nor does a business park depend upon the extension of the runway.
Set out specific standards which will be applied to the area. Standards of what, exactly? - behaviour? - building control? - road width? - signage?
The JAAP takes into account the impact of the proposals on other parts of Southend Borough Council areas, I don't think it does, there are at least 60,000 people and pupils in 10 schools likely to be adversely affected by increasing the flight capacity of the airport. Some of the aircraft may well be quieter than others, but there is no such thing as a quiet aeroplane. The higher a plane goes on take-off, by using a longer runway and a steeper ascent, the wider the 'noise footprint' will be. Surely that is a matter of basic physics. To attain the greater speed on the runway, the number of revs will increase, creating greater ground noise than at present. Also, as one aircraft is taking off, another will be preparing for take-off at peak times, a constant noise for all the houses around the take-off area.'Impact on...the existing built environment...' A possible 6 houses demolished for the runway to Eastwoodbury Lane and the brickfield cottages on Cherry Orchard Lane demolished for the business park. '...including listed buildings.' The church of St Laurence is a Grade One listed building, accepted by the CAA as a hazard. It is in constant use. The vibration caused by aircraft movements could surely endanger this beautful old church. The (admittedly remote) chance that a plane could strike the church and 130 worshippers must also be considered.
The 'Issues and Options' report was quietly introduced in the summer of 2008. It was not trumpeted loudly, but hidden in a website backwater for comments from those that could find it.
'The feedback...has been carefully considered and used'. The analysis was published in March 2009. When SAEN queried the statement on the penultimate page of the document, 'most respondents did not favour the high-growth option, they were told that 'this is not a referendum; it is a consultation'. So it would seem that views were asked for and then ignored. No wonder people say that the whole thing is a foregone conclusion!
'The economic benefits of the expansion in air travel' should be re-examined in the light of falling figures relating to air travel. The only airline operating regularly from Southend Airport has already gone into liquidation last winter - a victim of the credit crunch, not a victim of a runway that was too short.
The growing pressure on airports in the South-East is a pressure generated by the huge success of Stansted airport as a passenger terminal. Stansted is one hour away from Southend on the X30 bus; a comfortable journey with room for your luggage also, and a frequent service from the town.
Another pressure will be that the London Southend Airport has to consider that a drop-off point is now not to be too near a terminal building and other forms of security need to be addressed. There may be a 6 foot fence on the southern boundary, but a footpath that actually crosses the disused short runway to the north would have to be considered a security threat.
'Significant job opportunities' is a statement which must be challenged. There will not be any significant job opportunities connected to the airport until the airport starts to cater for millions of passengers. The jobs referred to in the booklet will almost exclusively provided by units in the Saxon Business Park. 'The Region's competitve strength and attractiveness as a business location and tourism destination.' Before Southend sees itself as a business location or a tourism destination, it needs to take a long hard look at what it does want to be. For some decades now. Southend Borough Council has been drying to ignore the fact that it is a seaside town. It is not a centre of things, it is on the coast. It is already well served by two rail lines for those who wish to come to the beach. It is only safe to swim when the tide is coming in (which it does twice a day), not when it is going out. When the tide is out, what should the visitor do? Visit the Pier? Why? There hasn't been enough cash in the kitty for years to develop the pier into a going concern, mostly due to an overspend on expensive consultants and lack of competent decision making. Visit the penny arcades, the pubs the shopping centre, visit Leigh and buy cockles go to the fun fair? Yes, but the airport is 3 miles away from all that, so after your flight, you will need a bus, (there are still a few left still running) or a taxi to the seaside. On the way, you may pass the remains of the Ecko site, the town's once-huge industry, or you pay pass the muli-storey buildings in Victoria Avenue, now derelict and unused, no longer the centres of commerce that they once were.
So, before Southend Borough Council addresses the question of the airport, which is 90% in Rochford anyway, perhaps they should expend a little effort, time and money considering the town's identity - you cant ignore the fact that it is a seaside town; commerce has failed hugely and manufacture is not what it once was, probably due to European influence and computer networking.
How does the local policy framework foresee Southend airport acting as a key driver for economic development? There is not enough detail given in the document.
With expansion of the airport'... issues of congestion and accessibility in and around the JAAP area...need to be addressed. And it will all have to be done at the same time. Public accounts of any difficulties experienced whilst getting to the airport are more than likely to be negative. People accept the good inherent in things but complain loudly when they are confronted by obstacles!
'Local policies support the growth of the airport' but local opinion, whilst largely embracing the airport as it is at present, is not generally in favour of the extension. The MRO sector should be safeguarded. However as the number of passengers increases towards 2 million, as proposed, the opportunity to test planes on the runway will necessarily decrease, pushing these older, noisier planes into times when passenger movements are less, that is to say, evenings and night times.
I object to the wording in this paragraph because it implies that London Southend Airport will be providing significant employment opportunities, when the facts are that the employment opportunities will arise when the Saxon Business Park is completed. Even then, there are several respondents to SAEN who understand that the jobs are not being created, but for the most part are jobs which will move from Hockley, where a number of business properties are to be demolished and moved to Rochford as part of the Hockley Area Action Plan.
Development of the airport...will not start delivering jobs until passengers exceed one million. Statistics collected from other airports will corroborate this; there are already enough people employed directly by the airport to cater for the first million people through the doors.
'...a need to release the potential of Southend's land and buildings...' Since nine-tenths of the land within the airport belongs to Rochford to what buildings does this part of the document refer? Buildings which stand directly opposite Southend's Council Offices have been neglected, run-down and empty for years. Given the constrains of budget, surely they should look closer to home to invest the taxpayer's money.
'...growth on London Southend Airport...attracts high technology businesses' - if the businesses are going next to the airport, why does this imply that the airport has to grow in order for the businesses to succeed. I object to the misleading way this paragraph has been written.
'...sustainable and high value employment' is a meaningless phrase to the layman. I object to this phrase as misleading 'spin'.
'...Passengers will travel on quiet, fuel efficient lanes...'There is no such thing as a quiet aeroplane! there are planes that are quieter than they were in the past, but it will take a very long time for airlines to ensure that all their aircraft are quieter than those they presently use. It would be too expensive for them to ditch the aircraft, until they have finished their natural life, which could be upto to 30 years. As to fuel efficiency, 'peak oil' may already have been reached so fuel efficient or not, prices will soon begin to rise again and put most flights beyond the reach of the man on the street. Why not reconsider the phrase 'quiet, fuel efficient plane's when they are quiet and fuel efficient, running on solar power?
The penultimate sentence seems to contradict itself:-'...the runway extension is a key factor in...aeroplanes (which) can take off in shorter distances.' If the planes take off in shorter distances, they do not need a longer runway! Or could it be that, because of the proximity of the railway line, the planes need to make a landing further away from the Rochford end of the railway, transferring the nuisance to the Southend end of the runway.
The MRO should be allowed to continue, but surely if passenger numbers are allowed to increase, the time available for landing, testing and take-off will be severely limited due to the number of passenger flights. Will this facility be moved to evenings and nights?'...there will be restrictions on night flights through a noise quota system.' That is good news! Why was the actual number for the quota not quoted here?
The Saxon Business Park could be good news. Common speculation, tying in the Hockley Action Plan with the Southend/Rochford Plan would indicate that many of the jobs will actually be moving from Hockley to the new site, along with some of the units that will be cleared to make way for other development, But I am sure there will be some new jobs created.
'...a new route will have been provided from Nestuda Way...etc'. The words make this sound like simplicity itself. Living here will not be simple for a very long time. The current runway and the proposed entension are over the place where the village of Eastwood once stood. Archaeological surveys will have to be done before work is carried out, local opinioin must be satisfied before work is carried out, explanations to those east of the church as to how they may obtain access to the church and churchyard will have to be given and the necessary funding found for the job. these are just a few of the obstacles in the way of progress with the extension of the runway. And yet here it is dismissed in a few simple words.
It is impossible to equate 2012 with the figure of 1 million passengers given the promises in the previous section. The quiet fuel efficient planes will not be in place entirely,the longer runway will not be in place, the infrastructure (i.e crowded roads, particularly Progress Road, Sadlers Farm will not have been addressed, since there is not enough time in 3 years to address all these things. At present there is not an airline lined up which is to provide a passenger service. They will surely not rely on promises, they have a business to run!
'The preferred option' as selected by joint councils is not the one chosen by the respondents to the first part of this consultation. On the penultimate page of the summary of responses, it is stated that the high-growth scenario was not favoured by the majority. When this was questioned by members of SAEN and other unrelated individuals, the response was that 'this is not a referendum, it is a consultation!' So the statements on many lips - 'Well the council will do what they like!' and 'It's only a paper exercise - it's a foregone conclusion!' may well be correct. Our views have not been taken into consideration so far, and there is no reason to think that we will be considered in this round, either. '...aircraft...fully laden...'must present more of a danger for the residents of the Mendip Estate, to the south-west of the runway. We cannot countenance a Lockerbie situation here in Westcliff. The houses are far too close to the runway now, before an extension is granted. Southend Council has allowed building to take place right up to the outskirts of the airport boundary over the last few years; this includes an enormous Tesco store and the huge building of the Royal bank of Scotland - landing and take-off procedures leave very little margin for error with so many people in the vicinity.
The promise of 6,200 jobs is a good one. It does not depend on the extension of the runway. It is however not clear what is meant by 'classes B1 and B2.'
'...environmental impacts (noise and air quality) will need to be carefully considered and assessed as a result of the increased aircraft movements and traffic in the area.'...'considering controls on airport operation to ensure quality of life is maintained for residents...minimise traffic impacts.' The way in which these measures are to be taken should be better described in this document; they are crucial to the quality of life of residents, old people and children being particularly vulnerable to noise and air pollutiion.
It is interesting to see that there are plans to improve public transport in Southend (or is it in Rochford?-it is not clear). Public transport has been in decline in Southend for some years, and it is apparent that the planning office has no idea how to deal with it all. There are current plans to demolish a multi-storey car park in the centre of Southend and replace it with a library for the university students. Yet alongside that, there seem to be no plans to improve access to the centre of the town by public transport.
It is not clear whether the Brickwork's cottages are to remain as part of an industrial area or whether they are intended for demolition.
Taking agricultural land for business and employment activity might seem a little unwise, Southend has already run out of agricultural land, and it now seems as if Rochford wants to go the same way. Has the term 'Green Belt' become so abused that it no longer means 'land that is green and cannot be built on'?
This is already a green lung and should remain so. Will there be any safeguards to stop this area becoming the next stage of development?
It is not clear whether this is meant as a compulsory purchase option! Were the current businesses asked for their views.
This is already an open space and provides a lovely green area which is currently well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
The flying Clubs have been the core of the airport activity for a very long time, training pilots and ensuring sustainability - will they be given a new area from which to function.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today!
The Park and Ride facility would be on a good place to commute to Southend by bus, if it were not for the fact that it is right under the flight path. Is it legal to have a bus stop within the Safety Zone.
'...sustainable drainage...'. It is not clear what is meant by this term. There are problems of drainage already in the Southend Road; during wet weather the Horse and Groom public house is frequently overwhelmed by water. Is there a guarantee that the situation will not worsen and that water will be drained off into the correct direction? There must be some sort of ruling governing the safety issues of rain/large areas of tarmac. Have these been fully investigated, and do we have assurances?
This data implies that there will be 1180 jobs directly related to the airport. Research into previous claims for directly-related airport jobs has proved that these predictions are grossly inflated. When 2 million passengers go through, there may be direct jobs for 100 people, but 1000 has to be seen as an optimistic exaggeration.
It is encouraging to see that there are to be new walking/cycling routes incorporated into the JAAP.
The brickwork cottages are now unique and should be preserved as part of the brickfield development in Essex over many hundreds of years.
An impressive entrance will make no difference to the quality of what goes on in the business park.
'...the business park will need to...deliver a visual presence to the A127.' It is not clear what is meant by this statement.
'Expansion is...only acceptable if...subject to environmental constraints...' Expansion plans were vetoed in the Nineteen-sixties because it was not environmentally viable. What can possibly have changed since then?
A baseline of noise levels can be set anywhere and it does not appear to be in the power of the local authority to set this baseline or to object to it after it is implemented. A Noise Evaluation Statement is just that. It does not promise to do anything about it. There are at least 60,000 people living under the flight path and they are the ones who can evaluate the noise levels for you. Heavy aircraft taking off or landing at night have not been a feature whilst the JAAP is in the balance, but as soon as the consultation is over, it is entirely possible that these will resume. Added to the daytime flights interrupting the sleep of night workers and the work of children in ten schools directly under the flight path, the noise levels will become an intolerable burden.
The added CO2 in the atmosphere is not easy to offsett given the limited amount of green space within the borough of Southend, school green areas having been sold off and built upon and former agricultural land now being seen as business parks. So the quality of life for all these people will be sadly reduced. Not to mention the prices of their houses falling, because no-one in their right mind will want to live close to an expanding airport.
There is currently opposition to expansion of airports within the Government and Opposition benches. Is it hoped that all this permission for the Rochford/Southend JAAP will slip under the wire before it becomes law to limit the use of airports.
(see London Southend Airport Introduction (para 3)
Why is there no printed plan yet available for the PSZ if and when the runway is extended? Will this entail further disruption and compulsory purchase?
'The airport operator will be required to...make a contribution towards construction...'what percentage of this will the operator be expected to pay. It does not seem fair that the public should be expected to pay anything towards these changes; why not ask the operator to pay for the lot. Southend taxpayers can not expect to get anything out of the proposals except noise, disruption and poor air quality. Is it fair to ask them to pay anything towards the cost of local taxes?
The hours of predicted air travel are far too wide. Children whose sleep patterns are likely to be affected by flights will be in bed by 8pm and that is when the flights should stop. We should not be accepting flights from London City Airport either. It is simply another way of raising income for the operator and does not benefit the town.
The closure of Eastwoodbury Lane and the provision of a new road will mean that all the traffic that currently uses the Lane as a back way in to Southend will have to travel along the A127 or Nestuda Way. It will add about a mile to the journey into Southend, so most people will not turn in to the new road but will attempt to continue their journey along the A127, putting intolerable strain on the junction at the Bell and Rochford Road junction. There will be more traffic movements also, connected with the new jobs planned for the Saxon Business Park. The current infrastructure is bulging with overuse and really cannot take any more. the proposed Park and Ride can take only a little of the traffic away. And if it is intended for long term use for the airport, it will be of no use to the daily commuter.
What time span is this to take? And surely this is the same piece of road - why is it taking two separate policies.
It is not clear why a new junction will be required at Aviation Way and Eastwoodbury Lane - there is already an adequate roundabout there.
It is noted that improvements in public transport are needed within the JAAP. They are needed throughout Southend in many areas not covered by The JAAP also.
I note with dismay that a Green Belt is not what it was designed to. It should not provide flexibility...to accomodate growth. It should provide a barrier between urban and rural areas that is sacrosanct and inviolable.
This is already an open space and provides a lovely green area which is currenty well used. Redirecting Eastwoodbury Lane is going to devastate the area so that no one will want to use it as a public park.
It is good to know that this is to be another green buffer. And good to know that the powers that be are capable of changing their minds. A couple of years ago, the plan was to make this into a car park. No-one is fooled by this apparent charitable act today.
'The success will be limited if, etc.' For whom?

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14216

Received: 17/12/2008

Respondent: Mr J Bramble

Representation Summary:

Paragraph 1.1
'The JAAP will...safeguard areas and places sensitive to change.'
Fine words....but empty words completely lacking credibility in the light of the preferred option (issue 1) to extend the runway the effect of which would be to destroy the quality of life for all those residents living close to or under the flight path.

Full text:

I write with the reference to your letter dated 3rd November 2008 which enclosed a questionnaire relating to the above exercise. I have to say I was a little surprised to receive your letter in as much as I reside within the Borough of Southend and normally look to Southend Council to consult me on any planning applications likely to effect me.
I can only think that your letter to me may have been the result of the correspondence I have had over the years with your good selves, amongst others, on the proposals of the expansion of Southend Airport. Living as we do on the flight path to and from the airport this remains a vital issue for us and our future quality of life; and we feel strongly that it is only right and proper that we (and residents in a similar position to us) are directly invited to have our say on whatever conclusions the working party reach as the result of there consideration of the consultation exercise on the Joint Area Action Plan. We felt very aggrieved that we were not directly included in this exercise having only become aware through a relatively small item in the Southend Standard. I wrote to the leader of Southend Council as the result of this and was assured by him that opportunity would be given to all interested parties of all contribute.
We are particularly in a difficult position relating to the airport issue inasmuch as we reside in the area under the jurisdiction of Southend Council but, of course, the airport and issue relating to it fall in the responsibility of Rochford District Council. I would therefore welcome your assurance that we will be invited to contribute before proposals are set in stone and your advice as to when such an invitation is likely to be sent out and from which council.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14217

Received: 17/12/2008

Respondent: Mr J Bramble

Representation Summary:

Paragraph 1.2
'The Preferred Options presented here follows consultation on an 'Issues and Options' report published in June 2008.'
The sin here is one of omission. Whilst the statement may be factually correct, what it cleverly (and a little underhandedly) omits to say is with whom the consultation took place - see comment on paragraph 1.5.

Full text:

I write with the reference to your letter dated 3rd November 2008 which enclosed a questionnaire relating to the above exercise. I have to say I was a little surprised to receive your letter in as much as I reside within the Borough of Southend and normally look to Southend Council to consult me on any planning applications likely to effect me.
I can only think that your letter to me may have been the result of the correspondence I have had over the years with your good selves, amongst others, on the proposals of the expansion of Southend Airport. Living as we do on the flight path to and from the airport this remains a vital issue for us and our future quality of life; and we feel strongly that it is only right and proper that we (and residents in a similar position to us) are directly invited to have our say on whatever conclusions the working party reach as the result of there consideration of the consultation exercise on the Joint Area Action Plan. We felt very aggrieved that we were not directly included in this exercise having only become aware through a relatively small item in the Southend Standard. I wrote to the leader of Southend Council as the result of this and was assured by him that opportunity would be given to all interested parties of all contribute.
We are particularly in a difficult position relating to the airport issue inasmuch as we reside in the area under the jurisdiction of Southend Council but, of course, the airport and issue relating to it fall in the responsibility of Rochford District Council. I would therefore welcome your assurance that we will be invited to contribute before proposals are set in stone and your advice as to when such an invitation is likely to be sent out and from which council.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14218

Received: 17/12/2008

Respondent: Mr J Bramble

Representation Summary:

Paragraph 1.5 'A key step in the process of establishing the JAAP was the preparation of an 'Issues and Options' report that provided an opportunity for all interested parties to have their say on the future development of London Southend Airport and its environs.'
That is manifestly NOT true. There cannot be many (if any) more interested parties than private residents, like ourselves who live near to or under the flightpath in close proximity to the airport itself. Yet we were not directly invited to contribute - in fact I did become aware of the existence of the report but only through a small item (not, I hasten to add, generated by the Council) in one of the local 'freebies' - and I can only assume that there were very many others in a similar position who were also excluded from the list of invitees. Indeed it is legitimate to ask whether Southend Borough Council directly consulted anyone apart from 'organisational stakeholders' on the 'Issues and Options' report. Prima facie, therefore, there has to be a very large question mark against the validity and credibility of the whole exercise, and it makes a nonsense of using the 'feedback' from it to prepare the 'Preferred Options' if, as appears to be the case, only one section of the community - with vested interests - was directly consulted.

Full text:

I write with the reference to your letter dated 3rd November 2008 which enclosed a questionnaire relating to the above exercise. I have to say I was a little surprised to receive your letter in as much as I reside within the Borough of Southend and normally look to Southend Council to consult me on any planning applications likely to effect me.
I can only think that your letter to me may have been the result of the correspondence I have had over the years with your good selves, amongst others, on the proposals of the expansion of Southend Airport. Living as we do on the flight path to and from the airport this remains a vital issue for us and our future quality of life; and we feel strongly that it is only right and proper that we (and residents in a similar position to us) are directly invited to have our say on whatever conclusions the working party reach as the result of there consideration of the consultation exercise on the Joint Area Action Plan. We felt very aggrieved that we were not directly included in this exercise having only become aware through a relatively small item in the Southend Standard. I wrote to the leader of Southend Council as the result of this and was assured by him that opportunity would be given to all interested parties of all contribute.
We are particularly in a difficult position relating to the airport issue inasmuch as we reside in the area under the jurisdiction of Southend Council but, of course, the airport and issue relating to it fall in the responsibility of Rochford District Council. I would therefore welcome your assurance that we will be invited to contribute before proposals are set in stone and your advice as to when such an invitation is likely to be sent out and from which council.

Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14219

Received: 17/12/2008

Respondent: Mr J Bramble

Representation Summary:

Paragraph 1.7
'We invite your views on the preferred option presented in this document'.
In the light of the glaring deficiencies surrounding the so called 'consultation' exercise carried out on the 'Issues and Options' report it is reasonable to ask to whom the invitation to comment has been extended this time around. I have to say that the signs are no more promising. I personally did receive notification of the publication of the 'Preferred Options' document and an invitation to comment thereon (hence this response!) NOT from Southend but from Rochford District Council - presumably as a direct result of my past correspondence with Mr Scrutton on the subject of airport expansion. However, like so many people on or close to the flightpath, we reside within the Borough of Southend and pay our council tax to Southend Borough Council. We have heard nothing from Southend Council nor, vitally, have neighbours and friends in the immediate vicinity to whom I have spoken. All the indications would seem to be that once more the direct invitation list has not been extended to many private residents who have most to lose if the 'Preferred Option' should come to fruition. Not having been consulted first time around they would, of course, anyway be unaware of the three other scenarios on which the views of the 'chosen' ones (organisational stakeholders!) were invited. What an unholy mess!

Full text:

I write with the reference to your letter dated 3rd November 2008 which enclosed a questionnaire relating to the above exercise. I have to say I was a little surprised to receive your letter in as much as I reside within the Borough of Southend and normally look to Southend Council to consult me on any planning applications likely to effect me.
I can only think that your letter to me may have been the result of the correspondence I have had over the years with your good selves, amongst others, on the proposals of the expansion of Southend Airport. Living as we do on the flight path to and from the airport this remains a vital issue for us and our future quality of life; and we feel strongly that it is only right and proper that we (and residents in a similar position to us) are directly invited to have our say on whatever conclusions the working party reach as the result of there consideration of the consultation exercise on the Joint Area Action Plan. We felt very aggrieved that we were not directly included in this exercise having only become aware through a relatively small item in the Southend Standard. I wrote to the leader of Southend Council as the result of this and was assured by him that opportunity would be given to all interested parties of all contribute.
We are particularly in a difficult position relating to the airport issue inasmuch as we reside in the area under the jurisdiction of Southend Council but, of course, the airport and issue relating to it fall in the responsibility of Rochford District Council. I would therefore welcome your assurance that we will be invited to contribute before proposals are set in stone and your advice as to when such an invitation is likely to be sent out and from which council.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14224

Received: 02/06/2009

Respondent: Mr Michael Downer

Representation Summary:

1.3 - In the absence of a definition of the world 'sustainability' this section is without meaning.
1.5 - The claim that 'the feedback received from the Options and Issues Report has been carefully considered and used to prepare the Preferred Options for Future Development in the Area' is not supported by what I read in The Report Summary of Responses to Consultation. The serious objections raised by GO East should alone have curtailed the Preferred Option.
1.6 - The Air Transport White Paper of 2002 is now out of date in terms of current economic and environmental concerns. But even it recognises there is a need to find a sustainable way forward in respect to Air Travel-Magic Carpets spring to mind. If the region's airports are such drivers for growth and expansion, why is it that in the many years of our airport's existence has it only happened once briefly in the 1960's. Accessibility and congestion surely need to be addressed PRIOR to any expansion. This is 'cart before horse' stuff. Its potential role in the 2012 Olympics for a few weeks seems a somewhat desperate example of 'straw-clutching'.

Full text:

Formal Objection.
Preamble - I notice that Southend on Sea Borough Council have signed up to the Nottingham Declaration. I presume that they have studied the contents. That being the case I am puzzled that they appear to see no contradiction in signing it and persisting with their preferred options on the JAAP.
I am equally puzzled by the absence of any mention of Climate Change or Peak Oil in the JAAP. It is as if these things did not exist and it is 'Business as usual'. Surely I should not need to emphasise the contribution that any expansion in flying will make towards Greenhouse Gas Emissions and the need to reduce such gases under the Climate Change Act.
Of equal concern is the failure to confront the onset of Peak Oil. If and when the World economy ceases to slow then the demand for oil will resume. The International Energy Agency is of the opinion that the combination of ageing fields, no new major oil provinces (apart from Brazil's deep sea one) and under investment will mean a peak in oil production of below 100 million barrels/day. That is that supply will not meet world demand for much longer. Some experts put a date of 2011-2013. The argument being that new oil coming on stream from discoveries made over the preceding decade will begin dropping and will compounded by accelerating depletion of the many old fields propping up much of global production today. This will result in either a 'Plateau' or 'Descent' scenario (or even a 'Collapse') in oil production. The Price Mechanism assumption that higher oil prices should lead to more exploration and discoveries has failed. In this situation the UK would have to persuade oil producing nations to favour it with a growing quota of inputs. This is because North Sea Oil (which peaked in 1999) will continue to decline at a best-case rate of 5% year.
This leaves the Aviation industry exposed in a way that other forms of transport are not, in that they can find alternative energy sources to continue operations.
In the face of the necessity to reduce Greenhouse Gases and the approach of Peak Oil it seems criminal to pursue a JAAP based on the expansion of Southend Airport and I strongly oppose it on the basis of the evidence above.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14325

Received: 07/05/2009

Respondent: Mr Stephen Dugmore

Representation Summary:

Evidence Base - The JAAP document makes a brief reference (para 1.2) to the evidence base consisting of 'national and regional planning policy, best practice guidance, background studies, socio-economic statistics and other published data'. However, it is notable that in the body of the document there is no data or evidence to support claims made concerning key elements of the plan - eg noise and pollution levels, additional employment opportunities to be generated.

Full text:

I have read the JAAP for Southend Airport and would like to register my strong objections to the proposals - both for the preferred option and in respect of any expansion at all. I should also be gratful if you could clarify some issues concerning the consultation process for the development of Southend Airport. Although the latest edition of Take Off invites people to indicate whether they support Southend becoming a fully functional regional airport, this decision already appears to have been taken. Given that ownership of the airport has transferred to one of the largest freight operators in the UK and a new rail link has been approved it would be highly unlikely that the expansiion would not go ahead. Could you therefore clarify the positiion by providing answers to the following questions. 1. Is the consultation process being overseen by an independent body (ie independent of Southend and Rochford Councils)? 2. What is the purpose of the consultation (ie to obtain general feedback on the preferred options or specifically to assess the degree of support or otherwide for development of the airport)? 3. If it is a genuine attempt to gauge the level of support for expansion, how will the responses be used in the overall decision-making process. For example, would it depend on a minimum number or responses received and a simple majority decision (ie at least 51% in favour or not in favour)? 4. When and where will the results of the consultation process be published.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14727

Received: 24/06/2009

Respondent: Mr Peter Symes

Representation Summary:

Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.

Full text:

Please refer to the attached document which lists all concerns with process and lack of information provided by the Councils concerned in respect of the JAAP. Again the demands placed upon objectors are onerous (as with the HAAP), namely the requirement to complete on-line or to file an individual form per objection are unfair and unwarranted. I understand however that this advice is actually waived upon request and as per my conversation with your offices! Attach one report for your attention lising all my issues with the JAAP at this time.
I expect a response to all queries raised.
The Councils have been extremely negligent in their duty to provide sufficient information.
At the present time the proposals are unacceptable in their entirety and there is nothing to suggest my opinion will change. I additionally support the comments made by campaign for protection of rural Essex (England) in their submission.
I am writing to object to the proposals contained within the London Southend Airport and Environs Joint Area Action Plan Preferred Options Dated February 2009.
I have a number of general objections regarding the process, documentation and manner of delivery as well as specific objections to the proposals and list these as follows:-
Flawed Process of Presentation.
1) There was little initial notification to the public of the first stage of consultation or the ramifications of not responding. We appear to have reached stage 2 of the process by default and dictation by the Councils, with stage 1 swept swiftly 'under the carpet' rather than the opportunity given to residents to undertake a considered process of weighing up the options. I do not believe that the majority, or even an adequate portion , of local residents understand the process and the JAAP documents do little to address this. Neighbouring authorities, that are also affected, will have had little input into the process and their residents no understanding of what is going on or what influence they can have. As such the process is flawed and details supplied inadequate. Unless the councils can demonstrate evidence to the contrary.
2) The selection of option three again has been decided adequate consideration of other options.
Whilst Southend Council have at least gone through the motions of offering roadshows to assist understanding RDC appear to have relied solely on advertising.
Notwithstanding this both Councils have failed to provide adequate information within the document, given their support of the proposal it must be concluded that this is a deliberate rather than just a negligent act and again calls into question the whole process.
As a bare minimum the JAAP should include :-
. Existing and post extension flight paths (how these may vary in inclement weather)
. Stacking arrangements in the event of runway closure/delays
. Basic statistics showing likelihood of inclement weather/runway closures and, as such how many times a year stacking arrangements and flight path changes are likely to be implemented and the anticipated number of flights this will affect.
. The types of aircraft able to take off, both before and after the extension (cargo, passenger and 'other')
. The minimum and maximum number of flights permitted (including split between cargo passenger, maintenance, training, testing) and flight times (including scheduled, non-scheduled, charter, training/testing/maintenance)
. The noise levels generated at ground level by the planes at altitudes - a noise map?
. expected plane altitude at say half mile intervals from take off/landing
. expected traffic volume increases (Stobart and other firms lorries and vans) for A127, A130 and B1013 (Rayleigh - Hockley - Rochford Road), as a result of airport expansion and closue of Eastwoodbury Lane
. Expected train timetable changes (including non-scheduled freight movements) and anticipated delays as a result of new passenger trains.
. the fact that the trains for the airport are not going to provide a local service (thus local commuting to the airport by train remains inconvenient)
. confirmation as to whether or not Stobart can apply (and whether or not the councils have any power or inclination to prevent or resist) to make rail freight movements to the airport or the immediate vicinity
. Which jobs are genuine new jobs, type etc and which will be transferred from other parts of the district (and lets not limit ourselves to Rochford and Southend, because undoubtedly Castle Point and Basildon will be affected)
. A summary of the impact of other developments in the area, including redevelopment of Hockley, Stambridge Road, Hawkwell, Daws Heath etc etc. These should be clearly marked on a flight path map also.
. Confirmation of detailed plans for inevitable road expansion schemes that will be required to support increased road traffic. Particularly A127, where proposals incorporate the Public Safety Zone and whether the expansion will be used to push through the unwanted development of a bypass via Hullbridge/North Rayleigh/Hockley and Rochford?
As such I would view this as a basic dereliction of Council duty - failure to inform and ensure that the interests of residents are looked after. I understand also that this may breach the Freedom of Information Act and RDC's own consultation strategy
3) The Councils have apparently selected the least popular option, although conveniently neglected to inform residents as to how or why this decision was arrived at. The only factor that seems to offer any support for their decision is 'increased jobs'. Various figures are quoted all prefixed by the worlds 'upto'. This term is 'up to' is sufficiently vague to mean that any number (including negative ones) below the figure quoted would be deemed a success. As such it has no place in the document as it constitutes mere speculation. Hard facts and details of how conclusions are arrived at are needed.
As such the information provided is surely skewed and the Councils are seemingly abusing their position in recommending the proposal with absolutely no solid evidence to back up the position.
4) The connection of this scheme with other projects in the area, notably a number of house building projects including those mentioned in 2) above, is not made clear Government document PPS12, makes clear reference to :-
Every local planning authority should produce a core strategy which includes :
1) an overall vision which sets out how the area and the places within it should develop;
2) strategic objectives for the area focussing on the key issues to be addressed;
3) a delivery strategy for achieving these objectives. This should set out how much development is intended to happen where, when, and by what means it will be delivered . Locations for strategic development should be indicated on a key diagram; and
4) clear arrangements for managing and monitoring the delivery of the strategy.
Whilst this document is no doubt available somewhere it should be included with the JAAP, since without it the JAAP is not placed in the required context, without clear direction it is impossible to understand how or why this is intended to be part of the core strategy.
Additionally how have residents been consulted on the overal strategy, because if that exercise is flawed - and certainly the desire to build more homes in a densely populated area, whilst simultaneously expanded an airport, demonstrates that it is, then much if not all of the sub-plans such as this area also flawed.
PPS12 also refers to
Period of operation
4.13 The time horizon of the core strategy should be at least 15 years from the date of adoption.
As above there is no clear advices as to where the JAAP fits in the core strategy or where we are in the time horizon. Again the document lacks context, although it even states that it must be read in context, it provides little clue on how to do this.
PP12 also refers to
Statements of Community Involvement:
An SCI should
. Explain clearly the process and methods for community involvement for different types of local development documents and for the different stages of plan preperation. This needs to include details of how the diverse sections of the community are engaged, in particular those groups which have been underrepresented in previous consultation exercises.
. Identify which umbrella organisations and community groups need be involved at different stages of the planning process, with special consideration given to those groups not normally involved.
. Explain the process and appropriate methods for effective community involvement in the determination of planning applications and where appropriate refer to Planning Performance Agreements.
. Include details of the LPA's approach to pre-application discussions.
. Include the LPAs approach to community involvement in planning obligations (S106 agreements).
. Include information on how the SCI will be monitored, evaluated and scrutinised at the local level.
. Include details of where community groups can get more information on the planning process, for example, from Planning Aid and other voluntary organisations.
. Identify how landowner and developer interests will be engaged.
These above items from the PPS demonstrate the assistance that should be given to ordinary residents (and others) in the process. As mentioned by Campaign for Protection Rural Essex a number of organisations should have been consulted including RSPB; Essex Wildlife Trust etc. It is disingenuous and perhaps even negligent of the council not to include these within the Action Plan. Most people have very little experience of dealing with documents such as this and it is only at this late stage in the process (given that we've already passed through stage 1) that RDC and Southend BC have offered even limited advice. Even having read as much as I can in the past few weeks, I (and I am certainly not alone in this) have very little information regarding :- the crucial stages in the process; whether residents can succeed in resisting or changing any aspect of the proposals - RDC really should explain the steps in simple terms. At the moment we seem to progress from one stage to the next with absolutely no guidance. For instance:- I understand from information received from other sources in relation to the airport, that unless I head this document as an objection it is merely treated as a comment. I believe petitions are ignored. I will need to get my wife to make a separate submission in order for her views to be considered, even though we agree. The council seems quite happy to tell people how to make positive comments, but far less inclined to advise on how to object - hardly democracy and clearly demonstrating a deficiency and unfairness in the process, that should be revisited before we move ahead.
PPS12 again
Justification of Core Strategies
4.36 core strategies must be justifiable: they must be:
. founded on a robust and credible evidence base; and
. the most appropriate strategy when considered against the reasonable alternatives.
As above we cannot be sure that the base is robust and credible or indeed the most appropriate when considered against reasonable alternatives, since we don't know how and why the initial alternatives were first selected and then rejected. The JAAP provides no evidence base to affirm that the selection or the process is credible and again the JAAP requires review and re-issue.
If this is the preferred option, what was the basis for selection and will any ideas arising from the consultation be put forward for further consideration? Is it possible (likely) that if decent alternatives are proposed in stage 2 the preferred option will be amended and re-submitted? If not then, again, the process is flawed.
5) The document produced glowingly mentions the positive aspects and underplays the negative - surely the document should be impartial and genuinely enable residents to make up their own mind? Plenty of rhetoric about jobs new businesses etc but no details and certainly no information on the negatives, noise, congestion, loss of property value, decline in overall living standards etc. Basic research reveals Stobart's close ties with Tesco and Network Rail are we going to end up with a huge Tesco distribution centre supporting the airport, similar to their Dudley operation?
While the JAAP includes a brief note that the airport is unsuitable for large scale cargo operation (only a niche operation). The terms 'large-scale' or 'niche' are undefined, will mean different things to different peope and are therefore meaningless in the context of the JAAP, again this requires clarification and re-issue. Notwithstanding this the actual use is surely the decision of the owners and not the councils? Stobart management are already quoted as saying upon the purchase of the airport 'we have found our Southern Base', doesn't really sound like they are planning a limited operation, quite the opposite.
It is also unclear where any 'new' jobs and businesses will come from. Given the proposals and redevelopment of Hockley it is apparent that a number will come from there and therefore aren't really new. Again disingenuous of RDC in relation to the HAAP (and Southend BC not to make this clear in the JAAP that a proportion of jobs at the Airport sites will actually be moved from Hockley)
6) The document itself is devoid of factual information, although admitting that aspects will be supplied later, this itself smacks of a rush job. We find ourselves moved on to a stage from which there is no going back without having the facts adequately presented. It seems that the councils are either negligent in preparation of the facts or trying to hide something.
Development of the airport could bring about a fundamental change to the area, not necessarily for the better and it is in resident's interest for all information to be divulged as soon as possible.
It also uses a number of undefined terms, notably around the word 'sustainable'. It could mean 'long-term use with minimal environmental impact', but it the council are not clear what meaning they are seeking to attach. Equally, there are (source Wilkipedia) different types of sustainability. Economic, Environmental and Sociopolitical, so there is significant room for confusion as to meaning and I'm quite sure most people have no understanding what is meant by sustainability in the context of the JAAP.
7) The council is geared very much to receiving information via the internet, whilst undoubtedy this is cost effective; it is unfair on those residents that do not have internet access, particularly the elderly who make up a significant proportion of the population in the area. It is doubtful therefore that the views obtained will actually be representative of all residents. I note at election time certain parties are very keen to get their voters to polling stations and will provide transport - I wonder how keen those same councillors are to dedicate time and petrol to those residents wishing to get assistance in completing JAAP.
Completion on line is actually quite difficult and near on impossible if you have lengthy comments to make. Again the councils are colluding to dissuade residents from making anything but the briefest of contributiions.
Additionally the representation form states that each objection/comment requires completion of a separate form. Clearly this is actually designed to put people off commenting. Although I understand from a telephone conversation with RDC planning department that the council will accept one form with clearly listed comments. I would have to question whether RDC/Southend BC can actually determine what form objections may take. Again the process appears flawed, as this is biased towards acceptance of JAAP. At best this builds mistrust between residents and the councils as to motive; at worst it is downright dishonest.
The JAAP relies too much on the reader having a detailed knowledge of planning terminology and documentation, mentioning a significant number of undefined, unexplained and unreferenced terms and documents (as mentioned later) and omitting adequate cross-referencing. As such it is an inaccessible, inadequate document not fit for purpose and until it is adequately amended and re-issued the consultation process is flawed.
8) Rochford Council's own Leisure document refers to Rochford being the 'Green Gateway', clearly there is a desire to put a wall up given the amount of building that has occurred in the West of the District - this needs to stop. The local infrastructure cannot cope:-
B1013 is a hugely busy Road already - HAAP refers to 15,000 + vehicles back in 2007 and significant building has taken place since then. If the Airport expansion takes place, and RDC regretfully support this, then further transport issues will arise.
What plans are considered for a major disaster, large aircraft crashing on residential or occupied business property? In the US 7 of the last 8 fatal commercial airline crashes involved regional airlines (BBC 12th May 2009) or indeed hijack, bearing in mind proximity to major centres of population, power stations etc.
What additional policing/customs and immigration officers will be supplied, both at the airport and elsewhere in the region? Not only do illegal immigrants use lorries to access the country (and a cargo terminal will increase the amount of vehicles in this part of Essex), but aircraft have also previously been used (e.g at Stansted). Additionally there are the increased risks associated with drug smuggling, particularly given that criminals may seek to use the nearest available market for contraband. There is also an increased likelihood (with increased vehicles) or road traffic offences, which speed cameras do not address. What additional resources will be provided to the NHS to deal with the upsurge in stress, sleeplessness and associated problems including violence and accidents?
9) No explanation has been given as to why RDC/Southend BC support Government policy (I have asked my local councillors and MP to explain this apparent anomaly) there seems to be no desire to protect the quality of life enjoyed by residents, certainly much of this part of Essex has previously shown (in Government statistics) to be one of the least deprived areas of the country, yet the proposals seem to treat it as though it is one of the most deprived - is this wishful thinking on the part of the compile? As recently as 2006 Southend was calculated to be the best place to retire to.
10) Both Councils are keen to promote the area as a great place to visit yet surely this will be the death knell for tourism, the only visitors will be those waiting for a plane to get away from an overly congested cargo handling centre.
11) There is no clear mention of what controls are able to enforce (and indeed whether they would agree on these). Given the track record of local authorities but locally and countrywide in rejecting and/or enforcing actions against big business and national government e.g totally inability to prevent McDonald's and Tesco building where they like and the fiasco of the change of use of Bullwood Hall prison I rather suspect that if the expansion is approved Stobart's will ride roughshod over any objections from residents irrespective of whether the council's support the residents.
12) No account appears to have been taken of the wider questions regarding airport usage. Aside from the environmental impact, the reduction of carbon emissions etc is supposed to be at the forefront of business, government and local authority strategies, and the JAAP clearly goes contradicts this. Why have the following not been mentioned.
a) Southend is only accessible from the East and North (there is so little to the West it is hardly worth mentioning and is obviously cut off fromt Kent by the Estuary). As such the Pool of passengers it is supposed to be attracting is actually very limited. To the North sits Stansted whilst to the East, London and the various airports accessible from there.
b) Why the runway is being extended to 1799m and not 1800m (something I believe to do with extra regulation), when this doesn't actually allow for any passenger planes that are larger than the current users to land.
c) With perhaps the exception of Luton, every major airport easily accessible from London i.e Gatwick, Stansted, Heathrow and London City itself have expansion plans in the pipeline, as such the need for expansion of Southend as a passenger airport is questionable if not foolhardy.
d) Most recent figures for air travel suggest that this form of transport is actually declining.
It would actually suggest that the freight forwarder Eddie Stobart has an entirely different motive for expanding the airport.
13) Apart from neglecting to place sufficient significance upon the fact that a freight forwarders now own the airport and thus that the expansion will cause increased in cargo shipments in the air and on the ground, I fully support the comments made by Campaign for Protection for Rural Essex (part of CPREngland).
14) The councils have made no mention of the plans to ease road congestion that expansion will undoubtedly bring. I anticipate that you will seek to resurrect the misguided and previously rejected plans to further develop on green belt by building a bypass across Hullbridge, North Rayleigh Hockley and Rochford, just exacerbating the over-development of this area.
Nor is the impact upon rail timetable and whether there is sufficient rolling stock available for the new train service (i.e whether existing commuter carriage availability will be cut to provide airport services) explored.
Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.
1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.
1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.
1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.
1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.
1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.
Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.
Para 3 significant job opportunities - again undefined as to what significant means and what type of jobs are referred to (McJobs)?. Given the competition from the above airports it would require significant, unwelcome further expansion for business to be attracted because of the airport. Businesses decisions are made for reasons unrelated to the airport, yet the report suggests that development would be a major driver for business (but does not say why or what type of business). Southend lost virtually every major office employer since I worked there in the 1980's. Most major insurers and brokers merged and moved out of Victoria Avenue, as did various government departments (due to National government strategy) and BT, this had absolutely nothing to do with the airport and attracting these businessses back will probably have equally little to do with an airport.
Why is the commuter belt aspect of the region completely ignored? Many people commute to work and bring money back to spend locally. Similarly the retirement aspect is also ignored completely. It is questionable whether there is any great need for huge swathes of industry in this part of Essex.
Tourism desination is an absolute joke, the region is overdeveloped and the only tourists would be waiting for a plane to get away.
Para 4 - why is only the airport considered to be a drive for economic development? Holidaymakers pass straight through to their destination and most companies are cutting back on expenses such as business flights and use of technology (video-conferencing etc) renders their need redundant. We can surely only be talking about freight movement????
Again paragraph 4 refers to 'employs a significant number' is non-specific as to quantum or job types. Are you including the airport trading estate? I've shopped there, but I've never flown from Southend, it is totally unrelated and again the document is misleading.
Surprisingly the JAAP refers to a specific document, but gives no clues as to where to find the Rochford Core Strategy Preferred Options Document.
Para 5 - Transport issues are understated and it really does seem rather pointless to even attempt to expand such a small airport and blight the whole area for good for a few weeks in 2012. European visitors would be far better served by train, whilst longer haul flights cannot land on a runway this size.
Para 6 Who sees the airport as important for development and prosperity? Another vague statement dressed as fact. I see it as actually the beginning of a sustained decline in the area as the affluent move away, house prices fall due to noise and congestion from air and road freight and the area goes into, pardon the pun, terminal decline. Again future employment needs take little account of commuting.
2.1
Para 1 The context against which the JAAP is set is now outdated, having been drawn up in time of boom and when it was inconceivable that banking institutions would have to be underwritten by National Government to the extent they now are. The financial pattern of this and other countries have changed fundamentally and it will be a significant time before things get back to normal (over 20 years), loans are no longer freely available and the 'Vision' clearly needs to be re-visited.
Para 2 - refers to quality of life for residents is mentioned, but actually not expanded upon in the report. It is quite clear that expansion of the airport will reduce the quality of life for all but a very few number of residents i.e those fortunate enough to be directly employed in senior positions.
Para 3 - London Southend Airport as a 'major employer' - again an undefined term
. How many people does the airport directly employ (I suspect that many of the jobs are in fact secondary and even if the airport closed work would be taken up by other airports e.g Stansted or London City and the jobs would remain within commutable distance)?
. How many of the jobs are actually in the adjacent business park and in reality unrelated to the airport?
. How many of the jobs will actually be lost upon expansion (e.g those at the flying clubs that are being pushed out, businesses that are forced to close due to congestion etc)?
. How many of the jobs would actually remain if the airport was unaltered?
. Why isn't the spare capacity being used?
. What could be done to improve the spare capacity usage?
. What are the costs/benefits in picking up the spare capacity?
. Why, if the airport is so important, won't it become a success without expansion?
All basic questions the JAAP fails to address.
Para 4 - what is the 'current and emerging policy framework in the area'? again an undefined and meaningless phrase.
Para 5/6 - Southend core strategy - wonderful, what other options were considered and why is Rochford so keen to support this if, as this document so clearly demonstrates, there are so few advantages and so many disadvantages for the area and its residents.
Para 7 to end
Who are/what is Renaissance Southend Regeneration Framework? Another undefined term. How they have arrived at the conclusion it should be a centre for international air services and then contradicted this by saying it would be a 'great place to live' - when it so clearly wouldn't with a huge number of planes flying over head day and night. Rochford Council have a similar objective in making this a great place to live!!! I've lived in the region all my life, with these proposals I have no desire to continue to do so (but my options will be restricted by the resultant slump in house prices the expansion will cause)
Again there is very little mention that most of the towns in the region are actually dormitory towns for London e.g. Rayleigh. The desire to encourage employment is actually questionable on this basis. Higher salaries are always available in the City and vast airport expansion would probably require a significant number of migrant (possibly overseas) workers to fill vacancies.
Hi tech businesses tend to be low scale employers and no examples are given of 'high value employment'. This is pie in the sky aspiration with no basis in fact; it should be only be included in the JAAP if noted as such.
2.2
Para 1 - again refers to unreferenced material, planning documents etc, and it is impossible to know if this has been fairly assessed or just the bits chosen to fit.
The objectives are:
. Creation of sustainable and high value employment and other land uses within the study area; - what is 'high value' and what 'other land' - this is a vague and washy statement requiring amendment.
. Maxamising the economic benefits of a thriving airport and related activity: - is this at all costs?
. Ensuring appropriate improvements in sustainable transport accessibility and facilities; what is appropriate (who decides) and sustainable again undefined what other plans are the Council's proposing to run off the back of airport expansion? the rightly rejected Hullbridge to Rochford bypass???
. Ensuring a high quality environment for residents whether expressed through noise pollution management or protection of green space: what about congestion, air quality from road pollution etc?
. Maximum return on public investment through attracting inward investment; and is this at all costs?
. Efficient use of existing employment land resources. Is this at all costs?
2.3
Economic growth and new jobs. Again no consideration that the area is largely dormitory, no mention of the type of jobs and the fact that the airport expansion could have a negative effect with wealthy moving away and the area actually being an undesirable place to live, spiralling into decline.
Para 2 - Why will it be successful when there is significant competition from Gatwick, Heathrow, London City, Luton and Stansted all of which have better infrastructure and passenger pools as well as expansion plans. The proposed runway extension offers no increase in options for passenger plane access, as it cannot cope with any larger planes than the present runaway, as such the extension should be rejected as it fulfils no purpose.
Passengers will travel on the same planes they do at the moment and no plane is quiet or fuel efficient, especially when you consider that in excess of 20,000 flights per annum will take place (25,000 according to CPRE). It could even be argued that Southend should withhold expansion until plane technology improves to allow even shorter take-off and landing?
Conclusion would be that passenger use is to be secondary to cargo use and that Stobart have little intention of promoting the passenger aspects, except as a means of additional profit to their core operation, the movement of freight.
Fast food access is not possible the speed limit on the A127 is now 50mph for large stretches and is interrupted by numerous sets of traffic lights. Congestion problems will be exacerbated by any increased cargo usage at the airport, which will see the number of vehicles increase. No mention here of closure of Eastwoodbury Lane/A127 Public Safety zone or use of A130 or B1013 all of which will be problematic.
Para 3
Maintenance and repair - this implies that faulty aircraft will be flying over densely populated areas in order to be fixed. Given that the last time Southend had a significant cargo operation a plane crashed on Rayleigh (at night, on the only commercial premises in a residential district) it may be tempting fate to suggest that you are rather chancing residents luck with this proposal.
Restrictions on night flights - again unspecified as to what these will be and how they will be enforced. No consideration to schools, hospices, hospitals, etc etc let alone resident.
Part 4 - award winning, which award and by whom a vague statement. How can this be an enhanced Green Lung - it was built on open fields, it is disingenuous of the council to suggest otherwise, could we not have had a wide open space rather than a confined Country Park?
We've already lost significant open space, including recreational amenities to make way for Tesco's RBS etc and the link road developments. What are the 'quality jobs', undefined term and how is it to be guaranteed that they are for local people - if they are that good surely everyone will want it; again this is a misleading statement and should be withdrawn or amended.
Part 5 - Lets be clear an area for plane spotters and the poor souls living nearby.
Part 3 - Issue 1
Para 1 The railway increases the catchment, but doesn't decrease the competition from other better designed and strategically placed airports, notably Stansted. The rail line doesn't allow locals to access the airport so actually offers no benefit to those in the near vicinity.
Para 2 - Runway size is a constraint; this is not necessarily a bad thing and does give the local authorities an element of control that they relinquished when they sold a 199 year lease. It is actually doubtful that increased runway size makes the runway any more attractive to any operators. Smaller sized airlines are continually going bust and the proposed size does not open the airport to use by any passenger planes that cannot already use the site. The reference to quieter and more fuel efficient are not backed up by any facts. What are we talking about in terms of decibels (residents have little concern about fuel efficiency as this is a trading issue)? It is hardly beneficial if we currently have 50 aircraft flying per day making 150dB of noise each, but expansion leads to 10dB noise reduction per aircraft, but 100 more aircraft taking off every day.
The economic benefit is limited in terms of passenger spend as there is no expansion of the airport facilities and passengers will therefore travel straight through without spending locally.
Again no mention of cargo planes or indeed maintenance/training etc aircraft i.e the flights the council cannot control. I have referred to concerns regarding maintenance and flying of faulty planes in the area.
Issue 2
Para 1 - Excepting that we are talking about a dormitory town (and questioning why large scale employment is so crucial) why is the JAAP considered as the only key to employment and what is the connection to high-tech business. You can't just mention them in the same sentence for them to be connected there has to be a basis in fact and the report (unsurprisingly given that it is bereft of facts) omits to explain the connection. Given that Southend had in the 80's a significant number of office based employers and has now lost most of them, what makes it think that it can attract and retain such employers now? Again no clues as to methodology, only we'll build a big airport and they will come.
Para 2 - Does not make clear where this land is coming from, although it is surely green belt that is being lost, again, in the same area Cherry Orchard Way. Lots of talk about new jobs in business parks, although again nothing to say whether these are actually new to the immediate area or just movement from Hockley (closure of Eldon Way) or indeed other commutable areas in Essex.
Issue 3
Again sustainable is used without meaning. Only noise and air quality are mentioned, although cannot be certain that this will be in relation to road air and rail traffic. No note on water quality, loss of green belt etc. This is not new public open space; areas of open space are being lost and have been lost in the course of the development around notably Cherry Orchard Way and Eastwoodbury Lane.
What are the controls on the airport being considered; are they enforceable (particularly if challenged by the owner) and who will monitor?
What is sustainable transport policy? Again an unexplained term.
This section is undoubtedly unfairly biased and required re-submission.
Issue 4
I understand that the A127 has it's own restrictions on development as per liberal councillor Graham Langley. I would question therefore whether the council's real intention is not to place a bypass through Hullbridge, North Rayleigh, Hockley and Rochford, a plan previously rightly rejected?
i) there is no linkage to public transport and never has been. Deregulation of buses means that these do not link to rail services and the new rail station is not for use by locals. A13, A127 B1013 are already congested, A127 has speed restrictions and Eastwoodbury Lane will be closed and moved.
ii) Locals are forced to use cars due to lack of public transport connections and the fact that the airport rail service will not serve local stations. Bus services are systematically cut e.g 7 & 8 through Hockley and there is no direct link from Liverpool St Rail Line to C2C either by bus or rail. It is nigh on impossible to get people to refuse to use their cars and CPRE statistics show that the vast majority of workers and passengers will always prefer cars to public transport. Luggage and Public Transport do not make a good mix.
iii) What are the new routes - again nothing specifically mentioned, in the short term B1013 already (according to HAAP taking over 15,000 vehicles daily) will be used as a shortcut, increasingly so when the A127 speed cameras start to work and it becomes congested with cargo lorries. Again conclusion is that council will seek to introduce an unwanted bypass through green belt. Essentially the council are creating a problem expanding the airport and seeking to solve it to the detriment of residents with loss of more green belt.
Issue 5
Brickworks - there was I thinking the current policy was to build more houses not demolish existing ones. Another business park is to be built on open space, yet there is little demand for such a park, with vacant units througout both regions, plus Basildon etc. The council are using the flawed plans for Hockley and surrounding areas including the demolishing of Eldon Way to provide a false demand. This is disingenuous and wasteful (i.e not environmentally friendly), why demolish perfectly serviceable existing units just to create new ones? If access is so poor surely this should have been addressed when the bypass was build a few years back, what investigations are taking place into this waste of money?
B1 - again questionable that the demand exists
Area ii b) given the above is actually sensible to move the rugby club to an even more inaccessible spot? Some of these plans would have been more sensible if Southend United Football Stadium had been moved to Warners Bridge site of Southend Rugby Club (floodlights aren't an issue Highbury didn't have pylons), the railway station would have served a dual purpose (and SUFC could have got into Europe!!) The Rugby Club could then have either shared with Westcliff or moved to the site of Fossetts Way new SUFC stadium, more green belt would have been protected and transport links for the football stadium would at least have been maintained, another missed opportunity.
ii c) a green lung, nice that this has been acknowledged, a pokey site between an industrial estate and an airport runway i.e it can't be used for anything else, be honest don't try and dress it up as something it isn't, it is wholly insufficient for the purpose described.
iii) Why is more land being given over, the airport was given away as a freebie (£1) and the local authorities have little control over usage. Keep the land and keep control, allowing the hand over of more land compounds the earlier errors surrounding the 199 year lease.
iv) Identified as inefficient by whom and in what way? Another vacuous, unstabstantiated statement. does the cost of improvement outweight any potential benefit and who is expected to finance this? If units are not fit for purpose then surely it is up to the landlord or tenant to improve them not the taxpayer.
v) Loss of another sports pitch in the area then. We will soon be left with loads of concrete and designated country parks as only green areas, another poor suggestion. Presume East West Corridor will mean a road being built and houses will inevitably follow as the area will be termed 'under-used' within a decade.
vi) 'opportunity sites' - presumably for development? At least this is located next to existing industrial units.
vii) Flying Clubs - all to be kicked out (despite the fact they they do employ people)
viii) opportunity sites - say what you mean development sites, again the JAAP is trying to dress up the unpalatable.
ix) A green buffer a derelict site with a few horses and occasional circus. I hardly feel grateful, this area is currently an eyesore and clearly the report writer as with area ii c) couldn't think of another use. The flying clubs could be retained if the railway line was moved back here!
x) and xi) Loss of yet more amenities for Southend (once home to the largest amateur football league in the country). Demolition and rebuilding of a road that is only a few years old and at last admission that public transport isn't the answer so a park and ride service is required (although this could be omitted forcing passengers to use public transport)!!
4 Policies pg 17
Introduction Para 2 - It is apparently important to put the JAAP into context, but absolutely no attempt by the compiler to do so. It is unreasonable to expect ordinary residents with little or no experience to have to undertake lengthy research of information that the council have. In fact it could be argued that the council withholding this information is a deliberate attempt to prevent opposition, or perhaps just a glaring omission?
Energy saving technology is to be used (save lots of energy reject expansion) and sustainable drainage - what is this, yet another example of poor drafting.
Accepted that the JAAP cannot be looked at without plans for S.E. Essex, but again no clues and why are we restricted to this part of Essex why ignore Stansted and indeed other airport developments that the target passenger pool can use???? Again JAAP is flawed.
Employment allocations
Introduction
Why high scale employment growth? The term isn't explained, what type of employment and what are the employment aspirations. The area has relatively low unemployment, admittedly many people do not work locally, but this is because of the dormitory (and indeed retirement nature of this part of Essex, that the expansion will undermine and ultimately destroy. There is a limited pool of labour and there are no supporting statistics regarding the composition of the current labour pool or the required labour pool, there seems little point in creating jobs that cannot be filled.
Additional floor space - is this purely within the JAAP, what about other plans locally e.g HAAP where floor space is being reduced, meaning businesses are moving and new jobs are not created, just being relocated at the whim of the councils. The JAAP cannot on one hand say that it must be looked at in context and then ignore the context, this document is flawed again.
Upto 4950 jobs, how is this figure arrived at? It is unsubstantiated and unsupported and meaningless. Up to means just that any figure (including a negative) lower than 4950 is up to the JAAP requires amendment (again). In the area - is this the JAAP area, S E Essex? Are they JAAP related jobs and what are they - 'McJobs'? Same applies to the additional 750 jobs in Aviation Way. Non-specific, non factual and misleading.
E1 - another unsubstantiated figure, unclear if the jobs above are included in this figure or not. How do you split the jobs 50/50, who measures this and who is to say whether the airport brought those jobs. Remember a significant number of insurance companies merged in the 1990's and Southend lost jobs as a result, it had little to do with council policy. Just as conceivably an organisation could decide to move to Southend or Rochford, with airport expansion having no bearing on that decision.
E2 - Is this suggesting that in the middle of a recession busineses will have to pay to upgrade, I feel their sights may be elsewhere. No details on the financial contribution are given - how much taxpayer's money will be poured in and, as with the airport sold on at a loss? Are businesses going to be asked to donate or taxed, won't this be a disincentive to relocate?
This requires more detail and a lot more thought from the councils.
E3 - It is not reasonable to expect significant numbers of employees to walk or cycle unless they live very close to the units. Anyone living any distance will have to negotiate extremely busy (and probably busier roads), the cycle paths may well prove to be a waste of money, cause further unnecessary traffic to motor vehicles and should be properly costed.
Again business contributions comments as per E2 above
E4 E7 - No additional comment given rejection of the entire concept
E8 - As above how are job totals arrived at?
Overall comment on how and why businesses will contribute and what will be cost to residents
London Southend Airport
Introduction
Recognised that Airport can provide a boost - recognised by whom? another unsubstantiated and flawed statement.
Agree should have quieter aircraft, but fuel efficiency is a business decision not a local authority one.
Why must these aircraft be 150 seats again not explained?
Will aircraft development not actually catch up with the airport i.e. over the next decade larger aircraft landing on shorter runways (we then have a problem that we've bigger aircraft than the council currently envisage).
Why is the runway set at 1799m (I believe to avoid additional regulation of 1800, + runways)?
Are there any passenger aircraft with a full payload that cannot access at present that but can at 1799m? If so what types, what noise levels.
Expected that use will be passenger - expected by whom? Certainly not me. It is owned by freight forwarders who have stated they 'have found (their) Southern base'. Low Cost Airlines such as Easty Jet have a fleet requiring longer runways that proposed, who is the new airport aimed at?
Para 2 Growth in MRO - this means defective aircraft will be flown in over densely populated areas - the potential for disaster is huge and the council could/should be held accountable if a crash occurs (as it did in the 1980's).
If there is a demand for high skilled jobs, it is unlikely that applicants exist in sufficient number in this area and therefore, we would be reliant on migrant workers.
Whilst it is not considered desirable for the airport to handle large volumes of freight how much control would the council actually have over this? If the owners want to ship freight can they be stopped? If they want to extend the rail line (and Stobarts already have close ties with both Network Rail through Stobart Rail and Tesco's in terms of freight delivery) can they be prevented? If they want to run HGV's and vans in and out what can the council do? This is their core business. I would suggest that the professional businessmen at Stobarts are more than capable of giving amateur councillors the run around when it comes to what the airport will be used for. Local Authorities are very poor at refusing planning changes when business puts through a commercial reason. The first of these will be 'we can't attract viable passenger numbers we need to increase freight movements'. Once the extension is approved it cannot be repealed.
Para 3
Environmental constraints - no clues as to what these are how they are enforced (indeed if they can be) and what penalties are if airport users do no comply (saying sorry won't be enough) - will they pay compensation to individuals, where will the burden of proof lie? JAAP is deficient again.
The JAAP is also deficient in that no map of flight paths, stacking arrangements or noise levels at altitude (CPRE refer to these as noise contour maps). It seems anomalous to let the operator make his own statement, surely, if this extension takes place the council need to set noise levels and dictate to the user? Road noise (either freight or passenger) is completely omitted, as is rail noise.
Currently train services do not run through the night, but do stop near local stations when operating. The airport timetable will have non-stop trains. Additionally no details of freight movements, all of this is a complete omission and a justifies re-issue of the JAAP.
The A127 is an insufficient carriageway in its current form, particularly following the misguided speed reductions. Cycling facilities just take up vehicle space. I understand that there are limitations on the improvements that can be undertaken on the A127 due to it in part running through the Public Safety Zone, where major roads are not permitted, this is sufficient in itself to justify refusal of the proposal.
LS1 - this support of the expansion policy is unexplained. Why are 2 Tory councils supporting a misguided Labour policy, which basically entails concreting over anywhere that votes conservative? Solid reason should be provided for expansion.
LS2 - Permission
. Airport related - how tenuous does the link have to be for permission to be granted? this is yet another vague statement.
. Agreed baseline - this is undecided, does it require constant noise at one site or intermittent noise again far too vague. No details on who determines/measures etc. I will wager that all complaints about noise will be refuted by the operator. What about non-passenger flights, cargo, maintenance, training etc etc.
. Contributes to road infrastructure needs - positively or negatively and to what extent?
. Modal shift - what are the targets how and who measures the movement and who assesses whether the application is actually reasonable.
Again the JAAP is too vague to be meaningful.
LS3 - what sort of statement, what must this include. The JAAP note is meaningless and needs to be more prescriptive.
LS4 - again JAAP should be more prescriptive, this is meaningless.
LS5 - this is a restriction on the usage of residents property - does this contravene human Rights Legislation??
LS6 - Mentioned previously what is justification in passenger terms to increase the runway. Is there actually an advantage to the council and the residents to refuse 1799m, but approve 1800m?
LS7 -
. Times, unacceptable, 2300 is too late; this is some hours after dark in winter and makes no consideration in particular of the disruption that wil be caused to the sleeping pattern of children. Early mornings are also an issue for similar reasons. No mention is made of unscheduled flights and of cargo flights etc etc. The number of flights is not mentioned. If successful no-one will ever have another peaceful weekend.
. Cargo flights - require more restriction than just noise levels. No passenger flights at night (in noise controlled jets), but loads of cargo flights throughout the night using any available aircraft. what about maintenance/testing/training flights etc
. Routing - existing routes aren't shown, what are the plans for future routes. Again the JAAP is not fit for purpose.
. Helicopters - what more or less, operating heights? As these are vertical take off they could surely reach altitude over the airport before moving off?
. Restricted to what - will it pick up maintenance training testing etc?
. Ground running again unspecified JAAP too vague
. Training movements again unspecified JAAP too vague.
Terminal Facilities
PF1 repeats LS7, why? Is there in fact missing information here.
Maintenance repair and Overall
MRO1-3 what is justification for this, as previously stated surely this just increases the danger that the airport poses in a densely populated area. The possibility of contributions from business at the current time are surely fanciful.
Airport Development Zone
What criteria will be used to decide if development supports the airport and why is retail use refused?
Transport
What sorts of contributions are expected? What about the B1013, there is absolutely nothing to stop drivers using this as a cut through, especially given the days and reduced speed limits on A127?
T1 - where is this proposed to run?
T2 - and this?
T3 - why dual this road, unless there are plans to reintroduce the bypass via Hullbridge/Rayleigh/Hockley. Dualling only encouraes further traffic along the over used B1013 via Rayleigh
T4 as T3 this is encouraging traffic away from preferred route of A127
T5 - Loss of public amentities
T6 - there remains little incentive to use anything but a car, no car parking facilities forces the use of public transport - radical but true?
T7/8 - what sort of contribution - inevitably the tax payer will fund the bulk of this and how will the bill be met - wholly by Southend? who decides on contribution?
T9 - these are not provided with the JAAP again an omission
Environment
Introduction, this is not a green lung, the development is taking place on the green lung. already, the developments along and of Cherry Orchard Way have eaten into this and I understand that the development will downgrade further land making it easier to develop the area in the future. The green belt boundary isn't 'reviewed', it is obliterated. This is unacceptable.
Para 3 - what are 'high levels of environmental efficiency?' and 'sustainable drainage' more vacuous statements. These need to be clarified the document is once more deficient.
ENV1 - unacceptable loss of green belt (again) both councils seem to really object to green belt principles and look for any opportunity to develop such sites apparently seeing them as an inconvenience rather than a necessity and a desirable asset.
ENV2 - this is not new - it is open at prsent and it is at best misleading and at worst a downright lie to call it new. The JAAP is once more factually erroneous
ENV3 - as 2 above.
ENV4 - and if no contribution arrives does it happen or does the taxpayer get saddled with the bill? How will contributions be collected, surely this is a tax on new enterprise?
ENV5 not new public space again incorrect
ENV6 - this is constitutes 'no change' presumably because the land is so poorly sighted it is permitted to escape development
5.1 - JAAP provides no idea of what scale of limitations will be i.e. one in 3 units are occupied, how many jobs will result, how many of the contributions will be made.
5.2 - intended to provide detailed information - need more details now, not a washy statement that it is 'intended'. Sorry intended to but didn't get around to it. Should say 'Full details will be provided'.
5.3 You have my views. The report JAAP itself is deficient in factual information and misleading in the extreme. There is a lack of information given to the individual and it is not apparent that the council have advised necessary interested parties e.g RSPB. As such the process is substantially flawed, sufficiently so for the whole of this stage to be delayed whilst the JAAP is re-issued with sufficient information and clarification.
From my understanding of the proposals the councils are to a varying degree being incredibly naive, disengenuous, negligent and as such untrustworthy. Again this is sufficient to warrant review of the JAAP.
I understand that as part of the review process Rochford councillors visited Southampton Airport. I would suggest that although the runway size is comparable, to undertake a visit to an airport that doesn't permit night flights except in extenuating circumstances (max 10 per month 100 a year) and out of season is not going to provide any great insight. Especially given that the European Region Association (ERAA) shows the following freight movements Southend and Southampton in 2008:-
Southend 443 Tonnes reducing 19.6% from 2007
Southampton 264 tonnes reducing 10.5% from 2007
So the two airports are not as comparable as has been suggested especially since freight cargo uses older, noisier (propeller aircraft) rather than those 'quiet' jets for passengers and Southend is now owned by a freight forwarder.
Additionally back in 2002 the DfT recognised the lack of appeal of Southend as a suitable site.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14728

Received: 24/06/2009

Respondent: Mr Peter Symes

Representation Summary:

1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.

Full text:

Please refer to the attached document which lists all concerns with process and lack of information provided by the Councils concerned in respect of the JAAP. Again the demands placed upon objectors are onerous (as with the HAAP), namely the requirement to complete on-line or to file an individual form per objection are unfair and unwarranted. I understand however that this advice is actually waived upon request and as per my conversation with your offices! Attach one report for your attention lising all my issues with the JAAP at this time.
I expect a response to all queries raised.
The Councils have been extremely negligent in their duty to provide sufficient information.
At the present time the proposals are unacceptable in their entirety and there is nothing to suggest my opinion will change. I additionally support the comments made by campaign for protection of rural Essex (England) in their submission.
I am writing to object to the proposals contained within the London Southend Airport and Environs Joint Area Action Plan Preferred Options Dated February 2009.
I have a number of general objections regarding the process, documentation and manner of delivery as well as specific objections to the proposals and list these as follows:-
Flawed Process of Presentation.
1) There was little initial notification to the public of the first stage of consultation or the ramifications of not responding. We appear to have reached stage 2 of the process by default and dictation by the Councils, with stage 1 swept swiftly 'under the carpet' rather than the opportunity given to residents to undertake a considered process of weighing up the options. I do not believe that the majority, or even an adequate portion , of local residents understand the process and the JAAP documents do little to address this. Neighbouring authorities, that are also affected, will have had little input into the process and their residents no understanding of what is going on or what influence they can have. As such the process is flawed and details supplied inadequate. Unless the councils can demonstrate evidence to the contrary.
2) The selection of option three again has been decided adequate consideration of other options.
Whilst Southend Council have at least gone through the motions of offering roadshows to assist understanding RDC appear to have relied solely on advertising.
Notwithstanding this both Councils have failed to provide adequate information within the document, given their support of the proposal it must be concluded that this is a deliberate rather than just a negligent act and again calls into question the whole process.
As a bare minimum the JAAP should include :-
. Existing and post extension flight paths (how these may vary in inclement weather)
. Stacking arrangements in the event of runway closure/delays
. Basic statistics showing likelihood of inclement weather/runway closures and, as such how many times a year stacking arrangements and flight path changes are likely to be implemented and the anticipated number of flights this will affect.
. The types of aircraft able to take off, both before and after the extension (cargo, passenger and 'other')
. The minimum and maximum number of flights permitted (including split between cargo passenger, maintenance, training, testing) and flight times (including scheduled, non-scheduled, charter, training/testing/maintenance)
. The noise levels generated at ground level by the planes at altitudes - a noise map?
. expected plane altitude at say half mile intervals from take off/landing
. expected traffic volume increases (Stobart and other firms lorries and vans) for A127, A130 and B1013 (Rayleigh - Hockley - Rochford Road), as a result of airport expansion and closue of Eastwoodbury Lane
. Expected train timetable changes (including non-scheduled freight movements) and anticipated delays as a result of new passenger trains.
. the fact that the trains for the airport are not going to provide a local service (thus local commuting to the airport by train remains inconvenient)
. confirmation as to whether or not Stobart can apply (and whether or not the councils have any power or inclination to prevent or resist) to make rail freight movements to the airport or the immediate vicinity
. Which jobs are genuine new jobs, type etc and which will be transferred from other parts of the district (and lets not limit ourselves to Rochford and Southend, because undoubtedly Castle Point and Basildon will be affected)
. A summary of the impact of other developments in the area, including redevelopment of Hockley, Stambridge Road, Hawkwell, Daws Heath etc etc. These should be clearly marked on a flight path map also.
. Confirmation of detailed plans for inevitable road expansion schemes that will be required to support increased road traffic. Particularly A127, where proposals incorporate the Public Safety Zone and whether the expansion will be used to push through the unwanted development of a bypass via Hullbridge/North Rayleigh/Hockley and Rochford?
As such I would view this as a basic dereliction of Council duty - failure to inform and ensure that the interests of residents are looked after. I understand also that this may breach the Freedom of Information Act and RDC's own consultation strategy
3) The Councils have apparently selected the least popular option, although conveniently neglected to inform residents as to how or why this decision was arrived at. The only factor that seems to offer any support for their decision is 'increased jobs'. Various figures are quoted all prefixed by the worlds 'upto'. This term is 'up to' is sufficiently vague to mean that any number (including negative ones) below the figure quoted would be deemed a success. As such it has no place in the document as it constitutes mere speculation. Hard facts and details of how conclusions are arrived at are needed.
As such the information provided is surely skewed and the Councils are seemingly abusing their position in recommending the proposal with absolutely no solid evidence to back up the position.
4) The connection of this scheme with other projects in the area, notably a number of house building projects including those mentioned in 2) above, is not made clear Government document PPS12, makes clear reference to :-
Every local planning authority should produce a core strategy which includes :
1) an overall vision which sets out how the area and the places within it should develop;
2) strategic objectives for the area focussing on the key issues to be addressed;
3) a delivery strategy for achieving these objectives. This should set out how much development is intended to happen where, when, and by what means it will be delivered . Locations for strategic development should be indicated on a key diagram; and
4) clear arrangements for managing and monitoring the delivery of the strategy.
Whilst this document is no doubt available somewhere it should be included with the JAAP, since without it the JAAP is not placed in the required context, without clear direction it is impossible to understand how or why this is intended to be part of the core strategy.
Additionally how have residents been consulted on the overal strategy, because if that exercise is flawed - and certainly the desire to build more homes in a densely populated area, whilst simultaneously expanded an airport, demonstrates that it is, then much if not all of the sub-plans such as this area also flawed.
PPS12 also refers to
Period of operation
4.13 The time horizon of the core strategy should be at least 15 years from the date of adoption.
As above there is no clear advices as to where the JAAP fits in the core strategy or where we are in the time horizon. Again the document lacks context, although it even states that it must be read in context, it provides little clue on how to do this.
PP12 also refers to
Statements of Community Involvement:
An SCI should
. Explain clearly the process and methods for community involvement for different types of local development documents and for the different stages of plan preperation. This needs to include details of how the diverse sections of the community are engaged, in particular those groups which have been underrepresented in previous consultation exercises.
. Identify which umbrella organisations and community groups need be involved at different stages of the planning process, with special consideration given to those groups not normally involved.
. Explain the process and appropriate methods for effective community involvement in the determination of planning applications and where appropriate refer to Planning Performance Agreements.
. Include details of the LPA's approach to pre-application discussions.
. Include the LPAs approach to community involvement in planning obligations (S106 agreements).
. Include information on how the SCI will be monitored, evaluated and scrutinised at the local level.
. Include details of where community groups can get more information on the planning process, for example, from Planning Aid and other voluntary organisations.
. Identify how landowner and developer interests will be engaged.
These above items from the PPS demonstrate the assistance that should be given to ordinary residents (and others) in the process. As mentioned by Campaign for Protection Rural Essex a number of organisations should have been consulted including RSPB; Essex Wildlife Trust etc. It is disingenuous and perhaps even negligent of the council not to include these within the Action Plan. Most people have very little experience of dealing with documents such as this and it is only at this late stage in the process (given that we've already passed through stage 1) that RDC and Southend BC have offered even limited advice. Even having read as much as I can in the past few weeks, I (and I am certainly not alone in this) have very little information regarding :- the crucial stages in the process; whether residents can succeed in resisting or changing any aspect of the proposals - RDC really should explain the steps in simple terms. At the moment we seem to progress from one stage to the next with absolutely no guidance. For instance:- I understand from information received from other sources in relation to the airport, that unless I head this document as an objection it is merely treated as a comment. I believe petitions are ignored. I will need to get my wife to make a separate submission in order for her views to be considered, even though we agree. The council seems quite happy to tell people how to make positive comments, but far less inclined to advise on how to object - hardly democracy and clearly demonstrating a deficiency and unfairness in the process, that should be revisited before we move ahead.
PPS12 again
Justification of Core Strategies
4.36 core strategies must be justifiable: they must be:
. founded on a robust and credible evidence base; and
. the most appropriate strategy when considered against the reasonable alternatives.
As above we cannot be sure that the base is robust and credible or indeed the most appropriate when considered against reasonable alternatives, since we don't know how and why the initial alternatives were first selected and then rejected. The JAAP provides no evidence base to affirm that the selection or the process is credible and again the JAAP requires review and re-issue.
If this is the preferred option, what was the basis for selection and will any ideas arising from the consultation be put forward for further consideration? Is it possible (likely) that if decent alternatives are proposed in stage 2 the preferred option will be amended and re-submitted? If not then, again, the process is flawed.
5) The document produced glowingly mentions the positive aspects and underplays the negative - surely the document should be impartial and genuinely enable residents to make up their own mind? Plenty of rhetoric about jobs new businesses etc but no details and certainly no information on the negatives, noise, congestion, loss of property value, decline in overall living standards etc. Basic research reveals Stobart's close ties with Tesco and Network Rail are we going to end up with a huge Tesco distribution centre supporting the airport, similar to their Dudley operation?
While the JAAP includes a brief note that the airport is unsuitable for large scale cargo operation (only a niche operation). The terms 'large-scale' or 'niche' are undefined, will mean different things to different peope and are therefore meaningless in the context of the JAAP, again this requires clarification and re-issue. Notwithstanding this the actual use is surely the decision of the owners and not the councils? Stobart management are already quoted as saying upon the purchase of the airport 'we have found our Southern Base', doesn't really sound like they are planning a limited operation, quite the opposite.
It is also unclear where any 'new' jobs and businesses will come from. Given the proposals and redevelopment of Hockley it is apparent that a number will come from there and therefore aren't really new. Again disingenuous of RDC in relation to the HAAP (and Southend BC not to make this clear in the JAAP that a proportion of jobs at the Airport sites will actually be moved from Hockley)
6) The document itself is devoid of factual information, although admitting that aspects will be supplied later, this itself smacks of a rush job. We find ourselves moved on to a stage from which there is no going back without having the facts adequately presented. It seems that the councils are either negligent in preparation of the facts or trying to hide something.
Development of the airport could bring about a fundamental change to the area, not necessarily for the better and it is in resident's interest for all information to be divulged as soon as possible.
It also uses a number of undefined terms, notably around the word 'sustainable'. It could mean 'long-term use with minimal environmental impact', but it the council are not clear what meaning they are seeking to attach. Equally, there are (source Wilkipedia) different types of sustainability. Economic, Environmental and Sociopolitical, so there is significant room for confusion as to meaning and I'm quite sure most people have no understanding what is meant by sustainability in the context of the JAAP.
7) The council is geared very much to receiving information via the internet, whilst undoubtedy this is cost effective; it is unfair on those residents that do not have internet access, particularly the elderly who make up a significant proportion of the population in the area. It is doubtful therefore that the views obtained will actually be representative of all residents. I note at election time certain parties are very keen to get their voters to polling stations and will provide transport - I wonder how keen those same councillors are to dedicate time and petrol to those residents wishing to get assistance in completing JAAP.
Completion on line is actually quite difficult and near on impossible if you have lengthy comments to make. Again the councils are colluding to dissuade residents from making anything but the briefest of contributiions.
Additionally the representation form states that each objection/comment requires completion of a separate form. Clearly this is actually designed to put people off commenting. Although I understand from a telephone conversation with RDC planning department that the council will accept one form with clearly listed comments. I would have to question whether RDC/Southend BC can actually determine what form objections may take. Again the process appears flawed, as this is biased towards acceptance of JAAP. At best this builds mistrust between residents and the councils as to motive; at worst it is downright dishonest.
The JAAP relies too much on the reader having a detailed knowledge of planning terminology and documentation, mentioning a significant number of undefined, unexplained and unreferenced terms and documents (as mentioned later) and omitting adequate cross-referencing. As such it is an inaccessible, inadequate document not fit for purpose and until it is adequately amended and re-issued the consultation process is flawed.
8) Rochford Council's own Leisure document refers to Rochford being the 'Green Gateway', clearly there is a desire to put a wall up given the amount of building that has occurred in the West of the District - this needs to stop. The local infrastructure cannot cope:-
B1013 is a hugely busy Road already - HAAP refers to 15,000 + vehicles back in 2007 and significant building has taken place since then. If the Airport expansion takes place, and RDC regretfully support this, then further transport issues will arise.
What plans are considered for a major disaster, large aircraft crashing on residential or occupied business property? In the US 7 of the last 8 fatal commercial airline crashes involved regional airlines (BBC 12th May 2009) or indeed hijack, bearing in mind proximity to major centres of population, power stations etc.
What additional policing/customs and immigration officers will be supplied, both at the airport and elsewhere in the region? Not only do illegal immigrants use lorries to access the country (and a cargo terminal will increase the amount of vehicles in this part of Essex), but aircraft have also previously been used (e.g at Stansted). Additionally there are the increased risks associated with drug smuggling, particularly given that criminals may seek to use the nearest available market for contraband. There is also an increased likelihood (with increased vehicles) or road traffic offences, which speed cameras do not address. What additional resources will be provided to the NHS to deal with the upsurge in stress, sleeplessness and associated problems including violence and accidents?
9) No explanation has been given as to why RDC/Southend BC support Government policy (I have asked my local councillors and MP to explain this apparent anomaly) there seems to be no desire to protect the quality of life enjoyed by residents, certainly much of this part of Essex has previously shown (in Government statistics) to be one of the least deprived areas of the country, yet the proposals seem to treat it as though it is one of the most deprived - is this wishful thinking on the part of the compile? As recently as 2006 Southend was calculated to be the best place to retire to.
10) Both Councils are keen to promote the area as a great place to visit yet surely this will be the death knell for tourism, the only visitors will be those waiting for a plane to get away from an overly congested cargo handling centre.
11) There is no clear mention of what controls are able to enforce (and indeed whether they would agree on these). Given the track record of local authorities but locally and countrywide in rejecting and/or enforcing actions against big business and national government e.g totally inability to prevent McDonald's and Tesco building where they like and the fiasco of the change of use of Bullwood Hall prison I rather suspect that if the expansion is approved Stobart's will ride roughshod over any objections from residents irrespective of whether the council's support the residents.
12) No account appears to have been taken of the wider questions regarding airport usage. Aside from the environmental impact, the reduction of carbon emissions etc is supposed to be at the forefront of business, government and local authority strategies, and the JAAP clearly goes contradicts this. Why have the following not been mentioned.
a) Southend is only accessible from the East and North (there is so little to the West it is hardly worth mentioning and is obviously cut off fromt Kent by the Estuary). As such the Pool of passengers it is supposed to be attracting is actually very limited. To the North sits Stansted whilst to the East, London and the various airports accessible from there.
b) Why the runway is being extended to 1799m and not 1800m (something I believe to do with extra regulation), when this doesn't actually allow for any passenger planes that are larger than the current users to land.
c) With perhaps the exception of Luton, every major airport easily accessible from London i.e Gatwick, Stansted, Heathrow and London City itself have expansion plans in the pipeline, as such the need for expansion of Southend as a passenger airport is questionable if not foolhardy.
d) Most recent figures for air travel suggest that this form of transport is actually declining.
It would actually suggest that the freight forwarder Eddie Stobart has an entirely different motive for expanding the airport.
13) Apart from neglecting to place sufficient significance upon the fact that a freight forwarders now own the airport and thus that the expansion will cause increased in cargo shipments in the air and on the ground, I fully support the comments made by Campaign for Protection for Rural Essex (part of CPREngland).
14) The councils have made no mention of the plans to ease road congestion that expansion will undoubtedly bring. I anticipate that you will seek to resurrect the misguided and previously rejected plans to further develop on green belt by building a bypass across Hullbridge, North Rayleigh Hockley and Rochford, just exacerbating the over-development of this area.
Nor is the impact upon rail timetable and whether there is sufficient rolling stock available for the new train service (i.e whether existing commuter carriage availability will be cut to provide airport services) explored.
Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.
1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.
1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.
1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.
1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.
1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.
Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.
Para 3 significant job opportunities - again undefined as to what significant means and what type of jobs are referred to (McJobs)?. Given the competition from the above airports it would require significant, unwelcome further expansion for business to be attracted because of the airport. Businesses decisions are made for reasons unrelated to the airport, yet the report suggests that development would be a major driver for business (but does not say why or what type of business). Southend lost virtually every major office employer since I worked there in the 1980's. Most major insurers and brokers merged and moved out of Victoria Avenue, as did various government departments (due to National government strategy) and BT, this had absolutely nothing to do with the airport and attracting these businessses back will probably have equally little to do with an airport.
Why is the commuter belt aspect of the region completely ignored? Many people commute to work and bring money back to spend locally. Similarly the retirement aspect is also ignored completely. It is questionable whether there is any great need for huge swathes of industry in this part of Essex.
Tourism desination is an absolute joke, the region is overdeveloped and the only tourists would be waiting for a plane to get away.
Para 4 - why is only the airport considered to be a drive for economic development? Holidaymakers pass straight through to their destination and most companies are cutting back on expenses such as business flights and use of technology (video-conferencing etc) renders their need redundant. We can surely only be talking about freight movement????
Again paragraph 4 refers to 'employs a significant number' is non-specific as to quantum or job types. Are you including the airport trading estate? I've shopped there, but I've never flown from Southend, it is totally unrelated and again the document is misleading.
Surprisingly the JAAP refers to a specific document, but gives no clues as to where to find the Rochford Core Strategy Preferred Options Document.
Para 5 - Transport issues are understated and it really does seem rather pointless to even attempt to expand such a small airport and blight the whole area for good for a few weeks in 2012. European visitors would be far better served by train, whilst longer haul flights cannot land on a runway this size.
Para 6 Who sees the airport as important for development and prosperity? Another vague statement dressed as fact. I see it as actually the beginning of a sustained decline in the area as the affluent move away, house prices fall due to noise and congestion from air and road freight and the area goes into, pardon the pun, terminal decline. Again future employment needs take little account of commuting.
2.1
Para 1 The context against which the JAAP is set is now outdated, having been drawn up in time of boom and when it was inconceivable that banking institutions would have to be underwritten by National Government to the extent they now are. The financial pattern of this and other countries have changed fundamentally and it will be a significant time before things get back to normal (over 20 years), loans are no longer freely available and the 'Vision' clearly needs to be re-visited.
Para 2 - refers to quality of life for residents is mentioned, but actually not expanded upon in the report. It is quite clear that expansion of the airport will reduce the quality of life for all but a very few number of residents i.e those fortunate enough to be directly employed in senior positions.
Para 3 - London Southend Airport as a 'major employer' - again an undefined term
. How many people does the airport directly employ (I suspect that many of the jobs are in fact secondary and even if the airport closed work would be taken up by other airports e.g Stansted or London City and the jobs would remain within commutable distance)?
. How many of the jobs are actually in the adjacent business park and in reality unrelated to the airport?
. How many of the jobs will actually be lost upon expansion (e.g those at the flying clubs that are being pushed out, businesses that are forced to close due to congestion etc)?
. How many of the jobs would actually remain if the airport was unaltered?
. Why isn't the spare capacity being used?
. What could be done to improve the spare capacity usage?
. What are the costs/benefits in picking up the spare capacity?
. Why, if the airport is so important, won't it become a success without expansion?
All basic questions the JAAP fails to address.
Para 4 - what is the 'current and emerging policy framework in the area'? again an undefined and meaningless phrase.
Para 5/6 - Southend core strategy - wonderful, what other options were considered and why is Rochford so keen to support this if, as this document so clearly demonstrates, there are so few advantages and so many disadvantages for the area and its residents.
Para 7 to end
Who are/what is Renaissance Southend Regeneration Framework? Another undefined term. How they have arrived at the conclusion it should be a centre for international air services and then contradicted this by saying it would be a 'great place to live' - when it so clearly wouldn't with a huge number of planes flying over head day and night. Rochford Council have a similar objective in making this a great place to live!!! I've lived in the region all my life, with these proposals I have no desire to continue to do so (but my options will be restricted by the resultant slump in house prices the expansion will cause)
Again there is very little mention that most of the towns in the region are actually dormitory towns for London e.g. Rayleigh. The desire to encourage employment is actually questionable on this basis. Higher salaries are always available in the City and vast airport expansion would probably require a significant number of migrant (possibly overseas) workers to fill vacancies.
Hi tech businesses tend to be low scale employers and no examples are given of 'high value employment'. This is pie in the sky aspiration with no basis in fact; it should be only be included in the JAAP if noted as such.
2.2
Para 1 - again refers to unreferenced material, planning documents etc, and it is impossible to know if this has been fairly assessed or just the bits chosen to fit.
The objectives are:
. Creation of sustainable and high value employment and other land uses within the study area; - what is 'high value' and what 'other land' - this is a vague and washy statement requiring amendment.
. Maxamising the economic benefits of a thriving airport and related activity: - is this at all costs?
. Ensuring appropriate improvements in sustainable transport accessibility and facilities; what is appropriate (who decides) and sustainable again undefined what other plans are the Council's proposing to run off the back of airport expansion? the rightly rejected Hullbridge to Rochford bypass???
. Ensuring a high quality environment for residents whether expressed through noise pollution management or protection of green space: what about congestion, air quality from road pollution etc?
. Maximum return on public investment through attracting inward investment; and is this at all costs?
. Efficient use of existing employment land resources. Is this at all costs?
2.3
Economic growth and new jobs. Again no consideration that the area is largely dormitory, no mention of the type of jobs and the fact that the airport expansion could have a negative effect with wealthy moving away and the area actually being an undesirable place to live, spiralling into decline.
Para 2 - Why will it be successful when there is significant competition from Gatwick, Heathrow, London City, Luton and Stansted all of which have better infrastructure and passenger pools as well as expansion plans. The proposed runway extension offers no increase in options for passenger plane access, as it cannot cope with any larger planes than the present runaway, as such the extension should be rejected as it fulfils no purpose.
Passengers will travel on the same planes they do at the moment and no plane is quiet or fuel efficient, especially when you consider that in excess of 20,000 flights per annum will take place (25,000 according to CPRE). It could even be argued that Southend should withhold expansion until plane technology improves to allow even shorter take-off and landing?
Conclusion would be that passenger use is to be secondary to cargo use and that Stobart have little intention of promoting the passenger aspects, except as a means of additional profit to their core operation, the movement of freight.
Fast food access is not possible the speed limit on the A127 is now 50mph for large stretches and is interrupted by numerous sets of traffic lights. Congestion problems will be exacerbated by any increased cargo usage at the airport, which will see the number of vehicles increase. No mention here of closure of Eastwoodbury Lane/A127 Public Safety zone or use of A130 or B1013 all of which will be problematic.
Para 3
Maintenance and repair - this implies that faulty aircraft will be flying over densely populated areas in order to be fixed. Given that the last time Southend had a significant cargo operation a plane crashed on Rayleigh (at night, on the only commercial premises in a residential district) it may be tempting fate to suggest that you are rather chancing residents luck with this proposal.
Restrictions on night flights - again unspecified as to what these will be and how they will be enforced. No consideration to schools, hospices, hospitals, etc etc let alone resident.
Part 4 - award winning, which award and by whom a vague statement. How can this be an enhanced Green Lung - it was built on open fields, it is disingenuous of the council to suggest otherwise, could we not have had a wide open space rather than a confined Country Park?
We've already lost significant open space, including recreational amenities to make way for Tesco's RBS etc and the link road developments. What are the 'quality jobs', undefined term and how is it to be guaranteed that they are for local people - if they are that good surely everyone will want it; again this is a misleading statement and should be withdrawn or amended.
Part 5 - Lets be clear an area for plane spotters and the poor souls living nearby.
Part 3 - Issue 1
Para 1 The railway increases the catchment, but doesn't decrease the competition from other better designed and strategically placed airports, notably Stansted. The rail line doesn't allow locals to access the airport so actually offers no benefit to those in the near vicinity.
Para 2 - Runway size is a constraint; this is not necessarily a bad thing and does give the local authorities an element of control that they relinquished when they sold a 199 year lease. It is actually doubtful that increased runway size makes the runway any more attractive to any operators. Smaller sized airlines are continually going bust and the proposed size does not open the airport to use by any passenger planes that cannot already use the site. The reference to quieter and more fuel efficient are not backed up by any facts. What are we talking about in terms of decibels (residents have little concern about fuel efficiency as this is a trading issue)? It is hardly beneficial if we currently have 50 aircraft flying per day making 150dB of noise each, but expansion leads to 10dB noise reduction per aircraft, but 100 more aircraft taking off every day.
The economic benefit is limited in terms of passenger spend as there is no expansion of the airport facilities and passengers will therefore travel straight through without spending locally.
Again no mention of cargo planes or indeed maintenance/training etc aircraft i.e the flights the council cannot control. I have referred to concerns regarding maintenance and flying of faulty planes in the area.
Issue 2
Para 1 - Excepting that we are talking about a dormitory town (and questioning why large scale employment is so crucial) why is the JAAP considered as the only key to employment and what is the connection to high-tech business. You can't just mention them in the same sentence for them to be connected there has to be a basis in fact and the report (unsurprisingly given that it is bereft of facts) omits to explain the connection. Given that Southend had in the 80's a significant number of office based employers and has now lost most of them, what makes it think that it can attract and retain such employers now? Again no clues as to methodology, only we'll build a big airport and they will come.
Para 2 - Does not make clear where this land is coming from, although it is surely green belt that is being lost, again, in the same area Cherry Orchard Way. Lots of talk about new jobs in business parks, although again nothing to say whether these are actually new to the immediate area or just movement from Hockley (closure of Eldon Way) or indeed other commutable areas in Essex.
Issue 3
Again sustainable is used without meaning. Only noise and air quality are mentioned, although cannot be certain that this will be in relation to road air and rail traffic. No note on water quality, loss of green belt etc. This is not new public open space; areas of open space are being lost and have been lost in the course of the development around notably Cherry Orchard Way and Eastwoodbury Lane.
What are the controls on the airport being considered; are they enforceable (particularly if challenged by the owner) and who will monitor?
What is sustainable transport policy? Again an unexplained term.
This section is undoubtedly unfairly biased and required re-submission.
Issue 4
I understand that the A127 has it's own restrictions on development as per liberal councillor Graham Langley. I would question therefore whether the council's real intention is not to place a bypass through Hullbridge, North Rayleigh, Hockley and Rochford, a plan previously rightly rejected?
i) there is no linkage to public transport and never has been. Deregulation of buses means that these do not link to rail services and the new rail station is not for use by locals. A13, A127 B1013 are already congested, A127 has speed restrictions and Eastwoodbury Lane will be closed and moved.
ii) Locals are forced to use cars due to lack of public transport connections and the fact that the airport rail service will not serve local stations. Bus services are systematically cut e.g 7 & 8 through Hockley and there is no direct link from Liverpool St Rail Line to C2C either by bus or rail. It is nigh on impossible to get people to refuse to use their cars and CPRE statistics show that the vast majority of workers and passengers will always prefer cars to public transport. Luggage and Public Transport do not make a good mix.
iii) What are the new routes - again nothing specifically mentioned, in the short term B1013 already (according to HAAP taking over 15,000 vehicles daily) will be used as a shortcut, increasingly so when the A127 speed cameras start to work and it becomes congested with cargo lorries. Again conclusion is that council will seek to introduce an unwanted bypass through green belt. Essentially the council are creating a problem expanding the airport and seeking to solve it to the detriment of residents with loss of more green belt.
Issue 5
Brickworks - there was I thinking the current policy was to build more houses not demolish existing ones. Another business park is to be built on open space, yet there is little demand for such a park, with vacant units througout both regions, plus Basildon etc. The council are using the flawed plans for Hockley and surrounding areas including the demolishing of Eldon Way to provide a false demand. This is disingenuous and wasteful (i.e not environmentally friendly), why demolish perfectly serviceable existing units just to create new ones? If access is so poor surely this should have been addressed when the bypass was build a few years back, what investigations are taking place into this waste of money?
B1 - again questionable that the demand exists
Area ii b) given the above is actually sensible to move the rugby club to an even more inaccessible spot? Some of these plans would have been more sensible if Southend United Football Stadium had been moved to Warners Bridge site of Southend Rugby Club (floodlights aren't an issue Highbury didn't have pylons), the railway station would have served a dual purpose (and SUFC could have got into Europe!!) The Rugby Club could then have either shared with Westcliff or moved to the site of Fossetts Way new SUFC stadium, more green belt would have been protected and transport links for the football stadium would at least have been maintained, another missed opportunity.
ii c) a green lung, nice that this has been acknowledged, a pokey site between an industrial estate and an airport runway i.e it can't be used for anything else, be honest don't try and dress it up as something it isn't, it is wholly insufficient for the purpose described.
iii) Why is more land being given over, the airport was given away as a freebie (£1) and the local authorities have little control over usage. Keep the land and keep control, allowing the hand over of more land compounds the earlier errors surrounding the 199 year lease.
iv) Identified as inefficient by whom and in what way? Another vacuous, unstabstantiated statement. does the cost of improvement outweight any potential benefit and who is expected to finance this? If units are not fit for purpose then surely it is up to the landlord or tenant to improve them not the taxpayer.
v) Loss of another sports pitch in the area then. We will soon be left with loads of concrete and designated country parks as only green areas, another poor suggestion. Presume East West Corridor will mean a road being built and houses will inevitably follow as the area will be termed 'under-used' within a decade.
vi) 'opportunity sites' - presumably for development? At least this is located next to existing industrial units.
vii) Flying Clubs - all to be kicked out (despite the fact they they do employ people)
viii) opportunity sites - say what you mean development sites, again the JAAP is trying to dress up the unpalatable.
ix) A green buffer a derelict site with a few horses and occasional circus. I hardly feel grateful, this area is currently an eyesore and clearly the report writer as with area ii c) couldn't think of another use. The flying clubs could be retained if the railway line was moved back here!
x) and xi) Loss of yet more amenities for Southend (once home to the largest amateur football league in the country). Demolition and rebuilding of a road that is only a few years old and at last admission that public transport isn't the answer so a park and ride service is required (although this could be omitted forcing passengers to use public transport)!!
4 Policies pg 17
Introduction Para 2 - It is apparently important to put the JAAP into context, but absolutely no attempt by the compiler to do so. It is unreasonable to expect ordinary residents with little or no experience to have to undertake lengthy research of information that the council have. In fact it could be argued that the council withholding this information is a deliberate attempt to prevent opposition, or perhaps just a glaring omission?
Energy saving technology is to be used (save lots of energy reject expansion) and sustainable drainage - what is this, yet another example of poor drafting.
Accepted that the JAAP cannot be looked at without plans for S.E. Essex, but again no clues and why are we restricted to this part of Essex why ignore Stansted and indeed other airport developments that the target passenger pool can use???? Again JAAP is flawed.
Employment allocations
Introduction
Why high scale employment growth? The term isn't explained, what type of employment and what are the employment aspirations. The area has relatively low unemployment, admittedly many people do not work locally, but this is because of the dormitory (and indeed retirement nature of this part of Essex, that the expansion will undermine and ultimately destroy. There is a limited pool of labour and there are no supporting statistics regarding the composition of the current labour pool or the required labour pool, there seems little point in creating jobs that cannot be filled.
Additional floor space - is this purely within the JAAP, what about other plans locally e.g HAAP where floor space is being reduced, meaning businesses are moving and new jobs are not created, just being relocated at the whim of the councils. The JAAP cannot on one hand say that it must be looked at in context and then ignore the context, this document is flawed again.
Upto 4950 jobs, how is this figure arrived at? It is unsubstantiated and unsupported and meaningless. Up to means just that any figure (including a negative) lower than 4950 is up to the JAAP requires amendment (again). In the area - is this the JAAP area, S E Essex? Are they JAAP related jobs and what are they - 'McJobs'? Same applies to the additional 750 jobs in Aviation Way. Non-specific, non factual and misleading.
E1 - another unsubstantiated figure, unclear if the jobs above are included in this figure or not. How do you split the jobs 50/50, who measures this and who is to say whether the airport brought those jobs. Remember a significant number of insurance companies merged in the 1990's and Southend lost jobs as a result, it had little to do with council policy. Just as conceivably an organisation could decide to move to Southend or Rochford, with airport expansion having no bearing on that decision.
E2 - Is this suggesting that in the middle of a recession busineses will have to pay to upgrade, I feel their sights may be elsewhere. No details on the financial contribution are given - how much taxpayer's money will be poured in and, as with the airport sold on at a loss? Are businesses going to be asked to donate or taxed, won't this be a disincentive to relocate?
This requires more detail and a lot more thought from the councils.
E3 - It is not reasonable to expect significant numbers of employees to walk or cycle unless they live very close to the units. Anyone living any distance will have to negotiate extremely busy (and probably busier roads), the cycle paths may well prove to be a waste of money, cause further unnecessary traffic to motor vehicles and should be properly costed.
Again business contributions comments as per E2 above
E4 E7 - No additional comment given rejection of the entire concept
E8 - As above how are job totals arrived at?
Overall comment on how and why businesses will contribute and what will be cost to residents
London Southend Airport
Introduction
Recognised that Airport can provide a boost - recognised by whom? another unsubstantiated and flawed statement.
Agree should have quieter aircraft, but fuel efficiency is a business decision not a local authority one.
Why must these aircraft be 150 seats again not explained?
Will aircraft development not actually catch up with the airport i.e. over the next decade larger aircraft landing on shorter runways (we then have a problem that we've bigger aircraft than the council currently envisage).
Why is the runway set at 1799m (I believe to avoid additional regulation of 1800, + runways)?
Are there any passenger aircraft with a full payload that cannot access at present that but can at 1799m? If so what types, what noise levels.
Expected that use will be passenger - expected by whom? Certainly not me. It is owned by freight forwarders who have stated they 'have found (their) Southern base'. Low Cost Airlines such as Easty Jet have a fleet requiring longer runways that proposed, who is the new airport aimed at?
Para 2 Growth in MRO - this means defective aircraft will be flown in over densely populated areas - the potential for disaster is huge and the council could/should be held accountable if a crash occurs (as it did in the 1980's).
If there is a demand for high skilled jobs, it is unlikely that applicants exist in sufficient number in this area and therefore, we would be reliant on migrant workers.
Whilst it is not considered desirable for the airport to handle large volumes of freight how much control would the council actually have over this? If the owners want to ship freight can they be stopped? If they want to extend the rail line (and Stobarts already have close ties with both Network Rail through Stobart Rail and Tesco's in terms of freight delivery) can they be prevented? If they want to run HGV's and vans in and out what can the council do? This is their core business. I would suggest that the professional businessmen at Stobarts are more than capable of giving amateur councillors the run around when it comes to what the airport will be used for. Local Authorities are very poor at refusing planning changes when business puts through a commercial reason. The first of these will be 'we can't attract viable passenger numbers we need to increase freight movements'. Once the extension is approved it cannot be repealed.
Para 3
Environmental constraints - no clues as to what these are how they are enforced (indeed if they can be) and what penalties are if airport users do no comply (saying sorry won't be enough) - will they pay compensation to individuals, where will the burden of proof lie? JAAP is deficient again.
The JAAP is also deficient in that no map of flight paths, stacking arrangements or noise levels at altitude (CPRE refer to these as noise contour maps). It seems anomalous to let the operator make his own statement, surely, if this extension takes place the council need to set noise levels and dictate to the user? Road noise (either freight or passenger) is completely omitted, as is rail noise.
Currently train services do not run through the night, but do stop near local stations when operating. The airport timetable will have non-stop trains. Additionally no details of freight movements, all of this is a complete omission and a justifies re-issue of the JAAP.
The A127 is an insufficient carriageway in its current form, particularly following the misguided speed reductions. Cycling facilities just take up vehicle space. I understand that there are limitations on the improvements that can be undertaken on the A127 due to it in part running through the Public Safety Zone, where major roads are not permitted, this is sufficient in itself to justify refusal of the proposal.
LS1 - this support of the expansion policy is unexplained. Why are 2 Tory councils supporting a misguided Labour policy, which basically entails concreting over anywhere that votes conservative? Solid reason should be provided for expansion.
LS2 - Permission
. Airport related - how tenuous does the link have to be for permission to be granted? this is yet another vague statement.
. Agreed baseline - this is undecided, does it require constant noise at one site or intermittent noise again far too vague. No details on who determines/measures etc. I will wager that all complaints about noise will be refuted by the operator. What about non-passenger flights, cargo, maintenance, training etc etc.
. Contributes to road infrastructure needs - positively or negatively and to what extent?
. Modal shift - what are the targets how and who measures the movement and who assesses whether the application is actually reasonable.
Again the JAAP is too vague to be meaningful.
LS3 - what sort of statement, what must this include. The JAAP note is meaningless and needs to be more prescriptive.
LS4 - again JAAP should be more prescriptive, this is meaningless.
LS5 - this is a restriction on the usage of residents property - does this contravene human Rights Legislation??
LS6 - Mentioned previously what is justification in passenger terms to increase the runway. Is there actually an advantage to the council and the residents to refuse 1799m, but approve 1800m?
LS7 -
. Times, unacceptable, 2300 is too late; this is some hours after dark in winter and makes no consideration in particular of the disruption that wil be caused to the sleeping pattern of children. Early mornings are also an issue for similar reasons. No mention is made of unscheduled flights and of cargo flights etc etc. The number of flights is not mentioned. If successful no-one will ever have another peaceful weekend.
. Cargo flights - require more restriction than just noise levels. No passenger flights at night (in noise controlled jets), but loads of cargo flights throughout the night using any available aircraft. what about maintenance/testing/training flights etc
. Routing - existing routes aren't shown, what are the plans for future routes. Again the JAAP is not fit for purpose.
. Helicopters - what more or less, operating heights? As these are vertical take off they could surely reach altitude over the airport before moving off?
. Restricted to what - will it pick up maintenance training testing etc?
. Ground running again unspecified JAAP too vague
. Training movements again unspecified JAAP too vague.
Terminal Facilities
PF1 repeats LS7, why? Is there in fact missing information here.
Maintenance repair and Overall
MRO1-3 what is justification for this, as previously stated surely this just increases the danger that the airport poses in a densely populated area. The possibility of contributions from business at the current time are surely fanciful.
Airport Development Zone
What criteria will be used to decide if development supports the airport and why is retail use refused?
Transport
What sorts of contributions are expected? What about the B1013, there is absolutely nothing to stop drivers using this as a cut through, especially given the days and reduced speed limits on A127?
T1 - where is this proposed to run?
T2 - and this?
T3 - why dual this road, unless there are plans to reintroduce the bypass via Hullbridge/Rayleigh/Hockley. Dualling only encouraes further traffic along the over used B1013 via Rayleigh
T4 as T3 this is encouraging traffic away from preferred route of A127
T5 - Loss of public amentities
T6 - there remains little incentive to use anything but a car, no car parking facilities forces the use of public transport - radical but true?
T7/8 - what sort of contribution - inevitably the tax payer will fund the bulk of this and how will the bill be met - wholly by Southend? who decides on contribution?
T9 - these are not provided with the JAAP again an omission
Environment
Introduction, this is not a green lung, the development is taking place on the green lung. already, the developments along and of Cherry Orchard Way have eaten into this and I understand that the development will downgrade further land making it easier to develop the area in the future. The green belt boundary isn't 'reviewed', it is obliterated. This is unacceptable.
Para 3 - what are 'high levels of environmental efficiency?' and 'sustainable drainage' more vacuous statements. These need to be clarified the document is once more deficient.
ENV1 - unacceptable loss of green belt (again) both councils seem to really object to green belt principles and look for any opportunity to develop such sites apparently seeing them as an inconvenience rather than a necessity and a desirable asset.
ENV2 - this is not new - it is open at prsent and it is at best misleading and at worst a downright lie to call it new. The JAAP is once more factually erroneous
ENV3 - as 2 above.
ENV4 - and if no contribution arrives does it happen or does the taxpayer get saddled with the bill? How will contributions be collected, surely this is a tax on new enterprise?
ENV5 not new public space again incorrect
ENV6 - this is constitutes 'no change' presumably because the land is so poorly sighted it is permitted to escape development
5.1 - JAAP provides no idea of what scale of limitations will be i.e. one in 3 units are occupied, how many jobs will result, how many of the contributions will be made.
5.2 - intended to provide detailed information - need more details now, not a washy statement that it is 'intended'. Sorry intended to but didn't get around to it. Should say 'Full details will be provided'.
5.3 You have my views. The report JAAP itself is deficient in factual information and misleading in the extreme. There is a lack of information given to the individual and it is not apparent that the council have advised necessary interested parties e.g RSPB. As such the process is substantially flawed, sufficiently so for the whole of this stage to be delayed whilst the JAAP is re-issued with sufficient information and clarification.
From my understanding of the proposals the councils are to a varying degree being incredibly naive, disengenuous, negligent and as such untrustworthy. Again this is sufficient to warrant review of the JAAP.
I understand that as part of the review process Rochford councillors visited Southampton Airport. I would suggest that although the runway size is comparable, to undertake a visit to an airport that doesn't permit night flights except in extenuating circumstances (max 10 per month 100 a year) and out of season is not going to provide any great insight. Especially given that the European Region Association (ERAA) shows the following freight movements Southend and Southampton in 2008:-
Southend 443 Tonnes reducing 19.6% from 2007
Southampton 264 tonnes reducing 10.5% from 2007
So the two airports are not as comparable as has been suggested especially since freight cargo uses older, noisier (propeller aircraft) rather than those 'quiet' jets for passengers and Southend is now owned by a freight forwarder.
Additionally back in 2002 the DfT recognised the lack of appeal of Southend as a suitable site.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14729

Received: 24/06/2009

Respondent: Mr Peter Symes

Representation Summary:

1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.

Full text:

Please refer to the attached document which lists all concerns with process and lack of information provided by the Councils concerned in respect of the JAAP. Again the demands placed upon objectors are onerous (as with the HAAP), namely the requirement to complete on-line or to file an individual form per objection are unfair and unwarranted. I understand however that this advice is actually waived upon request and as per my conversation with your offices! Attach one report for your attention lising all my issues with the JAAP at this time.
I expect a response to all queries raised.
The Councils have been extremely negligent in their duty to provide sufficient information.
At the present time the proposals are unacceptable in their entirety and there is nothing to suggest my opinion will change. I additionally support the comments made by campaign for protection of rural Essex (England) in their submission.
I am writing to object to the proposals contained within the London Southend Airport and Environs Joint Area Action Plan Preferred Options Dated February 2009.
I have a number of general objections regarding the process, documentation and manner of delivery as well as specific objections to the proposals and list these as follows:-
Flawed Process of Presentation.
1) There was little initial notification to the public of the first stage of consultation or the ramifications of not responding. We appear to have reached stage 2 of the process by default and dictation by the Councils, with stage 1 swept swiftly 'under the carpet' rather than the opportunity given to residents to undertake a considered process of weighing up the options. I do not believe that the majority, or even an adequate portion , of local residents understand the process and the JAAP documents do little to address this. Neighbouring authorities, that are also affected, will have had little input into the process and their residents no understanding of what is going on or what influence they can have. As such the process is flawed and details supplied inadequate. Unless the councils can demonstrate evidence to the contrary.
2) The selection of option three again has been decided adequate consideration of other options.
Whilst Southend Council have at least gone through the motions of offering roadshows to assist understanding RDC appear to have relied solely on advertising.
Notwithstanding this both Councils have failed to provide adequate information within the document, given their support of the proposal it must be concluded that this is a deliberate rather than just a negligent act and again calls into question the whole process.
As a bare minimum the JAAP should include :-
. Existing and post extension flight paths (how these may vary in inclement weather)
. Stacking arrangements in the event of runway closure/delays
. Basic statistics showing likelihood of inclement weather/runway closures and, as such how many times a year stacking arrangements and flight path changes are likely to be implemented and the anticipated number of flights this will affect.
. The types of aircraft able to take off, both before and after the extension (cargo, passenger and 'other')
. The minimum and maximum number of flights permitted (including split between cargo passenger, maintenance, training, testing) and flight times (including scheduled, non-scheduled, charter, training/testing/maintenance)
. The noise levels generated at ground level by the planes at altitudes - a noise map?
. expected plane altitude at say half mile intervals from take off/landing
. expected traffic volume increases (Stobart and other firms lorries and vans) for A127, A130 and B1013 (Rayleigh - Hockley - Rochford Road), as a result of airport expansion and closue of Eastwoodbury Lane
. Expected train timetable changes (including non-scheduled freight movements) and anticipated delays as a result of new passenger trains.
. the fact that the trains for the airport are not going to provide a local service (thus local commuting to the airport by train remains inconvenient)
. confirmation as to whether or not Stobart can apply (and whether or not the councils have any power or inclination to prevent or resist) to make rail freight movements to the airport or the immediate vicinity
. Which jobs are genuine new jobs, type etc and which will be transferred from other parts of the district (and lets not limit ourselves to Rochford and Southend, because undoubtedly Castle Point and Basildon will be affected)
. A summary of the impact of other developments in the area, including redevelopment of Hockley, Stambridge Road, Hawkwell, Daws Heath etc etc. These should be clearly marked on a flight path map also.
. Confirmation of detailed plans for inevitable road expansion schemes that will be required to support increased road traffic. Particularly A127, where proposals incorporate the Public Safety Zone and whether the expansion will be used to push through the unwanted development of a bypass via Hullbridge/North Rayleigh/Hockley and Rochford?
As such I would view this as a basic dereliction of Council duty - failure to inform and ensure that the interests of residents are looked after. I understand also that this may breach the Freedom of Information Act and RDC's own consultation strategy
3) The Councils have apparently selected the least popular option, although conveniently neglected to inform residents as to how or why this decision was arrived at. The only factor that seems to offer any support for their decision is 'increased jobs'. Various figures are quoted all prefixed by the worlds 'upto'. This term is 'up to' is sufficiently vague to mean that any number (including negative ones) below the figure quoted would be deemed a success. As such it has no place in the document as it constitutes mere speculation. Hard facts and details of how conclusions are arrived at are needed.
As such the information provided is surely skewed and the Councils are seemingly abusing their position in recommending the proposal with absolutely no solid evidence to back up the position.
4) The connection of this scheme with other projects in the area, notably a number of house building projects including those mentioned in 2) above, is not made clear Government document PPS12, makes clear reference to :-
Every local planning authority should produce a core strategy which includes :
1) an overall vision which sets out how the area and the places within it should develop;
2) strategic objectives for the area focussing on the key issues to be addressed;
3) a delivery strategy for achieving these objectives. This should set out how much development is intended to happen where, when, and by what means it will be delivered . Locations for strategic development should be indicated on a key diagram; and
4) clear arrangements for managing and monitoring the delivery of the strategy.
Whilst this document is no doubt available somewhere it should be included with the JAAP, since without it the JAAP is not placed in the required context, without clear direction it is impossible to understand how or why this is intended to be part of the core strategy.
Additionally how have residents been consulted on the overal strategy, because if that exercise is flawed - and certainly the desire to build more homes in a densely populated area, whilst simultaneously expanded an airport, demonstrates that it is, then much if not all of the sub-plans such as this area also flawed.
PPS12 also refers to
Period of operation
4.13 The time horizon of the core strategy should be at least 15 years from the date of adoption.
As above there is no clear advices as to where the JAAP fits in the core strategy or where we are in the time horizon. Again the document lacks context, although it even states that it must be read in context, it provides little clue on how to do this.
PP12 also refers to
Statements of Community Involvement:
An SCI should
. Explain clearly the process and methods for community involvement for different types of local development documents and for the different stages of plan preperation. This needs to include details of how the diverse sections of the community are engaged, in particular those groups which have been underrepresented in previous consultation exercises.
. Identify which umbrella organisations and community groups need be involved at different stages of the planning process, with special consideration given to those groups not normally involved.
. Explain the process and appropriate methods for effective community involvement in the determination of planning applications and where appropriate refer to Planning Performance Agreements.
. Include details of the LPA's approach to pre-application discussions.
. Include the LPAs approach to community involvement in planning obligations (S106 agreements).
. Include information on how the SCI will be monitored, evaluated and scrutinised at the local level.
. Include details of where community groups can get more information on the planning process, for example, from Planning Aid and other voluntary organisations.
. Identify how landowner and developer interests will be engaged.
These above items from the PPS demonstrate the assistance that should be given to ordinary residents (and others) in the process. As mentioned by Campaign for Protection Rural Essex a number of organisations should have been consulted including RSPB; Essex Wildlife Trust etc. It is disingenuous and perhaps even negligent of the council not to include these within the Action Plan. Most people have very little experience of dealing with documents such as this and it is only at this late stage in the process (given that we've already passed through stage 1) that RDC and Southend BC have offered even limited advice. Even having read as much as I can in the past few weeks, I (and I am certainly not alone in this) have very little information regarding :- the crucial stages in the process; whether residents can succeed in resisting or changing any aspect of the proposals - RDC really should explain the steps in simple terms. At the moment we seem to progress from one stage to the next with absolutely no guidance. For instance:- I understand from information received from other sources in relation to the airport, that unless I head this document as an objection it is merely treated as a comment. I believe petitions are ignored. I will need to get my wife to make a separate submission in order for her views to be considered, even though we agree. The council seems quite happy to tell people how to make positive comments, but far less inclined to advise on how to object - hardly democracy and clearly demonstrating a deficiency and unfairness in the process, that should be revisited before we move ahead.
PPS12 again
Justification of Core Strategies
4.36 core strategies must be justifiable: they must be:
. founded on a robust and credible evidence base; and
. the most appropriate strategy when considered against the reasonable alternatives.
As above we cannot be sure that the base is robust and credible or indeed the most appropriate when considered against reasonable alternatives, since we don't know how and why the initial alternatives were first selected and then rejected. The JAAP provides no evidence base to affirm that the selection or the process is credible and again the JAAP requires review and re-issue.
If this is the preferred option, what was the basis for selection and will any ideas arising from the consultation be put forward for further consideration? Is it possible (likely) that if decent alternatives are proposed in stage 2 the preferred option will be amended and re-submitted? If not then, again, the process is flawed.
5) The document produced glowingly mentions the positive aspects and underplays the negative - surely the document should be impartial and genuinely enable residents to make up their own mind? Plenty of rhetoric about jobs new businesses etc but no details and certainly no information on the negatives, noise, congestion, loss of property value, decline in overall living standards etc. Basic research reveals Stobart's close ties with Tesco and Network Rail are we going to end up with a huge Tesco distribution centre supporting the airport, similar to their Dudley operation?
While the JAAP includes a brief note that the airport is unsuitable for large scale cargo operation (only a niche operation). The terms 'large-scale' or 'niche' are undefined, will mean different things to different peope and are therefore meaningless in the context of the JAAP, again this requires clarification and re-issue. Notwithstanding this the actual use is surely the decision of the owners and not the councils? Stobart management are already quoted as saying upon the purchase of the airport 'we have found our Southern Base', doesn't really sound like they are planning a limited operation, quite the opposite.
It is also unclear where any 'new' jobs and businesses will come from. Given the proposals and redevelopment of Hockley it is apparent that a number will come from there and therefore aren't really new. Again disingenuous of RDC in relation to the HAAP (and Southend BC not to make this clear in the JAAP that a proportion of jobs at the Airport sites will actually be moved from Hockley)
6) The document itself is devoid of factual information, although admitting that aspects will be supplied later, this itself smacks of a rush job. We find ourselves moved on to a stage from which there is no going back without having the facts adequately presented. It seems that the councils are either negligent in preparation of the facts or trying to hide something.
Development of the airport could bring about a fundamental change to the area, not necessarily for the better and it is in resident's interest for all information to be divulged as soon as possible.
It also uses a number of undefined terms, notably around the word 'sustainable'. It could mean 'long-term use with minimal environmental impact', but it the council are not clear what meaning they are seeking to attach. Equally, there are (source Wilkipedia) different types of sustainability. Economic, Environmental and Sociopolitical, so there is significant room for confusion as to meaning and I'm quite sure most people have no understanding what is meant by sustainability in the context of the JAAP.
7) The council is geared very much to receiving information via the internet, whilst undoubtedy this is cost effective; it is unfair on those residents that do not have internet access, particularly the elderly who make up a significant proportion of the population in the area. It is doubtful therefore that the views obtained will actually be representative of all residents. I note at election time certain parties are very keen to get their voters to polling stations and will provide transport - I wonder how keen those same councillors are to dedicate time and petrol to those residents wishing to get assistance in completing JAAP.
Completion on line is actually quite difficult and near on impossible if you have lengthy comments to make. Again the councils are colluding to dissuade residents from making anything but the briefest of contributiions.
Additionally the representation form states that each objection/comment requires completion of a separate form. Clearly this is actually designed to put people off commenting. Although I understand from a telephone conversation with RDC planning department that the council will accept one form with clearly listed comments. I would have to question whether RDC/Southend BC can actually determine what form objections may take. Again the process appears flawed, as this is biased towards acceptance of JAAP. At best this builds mistrust between residents and the councils as to motive; at worst it is downright dishonest.
The JAAP relies too much on the reader having a detailed knowledge of planning terminology and documentation, mentioning a significant number of undefined, unexplained and unreferenced terms and documents (as mentioned later) and omitting adequate cross-referencing. As such it is an inaccessible, inadequate document not fit for purpose and until it is adequately amended and re-issued the consultation process is flawed.
8) Rochford Council's own Leisure document refers to Rochford being the 'Green Gateway', clearly there is a desire to put a wall up given the amount of building that has occurred in the West of the District - this needs to stop. The local infrastructure cannot cope:-
B1013 is a hugely busy Road already - HAAP refers to 15,000 + vehicles back in 2007 and significant building has taken place since then. If the Airport expansion takes place, and RDC regretfully support this, then further transport issues will arise.
What plans are considered for a major disaster, large aircraft crashing on residential or occupied business property? In the US 7 of the last 8 fatal commercial airline crashes involved regional airlines (BBC 12th May 2009) or indeed hijack, bearing in mind proximity to major centres of population, power stations etc.
What additional policing/customs and immigration officers will be supplied, both at the airport and elsewhere in the region? Not only do illegal immigrants use lorries to access the country (and a cargo terminal will increase the amount of vehicles in this part of Essex), but aircraft have also previously been used (e.g at Stansted). Additionally there are the increased risks associated with drug smuggling, particularly given that criminals may seek to use the nearest available market for contraband. There is also an increased likelihood (with increased vehicles) or road traffic offences, which speed cameras do not address. What additional resources will be provided to the NHS to deal with the upsurge in stress, sleeplessness and associated problems including violence and accidents?
9) No explanation has been given as to why RDC/Southend BC support Government policy (I have asked my local councillors and MP to explain this apparent anomaly) there seems to be no desire to protect the quality of life enjoyed by residents, certainly much of this part of Essex has previously shown (in Government statistics) to be one of the least deprived areas of the country, yet the proposals seem to treat it as though it is one of the most deprived - is this wishful thinking on the part of the compile? As recently as 2006 Southend was calculated to be the best place to retire to.
10) Both Councils are keen to promote the area as a great place to visit yet surely this will be the death knell for tourism, the only visitors will be those waiting for a plane to get away from an overly congested cargo handling centre.
11) There is no clear mention of what controls are able to enforce (and indeed whether they would agree on these). Given the track record of local authorities but locally and countrywide in rejecting and/or enforcing actions against big business and national government e.g totally inability to prevent McDonald's and Tesco building where they like and the fiasco of the change of use of Bullwood Hall prison I rather suspect that if the expansion is approved Stobart's will ride roughshod over any objections from residents irrespective of whether the council's support the residents.
12) No account appears to have been taken of the wider questions regarding airport usage. Aside from the environmental impact, the reduction of carbon emissions etc is supposed to be at the forefront of business, government and local authority strategies, and the JAAP clearly goes contradicts this. Why have the following not been mentioned.
a) Southend is only accessible from the East and North (there is so little to the West it is hardly worth mentioning and is obviously cut off fromt Kent by the Estuary). As such the Pool of passengers it is supposed to be attracting is actually very limited. To the North sits Stansted whilst to the East, London and the various airports accessible from there.
b) Why the runway is being extended to 1799m and not 1800m (something I believe to do with extra regulation), when this doesn't actually allow for any passenger planes that are larger than the current users to land.
c) With perhaps the exception of Luton, every major airport easily accessible from London i.e Gatwick, Stansted, Heathrow and London City itself have expansion plans in the pipeline, as such the need for expansion of Southend as a passenger airport is questionable if not foolhardy.
d) Most recent figures for air travel suggest that this form of transport is actually declining.
It would actually suggest that the freight forwarder Eddie Stobart has an entirely different motive for expanding the airport.
13) Apart from neglecting to place sufficient significance upon the fact that a freight forwarders now own the airport and thus that the expansion will cause increased in cargo shipments in the air and on the ground, I fully support the comments made by Campaign for Protection for Rural Essex (part of CPREngland).
14) The councils have made no mention of the plans to ease road congestion that expansion will undoubtedly bring. I anticipate that you will seek to resurrect the misguided and previously rejected plans to further develop on green belt by building a bypass across Hullbridge, North Rayleigh Hockley and Rochford, just exacerbating the over-development of this area.
Nor is the impact upon rail timetable and whether there is sufficient rolling stock available for the new train service (i.e whether existing commuter carriage availability will be cut to provide airport services) explored.
Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.
1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.
1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.
1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.
1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.
1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.
Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.
Para 3 significant job opportunities - again undefined as to what significant means and what type of jobs are referred to (McJobs)?. Given the competition from the above airports it would require significant, unwelcome further expansion for business to be attracted because of the airport. Businesses decisions are made for reasons unrelated to the airport, yet the report suggests that development would be a major driver for business (but does not say why or what type of business). Southend lost virtually every major office employer since I worked there in the 1980's. Most major insurers and brokers merged and moved out of Victoria Avenue, as did various government departments (due to National government strategy) and BT, this had absolutely nothing to do with the airport and attracting these businessses back will probably have equally little to do with an airport.
Why is the commuter belt aspect of the region completely ignored? Many people commute to work and bring money back to spend locally. Similarly the retirement aspect is also ignored completely. It is questionable whether there is any great need for huge swathes of industry in this part of Essex.
Tourism desination is an absolute joke, the region is overdeveloped and the only tourists would be waiting for a plane to get away.
Para 4 - why is only the airport considered to be a drive for economic development? Holidaymakers pass straight through to their destination and most companies are cutting back on expenses such as business flights and use of technology (video-conferencing etc) renders their need redundant. We can surely only be talking about freight movement????
Again paragraph 4 refers to 'employs a significant number' is non-specific as to quantum or job types. Are you including the airport trading estate? I've shopped there, but I've never flown from Southend, it is totally unrelated and again the document is misleading.
Surprisingly the JAAP refers to a specific document, but gives no clues as to where to find the Rochford Core Strategy Preferred Options Document.
Para 5 - Transport issues are understated and it really does seem rather pointless to even attempt to expand such a small airport and blight the whole area for good for a few weeks in 2012. European visitors would be far better served by train, whilst longer haul flights cannot land on a runway this size.
Para 6 Who sees the airport as important for development and prosperity? Another vague statement dressed as fact. I see it as actually the beginning of a sustained decline in the area as the affluent move away, house prices fall due to noise and congestion from air and road freight and the area goes into, pardon the pun, terminal decline. Again future employment needs take little account of commuting.
2.1
Para 1 The context against which the JAAP is set is now outdated, having been drawn up in time of boom and when it was inconceivable that banking institutions would have to be underwritten by National Government to the extent they now are. The financial pattern of this and other countries have changed fundamentally and it will be a significant time before things get back to normal (over 20 years), loans are no longer freely available and the 'Vision' clearly needs to be re-visited.
Para 2 - refers to quality of life for residents is mentioned, but actually not expanded upon in the report. It is quite clear that expansion of the airport will reduce the quality of life for all but a very few number of residents i.e those fortunate enough to be directly employed in senior positions.
Para 3 - London Southend Airport as a 'major employer' - again an undefined term
. How many people does the airport directly employ (I suspect that many of the jobs are in fact secondary and even if the airport closed work would be taken up by other airports e.g Stansted or London City and the jobs would remain within commutable distance)?
. How many of the jobs are actually in the adjacent business park and in reality unrelated to the airport?
. How many of the jobs will actually be lost upon expansion (e.g those at the flying clubs that are being pushed out, businesses that are forced to close due to congestion etc)?
. How many of the jobs would actually remain if the airport was unaltered?
. Why isn't the spare capacity being used?
. What could be done to improve the spare capacity usage?
. What are the costs/benefits in picking up the spare capacity?
. Why, if the airport is so important, won't it become a success without expansion?
All basic questions the JAAP fails to address.
Para 4 - what is the 'current and emerging policy framework in the area'? again an undefined and meaningless phrase.
Para 5/6 - Southend core strategy - wonderful, what other options were considered and why is Rochford so keen to support this if, as this document so clearly demonstrates, there are so few advantages and so many disadvantages for the area and its residents.
Para 7 to end
Who are/what is Renaissance Southend Regeneration Framework? Another undefined term. How they have arrived at the conclusion it should be a centre for international air services and then contradicted this by saying it would be a 'great place to live' - when it so clearly wouldn't with a huge number of planes flying over head day and night. Rochford Council have a similar objective in making this a great place to live!!! I've lived in the region all my life, with these proposals I have no desire to continue to do so (but my options will be restricted by the resultant slump in house prices the expansion will cause)
Again there is very little mention that most of the towns in the region are actually dormitory towns for London e.g. Rayleigh. The desire to encourage employment is actually questionable on this basis. Higher salaries are always available in the City and vast airport expansion would probably require a significant number of migrant (possibly overseas) workers to fill vacancies.
Hi tech businesses tend to be low scale employers and no examples are given of 'high value employment'. This is pie in the sky aspiration with no basis in fact; it should be only be included in the JAAP if noted as such.
2.2
Para 1 - again refers to unreferenced material, planning documents etc, and it is impossible to know if this has been fairly assessed or just the bits chosen to fit.
The objectives are:
. Creation of sustainable and high value employment and other land uses within the study area; - what is 'high value' and what 'other land' - this is a vague and washy statement requiring amendment.
. Maxamising the economic benefits of a thriving airport and related activity: - is this at all costs?
. Ensuring appropriate improvements in sustainable transport accessibility and facilities; what is appropriate (who decides) and sustainable again undefined what other plans are the Council's proposing to run off the back of airport expansion? the rightly rejected Hullbridge to Rochford bypass???
. Ensuring a high quality environment for residents whether expressed through noise pollution management or protection of green space: what about congestion, air quality from road pollution etc?
. Maximum return on public investment through attracting inward investment; and is this at all costs?
. Efficient use of existing employment land resources. Is this at all costs?
2.3
Economic growth and new jobs. Again no consideration that the area is largely dormitory, no mention of the type of jobs and the fact that the airport expansion could have a negative effect with wealthy moving away and the area actually being an undesirable place to live, spiralling into decline.
Para 2 - Why will it be successful when there is significant competition from Gatwick, Heathrow, London City, Luton and Stansted all of which have better infrastructure and passenger pools as well as expansion plans. The proposed runway extension offers no increase in options for passenger plane access, as it cannot cope with any larger planes than the present runaway, as such the extension should be rejected as it fulfils no purpose.
Passengers will travel on the same planes they do at the moment and no plane is quiet or fuel efficient, especially when you consider that in excess of 20,000 flights per annum will take place (25,000 according to CPRE). It could even be argued that Southend should withhold expansion until plane technology improves to allow even shorter take-off and landing?
Conclusion would be that passenger use is to be secondary to cargo use and that Stobart have little intention of promoting the passenger aspects, except as a means of additional profit to their core operation, the movement of freight.
Fast food access is not possible the speed limit on the A127 is now 50mph for large stretches and is interrupted by numerous sets of traffic lights. Congestion problems will be exacerbated by any increased cargo usage at the airport, which will see the number of vehicles increase. No mention here of closure of Eastwoodbury Lane/A127 Public Safety zone or use of A130 or B1013 all of which will be problematic.
Para 3
Maintenance and repair - this implies that faulty aircraft will be flying over densely populated areas in order to be fixed. Given that the last time Southend had a significant cargo operation a plane crashed on Rayleigh (at night, on the only commercial premises in a residential district) it may be tempting fate to suggest that you are rather chancing residents luck with this proposal.
Restrictions on night flights - again unspecified as to what these will be and how they will be enforced. No consideration to schools, hospices, hospitals, etc etc let alone resident.
Part 4 - award winning, which award and by whom a vague statement. How can this be an enhanced Green Lung - it was built on open fields, it is disingenuous of the council to suggest otherwise, could we not have had a wide open space rather than a confined Country Park?
We've already lost significant open space, including recreational amenities to make way for Tesco's RBS etc and the link road developments. What are the 'quality jobs', undefined term and how is it to be guaranteed that they are for local people - if they are that good surely everyone will want it; again this is a misleading statement and should be withdrawn or amended.
Part 5 - Lets be clear an area for plane spotters and the poor souls living nearby.
Part 3 - Issue 1
Para 1 The railway increases the catchment, but doesn't decrease the competition from other better designed and strategically placed airports, notably Stansted. The rail line doesn't allow locals to access the airport so actually offers no benefit to those in the near vicinity.
Para 2 - Runway size is a constraint; this is not necessarily a bad thing and does give the local authorities an element of control that they relinquished when they sold a 199 year lease. It is actually doubtful that increased runway size makes the runway any more attractive to any operators. Smaller sized airlines are continually going bust and the proposed size does not open the airport to use by any passenger planes that cannot already use the site. The reference to quieter and more fuel efficient are not backed up by any facts. What are we talking about in terms of decibels (residents have little concern about fuel efficiency as this is a trading issue)? It is hardly beneficial if we currently have 50 aircraft flying per day making 150dB of noise each, but expansion leads to 10dB noise reduction per aircraft, but 100 more aircraft taking off every day.
The economic benefit is limited in terms of passenger spend as there is no expansion of the airport facilities and passengers will therefore travel straight through without spending locally.
Again no mention of cargo planes or indeed maintenance/training etc aircraft i.e the flights the council cannot control. I have referred to concerns regarding maintenance and flying of faulty planes in the area.
Issue 2
Para 1 - Excepting that we are talking about a dormitory town (and questioning why large scale employment is so crucial) why is the JAAP considered as the only key to employment and what is the connection to high-tech business. You can't just mention them in the same sentence for them to be connected there has to be a basis in fact and the report (unsurprisingly given that it is bereft of facts) omits to explain the connection. Given that Southend had in the 80's a significant number of office based employers and has now lost most of them, what makes it think that it can attract and retain such employers now? Again no clues as to methodology, only we'll build a big airport and they will come.
Para 2 - Does not make clear where this land is coming from, although it is surely green belt that is being lost, again, in the same area Cherry Orchard Way. Lots of talk about new jobs in business parks, although again nothing to say whether these are actually new to the immediate area or just movement from Hockley (closure of Eldon Way) or indeed other commutable areas in Essex.
Issue 3
Again sustainable is used without meaning. Only noise and air quality are mentioned, although cannot be certain that this will be in relation to road air and rail traffic. No note on water quality, loss of green belt etc. This is not new public open space; areas of open space are being lost and have been lost in the course of the development around notably Cherry Orchard Way and Eastwoodbury Lane.
What are the controls on the airport being considered; are they enforceable (particularly if challenged by the owner) and who will monitor?
What is sustainable transport policy? Again an unexplained term.
This section is undoubtedly unfairly biased and required re-submission.
Issue 4
I understand that the A127 has it's own restrictions on development as per liberal councillor Graham Langley. I would question therefore whether the council's real intention is not to place a bypass through Hullbridge, North Rayleigh, Hockley and Rochford, a plan previously rightly rejected?
i) there is no linkage to public transport and never has been. Deregulation of buses means that these do not link to rail services and the new rail station is not for use by locals. A13, A127 B1013 are already congested, A127 has speed restrictions and Eastwoodbury Lane will be closed and moved.
ii) Locals are forced to use cars due to lack of public transport connections and the fact that the airport rail service will not serve local stations. Bus services are systematically cut e.g 7 & 8 through Hockley and there is no direct link from Liverpool St Rail Line to C2C either by bus or rail. It is nigh on impossible to get people to refuse to use their cars and CPRE statistics show that the vast majority of workers and passengers will always prefer cars to public transport. Luggage and Public Transport do not make a good mix.
iii) What are the new routes - again nothing specifically mentioned, in the short term B1013 already (according to HAAP taking over 15,000 vehicles daily) will be used as a shortcut, increasingly so when the A127 speed cameras start to work and it becomes congested with cargo lorries. Again conclusion is that council will seek to introduce an unwanted bypass through green belt. Essentially the council are creating a problem expanding the airport and seeking to solve it to the detriment of residents with loss of more green belt.
Issue 5
Brickworks - there was I thinking the current policy was to build more houses not demolish existing ones. Another business park is to be built on open space, yet there is little demand for such a park, with vacant units througout both regions, plus Basildon etc. The council are using the flawed plans for Hockley and surrounding areas including the demolishing of Eldon Way to provide a false demand. This is disingenuous and wasteful (i.e not environmentally friendly), why demolish perfectly serviceable existing units just to create new ones? If access is so poor surely this should have been addressed when the bypass was build a few years back, what investigations are taking place into this waste of money?
B1 - again questionable that the demand exists
Area ii b) given the above is actually sensible to move the rugby club to an even more inaccessible spot? Some of these plans would have been more sensible if Southend United Football Stadium had been moved to Warners Bridge site of Southend Rugby Club (floodlights aren't an issue Highbury didn't have pylons), the railway station would have served a dual purpose (and SUFC could have got into Europe!!) The Rugby Club could then have either shared with Westcliff or moved to the site of Fossetts Way new SUFC stadium, more green belt would have been protected and transport links for the football stadium would at least have been maintained, another missed opportunity.
ii c) a green lung, nice that this has been acknowledged, a pokey site between an industrial estate and an airport runway i.e it can't be used for anything else, be honest don't try and dress it up as something it isn't, it is wholly insufficient for the purpose described.
iii) Why is more land being given over, the airport was given away as a freebie (£1) and the local authorities have little control over usage. Keep the land and keep control, allowing the hand over of more land compounds the earlier errors surrounding the 199 year lease.
iv) Identified as inefficient by whom and in what way? Another vacuous, unstabstantiated statement. does the cost of improvement outweight any potential benefit and who is expected to finance this? If units are not fit for purpose then surely it is up to the landlord or tenant to improve them not the taxpayer.
v) Loss of another sports pitch in the area then. We will soon be left with loads of concrete and designated country parks as only green areas, another poor suggestion. Presume East West Corridor will mean a road being built and houses will inevitably follow as the area will be termed 'under-used' within a decade.
vi) 'opportunity sites' - presumably for development? At least this is located next to existing industrial units.
vii) Flying Clubs - all to be kicked out (despite the fact they they do employ people)
viii) opportunity sites - say what you mean development sites, again the JAAP is trying to dress up the unpalatable.
ix) A green buffer a derelict site with a few horses and occasional circus. I hardly feel grateful, this area is currently an eyesore and clearly the report writer as with area ii c) couldn't think of another use. The flying clubs could be retained if the railway line was moved back here!
x) and xi) Loss of yet more amenities for Southend (once home to the largest amateur football league in the country). Demolition and rebuilding of a road that is only a few years old and at last admission that public transport isn't the answer so a park and ride service is required (although this could be omitted forcing passengers to use public transport)!!
4 Policies pg 17
Introduction Para 2 - It is apparently important to put the JAAP into context, but absolutely no attempt by the compiler to do so. It is unreasonable to expect ordinary residents with little or no experience to have to undertake lengthy research of information that the council have. In fact it could be argued that the council withholding this information is a deliberate attempt to prevent opposition, or perhaps just a glaring omission?
Energy saving technology is to be used (save lots of energy reject expansion) and sustainable drainage - what is this, yet another example of poor drafting.
Accepted that the JAAP cannot be looked at without plans for S.E. Essex, but again no clues and why are we restricted to this part of Essex why ignore Stansted and indeed other airport developments that the target passenger pool can use???? Again JAAP is flawed.
Employment allocations
Introduction
Why high scale employment growth? The term isn't explained, what type of employment and what are the employment aspirations. The area has relatively low unemployment, admittedly many people do not work locally, but this is because of the dormitory (and indeed retirement nature of this part of Essex, that the expansion will undermine and ultimately destroy. There is a limited pool of labour and there are no supporting statistics regarding the composition of the current labour pool or the required labour pool, there seems little point in creating jobs that cannot be filled.
Additional floor space - is this purely within the JAAP, what about other plans locally e.g HAAP where floor space is being reduced, meaning businesses are moving and new jobs are not created, just being relocated at the whim of the councils. The JAAP cannot on one hand say that it must be looked at in context and then ignore the context, this document is flawed again.
Upto 4950 jobs, how is this figure arrived at? It is unsubstantiated and unsupported and meaningless. Up to means just that any figure (including a negative) lower than 4950 is up to the JAAP requires amendment (again). In the area - is this the JAAP area, S E Essex? Are they JAAP related jobs and what are they - 'McJobs'? Same applies to the additional 750 jobs in Aviation Way. Non-specific, non factual and misleading.
E1 - another unsubstantiated figure, unclear if the jobs above are included in this figure or not. How do you split the jobs 50/50, who measures this and who is to say whether the airport brought those jobs. Remember a significant number of insurance companies merged in the 1990's and Southend lost jobs as a result, it had little to do with council policy. Just as conceivably an organisation could decide to move to Southend or Rochford, with airport expansion having no bearing on that decision.
E2 - Is this suggesting that in the middle of a recession busineses will have to pay to upgrade, I feel their sights may be elsewhere. No details on the financial contribution are given - how much taxpayer's money will be poured in and, as with the airport sold on at a loss? Are businesses going to be asked to donate or taxed, won't this be a disincentive to relocate?
This requires more detail and a lot more thought from the councils.
E3 - It is not reasonable to expect significant numbers of employees to walk or cycle unless they live very close to the units. Anyone living any distance will have to negotiate extremely busy (and probably busier roads), the cycle paths may well prove to be a waste of money, cause further unnecessary traffic to motor vehicles and should be properly costed.
Again business contributions comments as per E2 above
E4 E7 - No additional comment given rejection of the entire concept
E8 - As above how are job totals arrived at?
Overall comment on how and why businesses will contribute and what will be cost to residents
London Southend Airport
Introduction
Recognised that Airport can provide a boost - recognised by whom? another unsubstantiated and flawed statement.
Agree should have quieter aircraft, but fuel efficiency is a business decision not a local authority one.
Why must these aircraft be 150 seats again not explained?
Will aircraft development not actually catch up with the airport i.e. over the next decade larger aircraft landing on shorter runways (we then have a problem that we've bigger aircraft than the council currently envisage).
Why is the runway set at 1799m (I believe to avoid additional regulation of 1800, + runways)?
Are there any passenger aircraft with a full payload that cannot access at present that but can at 1799m? If so what types, what noise levels.
Expected that use will be passenger - expected by whom? Certainly not me. It is owned by freight forwarders who have stated they 'have found (their) Southern base'. Low Cost Airlines such as Easty Jet have a fleet requiring longer runways that proposed, who is the new airport aimed at?
Para 2 Growth in MRO - this means defective aircraft will be flown in over densely populated areas - the potential for disaster is huge and the council could/should be held accountable if a crash occurs (as it did in the 1980's).
If there is a demand for high skilled jobs, it is unlikely that applicants exist in sufficient number in this area and therefore, we would be reliant on migrant workers.
Whilst it is not considered desirable for the airport to handle large volumes of freight how much control would the council actually have over this? If the owners want to ship freight can they be stopped? If they want to extend the rail line (and Stobarts already have close ties with both Network Rail through Stobart Rail and Tesco's in terms of freight delivery) can they be prevented? If they want to run HGV's and vans in and out what can the council do? This is their core business. I would suggest that the professional businessmen at Stobarts are more than capable of giving amateur councillors the run around when it comes to what the airport will be used for. Local Authorities are very poor at refusing planning changes when business puts through a commercial reason. The first of these will be 'we can't attract viable passenger numbers we need to increase freight movements'. Once the extension is approved it cannot be repealed.
Para 3
Environmental constraints - no clues as to what these are how they are enforced (indeed if they can be) and what penalties are if airport users do no comply (saying sorry won't be enough) - will they pay compensation to individuals, where will the burden of proof lie? JAAP is deficient again.
The JAAP is also deficient in that no map of flight paths, stacking arrangements or noise levels at altitude (CPRE refer to these as noise contour maps). It seems anomalous to let the operator make his own statement, surely, if this extension takes place the council need to set noise levels and dictate to the user? Road noise (either freight or passenger) is completely omitted, as is rail noise.
Currently train services do not run through the night, but do stop near local stations when operating. The airport timetable will have non-stop trains. Additionally no details of freight movements, all of this is a complete omission and a justifies re-issue of the JAAP.
The A127 is an insufficient carriageway in its current form, particularly following the misguided speed reductions. Cycling facilities just take up vehicle space. I understand that there are limitations on the improvements that can be undertaken on the A127 due to it in part running through the Public Safety Zone, where major roads are not permitted, this is sufficient in itself to justify refusal of the proposal.
LS1 - this support of the expansion policy is unexplained. Why are 2 Tory councils supporting a misguided Labour policy, which basically entails concreting over anywhere that votes conservative? Solid reason should be provided for expansion.
LS2 - Permission
. Airport related - how tenuous does the link have to be for permission to be granted? this is yet another vague statement.
. Agreed baseline - this is undecided, does it require constant noise at one site or intermittent noise again far too vague. No details on who determines/measures etc. I will wager that all complaints about noise will be refuted by the operator. What about non-passenger flights, cargo, maintenance, training etc etc.
. Contributes to road infrastructure needs - positively or negatively and to what extent?
. Modal shift - what are the targets how and who measures the movement and who assesses whether the application is actually reasonable.
Again the JAAP is too vague to be meaningful.
LS3 - what sort of statement, what must this include. The JAAP note is meaningless and needs to be more prescriptive.
LS4 - again JAAP should be more prescriptive, this is meaningless.
LS5 - this is a restriction on the usage of residents property - does this contravene human Rights Legislation??
LS6 - Mentioned previously what is justification in passenger terms to increase the runway. Is there actually an advantage to the council and the residents to refuse 1799m, but approve 1800m?
LS7 -
. Times, unacceptable, 2300 is too late; this is some hours after dark in winter and makes no consideration in particular of the disruption that wil be caused to the sleeping pattern of children. Early mornings are also an issue for similar reasons. No mention is made of unscheduled flights and of cargo flights etc etc. The number of flights is not mentioned. If successful no-one will ever have another peaceful weekend.
. Cargo flights - require more restriction than just noise levels. No passenger flights at night (in noise controlled jets), but loads of cargo flights throughout the night using any available aircraft. what about maintenance/testing/training flights etc
. Routing - existing routes aren't shown, what are the plans for future routes. Again the JAAP is not fit for purpose.
. Helicopters - what more or less, operating heights? As these are vertical take off they could surely reach altitude over the airport before moving off?
. Restricted to what - will it pick up maintenance training testing etc?
. Ground running again unspecified JAAP too vague
. Training movements again unspecified JAAP too vague.
Terminal Facilities
PF1 repeats LS7, why? Is there in fact missing information here.
Maintenance repair and Overall
MRO1-3 what is justification for this, as previously stated surely this just increases the danger that the airport poses in a densely populated area. The possibility of contributions from business at the current time are surely fanciful.
Airport Development Zone
What criteria will be used to decide if development supports the airport and why is retail use refused?
Transport
What sorts of contributions are expected? What about the B1013, there is absolutely nothing to stop drivers using this as a cut through, especially given the days and reduced speed limits on A127?
T1 - where is this proposed to run?
T2 - and this?
T3 - why dual this road, unless there are plans to reintroduce the bypass via Hullbridge/Rayleigh/Hockley. Dualling only encouraes further traffic along the over used B1013 via Rayleigh
T4 as T3 this is encouraging traffic away from preferred route of A127
T5 - Loss of public amentities
T6 - there remains little incentive to use anything but a car, no car parking facilities forces the use of public transport - radical but true?
T7/8 - what sort of contribution - inevitably the tax payer will fund the bulk of this and how will the bill be met - wholly by Southend? who decides on contribution?
T9 - these are not provided with the JAAP again an omission
Environment
Introduction, this is not a green lung, the development is taking place on the green lung. already, the developments along and of Cherry Orchard Way have eaten into this and I understand that the development will downgrade further land making it easier to develop the area in the future. The green belt boundary isn't 'reviewed', it is obliterated. This is unacceptable.
Para 3 - what are 'high levels of environmental efficiency?' and 'sustainable drainage' more vacuous statements. These need to be clarified the document is once more deficient.
ENV1 - unacceptable loss of green belt (again) both councils seem to really object to green belt principles and look for any opportunity to develop such sites apparently seeing them as an inconvenience rather than a necessity and a desirable asset.
ENV2 - this is not new - it is open at prsent and it is at best misleading and at worst a downright lie to call it new. The JAAP is once more factually erroneous
ENV3 - as 2 above.
ENV4 - and if no contribution arrives does it happen or does the taxpayer get saddled with the bill? How will contributions be collected, surely this is a tax on new enterprise?
ENV5 not new public space again incorrect
ENV6 - this is constitutes 'no change' presumably because the land is so poorly sighted it is permitted to escape development
5.1 - JAAP provides no idea of what scale of limitations will be i.e. one in 3 units are occupied, how many jobs will result, how many of the contributions will be made.
5.2 - intended to provide detailed information - need more details now, not a washy statement that it is 'intended'. Sorry intended to but didn't get around to it. Should say 'Full details will be provided'.
5.3 You have my views. The report JAAP itself is deficient in factual information and misleading in the extreme. There is a lack of information given to the individual and it is not apparent that the council have advised necessary interested parties e.g RSPB. As such the process is substantially flawed, sufficiently so for the whole of this stage to be delayed whilst the JAAP is re-issued with sufficient information and clarification.
From my understanding of the proposals the councils are to a varying degree being incredibly naive, disengenuous, negligent and as such untrustworthy. Again this is sufficient to warrant review of the JAAP.
I understand that as part of the review process Rochford councillors visited Southampton Airport. I would suggest that although the runway size is comparable, to undertake a visit to an airport that doesn't permit night flights except in extenuating circumstances (max 10 per month 100 a year) and out of season is not going to provide any great insight. Especially given that the European Region Association (ERAA) shows the following freight movements Southend and Southampton in 2008:-
Southend 443 Tonnes reducing 19.6% from 2007
Southampton 264 tonnes reducing 10.5% from 2007
So the two airports are not as comparable as has been suggested especially since freight cargo uses older, noisier (propeller aircraft) rather than those 'quiet' jets for passengers and Southend is now owned by a freight forwarder.
Additionally back in 2002 the DfT recognised the lack of appeal of Southend as a suitable site.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14730

Received: 24/06/2009

Respondent: Mr Peter Symes

Representation Summary:

1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.

Full text:

Please refer to the attached document which lists all concerns with process and lack of information provided by the Councils concerned in respect of the JAAP. Again the demands placed upon objectors are onerous (as with the HAAP), namely the requirement to complete on-line or to file an individual form per objection are unfair and unwarranted. I understand however that this advice is actually waived upon request and as per my conversation with your offices! Attach one report for your attention lising all my issues with the JAAP at this time.
I expect a response to all queries raised.
The Councils have been extremely negligent in their duty to provide sufficient information.
At the present time the proposals are unacceptable in their entirety and there is nothing to suggest my opinion will change. I additionally support the comments made by campaign for protection of rural Essex (England) in their submission.
I am writing to object to the proposals contained within the London Southend Airport and Environs Joint Area Action Plan Preferred Options Dated February 2009.
I have a number of general objections regarding the process, documentation and manner of delivery as well as specific objections to the proposals and list these as follows:-
Flawed Process of Presentation.
1) There was little initial notification to the public of the first stage of consultation or the ramifications of not responding. We appear to have reached stage 2 of the process by default and dictation by the Councils, with stage 1 swept swiftly 'under the carpet' rather than the opportunity given to residents to undertake a considered process of weighing up the options. I do not believe that the majority, or even an adequate portion , of local residents understand the process and the JAAP documents do little to address this. Neighbouring authorities, that are also affected, will have had little input into the process and their residents no understanding of what is going on or what influence they can have. As such the process is flawed and details supplied inadequate. Unless the councils can demonstrate evidence to the contrary.
2) The selection of option three again has been decided adequate consideration of other options.
Whilst Southend Council have at least gone through the motions of offering roadshows to assist understanding RDC appear to have relied solely on advertising.
Notwithstanding this both Councils have failed to provide adequate information within the document, given their support of the proposal it must be concluded that this is a deliberate rather than just a negligent act and again calls into question the whole process.
As a bare minimum the JAAP should include :-
. Existing and post extension flight paths (how these may vary in inclement weather)
. Stacking arrangements in the event of runway closure/delays
. Basic statistics showing likelihood of inclement weather/runway closures and, as such how many times a year stacking arrangements and flight path changes are likely to be implemented and the anticipated number of flights this will affect.
. The types of aircraft able to take off, both before and after the extension (cargo, passenger and 'other')
. The minimum and maximum number of flights permitted (including split between cargo passenger, maintenance, training, testing) and flight times (including scheduled, non-scheduled, charter, training/testing/maintenance)
. The noise levels generated at ground level by the planes at altitudes - a noise map?
. expected plane altitude at say half mile intervals from take off/landing
. expected traffic volume increases (Stobart and other firms lorries and vans) for A127, A130 and B1013 (Rayleigh - Hockley - Rochford Road), as a result of airport expansion and closue of Eastwoodbury Lane
. Expected train timetable changes (including non-scheduled freight movements) and anticipated delays as a result of new passenger trains.
. the fact that the trains for the airport are not going to provide a local service (thus local commuting to the airport by train remains inconvenient)
. confirmation as to whether or not Stobart can apply (and whether or not the councils have any power or inclination to prevent or resist) to make rail freight movements to the airport or the immediate vicinity
. Which jobs are genuine new jobs, type etc and which will be transferred from other parts of the district (and lets not limit ourselves to Rochford and Southend, because undoubtedly Castle Point and Basildon will be affected)
. A summary of the impact of other developments in the area, including redevelopment of Hockley, Stambridge Road, Hawkwell, Daws Heath etc etc. These should be clearly marked on a flight path map also.
. Confirmation of detailed plans for inevitable road expansion schemes that will be required to support increased road traffic. Particularly A127, where proposals incorporate the Public Safety Zone and whether the expansion will be used to push through the unwanted development of a bypass via Hullbridge/North Rayleigh/Hockley and Rochford?
As such I would view this as a basic dereliction of Council duty - failure to inform and ensure that the interests of residents are looked after. I understand also that this may breach the Freedom of Information Act and RDC's own consultation strategy
3) The Councils have apparently selected the least popular option, although conveniently neglected to inform residents as to how or why this decision was arrived at. The only factor that seems to offer any support for their decision is 'increased jobs'. Various figures are quoted all prefixed by the worlds 'upto'. This term is 'up to' is sufficiently vague to mean that any number (including negative ones) below the figure quoted would be deemed a success. As such it has no place in the document as it constitutes mere speculation. Hard facts and details of how conclusions are arrived at are needed.
As such the information provided is surely skewed and the Councils are seemingly abusing their position in recommending the proposal with absolutely no solid evidence to back up the position.
4) The connection of this scheme with other projects in the area, notably a number of house building projects including those mentioned in 2) above, is not made clear Government document PPS12, makes clear reference to :-
Every local planning authority should produce a core strategy which includes :
1) an overall vision which sets out how the area and the places within it should develop;
2) strategic objectives for the area focussing on the key issues to be addressed;
3) a delivery strategy for achieving these objectives. This should set out how much development is intended to happen where, when, and by what means it will be delivered . Locations for strategic development should be indicated on a key diagram; and
4) clear arrangements for managing and monitoring the delivery of the strategy.
Whilst this document is no doubt available somewhere it should be included with the JAAP, since without it the JAAP is not placed in the required context, without clear direction it is impossible to understand how or why this is intended to be part of the core strategy.
Additionally how have residents been consulted on the overal strategy, because if that exercise is flawed - and certainly the desire to build more homes in a densely populated area, whilst simultaneously expanded an airport, demonstrates that it is, then much if not all of the sub-plans such as this area also flawed.
PPS12 also refers to
Period of operation
4.13 The time horizon of the core strategy should be at least 15 years from the date of adoption.
As above there is no clear advices as to where the JAAP fits in the core strategy or where we are in the time horizon. Again the document lacks context, although it even states that it must be read in context, it provides little clue on how to do this.
PP12 also refers to
Statements of Community Involvement:
An SCI should
. Explain clearly the process and methods for community involvement for different types of local development documents and for the different stages of plan preperation. This needs to include details of how the diverse sections of the community are engaged, in particular those groups which have been underrepresented in previous consultation exercises.
. Identify which umbrella organisations and community groups need be involved at different stages of the planning process, with special consideration given to those groups not normally involved.
. Explain the process and appropriate methods for effective community involvement in the determination of planning applications and where appropriate refer to Planning Performance Agreements.
. Include details of the LPA's approach to pre-application discussions.
. Include the LPAs approach to community involvement in planning obligations (S106 agreements).
. Include information on how the SCI will be monitored, evaluated and scrutinised at the local level.
. Include details of where community groups can get more information on the planning process, for example, from Planning Aid and other voluntary organisations.
. Identify how landowner and developer interests will be engaged.
These above items from the PPS demonstrate the assistance that should be given to ordinary residents (and others) in the process. As mentioned by Campaign for Protection Rural Essex a number of organisations should have been consulted including RSPB; Essex Wildlife Trust etc. It is disingenuous and perhaps even negligent of the council not to include these within the Action Plan. Most people have very little experience of dealing with documents such as this and it is only at this late stage in the process (given that we've already passed through stage 1) that RDC and Southend BC have offered even limited advice. Even having read as much as I can in the past few weeks, I (and I am certainly not alone in this) have very little information regarding :- the crucial stages in the process; whether residents can succeed in resisting or changing any aspect of the proposals - RDC really should explain the steps in simple terms. At the moment we seem to progress from one stage to the next with absolutely no guidance. For instance:- I understand from information received from other sources in relation to the airport, that unless I head this document as an objection it is merely treated as a comment. I believe petitions are ignored. I will need to get my wife to make a separate submission in order for her views to be considered, even though we agree. The council seems quite happy to tell people how to make positive comments, but far less inclined to advise on how to object - hardly democracy and clearly demonstrating a deficiency and unfairness in the process, that should be revisited before we move ahead.
PPS12 again
Justification of Core Strategies
4.36 core strategies must be justifiable: they must be:
. founded on a robust and credible evidence base; and
. the most appropriate strategy when considered against the reasonable alternatives.
As above we cannot be sure that the base is robust and credible or indeed the most appropriate when considered against reasonable alternatives, since we don't know how and why the initial alternatives were first selected and then rejected. The JAAP provides no evidence base to affirm that the selection or the process is credible and again the JAAP requires review and re-issue.
If this is the preferred option, what was the basis for selection and will any ideas arising from the consultation be put forward for further consideration? Is it possible (likely) that if decent alternatives are proposed in stage 2 the preferred option will be amended and re-submitted? If not then, again, the process is flawed.
5) The document produced glowingly mentions the positive aspects and underplays the negative - surely the document should be impartial and genuinely enable residents to make up their own mind? Plenty of rhetoric about jobs new businesses etc but no details and certainly no information on the negatives, noise, congestion, loss of property value, decline in overall living standards etc. Basic research reveals Stobart's close ties with Tesco and Network Rail are we going to end up with a huge Tesco distribution centre supporting the airport, similar to their Dudley operation?
While the JAAP includes a brief note that the airport is unsuitable for large scale cargo operation (only a niche operation). The terms 'large-scale' or 'niche' are undefined, will mean different things to different peope and are therefore meaningless in the context of the JAAP, again this requires clarification and re-issue. Notwithstanding this the actual use is surely the decision of the owners and not the councils? Stobart management are already quoted as saying upon the purchase of the airport 'we have found our Southern Base', doesn't really sound like they are planning a limited operation, quite the opposite.
It is also unclear where any 'new' jobs and businesses will come from. Given the proposals and redevelopment of Hockley it is apparent that a number will come from there and therefore aren't really new. Again disingenuous of RDC in relation to the HAAP (and Southend BC not to make this clear in the JAAP that a proportion of jobs at the Airport sites will actually be moved from Hockley)
6) The document itself is devoid of factual information, although admitting that aspects will be supplied later, this itself smacks of a rush job. We find ourselves moved on to a stage from which there is no going back without having the facts adequately presented. It seems that the councils are either negligent in preparation of the facts or trying to hide something.
Development of the airport could bring about a fundamental change to the area, not necessarily for the better and it is in resident's interest for all information to be divulged as soon as possible.
It also uses a number of undefined terms, notably around the word 'sustainable'. It could mean 'long-term use with minimal environmental impact', but it the council are not clear what meaning they are seeking to attach. Equally, there are (source Wilkipedia) different types of sustainability. Economic, Environmental and Sociopolitical, so there is significant room for confusion as to meaning and I'm quite sure most people have no understanding what is meant by sustainability in the context of the JAAP.
7) The council is geared very much to receiving information via the internet, whilst undoubtedy this is cost effective; it is unfair on those residents that do not have internet access, particularly the elderly who make up a significant proportion of the population in the area. It is doubtful therefore that the views obtained will actually be representative of all residents. I note at election time certain parties are very keen to get their voters to polling stations and will provide transport - I wonder how keen those same councillors are to dedicate time and petrol to those residents wishing to get assistance in completing JAAP.
Completion on line is actually quite difficult and near on impossible if you have lengthy comments to make. Again the councils are colluding to dissuade residents from making anything but the briefest of contributiions.
Additionally the representation form states that each objection/comment requires completion of a separate form. Clearly this is actually designed to put people off commenting. Although I understand from a telephone conversation with RDC planning department that the council will accept one form with clearly listed comments. I would have to question whether RDC/Southend BC can actually determine what form objections may take. Again the process appears flawed, as this is biased towards acceptance of JAAP. At best this builds mistrust between residents and the councils as to motive; at worst it is downright dishonest.
The JAAP relies too much on the reader having a detailed knowledge of planning terminology and documentation, mentioning a significant number of undefined, unexplained and unreferenced terms and documents (as mentioned later) and omitting adequate cross-referencing. As such it is an inaccessible, inadequate document not fit for purpose and until it is adequately amended and re-issued the consultation process is flawed.
8) Rochford Council's own Leisure document refers to Rochford being the 'Green Gateway', clearly there is a desire to put a wall up given the amount of building that has occurred in the West of the District - this needs to stop. The local infrastructure cannot cope:-
B1013 is a hugely busy Road already - HAAP refers to 15,000 + vehicles back in 2007 and significant building has taken place since then. If the Airport expansion takes place, and RDC regretfully support this, then further transport issues will arise.
What plans are considered for a major disaster, large aircraft crashing on residential or occupied business property? In the US 7 of the last 8 fatal commercial airline crashes involved regional airlines (BBC 12th May 2009) or indeed hijack, bearing in mind proximity to major centres of population, power stations etc.
What additional policing/customs and immigration officers will be supplied, both at the airport and elsewhere in the region? Not only do illegal immigrants use lorries to access the country (and a cargo terminal will increase the amount of vehicles in this part of Essex), but aircraft have also previously been used (e.g at Stansted). Additionally there are the increased risks associated with drug smuggling, particularly given that criminals may seek to use the nearest available market for contraband. There is also an increased likelihood (with increased vehicles) or road traffic offences, which speed cameras do not address. What additional resources will be provided to the NHS to deal with the upsurge in stress, sleeplessness and associated problems including violence and accidents?
9) No explanation has been given as to why RDC/Southend BC support Government policy (I have asked my local councillors and MP to explain this apparent anomaly) there seems to be no desire to protect the quality of life enjoyed by residents, certainly much of this part of Essex has previously shown (in Government statistics) to be one of the least deprived areas of the country, yet the proposals seem to treat it as though it is one of the most deprived - is this wishful thinking on the part of the compile? As recently as 2006 Southend was calculated to be the best place to retire to.
10) Both Councils are keen to promote the area as a great place to visit yet surely this will be the death knell for tourism, the only visitors will be those waiting for a plane to get away from an overly congested cargo handling centre.
11) There is no clear mention of what controls are able to enforce (and indeed whether they would agree on these). Given the track record of local authorities but locally and countrywide in rejecting and/or enforcing actions against big business and national government e.g totally inability to prevent McDonald's and Tesco building where they like and the fiasco of the change of use of Bullwood Hall prison I rather suspect that if the expansion is approved Stobart's will ride roughshod over any objections from residents irrespective of whether the council's support the residents.
12) No account appears to have been taken of the wider questions regarding airport usage. Aside from the environmental impact, the reduction of carbon emissions etc is supposed to be at the forefront of business, government and local authority strategies, and the JAAP clearly goes contradicts this. Why have the following not been mentioned.
a) Southend is only accessible from the East and North (there is so little to the West it is hardly worth mentioning and is obviously cut off fromt Kent by the Estuary). As such the Pool of passengers it is supposed to be attracting is actually very limited. To the North sits Stansted whilst to the East, London and the various airports accessible from there.
b) Why the runway is being extended to 1799m and not 1800m (something I believe to do with extra regulation), when this doesn't actually allow for any passenger planes that are larger than the current users to land.
c) With perhaps the exception of Luton, every major airport easily accessible from London i.e Gatwick, Stansted, Heathrow and London City itself have expansion plans in the pipeline, as such the need for expansion of Southend as a passenger airport is questionable if not foolhardy.
d) Most recent figures for air travel suggest that this form of transport is actually declining.
It would actually suggest that the freight forwarder Eddie Stobart has an entirely different motive for expanding the airport.
13) Apart from neglecting to place sufficient significance upon the fact that a freight forwarders now own the airport and thus that the expansion will cause increased in cargo shipments in the air and on the ground, I fully support the comments made by Campaign for Protection for Rural Essex (part of CPREngland).
14) The councils have made no mention of the plans to ease road congestion that expansion will undoubtedly bring. I anticipate that you will seek to resurrect the misguided and previously rejected plans to further develop on green belt by building a bypass across Hullbridge, North Rayleigh Hockley and Rochford, just exacerbating the over-development of this area.
Nor is the impact upon rail timetable and whether there is sufficient rolling stock available for the new train service (i.e whether existing commuter carriage availability will be cut to provide airport services) explored.
Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.
1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.
1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.
1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.
1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.
1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.
Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.
Para 3 significant job opportunities - again undefined as to what significant means and what type of jobs are referred to (McJobs)?. Given the competition from the above airports it would require significant, unwelcome further expansion for business to be attracted because of the airport. Businesses decisions are made for reasons unrelated to the airport, yet the report suggests that development would be a major driver for business (but does not say why or what type of business). Southend lost virtually every major office employer since I worked there in the 1980's. Most major insurers and brokers merged and moved out of Victoria Avenue, as did various government departments (due to National government strategy) and BT, this had absolutely nothing to do with the airport and attracting these businessses back will probably have equally little to do with an airport.
Why is the commuter belt aspect of the region completely ignored? Many people commute to work and bring money back to spend locally. Similarly the retirement aspect is also ignored completely. It is questionable whether there is any great need for huge swathes of industry in this part of Essex.
Tourism desination is an absolute joke, the region is overdeveloped and the only tourists would be waiting for a plane to get away.
Para 4 - why is only the airport considered to be a drive for economic development? Holidaymakers pass straight through to their destination and most companies are cutting back on expenses such as business flights and use of technology (video-conferencing etc) renders their need redundant. We can surely only be talking about freight movement????
Again paragraph 4 refers to 'employs a significant number' is non-specific as to quantum or job types. Are you including the airport trading estate? I've shopped there, but I've never flown from Southend, it is totally unrelated and again the document is misleading.
Surprisingly the JAAP refers to a specific document, but gives no clues as to where to find the Rochford Core Strategy Preferred Options Document.
Para 5 - Transport issues are understated and it really does seem rather pointless to even attempt to expand such a small airport and blight the whole area for good for a few weeks in 2012. European visitors would be far better served by train, whilst longer haul flights cannot land on a runway this size.
Para 6 Who sees the airport as important for development and prosperity? Another vague statement dressed as fact. I see it as actually the beginning of a sustained decline in the area as the affluent move away, house prices fall due to noise and congestion from air and road freight and the area goes into, pardon the pun, terminal decline. Again future employment needs take little account of commuting.
2.1
Para 1 The context against which the JAAP is set is now outdated, having been drawn up in time of boom and when it was inconceivable that banking institutions would have to be underwritten by National Government to the extent they now are. The financial pattern of this and other countries have changed fundamentally and it will be a significant time before things get back to normal (over 20 years), loans are no longer freely available and the 'Vision' clearly needs to be re-visited.
Para 2 - refers to quality of life for residents is mentioned, but actually not expanded upon in the report. It is quite clear that expansion of the airport will reduce the quality of life for all but a very few number of residents i.e those fortunate enough to be directly employed in senior positions.
Para 3 - London Southend Airport as a 'major employer' - again an undefined term
. How many people does the airport directly employ (I suspect that many of the jobs are in fact secondary and even if the airport closed work would be taken up by other airports e.g Stansted or London City and the jobs would remain within commutable distance)?
. How many of the jobs are actually in the adjacent business park and in reality unrelated to the airport?
. How many of the jobs will actually be lost upon expansion (e.g those at the flying clubs that are being pushed out, businesses that are forced to close due to congestion etc)?
. How many of the jobs would actually remain if the airport was unaltered?
. Why isn't the spare capacity being used?
. What could be done to improve the spare capacity usage?
. What are the costs/benefits in picking up the spare capacity?
. Why, if the airport is so important, won't it become a success without expansion?
All basic questions the JAAP fails to address.
Para 4 - what is the 'current and emerging policy framework in the area'? again an undefined and meaningless phrase.
Para 5/6 - Southend core strategy - wonderful, what other options were considered and why is Rochford so keen to support this if, as this document so clearly demonstrates, there are so few advantages and so many disadvantages for the area and its residents.
Para 7 to end
Who are/what is Renaissance Southend Regeneration Framework? Another undefined term. How they have arrived at the conclusion it should be a centre for international air services and then contradicted this by saying it would be a 'great place to live' - when it so clearly wouldn't with a huge number of planes flying over head day and night. Rochford Council have a similar objective in making this a great place to live!!! I've lived in the region all my life, with these proposals I have no desire to continue to do so (but my options will be restricted by the resultant slump in house prices the expansion will cause)
Again there is very little mention that most of the towns in the region are actually dormitory towns for London e.g. Rayleigh. The desire to encourage employment is actually questionable on this basis. Higher salaries are always available in the City and vast airport expansion would probably require a significant number of migrant (possibly overseas) workers to fill vacancies.
Hi tech businesses tend to be low scale employers and no examples are given of 'high value employment'. This is pie in the sky aspiration with no basis in fact; it should be only be included in the JAAP if noted as such.
2.2
Para 1 - again refers to unreferenced material, planning documents etc, and it is impossible to know if this has been fairly assessed or just the bits chosen to fit.
The objectives are:
. Creation of sustainable and high value employment and other land uses within the study area; - what is 'high value' and what 'other land' - this is a vague and washy statement requiring amendment.
. Maxamising the economic benefits of a thriving airport and related activity: - is this at all costs?
. Ensuring appropriate improvements in sustainable transport accessibility and facilities; what is appropriate (who decides) and sustainable again undefined what other plans are the Council's proposing to run off the back of airport expansion? the rightly rejected Hullbridge to Rochford bypass???
. Ensuring a high quality environment for residents whether expressed through noise pollution management or protection of green space: what about congestion, air quality from road pollution etc?
. Maximum return on public investment through attracting inward investment; and is this at all costs?
. Efficient use of existing employment land resources. Is this at all costs?
2.3
Economic growth and new jobs. Again no consideration that the area is largely dormitory, no mention of the type of jobs and the fact that the airport expansion could have a negative effect with wealthy moving away and the area actually being an undesirable place to live, spiralling into decline.
Para 2 - Why will it be successful when there is significant competition from Gatwick, Heathrow, London City, Luton and Stansted all of which have better infrastructure and passenger pools as well as expansion plans. The proposed runway extension offers no increase in options for passenger plane access, as it cannot cope with any larger planes than the present runaway, as such the extension should be rejected as it fulfils no purpose.
Passengers will travel on the same planes they do at the moment and no plane is quiet or fuel efficient, especially when you consider that in excess of 20,000 flights per annum will take place (25,000 according to CPRE). It could even be argued that Southend should withhold expansion until plane technology improves to allow even shorter take-off and landing?
Conclusion would be that passenger use is to be secondary to cargo use and that Stobart have little intention of promoting the passenger aspects, except as a means of additional profit to their core operation, the movement of freight.
Fast food access is not possible the speed limit on the A127 is now 50mph for large stretches and is interrupted by numerous sets of traffic lights. Congestion problems will be exacerbated by any increased cargo usage at the airport, which will see the number of vehicles increase. No mention here of closure of Eastwoodbury Lane/A127 Public Safety zone or use of A130 or B1013 all of which will be problematic.
Para 3
Maintenance and repair - this implies that faulty aircraft will be flying over densely populated areas in order to be fixed. Given that the last time Southend had a significant cargo operation a plane crashed on Rayleigh (at night, on the only commercial premises in a residential district) it may be tempting fate to suggest that you are rather chancing residents luck with this proposal.
Restrictions on night flights - again unspecified as to what these will be and how they will be enforced. No consideration to schools, hospices, hospitals, etc etc let alone resident.
Part 4 - award winning, which award and by whom a vague statement. How can this be an enhanced Green Lung - it was built on open fields, it is disingenuous of the council to suggest otherwise, could we not have had a wide open space rather than a confined Country Park?
We've already lost significant open space, including recreational amenities to make way for Tesco's RBS etc and the link road developments. What are the 'quality jobs', undefined term and how is it to be guaranteed that they are for local people - if they are that good surely everyone will want it; again this is a misleading statement and should be withdrawn or amended.
Part 5 - Lets be clear an area for plane spotters and the poor souls living nearby.
Part 3 - Issue 1
Para 1 The railway increases the catchment, but doesn't decrease the competition from other better designed and strategically placed airports, notably Stansted. The rail line doesn't allow locals to access the airport so actually offers no benefit to those in the near vicinity.
Para 2 - Runway size is a constraint; this is not necessarily a bad thing and does give the local authorities an element of control that they relinquished when they sold a 199 year lease. It is actually doubtful that increased runway size makes the runway any more attractive to any operators. Smaller sized airlines are continually going bust and the proposed size does not open the airport to use by any passenger planes that cannot already use the site. The reference to quieter and more fuel efficient are not backed up by any facts. What are we talking about in terms of decibels (residents have little concern about fuel efficiency as this is a trading issue)? It is hardly beneficial if we currently have 50 aircraft flying per day making 150dB of noise each, but expansion leads to 10dB noise reduction per aircraft, but 100 more aircraft taking off every day.
The economic benefit is limited in terms of passenger spend as there is no expansion of the airport facilities and passengers will therefore travel straight through without spending locally.
Again no mention of cargo planes or indeed maintenance/training etc aircraft i.e the flights the council cannot control. I have referred to concerns regarding maintenance and flying of faulty planes in the area.
Issue 2
Para 1 - Excepting that we are talking about a dormitory town (and questioning why large scale employment is so crucial) why is the JAAP considered as the only key to employment and what is the connection to high-tech business. You can't just mention them in the same sentence for them to be connected there has to be a basis in fact and the report (unsurprisingly given that it is bereft of facts) omits to explain the connection. Given that Southend had in the 80's a significant number of office based employers and has now lost most of them, what makes it think that it can attract and retain such employers now? Again no clues as to methodology, only we'll build a big airport and they will come.
Para 2 - Does not make clear where this land is coming from, although it is surely green belt that is being lost, again, in the same area Cherry Orchard Way. Lots of talk about new jobs in business parks, although again nothing to say whether these are actually new to the immediate area or just movement from Hockley (closure of Eldon Way) or indeed other commutable areas in Essex.
Issue 3
Again sustainable is used without meaning. Only noise and air quality are mentioned, although cannot be certain that this will be in relation to road air and rail traffic. No note on water quality, loss of green belt etc. This is not new public open space; areas of open space are being lost and have been lost in the course of the development around notably Cherry Orchard Way and Eastwoodbury Lane.
What are the controls on the airport being considered; are they enforceable (particularly if challenged by the owner) and who will monitor?
What is sustainable transport policy? Again an unexplained term.
This section is undoubtedly unfairly biased and required re-submission.
Issue 4
I understand that the A127 has it's own restrictions on development as per liberal councillor Graham Langley. I would question therefore whether the council's real intention is not to place a bypass through Hullbridge, North Rayleigh, Hockley and Rochford, a plan previously rightly rejected?
i) there is no linkage to public transport and never has been. Deregulation of buses means that these do not link to rail services and the new rail station is not for use by locals. A13, A127 B1013 are already congested, A127 has speed restrictions and Eastwoodbury Lane will be closed and moved.
ii) Locals are forced to use cars due to lack of public transport connections and the fact that the airport rail service will not serve local stations. Bus services are systematically cut e.g 7 & 8 through Hockley and there is no direct link from Liverpool St Rail Line to C2C either by bus or rail. It is nigh on impossible to get people to refuse to use their cars and CPRE statistics show that the vast majority of workers and passengers will always prefer cars to public transport. Luggage and Public Transport do not make a good mix.
iii) What are the new routes - again nothing specifically mentioned, in the short term B1013 already (according to HAAP taking over 15,000 vehicles daily) will be used as a shortcut, increasingly so when the A127 speed cameras start to work and it becomes congested with cargo lorries. Again conclusion is that council will seek to introduce an unwanted bypass through green belt. Essentially the council are creating a problem expanding the airport and seeking to solve it to the detriment of residents with loss of more green belt.
Issue 5
Brickworks - there was I thinking the current policy was to build more houses not demolish existing ones. Another business park is to be built on open space, yet there is little demand for such a park, with vacant units througout both regions, plus Basildon etc. The council are using the flawed plans for Hockley and surrounding areas including the demolishing of Eldon Way to provide a false demand. This is disingenuous and wasteful (i.e not environmentally friendly), why demolish perfectly serviceable existing units just to create new ones? If access is so poor surely this should have been addressed when the bypass was build a few years back, what investigations are taking place into this waste of money?
B1 - again questionable that the demand exists
Area ii b) given the above is actually sensible to move the rugby club to an even more inaccessible spot? Some of these plans would have been more sensible if Southend United Football Stadium had been moved to Warners Bridge site of Southend Rugby Club (floodlights aren't an issue Highbury didn't have pylons), the railway station would have served a dual purpose (and SUFC could have got into Europe!!) The Rugby Club could then have either shared with Westcliff or moved to the site of Fossetts Way new SUFC stadium, more green belt would have been protected and transport links for the football stadium would at least have been maintained, another missed opportunity.
ii c) a green lung, nice that this has been acknowledged, a pokey site between an industrial estate and an airport runway i.e it can't be used for anything else, be honest don't try and dress it up as something it isn't, it is wholly insufficient for the purpose described.
iii) Why is more land being given over, the airport was given away as a freebie (£1) and the local authorities have little control over usage. Keep the land and keep control, allowing the hand over of more land compounds the earlier errors surrounding the 199 year lease.
iv) Identified as inefficient by whom and in what way? Another vacuous, unstabstantiated statement. does the cost of improvement outweight any potential benefit and who is expected to finance this? If units are not fit for purpose then surely it is up to the landlord or tenant to improve them not the taxpayer.
v) Loss of another sports pitch in the area then. We will soon be left with loads of concrete and designated country parks as only green areas, another poor suggestion. Presume East West Corridor will mean a road being built and houses will inevitably follow as the area will be termed 'under-used' within a decade.
vi) 'opportunity sites' - presumably for development? At least this is located next to existing industrial units.
vii) Flying Clubs - all to be kicked out (despite the fact they they do employ people)
viii) opportunity sites - say what you mean development sites, again the JAAP is trying to dress up the unpalatable.
ix) A green buffer a derelict site with a few horses and occasional circus. I hardly feel grateful, this area is currently an eyesore and clearly the report writer as with area ii c) couldn't think of another use. The flying clubs could be retained if the railway line was moved back here!
x) and xi) Loss of yet more amenities for Southend (once home to the largest amateur football league in the country). Demolition and rebuilding of a road that is only a few years old and at last admission that public transport isn't the answer so a park and ride service is required (although this could be omitted forcing passengers to use public transport)!!
4 Policies pg 17
Introduction Para 2 - It is apparently important to put the JAAP into context, but absolutely no attempt by the compiler to do so. It is unreasonable to expect ordinary residents with little or no experience to have to undertake lengthy research of information that the council have. In fact it could be argued that the council withholding this information is a deliberate attempt to prevent opposition, or perhaps just a glaring omission?
Energy saving technology is to be used (save lots of energy reject expansion) and sustainable drainage - what is this, yet another example of poor drafting.
Accepted that the JAAP cannot be looked at without plans for S.E. Essex, but again no clues and why are we restricted to this part of Essex why ignore Stansted and indeed other airport developments that the target passenger pool can use???? Again JAAP is flawed.
Employment allocations
Introduction
Why high scale employment growth? The term isn't explained, what type of employment and what are the employment aspirations. The area has relatively low unemployment, admittedly many people do not work locally, but this is because of the dormitory (and indeed retirement nature of this part of Essex, that the expansion will undermine and ultimately destroy. There is a limited pool of labour and there are no supporting statistics regarding the composition of the current labour pool or the required labour pool, there seems little point in creating jobs that cannot be filled.
Additional floor space - is this purely within the JAAP, what about other plans locally e.g HAAP where floor space is being reduced, meaning businesses are moving and new jobs are not created, just being relocated at the whim of the councils. The JAAP cannot on one hand say that it must be looked at in context and then ignore the context, this document is flawed again.
Upto 4950 jobs, how is this figure arrived at? It is unsubstantiated and unsupported and meaningless. Up to means just that any figure (including a negative) lower than 4950 is up to the JAAP requires amendment (again). In the area - is this the JAAP area, S E Essex? Are they JAAP related jobs and what are they - 'McJobs'? Same applies to the additional 750 jobs in Aviation Way. Non-specific, non factual and misleading.
E1 - another unsubstantiated figure, unclear if the jobs above are included in this figure or not. How do you split the jobs 50/50, who measures this and who is to say whether the airport brought those jobs. Remember a significant number of insurance companies merged in the 1990's and Southend lost jobs as a result, it had little to do with council policy. Just as conceivably an organisation could decide to move to Southend or Rochford, with airport expansion having no bearing on that decision.
E2 - Is this suggesting that in the middle of a recession busineses will have to pay to upgrade, I feel their sights may be elsewhere. No details on the financial contribution are given - how much taxpayer's money will be poured in and, as with the airport sold on at a loss? Are businesses going to be asked to donate or taxed, won't this be a disincentive to relocate?
This requires more detail and a lot more thought from the councils.
E3 - It is not reasonable to expect significant numbers of employees to walk or cycle unless they live very close to the units. Anyone living any distance will have to negotiate extremely busy (and probably busier roads), the cycle paths may well prove to be a waste of money, cause further unnecessary traffic to motor vehicles and should be properly costed.
Again business contributions comments as per E2 above
E4 E7 - No additional comment given rejection of the entire concept
E8 - As above how are job totals arrived at?
Overall comment on how and why businesses will contribute and what will be cost to residents
London Southend Airport
Introduction
Recognised that Airport can provide a boost - recognised by whom? another unsubstantiated and flawed statement.
Agree should have quieter aircraft, but fuel efficiency is a business decision not a local authority one.
Why must these aircraft be 150 seats again not explained?
Will aircraft development not actually catch up with the airport i.e. over the next decade larger aircraft landing on shorter runways (we then have a problem that we've bigger aircraft than the council currently envisage).
Why is the runway set at 1799m (I believe to avoid additional regulation of 1800, + runways)?
Are there any passenger aircraft with a full payload that cannot access at present that but can at 1799m? If so what types, what noise levels.
Expected that use will be passenger - expected by whom? Certainly not me. It is owned by freight forwarders who have stated they 'have found (their) Southern base'. Low Cost Airlines such as Easty Jet have a fleet requiring longer runways that proposed, who is the new airport aimed at?
Para 2 Growth in MRO - this means defective aircraft will be flown in over densely populated areas - the potential for disaster is huge and the council could/should be held accountable if a crash occurs (as it did in the 1980's).
If there is a demand for high skilled jobs, it is unlikely that applicants exist in sufficient number in this area and therefore, we would be reliant on migrant workers.
Whilst it is not considered desirable for the airport to handle large volumes of freight how much control would the council actually have over this? If the owners want to ship freight can they be stopped? If they want to extend the rail line (and Stobarts already have close ties with both Network Rail through Stobart Rail and Tesco's in terms of freight delivery) can they be prevented? If they want to run HGV's and vans in and out what can the council do? This is their core business. I would suggest that the professional businessmen at Stobarts are more than capable of giving amateur councillors the run around when it comes to what the airport will be used for. Local Authorities are very poor at refusing planning changes when business puts through a commercial reason. The first of these will be 'we can't attract viable passenger numbers we need to increase freight movements'. Once the extension is approved it cannot be repealed.
Para 3
Environmental constraints - no clues as to what these are how they are enforced (indeed if they can be) and what penalties are if airport users do no comply (saying sorry won't be enough) - will they pay compensation to individuals, where will the burden of proof lie? JAAP is deficient again.
The JAAP is also deficient in that no map of flight paths, stacking arrangements or noise levels at altitude (CPRE refer to these as noise contour maps). It seems anomalous to let the operator make his own statement, surely, if this extension takes place the council need to set noise levels and dictate to the user? Road noise (either freight or passenger) is completely omitted, as is rail noise.
Currently train services do not run through the night, but do stop near local stations when operating. The airport timetable will have non-stop trains. Additionally no details of freight movements, all of this is a complete omission and a justifies re-issue of the JAAP.
The A127 is an insufficient carriageway in its current form, particularly following the misguided speed reductions. Cycling facilities just take up vehicle space. I understand that there are limitations on the improvements that can be undertaken on the A127 due to it in part running through the Public Safety Zone, where major roads are not permitted, this is sufficient in itself to justify refusal of the proposal.
LS1 - this support of the expansion policy is unexplained. Why are 2 Tory councils supporting a misguided Labour policy, which basically entails concreting over anywhere that votes conservative? Solid reason should be provided for expansion.
LS2 - Permission
. Airport related - how tenuous does the link have to be for permission to be granted? this is yet another vague statement.
. Agreed baseline - this is undecided, does it require constant noise at one site or intermittent noise again far too vague. No details on who determines/measures etc. I will wager that all complaints about noise will be refuted by the operator. What about non-passenger flights, cargo, maintenance, training etc etc.
. Contributes to road infrastructure needs - positively or negatively and to what extent?
. Modal shift - what are the targets how and who measures the movement and who assesses whether the application is actually reasonable.
Again the JAAP is too vague to be meaningful.
LS3 - what sort of statement, what must this include. The JAAP note is meaningless and needs to be more prescriptive.
LS4 - again JAAP should be more prescriptive, this is meaningless.
LS5 - this is a restriction on the usage of residents property - does this contravene human Rights Legislation??
LS6 - Mentioned previously what is justification in passenger terms to increase the runway. Is there actually an advantage to the council and the residents to refuse 1799m, but approve 1800m?
LS7 -
. Times, unacceptable, 2300 is too late; this is some hours after dark in winter and makes no consideration in particular of the disruption that wil be caused to the sleeping pattern of children. Early mornings are also an issue for similar reasons. No mention is made of unscheduled flights and of cargo flights etc etc. The number of flights is not mentioned. If successful no-one will ever have another peaceful weekend.
. Cargo flights - require more restriction than just noise levels. No passenger flights at night (in noise controlled jets), but loads of cargo flights throughout the night using any available aircraft. what about maintenance/testing/training flights etc
. Routing - existing routes aren't shown, what are the plans for future routes. Again the JAAP is not fit for purpose.
. Helicopters - what more or less, operating heights? As these are vertical take off they could surely reach altitude over the airport before moving off?
. Restricted to what - will it pick up maintenance training testing etc?
. Ground running again unspecified JAAP too vague
. Training movements again unspecified JAAP too vague.
Terminal Facilities
PF1 repeats LS7, why? Is there in fact missing information here.
Maintenance repair and Overall
MRO1-3 what is justification for this, as previously stated surely this just increases the danger that the airport poses in a densely populated area. The possibility of contributions from business at the current time are surely fanciful.
Airport Development Zone
What criteria will be used to decide if development supports the airport and why is retail use refused?
Transport
What sorts of contributions are expected? What about the B1013, there is absolutely nothing to stop drivers using this as a cut through, especially given the days and reduced speed limits on A127?
T1 - where is this proposed to run?
T2 - and this?
T3 - why dual this road, unless there are plans to reintroduce the bypass via Hullbridge/Rayleigh/Hockley. Dualling only encouraes further traffic along the over used B1013 via Rayleigh
T4 as T3 this is encouraging traffic away from preferred route of A127
T5 - Loss of public amentities
T6 - there remains little incentive to use anything but a car, no car parking facilities forces the use of public transport - radical but true?
T7/8 - what sort of contribution - inevitably the tax payer will fund the bulk of this and how will the bill be met - wholly by Southend? who decides on contribution?
T9 - these are not provided with the JAAP again an omission
Environment
Introduction, this is not a green lung, the development is taking place on the green lung. already, the developments along and of Cherry Orchard Way have eaten into this and I understand that the development will downgrade further land making it easier to develop the area in the future. The green belt boundary isn't 'reviewed', it is obliterated. This is unacceptable.
Para 3 - what are 'high levels of environmental efficiency?' and 'sustainable drainage' more vacuous statements. These need to be clarified the document is once more deficient.
ENV1 - unacceptable loss of green belt (again) both councils seem to really object to green belt principles and look for any opportunity to develop such sites apparently seeing them as an inconvenience rather than a necessity and a desirable asset.
ENV2 - this is not new - it is open at prsent and it is at best misleading and at worst a downright lie to call it new. The JAAP is once more factually erroneous
ENV3 - as 2 above.
ENV4 - and if no contribution arrives does it happen or does the taxpayer get saddled with the bill? How will contributions be collected, surely this is a tax on new enterprise?
ENV5 not new public space again incorrect
ENV6 - this is constitutes 'no change' presumably because the land is so poorly sighted it is permitted to escape development
5.1 - JAAP provides no idea of what scale of limitations will be i.e. one in 3 units are occupied, how many jobs will result, how many of the contributions will be made.
5.2 - intended to provide detailed information - need more details now, not a washy statement that it is 'intended'. Sorry intended to but didn't get around to it. Should say 'Full details will be provided'.
5.3 You have my views. The report JAAP itself is deficient in factual information and misleading in the extreme. There is a lack of information given to the individual and it is not apparent that the council have advised necessary interested parties e.g RSPB. As such the process is substantially flawed, sufficiently so for the whole of this stage to be delayed whilst the JAAP is re-issued with sufficient information and clarification.
From my understanding of the proposals the councils are to a varying degree being incredibly naive, disengenuous, negligent and as such untrustworthy. Again this is sufficient to warrant review of the JAAP.
I understand that as part of the review process Rochford councillors visited Southampton Airport. I would suggest that although the runway size is comparable, to undertake a visit to an airport that doesn't permit night flights except in extenuating circumstances (max 10 per month 100 a year) and out of season is not going to provide any great insight. Especially given that the European Region Association (ERAA) shows the following freight movements Southend and Southampton in 2008:-
Southend 443 Tonnes reducing 19.6% from 2007
Southampton 264 tonnes reducing 10.5% from 2007
So the two airports are not as comparable as has been suggested especially since freight cargo uses older, noisier (propeller aircraft) rather than those 'quiet' jets for passengers and Southend is now owned by a freight forwarder.
Additionally back in 2002 the DfT recognised the lack of appeal of Southend as a suitable site.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14731

Received: 24/06/2009

Respondent: Mr Peter Symes

Representation Summary:

1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.

Full text:

Please refer to the attached document which lists all concerns with process and lack of information provided by the Councils concerned in respect of the JAAP. Again the demands placed upon objectors are onerous (as with the HAAP), namely the requirement to complete on-line or to file an individual form per objection are unfair and unwarranted. I understand however that this advice is actually waived upon request and as per my conversation with your offices! Attach one report for your attention lising all my issues with the JAAP at this time.
I expect a response to all queries raised.
The Councils have been extremely negligent in their duty to provide sufficient information.
At the present time the proposals are unacceptable in their entirety and there is nothing to suggest my opinion will change. I additionally support the comments made by campaign for protection of rural Essex (England) in their submission.
I am writing to object to the proposals contained within the London Southend Airport and Environs Joint Area Action Plan Preferred Options Dated February 2009.
I have a number of general objections regarding the process, documentation and manner of delivery as well as specific objections to the proposals and list these as follows:-
Flawed Process of Presentation.
1) There was little initial notification to the public of the first stage of consultation or the ramifications of not responding. We appear to have reached stage 2 of the process by default and dictation by the Councils, with stage 1 swept swiftly 'under the carpet' rather than the opportunity given to residents to undertake a considered process of weighing up the options. I do not believe that the majority, or even an adequate portion , of local residents understand the process and the JAAP documents do little to address this. Neighbouring authorities, that are also affected, will have had little input into the process and their residents no understanding of what is going on or what influence they can have. As such the process is flawed and details supplied inadequate. Unless the councils can demonstrate evidence to the contrary.
2) The selection of option three again has been decided adequate consideration of other options.
Whilst Southend Council have at least gone through the motions of offering roadshows to assist understanding RDC appear to have relied solely on advertising.
Notwithstanding this both Councils have failed to provide adequate information within the document, given their support of the proposal it must be concluded that this is a deliberate rather than just a negligent act and again calls into question the whole process.
As a bare minimum the JAAP should include :-
. Existing and post extension flight paths (how these may vary in inclement weather)
. Stacking arrangements in the event of runway closure/delays
. Basic statistics showing likelihood of inclement weather/runway closures and, as such how many times a year stacking arrangements and flight path changes are likely to be implemented and the anticipated number of flights this will affect.
. The types of aircraft able to take off, both before and after the extension (cargo, passenger and 'other')
. The minimum and maximum number of flights permitted (including split between cargo passenger, maintenance, training, testing) and flight times (including scheduled, non-scheduled, charter, training/testing/maintenance)
. The noise levels generated at ground level by the planes at altitudes - a noise map?
. expected plane altitude at say half mile intervals from take off/landing
. expected traffic volume increases (Stobart and other firms lorries and vans) for A127, A130 and B1013 (Rayleigh - Hockley - Rochford Road), as a result of airport expansion and closue of Eastwoodbury Lane
. Expected train timetable changes (including non-scheduled freight movements) and anticipated delays as a result of new passenger trains.
. the fact that the trains for the airport are not going to provide a local service (thus local commuting to the airport by train remains inconvenient)
. confirmation as to whether or not Stobart can apply (and whether or not the councils have any power or inclination to prevent or resist) to make rail freight movements to the airport or the immediate vicinity
. Which jobs are genuine new jobs, type etc and which will be transferred from other parts of the district (and lets not limit ourselves to Rochford and Southend, because undoubtedly Castle Point and Basildon will be affected)
. A summary of the impact of other developments in the area, including redevelopment of Hockley, Stambridge Road, Hawkwell, Daws Heath etc etc. These should be clearly marked on a flight path map also.
. Confirmation of detailed plans for inevitable road expansion schemes that will be required to support increased road traffic. Particularly A127, where proposals incorporate the Public Safety Zone and whether the expansion will be used to push through the unwanted development of a bypass via Hullbridge/North Rayleigh/Hockley and Rochford?
As such I would view this as a basic dereliction of Council duty - failure to inform and ensure that the interests of residents are looked after. I understand also that this may breach the Freedom of Information Act and RDC's own consultation strategy
3) The Councils have apparently selected the least popular option, although conveniently neglected to inform residents as to how or why this decision was arrived at. The only factor that seems to offer any support for their decision is 'increased jobs'. Various figures are quoted all prefixed by the worlds 'upto'. This term is 'up to' is sufficiently vague to mean that any number (including negative ones) below the figure quoted would be deemed a success. As such it has no place in the document as it constitutes mere speculation. Hard facts and details of how conclusions are arrived at are needed.
As such the information provided is surely skewed and the Councils are seemingly abusing their position in recommending the proposal with absolutely no solid evidence to back up the position.
4) The connection of this scheme with other projects in the area, notably a number of house building projects including those mentioned in 2) above, is not made clear Government document PPS12, makes clear reference to :-
Every local planning authority should produce a core strategy which includes :
1) an overall vision which sets out how the area and the places within it should develop;
2) strategic objectives for the area focussing on the key issues to be addressed;
3) a delivery strategy for achieving these objectives. This should set out how much development is intended to happen where, when, and by what means it will be delivered . Locations for strategic development should be indicated on a key diagram; and
4) clear arrangements for managing and monitoring the delivery of the strategy.
Whilst this document is no doubt available somewhere it should be included with the JAAP, since without it the JAAP is not placed in the required context, without clear direction it is impossible to understand how or why this is intended to be part of the core strategy.
Additionally how have residents been consulted on the overal strategy, because if that exercise is flawed - and certainly the desire to build more homes in a densely populated area, whilst simultaneously expanded an airport, demonstrates that it is, then much if not all of the sub-plans such as this area also flawed.
PPS12 also refers to
Period of operation
4.13 The time horizon of the core strategy should be at least 15 years from the date of adoption.
As above there is no clear advices as to where the JAAP fits in the core strategy or where we are in the time horizon. Again the document lacks context, although it even states that it must be read in context, it provides little clue on how to do this.
PP12 also refers to
Statements of Community Involvement:
An SCI should
. Explain clearly the process and methods for community involvement for different types of local development documents and for the different stages of plan preperation. This needs to include details of how the diverse sections of the community are engaged, in particular those groups which have been underrepresented in previous consultation exercises.
. Identify which umbrella organisations and community groups need be involved at different stages of the planning process, with special consideration given to those groups not normally involved.
. Explain the process and appropriate methods for effective community involvement in the determination of planning applications and where appropriate refer to Planning Performance Agreements.
. Include details of the LPA's approach to pre-application discussions.
. Include the LPAs approach to community involvement in planning obligations (S106 agreements).
. Include information on how the SCI will be monitored, evaluated and scrutinised at the local level.
. Include details of where community groups can get more information on the planning process, for example, from Planning Aid and other voluntary organisations.
. Identify how landowner and developer interests will be engaged.
These above items from the PPS demonstrate the assistance that should be given to ordinary residents (and others) in the process. As mentioned by Campaign for Protection Rural Essex a number of organisations should have been consulted including RSPB; Essex Wildlife Trust etc. It is disingenuous and perhaps even negligent of the council not to include these within the Action Plan. Most people have very little experience of dealing with documents such as this and it is only at this late stage in the process (given that we've already passed through stage 1) that RDC and Southend BC have offered even limited advice. Even having read as much as I can in the past few weeks, I (and I am certainly not alone in this) have very little information regarding :- the crucial stages in the process; whether residents can succeed in resisting or changing any aspect of the proposals - RDC really should explain the steps in simple terms. At the moment we seem to progress from one stage to the next with absolutely no guidance. For instance:- I understand from information received from other sources in relation to the airport, that unless I head this document as an objection it is merely treated as a comment. I believe petitions are ignored. I will need to get my wife to make a separate submission in order for her views to be considered, even though we agree. The council seems quite happy to tell people how to make positive comments, but far less inclined to advise on how to object - hardly democracy and clearly demonstrating a deficiency and unfairness in the process, that should be revisited before we move ahead.
PPS12 again
Justification of Core Strategies
4.36 core strategies must be justifiable: they must be:
. founded on a robust and credible evidence base; and
. the most appropriate strategy when considered against the reasonable alternatives.
As above we cannot be sure that the base is robust and credible or indeed the most appropriate when considered against reasonable alternatives, since we don't know how and why the initial alternatives were first selected and then rejected. The JAAP provides no evidence base to affirm that the selection or the process is credible and again the JAAP requires review and re-issue.
If this is the preferred option, what was the basis for selection and will any ideas arising from the consultation be put forward for further consideration? Is it possible (likely) that if decent alternatives are proposed in stage 2 the preferred option will be amended and re-submitted? If not then, again, the process is flawed.
5) The document produced glowingly mentions the positive aspects and underplays the negative - surely the document should be impartial and genuinely enable residents to make up their own mind? Plenty of rhetoric about jobs new businesses etc but no details and certainly no information on the negatives, noise, congestion, loss of property value, decline in overall living standards etc. Basic research reveals Stobart's close ties with Tesco and Network Rail are we going to end up with a huge Tesco distribution centre supporting the airport, similar to their Dudley operation?
While the JAAP includes a brief note that the airport is unsuitable for large scale cargo operation (only a niche operation). The terms 'large-scale' or 'niche' are undefined, will mean different things to different peope and are therefore meaningless in the context of the JAAP, again this requires clarification and re-issue. Notwithstanding this the actual use is surely the decision of the owners and not the councils? Stobart management are already quoted as saying upon the purchase of the airport 'we have found our Southern Base', doesn't really sound like they are planning a limited operation, quite the opposite.
It is also unclear where any 'new' jobs and businesses will come from. Given the proposals and redevelopment of Hockley it is apparent that a number will come from there and therefore aren't really new. Again disingenuous of RDC in relation to the HAAP (and Southend BC not to make this clear in the JAAP that a proportion of jobs at the Airport sites will actually be moved from Hockley)
6) The document itself is devoid of factual information, although admitting that aspects will be supplied later, this itself smacks of a rush job. We find ourselves moved on to a stage from which there is no going back without having the facts adequately presented. It seems that the councils are either negligent in preparation of the facts or trying to hide something.
Development of the airport could bring about a fundamental change to the area, not necessarily for the better and it is in resident's interest for all information to be divulged as soon as possible.
It also uses a number of undefined terms, notably around the word 'sustainable'. It could mean 'long-term use with minimal environmental impact', but it the council are not clear what meaning they are seeking to attach. Equally, there are (source Wilkipedia) different types of sustainability. Economic, Environmental and Sociopolitical, so there is significant room for confusion as to meaning and I'm quite sure most people have no understanding what is meant by sustainability in the context of the JAAP.
7) The council is geared very much to receiving information via the internet, whilst undoubtedy this is cost effective; it is unfair on those residents that do not have internet access, particularly the elderly who make up a significant proportion of the population in the area. It is doubtful therefore that the views obtained will actually be representative of all residents. I note at election time certain parties are very keen to get their voters to polling stations and will provide transport - I wonder how keen those same councillors are to dedicate time and petrol to those residents wishing to get assistance in completing JAAP.
Completion on line is actually quite difficult and near on impossible if you have lengthy comments to make. Again the councils are colluding to dissuade residents from making anything but the briefest of contributiions.
Additionally the representation form states that each objection/comment requires completion of a separate form. Clearly this is actually designed to put people off commenting. Although I understand from a telephone conversation with RDC planning department that the council will accept one form with clearly listed comments. I would have to question whether RDC/Southend BC can actually determine what form objections may take. Again the process appears flawed, as this is biased towards acceptance of JAAP. At best this builds mistrust between residents and the councils as to motive; at worst it is downright dishonest.
The JAAP relies too much on the reader having a detailed knowledge of planning terminology and documentation, mentioning a significant number of undefined, unexplained and unreferenced terms and documents (as mentioned later) and omitting adequate cross-referencing. As such it is an inaccessible, inadequate document not fit for purpose and until it is adequately amended and re-issued the consultation process is flawed.
8) Rochford Council's own Leisure document refers to Rochford being the 'Green Gateway', clearly there is a desire to put a wall up given the amount of building that has occurred in the West of the District - this needs to stop. The local infrastructure cannot cope:-
B1013 is a hugely busy Road already - HAAP refers to 15,000 + vehicles back in 2007 and significant building has taken place since then. If the Airport expansion takes place, and RDC regretfully support this, then further transport issues will arise.
What plans are considered for a major disaster, large aircraft crashing on residential or occupied business property? In the US 7 of the last 8 fatal commercial airline crashes involved regional airlines (BBC 12th May 2009) or indeed hijack, bearing in mind proximity to major centres of population, power stations etc.
What additional policing/customs and immigration officers will be supplied, both at the airport and elsewhere in the region? Not only do illegal immigrants use lorries to access the country (and a cargo terminal will increase the amount of vehicles in this part of Essex), but aircraft have also previously been used (e.g at Stansted). Additionally there are the increased risks associated with drug smuggling, particularly given that criminals may seek to use the nearest available market for contraband. There is also an increased likelihood (with increased vehicles) or road traffic offences, which speed cameras do not address. What additional resources will be provided to the NHS to deal with the upsurge in stress, sleeplessness and associated problems including violence and accidents?
9) No explanation has been given as to why RDC/Southend BC support Government policy (I have asked my local councillors and MP to explain this apparent anomaly) there seems to be no desire to protect the quality of life enjoyed by residents, certainly much of this part of Essex has previously shown (in Government statistics) to be one of the least deprived areas of the country, yet the proposals seem to treat it as though it is one of the most deprived - is this wishful thinking on the part of the compile? As recently as 2006 Southend was calculated to be the best place to retire to.
10) Both Councils are keen to promote the area as a great place to visit yet surely this will be the death knell for tourism, the only visitors will be those waiting for a plane to get away from an overly congested cargo handling centre.
11) There is no clear mention of what controls are able to enforce (and indeed whether they would agree on these). Given the track record of local authorities but locally and countrywide in rejecting and/or enforcing actions against big business and national government e.g totally inability to prevent McDonald's and Tesco building where they like and the fiasco of the change of use of Bullwood Hall prison I rather suspect that if the expansion is approved Stobart's will ride roughshod over any objections from residents irrespective of whether the council's support the residents.
12) No account appears to have been taken of the wider questions regarding airport usage. Aside from the environmental impact, the reduction of carbon emissions etc is supposed to be at the forefront of business, government and local authority strategies, and the JAAP clearly goes contradicts this. Why have the following not been mentioned.
a) Southend is only accessible from the East and North (there is so little to the West it is hardly worth mentioning and is obviously cut off fromt Kent by the Estuary). As such the Pool of passengers it is supposed to be attracting is actually very limited. To the North sits Stansted whilst to the East, London and the various airports accessible from there.
b) Why the runway is being extended to 1799m and not 1800m (something I believe to do with extra regulation), when this doesn't actually allow for any passenger planes that are larger than the current users to land.
c) With perhaps the exception of Luton, every major airport easily accessible from London i.e Gatwick, Stansted, Heathrow and London City itself have expansion plans in the pipeline, as such the need for expansion of Southend as a passenger airport is questionable if not foolhardy.
d) Most recent figures for air travel suggest that this form of transport is actually declining.
It would actually suggest that the freight forwarder Eddie Stobart has an entirely different motive for expanding the airport.
13) Apart from neglecting to place sufficient significance upon the fact that a freight forwarders now own the airport and thus that the expansion will cause increased in cargo shipments in the air and on the ground, I fully support the comments made by Campaign for Protection for Rural Essex (part of CPREngland).
14) The councils have made no mention of the plans to ease road congestion that expansion will undoubtedly bring. I anticipate that you will seek to resurrect the misguided and previously rejected plans to further develop on green belt by building a bypass across Hullbridge, North Rayleigh Hockley and Rochford, just exacerbating the over-development of this area.
Nor is the impact upon rail timetable and whether there is sufficient rolling stock available for the new train service (i.e whether existing commuter carriage availability will be cut to provide airport services) explored.
Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.
1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.
1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.
1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.
1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.
1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.
Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.
Para 3 significant job opportunities - again undefined as to what significant means and what type of jobs are referred to (McJobs)?. Given the competition from the above airports it would require significant, unwelcome further expansion for business to be attracted because of the airport. Businesses decisions are made for reasons unrelated to the airport, yet the report suggests that development would be a major driver for business (but does not say why or what type of business). Southend lost virtually every major office employer since I worked there in the 1980's. Most major insurers and brokers merged and moved out of Victoria Avenue, as did various government departments (due to National government strategy) and BT, this had absolutely nothing to do with the airport and attracting these businessses back will probably have equally little to do with an airport.
Why is the commuter belt aspect of the region completely ignored? Many people commute to work and bring money back to spend locally. Similarly the retirement aspect is also ignored completely. It is questionable whether there is any great need for huge swathes of industry in this part of Essex.
Tourism desination is an absolute joke, the region is overdeveloped and the only tourists would be waiting for a plane to get away.
Para 4 - why is only the airport considered to be a drive for economic development? Holidaymakers pass straight through to their destination and most companies are cutting back on expenses such as business flights and use of technology (video-conferencing etc) renders their need redundant. We can surely only be talking about freight movement????
Again paragraph 4 refers to 'employs a significant number' is non-specific as to quantum or job types. Are you including the airport trading estate? I've shopped there, but I've never flown from Southend, it is totally unrelated and again the document is misleading.
Surprisingly the JAAP refers to a specific document, but gives no clues as to where to find the Rochford Core Strategy Preferred Options Document.
Para 5 - Transport issues are understated and it really does seem rather pointless to even attempt to expand such a small airport and blight the whole area for good for a few weeks in 2012. European visitors would be far better served by train, whilst longer haul flights cannot land on a runway this size.
Para 6 Who sees the airport as important for development and prosperity? Another vague statement dressed as fact. I see it as actually the beginning of a sustained decline in the area as the affluent move away, house prices fall due to noise and congestion from air and road freight and the area goes into, pardon the pun, terminal decline. Again future employment needs take little account of commuting.
2.1
Para 1 The context against which the JAAP is set is now outdated, having been drawn up in time of boom and when it was inconceivable that banking institutions would have to be underwritten by National Government to the extent they now are. The financial pattern of this and other countries have changed fundamentally and it will be a significant time before things get back to normal (over 20 years), loans are no longer freely available and the 'Vision' clearly needs to be re-visited.
Para 2 - refers to quality of life for residents is mentioned, but actually not expanded upon in the report. It is quite clear that expansion of the airport will reduce the quality of life for all but a very few number of residents i.e those fortunate enough to be directly employed in senior positions.
Para 3 - London Southend Airport as a 'major employer' - again an undefined term
. How many people does the airport directly employ (I suspect that many of the jobs are in fact secondary and even if the airport closed work would be taken up by other airports e.g Stansted or London City and the jobs would remain within commutable distance)?
. How many of the jobs are actually in the adjacent business park and in reality unrelated to the airport?
. How many of the jobs will actually be lost upon expansion (e.g those at the flying clubs that are being pushed out, businesses that are forced to close due to congestion etc)?
. How many of the jobs would actually remain if the airport was unaltered?
. Why isn't the spare capacity being used?
. What could be done to improve the spare capacity usage?
. What are the costs/benefits in picking up the spare capacity?
. Why, if the airport is so important, won't it become a success without expansion?
All basic questions the JAAP fails to address.
Para 4 - what is the 'current and emerging policy framework in the area'? again an undefined and meaningless phrase.
Para 5/6 - Southend core strategy - wonderful, what other options were considered and why is Rochford so keen to support this if, as this document so clearly demonstrates, there are so few advantages and so many disadvantages for the area and its residents.
Para 7 to end
Who are/what is Renaissance Southend Regeneration Framework? Another undefined term. How they have arrived at the conclusion it should be a centre for international air services and then contradicted this by saying it would be a 'great place to live' - when it so clearly wouldn't with a huge number of planes flying over head day and night. Rochford Council have a similar objective in making this a great place to live!!! I've lived in the region all my life, with these proposals I have no desire to continue to do so (but my options will be restricted by the resultant slump in house prices the expansion will cause)
Again there is very little mention that most of the towns in the region are actually dormitory towns for London e.g. Rayleigh. The desire to encourage employment is actually questionable on this basis. Higher salaries are always available in the City and vast airport expansion would probably require a significant number of migrant (possibly overseas) workers to fill vacancies.
Hi tech businesses tend to be low scale employers and no examples are given of 'high value employment'. This is pie in the sky aspiration with no basis in fact; it should be only be included in the JAAP if noted as such.
2.2
Para 1 - again refers to unreferenced material, planning documents etc, and it is impossible to know if this has been fairly assessed or just the bits chosen to fit.
The objectives are:
. Creation of sustainable and high value employment and other land uses within the study area; - what is 'high value' and what 'other land' - this is a vague and washy statement requiring amendment.
. Maxamising the economic benefits of a thriving airport and related activity: - is this at all costs?
. Ensuring appropriate improvements in sustainable transport accessibility and facilities; what is appropriate (who decides) and sustainable again undefined what other plans are the Council's proposing to run off the back of airport expansion? the rightly rejected Hullbridge to Rochford bypass???
. Ensuring a high quality environment for residents whether expressed through noise pollution management or protection of green space: what about congestion, air quality from road pollution etc?
. Maximum return on public investment through attracting inward investment; and is this at all costs?
. Efficient use of existing employment land resources. Is this at all costs?
2.3
Economic growth and new jobs. Again no consideration that the area is largely dormitory, no mention of the type of jobs and the fact that the airport expansion could have a negative effect with wealthy moving away and the area actually being an undesirable place to live, spiralling into decline.
Para 2 - Why will it be successful when there is significant competition from Gatwick, Heathrow, London City, Luton and Stansted all of which have better infrastructure and passenger pools as well as expansion plans. The proposed runway extension offers no increase in options for passenger plane access, as it cannot cope with any larger planes than the present runaway, as such the extension should be rejected as it fulfils no purpose.
Passengers will travel on the same planes they do at the moment and no plane is quiet or fuel efficient, especially when you consider that in excess of 20,000 flights per annum will take place (25,000 according to CPRE). It could even be argued that Southend should withhold expansion until plane technology improves to allow even shorter take-off and landing?
Conclusion would be that passenger use is to be secondary to cargo use and that Stobart have little intention of promoting the passenger aspects, except as a means of additional profit to their core operation, the movement of freight.
Fast food access is not possible the speed limit on the A127 is now 50mph for large stretches and is interrupted by numerous sets of traffic lights. Congestion problems will be exacerbated by any increased cargo usage at the airport, which will see the number of vehicles increase. No mention here of closure of Eastwoodbury Lane/A127 Public Safety zone or use of A130 or B1013 all of which will be problematic.
Para 3
Maintenance and repair - this implies that faulty aircraft will be flying over densely populated areas in order to be fixed. Given that the last time Southend had a significant cargo operation a plane crashed on Rayleigh (at night, on the only commercial premises in a residential district) it may be tempting fate to suggest that you are rather chancing residents luck with this proposal.
Restrictions on night flights - again unspecified as to what these will be and how they will be enforced. No consideration to schools, hospices, hospitals, etc etc let alone resident.
Part 4 - award winning, which award and by whom a vague statement. How can this be an enhanced Green Lung - it was built on open fields, it is disingenuous of the council to suggest otherwise, could we not have had a wide open space rather than a confined Country Park?
We've already lost significant open space, including recreational amenities to make way for Tesco's RBS etc and the link road developments. What are the 'quality jobs', undefined term and how is it to be guaranteed that they are for local people - if they are that good surely everyone will want it; again this is a misleading statement and should be withdrawn or amended.
Part 5 - Lets be clear an area for plane spotters and the poor souls living nearby.
Part 3 - Issue 1
Para 1 The railway increases the catchment, but doesn't decrease the competition from other better designed and strategically placed airports, notably Stansted. The rail line doesn't allow locals to access the airport so actually offers no benefit to those in the near vicinity.
Para 2 - Runway size is a constraint; this is not necessarily a bad thing and does give the local authorities an element of control that they relinquished when they sold a 199 year lease. It is actually doubtful that increased runway size makes the runway any more attractive to any operators. Smaller sized airlines are continually going bust and the proposed size does not open the airport to use by any passenger planes that cannot already use the site. The reference to quieter and more fuel efficient are not backed up by any facts. What are we talking about in terms of decibels (residents have little concern about fuel efficiency as this is a trading issue)? It is hardly beneficial if we currently have 50 aircraft flying per day making 150dB of noise each, but expansion leads to 10dB noise reduction per aircraft, but 100 more aircraft taking off every day.
The economic benefit is limited in terms of passenger spend as there is no expansion of the airport facilities and passengers will therefore travel straight through without spending locally.
Again no mention of cargo planes or indeed maintenance/training etc aircraft i.e the flights the council cannot control. I have referred to concerns regarding maintenance and flying of faulty planes in the area.
Issue 2
Para 1 - Excepting that we are talking about a dormitory town (and questioning why large scale employment is so crucial) why is the JAAP considered as the only key to employment and what is the connection to high-tech business. You can't just mention them in the same sentence for them to be connected there has to be a basis in fact and the report (unsurprisingly given that it is bereft of facts) omits to explain the connection. Given that Southend had in the 80's a significant number of office based employers and has now lost most of them, what makes it think that it can attract and retain such employers now? Again no clues as to methodology, only we'll build a big airport and they will come.
Para 2 - Does not make clear where this land is coming from, although it is surely green belt that is being lost, again, in the same area Cherry Orchard Way. Lots of talk about new jobs in business parks, although again nothing to say whether these are actually new to the immediate area or just movement from Hockley (closure of Eldon Way) or indeed other commutable areas in Essex.
Issue 3
Again sustainable is used without meaning. Only noise and air quality are mentioned, although cannot be certain that this will be in relation to road air and rail traffic. No note on water quality, loss of green belt etc. This is not new public open space; areas of open space are being lost and have been lost in the course of the development around notably Cherry Orchard Way and Eastwoodbury Lane.
What are the controls on the airport being considered; are they enforceable (particularly if challenged by the owner) and who will monitor?
What is sustainable transport policy? Again an unexplained term.
This section is undoubtedly unfairly biased and required re-submission.
Issue 4
I understand that the A127 has it's own restrictions on development as per liberal councillor Graham Langley. I would question therefore whether the council's real intention is not to place a bypass through Hullbridge, North Rayleigh, Hockley and Rochford, a plan previously rightly rejected?
i) there is no linkage to public transport and never has been. Deregulation of buses means that these do not link to rail services and the new rail station is not for use by locals. A13, A127 B1013 are already congested, A127 has speed restrictions and Eastwoodbury Lane will be closed and moved.
ii) Locals are forced to use cars due to lack of public transport connections and the fact that the airport rail service will not serve local stations. Bus services are systematically cut e.g 7 & 8 through Hockley and there is no direct link from Liverpool St Rail Line to C2C either by bus or rail. It is nigh on impossible to get people to refuse to use their cars and CPRE statistics show that the vast majority of workers and passengers will always prefer cars to public transport. Luggage and Public Transport do not make a good mix.
iii) What are the new routes - again nothing specifically mentioned, in the short term B1013 already (according to HAAP taking over 15,000 vehicles daily) will be used as a shortcut, increasingly so when the A127 speed cameras start to work and it becomes congested with cargo lorries. Again conclusion is that council will seek to introduce an unwanted bypass through green belt. Essentially the council are creating a problem expanding the airport and seeking to solve it to the detriment of residents with loss of more green belt.
Issue 5
Brickworks - there was I thinking the current policy was to build more houses not demolish existing ones. Another business park is to be built on open space, yet there is little demand for such a park, with vacant units througout both regions, plus Basildon etc. The council are using the flawed plans for Hockley and surrounding areas including the demolishing of Eldon Way to provide a false demand. This is disingenuous and wasteful (i.e not environmentally friendly), why demolish perfectly serviceable existing units just to create new ones? If access is so poor surely this should have been addressed when the bypass was build a few years back, what investigations are taking place into this waste of money?
B1 - again questionable that the demand exists
Area ii b) given the above is actually sensible to move the rugby club to an even more inaccessible spot? Some of these plans would have been more sensible if Southend United Football Stadium had been moved to Warners Bridge site of Southend Rugby Club (floodlights aren't an issue Highbury didn't have pylons), the railway station would have served a dual purpose (and SUFC could have got into Europe!!) The Rugby Club could then have either shared with Westcliff or moved to the site of Fossetts Way new SUFC stadium, more green belt would have been protected and transport links for the football stadium would at least have been maintained, another missed opportunity.
ii c) a green lung, nice that this has been acknowledged, a pokey site between an industrial estate and an airport runway i.e it can't be used for anything else, be honest don't try and dress it up as something it isn't, it is wholly insufficient for the purpose described.
iii) Why is more land being given over, the airport was given away as a freebie (£1) and the local authorities have little control over usage. Keep the land and keep control, allowing the hand over of more land compounds the earlier errors surrounding the 199 year lease.
iv) Identified as inefficient by whom and in what way? Another vacuous, unstabstantiated statement. does the cost of improvement outweight any potential benefit and who is expected to finance this? If units are not fit for purpose then surely it is up to the landlord or tenant to improve them not the taxpayer.
v) Loss of another sports pitch in the area then. We will soon be left with loads of concrete and designated country parks as only green areas, another poor suggestion. Presume East West Corridor will mean a road being built and houses will inevitably follow as the area will be termed 'under-used' within a decade.
vi) 'opportunity sites' - presumably for development? At least this is located next to existing industrial units.
vii) Flying Clubs - all to be kicked out (despite the fact they they do employ people)
viii) opportunity sites - say what you mean development sites, again the JAAP is trying to dress up the unpalatable.
ix) A green buffer a derelict site with a few horses and occasional circus. I hardly feel grateful, this area is currently an eyesore and clearly the report writer as with area ii c) couldn't think of another use. The flying clubs could be retained if the railway line was moved back here!
x) and xi) Loss of yet more amenities for Southend (once home to the largest amateur football league in the country). Demolition and rebuilding of a road that is only a few years old and at last admission that public transport isn't the answer so a park and ride service is required (although this could be omitted forcing passengers to use public transport)!!
4 Policies pg 17
Introduction Para 2 - It is apparently important to put the JAAP into context, but absolutely no attempt by the compiler to do so. It is unreasonable to expect ordinary residents with little or no experience to have to undertake lengthy research of information that the council have. In fact it could be argued that the council withholding this information is a deliberate attempt to prevent opposition, or perhaps just a glaring omission?
Energy saving technology is to be used (save lots of energy reject expansion) and sustainable drainage - what is this, yet another example of poor drafting.
Accepted that the JAAP cannot be looked at without plans for S.E. Essex, but again no clues and why are we restricted to this part of Essex why ignore Stansted and indeed other airport developments that the target passenger pool can use???? Again JAAP is flawed.
Employment allocations
Introduction
Why high scale employment growth? The term isn't explained, what type of employment and what are the employment aspirations. The area has relatively low unemployment, admittedly many people do not work locally, but this is because of the dormitory (and indeed retirement nature of this part of Essex, that the expansion will undermine and ultimately destroy. There is a limited pool of labour and there are no supporting statistics regarding the composition of the current labour pool or the required labour pool, there seems little point in creating jobs that cannot be filled.
Additional floor space - is this purely within the JAAP, what about other plans locally e.g HAAP where floor space is being reduced, meaning businesses are moving and new jobs are not created, just being relocated at the whim of the councils. The JAAP cannot on one hand say that it must be looked at in context and then ignore the context, this document is flawed again.
Upto 4950 jobs, how is this figure arrived at? It is unsubstantiated and unsupported and meaningless. Up to means just that any figure (including a negative) lower than 4950 is up to the JAAP requires amendment (again). In the area - is this the JAAP area, S E Essex? Are they JAAP related jobs and what are they - 'McJobs'? Same applies to the additional 750 jobs in Aviation Way. Non-specific, non factual and misleading.
E1 - another unsubstantiated figure, unclear if the jobs above are included in this figure or not. How do you split the jobs 50/50, who measures this and who is to say whether the airport brought those jobs. Remember a significant number of insurance companies merged in the 1990's and Southend lost jobs as a result, it had little to do with council policy. Just as conceivably an organisation could decide to move to Southend or Rochford, with airport expansion having no bearing on that decision.
E2 - Is this suggesting that in the middle of a recession busineses will have to pay to upgrade, I feel their sights may be elsewhere. No details on the financial contribution are given - how much taxpayer's money will be poured in and, as with the airport sold on at a loss? Are businesses going to be asked to donate or taxed, won't this be a disincentive to relocate?
This requires more detail and a lot more thought from the councils.
E3 - It is not reasonable to expect significant numbers of employees to walk or cycle unless they live very close to the units. Anyone living any distance will have to negotiate extremely busy (and probably busier roads), the cycle paths may well prove to be a waste of money, cause further unnecessary traffic to motor vehicles and should be properly costed.
Again business contributions comments as per E2 above
E4 E7 - No additional comment given rejection of the entire concept
E8 - As above how are job totals arrived at?
Overall comment on how and why businesses will contribute and what will be cost to residents
London Southend Airport
Introduction
Recognised that Airport can provide a boost - recognised by whom? another unsubstantiated and flawed statement.
Agree should have quieter aircraft, but fuel efficiency is a business decision not a local authority one.
Why must these aircraft be 150 seats again not explained?
Will aircraft development not actually catch up with the airport i.e. over the next decade larger aircraft landing on shorter runways (we then have a problem that we've bigger aircraft than the council currently envisage).
Why is the runway set at 1799m (I believe to avoid additional regulation of 1800, + runways)?
Are there any passenger aircraft with a full payload that cannot access at present that but can at 1799m? If so what types, what noise levels.
Expected that use will be passenger - expected by whom? Certainly not me. It is owned by freight forwarders who have stated they 'have found (their) Southern base'. Low Cost Airlines such as Easty Jet have a fleet requiring longer runways that proposed, who is the new airport aimed at?
Para 2 Growth in MRO - this means defective aircraft will be flown in over densely populated areas - the potential for disaster is huge and the council could/should be held accountable if a crash occurs (as it did in the 1980's).
If there is a demand for high skilled jobs, it is unlikely that applicants exist in sufficient number in this area and therefore, we would be reliant on migrant workers.
Whilst it is not considered desirable for the airport to handle large volumes of freight how much control would the council actually have over this? If the owners want to ship freight can they be stopped? If they want to extend the rail line (and Stobarts already have close ties with both Network Rail through Stobart Rail and Tesco's in terms of freight delivery) can they be prevented? If they want to run HGV's and vans in and out what can the council do? This is their core business. I would suggest that the professional businessmen at Stobarts are more than capable of giving amateur councillors the run around when it comes to what the airport will be used for. Local Authorities are very poor at refusing planning changes when business puts through a commercial reason. The first of these will be 'we can't attract viable passenger numbers we need to increase freight movements'. Once the extension is approved it cannot be repealed.
Para 3
Environmental constraints - no clues as to what these are how they are enforced (indeed if they can be) and what penalties are if airport users do no comply (saying sorry won't be enough) - will they pay compensation to individuals, where will the burden of proof lie? JAAP is deficient again.
The JAAP is also deficient in that no map of flight paths, stacking arrangements or noise levels at altitude (CPRE refer to these as noise contour maps). It seems anomalous to let the operator make his own statement, surely, if this extension takes place the council need to set noise levels and dictate to the user? Road noise (either freight or passenger) is completely omitted, as is rail noise.
Currently train services do not run through the night, but do stop near local stations when operating. The airport timetable will have non-stop trains. Additionally no details of freight movements, all of this is a complete omission and a justifies re-issue of the JAAP.
The A127 is an insufficient carriageway in its current form, particularly following the misguided speed reductions. Cycling facilities just take up vehicle space. I understand that there are limitations on the improvements that can be undertaken on the A127 due to it in part running through the Public Safety Zone, where major roads are not permitted, this is sufficient in itself to justify refusal of the proposal.
LS1 - this support of the expansion policy is unexplained. Why are 2 Tory councils supporting a misguided Labour policy, which basically entails concreting over anywhere that votes conservative? Solid reason should be provided for expansion.
LS2 - Permission
. Airport related - how tenuous does the link have to be for permission to be granted? this is yet another vague statement.
. Agreed baseline - this is undecided, does it require constant noise at one site or intermittent noise again far too vague. No details on who determines/measures etc. I will wager that all complaints about noise will be refuted by the operator. What about non-passenger flights, cargo, maintenance, training etc etc.
. Contributes to road infrastructure needs - positively or negatively and to what extent?
. Modal shift - what are the targets how and who measures the movement and who assesses whether the application is actually reasonable.
Again the JAAP is too vague to be meaningful.
LS3 - what sort of statement, what must this include. The JAAP note is meaningless and needs to be more prescriptive.
LS4 - again JAAP should be more prescriptive, this is meaningless.
LS5 - this is a restriction on the usage of residents property - does this contravene human Rights Legislation??
LS6 - Mentioned previously what is justification in passenger terms to increase the runway. Is there actually an advantage to the council and the residents to refuse 1799m, but approve 1800m?
LS7 -
. Times, unacceptable, 2300 is too late; this is some hours after dark in winter and makes no consideration in particular of the disruption that wil be caused to the sleeping pattern of children. Early mornings are also an issue for similar reasons. No mention is made of unscheduled flights and of cargo flights etc etc. The number of flights is not mentioned. If successful no-one will ever have another peaceful weekend.
. Cargo flights - require more restriction than just noise levels. No passenger flights at night (in noise controlled jets), but loads of cargo flights throughout the night using any available aircraft. what about maintenance/testing/training flights etc
. Routing - existing routes aren't shown, what are the plans for future routes. Again the JAAP is not fit for purpose.
. Helicopters - what more or less, operating heights? As these are vertical take off they could surely reach altitude over the airport before moving off?
. Restricted to what - will it pick up maintenance training testing etc?
. Ground running again unspecified JAAP too vague
. Training movements again unspecified JAAP too vague.
Terminal Facilities
PF1 repeats LS7, why? Is there in fact missing information here.
Maintenance repair and Overall
MRO1-3 what is justification for this, as previously stated surely this just increases the danger that the airport poses in a densely populated area. The possibility of contributions from business at the current time are surely fanciful.
Airport Development Zone
What criteria will be used to decide if development supports the airport and why is retail use refused?
Transport
What sorts of contributions are expected? What about the B1013, there is absolutely nothing to stop drivers using this as a cut through, especially given the days and reduced speed limits on A127?
T1 - where is this proposed to run?
T2 - and this?
T3 - why dual this road, unless there are plans to reintroduce the bypass via Hullbridge/Rayleigh/Hockley. Dualling only encouraes further traffic along the over used B1013 via Rayleigh
T4 as T3 this is encouraging traffic away from preferred route of A127
T5 - Loss of public amentities
T6 - there remains little incentive to use anything but a car, no car parking facilities forces the use of public transport - radical but true?
T7/8 - what sort of contribution - inevitably the tax payer will fund the bulk of this and how will the bill be met - wholly by Southend? who decides on contribution?
T9 - these are not provided with the JAAP again an omission
Environment
Introduction, this is not a green lung, the development is taking place on the green lung. already, the developments along and of Cherry Orchard Way have eaten into this and I understand that the development will downgrade further land making it easier to develop the area in the future. The green belt boundary isn't 'reviewed', it is obliterated. This is unacceptable.
Para 3 - what are 'high levels of environmental efficiency?' and 'sustainable drainage' more vacuous statements. These need to be clarified the document is once more deficient.
ENV1 - unacceptable loss of green belt (again) both councils seem to really object to green belt principles and look for any opportunity to develop such sites apparently seeing them as an inconvenience rather than a necessity and a desirable asset.
ENV2 - this is not new - it is open at prsent and it is at best misleading and at worst a downright lie to call it new. The JAAP is once more factually erroneous
ENV3 - as 2 above.
ENV4 - and if no contribution arrives does it happen or does the taxpayer get saddled with the bill? How will contributions be collected, surely this is a tax on new enterprise?
ENV5 not new public space again incorrect
ENV6 - this is constitutes 'no change' presumably because the land is so poorly sighted it is permitted to escape development
5.1 - JAAP provides no idea of what scale of limitations will be i.e. one in 3 units are occupied, how many jobs will result, how many of the contributions will be made.
5.2 - intended to provide detailed information - need more details now, not a washy statement that it is 'intended'. Sorry intended to but didn't get around to it. Should say 'Full details will be provided'.
5.3 You have my views. The report JAAP itself is deficient in factual information and misleading in the extreme. There is a lack of information given to the individual and it is not apparent that the council have advised necessary interested parties e.g RSPB. As such the process is substantially flawed, sufficiently so for the whole of this stage to be delayed whilst the JAAP is re-issued with sufficient information and clarification.
From my understanding of the proposals the councils are to a varying degree being incredibly naive, disengenuous, negligent and as such untrustworthy. Again this is sufficient to warrant review of the JAAP.
I understand that as part of the review process Rochford councillors visited Southampton Airport. I would suggest that although the runway size is comparable, to undertake a visit to an airport that doesn't permit night flights except in extenuating circumstances (max 10 per month 100 a year) and out of season is not going to provide any great insight. Especially given that the European Region Association (ERAA) shows the following freight movements Southend and Southampton in 2008:-
Southend 443 Tonnes reducing 19.6% from 2007
Southampton 264 tonnes reducing 10.5% from 2007
So the two airports are not as comparable as has been suggested especially since freight cargo uses older, noisier (propeller aircraft) rather than those 'quiet' jets for passengers and Southend is now owned by a freight forwarder.
Additionally back in 2002 the DfT recognised the lack of appeal of Southend as a suitable site.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14732

Received: 24/06/2009

Respondent: Mr Peter Symes

Representation Summary:

1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.

Full text:

Please refer to the attached document which lists all concerns with process and lack of information provided by the Councils concerned in respect of the JAAP. Again the demands placed upon objectors are onerous (as with the HAAP), namely the requirement to complete on-line or to file an individual form per objection are unfair and unwarranted. I understand however that this advice is actually waived upon request and as per my conversation with your offices! Attach one report for your attention lising all my issues with the JAAP at this time.
I expect a response to all queries raised.
The Councils have been extremely negligent in their duty to provide sufficient information.
At the present time the proposals are unacceptable in their entirety and there is nothing to suggest my opinion will change. I additionally support the comments made by campaign for protection of rural Essex (England) in their submission.
I am writing to object to the proposals contained within the London Southend Airport and Environs Joint Area Action Plan Preferred Options Dated February 2009.
I have a number of general objections regarding the process, documentation and manner of delivery as well as specific objections to the proposals and list these as follows:-
Flawed Process of Presentation.
1) There was little initial notification to the public of the first stage of consultation or the ramifications of not responding. We appear to have reached stage 2 of the process by default and dictation by the Councils, with stage 1 swept swiftly 'under the carpet' rather than the opportunity given to residents to undertake a considered process of weighing up the options. I do not believe that the majority, or even an adequate portion , of local residents understand the process and the JAAP documents do little to address this. Neighbouring authorities, that are also affected, will have had little input into the process and their residents no understanding of what is going on or what influence they can have. As such the process is flawed and details supplied inadequate. Unless the councils can demonstrate evidence to the contrary.
2) The selection of option three again has been decided adequate consideration of other options.
Whilst Southend Council have at least gone through the motions of offering roadshows to assist understanding RDC appear to have relied solely on advertising.
Notwithstanding this both Councils have failed to provide adequate information within the document, given their support of the proposal it must be concluded that this is a deliberate rather than just a negligent act and again calls into question the whole process.
As a bare minimum the JAAP should include :-
. Existing and post extension flight paths (how these may vary in inclement weather)
. Stacking arrangements in the event of runway closure/delays
. Basic statistics showing likelihood of inclement weather/runway closures and, as such how many times a year stacking arrangements and flight path changes are likely to be implemented and the anticipated number of flights this will affect.
. The types of aircraft able to take off, both before and after the extension (cargo, passenger and 'other')
. The minimum and maximum number of flights permitted (including split between cargo passenger, maintenance, training, testing) and flight times (including scheduled, non-scheduled, charter, training/testing/maintenance)
. The noise levels generated at ground level by the planes at altitudes - a noise map?
. expected plane altitude at say half mile intervals from take off/landing
. expected traffic volume increases (Stobart and other firms lorries and vans) for A127, A130 and B1013 (Rayleigh - Hockley - Rochford Road), as a result of airport expansion and closue of Eastwoodbury Lane
. Expected train timetable changes (including non-scheduled freight movements) and anticipated delays as a result of new passenger trains.
. the fact that the trains for the airport are not going to provide a local service (thus local commuting to the airport by train remains inconvenient)
. confirmation as to whether or not Stobart can apply (and whether or not the councils have any power or inclination to prevent or resist) to make rail freight movements to the airport or the immediate vicinity
. Which jobs are genuine new jobs, type etc and which will be transferred from other parts of the district (and lets not limit ourselves to Rochford and Southend, because undoubtedly Castle Point and Basildon will be affected)
. A summary of the impact of other developments in the area, including redevelopment of Hockley, Stambridge Road, Hawkwell, Daws Heath etc etc. These should be clearly marked on a flight path map also.
. Confirmation of detailed plans for inevitable road expansion schemes that will be required to support increased road traffic. Particularly A127, where proposals incorporate the Public Safety Zone and whether the expansion will be used to push through the unwanted development of a bypass via Hullbridge/North Rayleigh/Hockley and Rochford?
As such I would view this as a basic dereliction of Council duty - failure to inform and ensure that the interests of residents are looked after. I understand also that this may breach the Freedom of Information Act and RDC's own consultation strategy
3) The Councils have apparently selected the least popular option, although conveniently neglected to inform residents as to how or why this decision was arrived at. The only factor that seems to offer any support for their decision is 'increased jobs'. Various figures are quoted all prefixed by the worlds 'upto'. This term is 'up to' is sufficiently vague to mean that any number (including negative ones) below the figure quoted would be deemed a success. As such it has no place in the document as it constitutes mere speculation. Hard facts and details of how conclusions are arrived at are needed.
As such the information provided is surely skewed and the Councils are seemingly abusing their position in recommending the proposal with absolutely no solid evidence to back up the position.
4) The connection of this scheme with other projects in the area, notably a number of house building projects including those mentioned in 2) above, is not made clear Government document PPS12, makes clear reference to :-
Every local planning authority should produce a core strategy which includes :
1) an overall vision which sets out how the area and the places within it should develop;
2) strategic objectives for the area focussing on the key issues to be addressed;
3) a delivery strategy for achieving these objectives. This should set out how much development is intended to happen where, when, and by what means it will be delivered . Locations for strategic development should be indicated on a key diagram; and
4) clear arrangements for managing and monitoring the delivery of the strategy.
Whilst this document is no doubt available somewhere it should be included with the JAAP, since without it the JAAP is not placed in the required context, without clear direction it is impossible to understand how or why this is intended to be part of the core strategy.
Additionally how have residents been consulted on the overal strategy, because if that exercise is flawed - and certainly the desire to build more homes in a densely populated area, whilst simultaneously expanded an airport, demonstrates that it is, then much if not all of the sub-plans such as this area also flawed.
PPS12 also refers to
Period of operation
4.13 The time horizon of the core strategy should be at least 15 years from the date of adoption.
As above there is no clear advices as to where the JAAP fits in the core strategy or where we are in the time horizon. Again the document lacks context, although it even states that it must be read in context, it provides little clue on how to do this.
PP12 also refers to
Statements of Community Involvement:
An SCI should
. Explain clearly the process and methods for community involvement for different types of local development documents and for the different stages of plan preperation. This needs to include details of how the diverse sections of the community are engaged, in particular those groups which have been underrepresented in previous consultation exercises.
. Identify which umbrella organisations and community groups need be involved at different stages of the planning process, with special consideration given to those groups not normally involved.
. Explain the process and appropriate methods for effective community involvement in the determination of planning applications and where appropriate refer to Planning Performance Agreements.
. Include details of the LPA's approach to pre-application discussions.
. Include the LPAs approach to community involvement in planning obligations (S106 agreements).
. Include information on how the SCI will be monitored, evaluated and scrutinised at the local level.
. Include details of where community groups can get more information on the planning process, for example, from Planning Aid and other voluntary organisations.
. Identify how landowner and developer interests will be engaged.
These above items from the PPS demonstrate the assistance that should be given to ordinary residents (and others) in the process. As mentioned by Campaign for Protection Rural Essex a number of organisations should have been consulted including RSPB; Essex Wildlife Trust etc. It is disingenuous and perhaps even negligent of the council not to include these within the Action Plan. Most people have very little experience of dealing with documents such as this and it is only at this late stage in the process (given that we've already passed through stage 1) that RDC and Southend BC have offered even limited advice. Even having read as much as I can in the past few weeks, I (and I am certainly not alone in this) have very little information regarding :- the crucial stages in the process; whether residents can succeed in resisting or changing any aspect of the proposals - RDC really should explain the steps in simple terms. At the moment we seem to progress from one stage to the next with absolutely no guidance. For instance:- I understand from information received from other sources in relation to the airport, that unless I head this document as an objection it is merely treated as a comment. I believe petitions are ignored. I will need to get my wife to make a separate submission in order for her views to be considered, even though we agree. The council seems quite happy to tell people how to make positive comments, but far less inclined to advise on how to object - hardly democracy and clearly demonstrating a deficiency and unfairness in the process, that should be revisited before we move ahead.
PPS12 again
Justification of Core Strategies
4.36 core strategies must be justifiable: they must be:
. founded on a robust and credible evidence base; and
. the most appropriate strategy when considered against the reasonable alternatives.
As above we cannot be sure that the base is robust and credible or indeed the most appropriate when considered against reasonable alternatives, since we don't know how and why the initial alternatives were first selected and then rejected. The JAAP provides no evidence base to affirm that the selection or the process is credible and again the JAAP requires review and re-issue.
If this is the preferred option, what was the basis for selection and will any ideas arising from the consultation be put forward for further consideration? Is it possible (likely) that if decent alternatives are proposed in stage 2 the preferred option will be amended and re-submitted? If not then, again, the process is flawed.
5) The document produced glowingly mentions the positive aspects and underplays the negative - surely the document should be impartial and genuinely enable residents to make up their own mind? Plenty of rhetoric about jobs new businesses etc but no details and certainly no information on the negatives, noise, congestion, loss of property value, decline in overall living standards etc. Basic research reveals Stobart's close ties with Tesco and Network Rail are we going to end up with a huge Tesco distribution centre supporting the airport, similar to their Dudley operation?
While the JAAP includes a brief note that the airport is unsuitable for large scale cargo operation (only a niche operation). The terms 'large-scale' or 'niche' are undefined, will mean different things to different peope and are therefore meaningless in the context of the JAAP, again this requires clarification and re-issue. Notwithstanding this the actual use is surely the decision of the owners and not the councils? Stobart management are already quoted as saying upon the purchase of the airport 'we have found our Southern Base', doesn't really sound like they are planning a limited operation, quite the opposite.
It is also unclear where any 'new' jobs and businesses will come from. Given the proposals and redevelopment of Hockley it is apparent that a number will come from there and therefore aren't really new. Again disingenuous of RDC in relation to the HAAP (and Southend BC not to make this clear in the JAAP that a proportion of jobs at the Airport sites will actually be moved from Hockley)
6) The document itself is devoid of factual information, although admitting that aspects will be supplied later, this itself smacks of a rush job. We find ourselves moved on to a stage from which there is no going back without having the facts adequately presented. It seems that the councils are either negligent in preparation of the facts or trying to hide something.
Development of the airport could bring about a fundamental change to the area, not necessarily for the better and it is in resident's interest for all information to be divulged as soon as possible.
It also uses a number of undefined terms, notably around the word 'sustainable'. It could mean 'long-term use with minimal environmental impact', but it the council are not clear what meaning they are seeking to attach. Equally, there are (source Wilkipedia) different types of sustainability. Economic, Environmental and Sociopolitical, so there is significant room for confusion as to meaning and I'm quite sure most people have no understanding what is meant by sustainability in the context of the JAAP.
7) The council is geared very much to receiving information via the internet, whilst undoubtedy this is cost effective; it is unfair on those residents that do not have internet access, particularly the elderly who make up a significant proportion of the population in the area. It is doubtful therefore that the views obtained will actually be representative of all residents. I note at election time certain parties are very keen to get their voters to polling stations and will provide transport - I wonder how keen those same councillors are to dedicate time and petrol to those residents wishing to get assistance in completing JAAP.
Completion on line is actually quite difficult and near on impossible if you have lengthy comments to make. Again the councils are colluding to dissuade residents from making anything but the briefest of contributiions.
Additionally the representation form states that each objection/comment requires completion of a separate form. Clearly this is actually designed to put people off commenting. Although I understand from a telephone conversation with RDC planning department that the council will accept one form with clearly listed comments. I would have to question whether RDC/Southend BC can actually determine what form objections may take. Again the process appears flawed, as this is biased towards acceptance of JAAP. At best this builds mistrust between residents and the councils as to motive; at worst it is downright dishonest.
The JAAP relies too much on the reader having a detailed knowledge of planning terminology and documentation, mentioning a significant number of undefined, unexplained and unreferenced terms and documents (as mentioned later) and omitting adequate cross-referencing. As such it is an inaccessible, inadequate document not fit for purpose and until it is adequately amended and re-issued the consultation process is flawed.
8) Rochford Council's own Leisure document refers to Rochford being the 'Green Gateway', clearly there is a desire to put a wall up given the amount of building that has occurred in the West of the District - this needs to stop. The local infrastructure cannot cope:-
B1013 is a hugely busy Road already - HAAP refers to 15,000 + vehicles back in 2007 and significant building has taken place since then. If the Airport expansion takes place, and RDC regretfully support this, then further transport issues will arise.
What plans are considered for a major disaster, large aircraft crashing on residential or occupied business property? In the US 7 of the last 8 fatal commercial airline crashes involved regional airlines (BBC 12th May 2009) or indeed hijack, bearing in mind proximity to major centres of population, power stations etc.
What additional policing/customs and immigration officers will be supplied, both at the airport and elsewhere in the region? Not only do illegal immigrants use lorries to access the country (and a cargo terminal will increase the amount of vehicles in this part of Essex), but aircraft have also previously been used (e.g at Stansted). Additionally there are the increased risks associated with drug smuggling, particularly given that criminals may seek to use the nearest available market for contraband. There is also an increased likelihood (with increased vehicles) or road traffic offences, which speed cameras do not address. What additional resources will be provided to the NHS to deal with the upsurge in stress, sleeplessness and associated problems including violence and accidents?
9) No explanation has been given as to why RDC/Southend BC support Government policy (I have asked my local councillors and MP to explain this apparent anomaly) there seems to be no desire to protect the quality of life enjoyed by residents, certainly much of this part of Essex has previously shown (in Government statistics) to be one of the least deprived areas of the country, yet the proposals seem to treat it as though it is one of the most deprived - is this wishful thinking on the part of the compile? As recently as 2006 Southend was calculated to be the best place to retire to.
10) Both Councils are keen to promote the area as a great place to visit yet surely this will be the death knell for tourism, the only visitors will be those waiting for a plane to get away from an overly congested cargo handling centre.
11) There is no clear mention of what controls are able to enforce (and indeed whether they would agree on these). Given the track record of local authorities but locally and countrywide in rejecting and/or enforcing actions against big business and national government e.g totally inability to prevent McDonald's and Tesco building where they like and the fiasco of the change of use of Bullwood Hall prison I rather suspect that if the expansion is approved Stobart's will ride roughshod over any objections from residents irrespective of whether the council's support the residents.
12) No account appears to have been taken of the wider questions regarding airport usage. Aside from the environmental impact, the reduction of carbon emissions etc is supposed to be at the forefront of business, government and local authority strategies, and the JAAP clearly goes contradicts this. Why have the following not been mentioned.
a) Southend is only accessible from the East and North (there is so little to the West it is hardly worth mentioning and is obviously cut off fromt Kent by the Estuary). As such the Pool of passengers it is supposed to be attracting is actually very limited. To the North sits Stansted whilst to the East, London and the various airports accessible from there.
b) Why the runway is being extended to 1799m and not 1800m (something I believe to do with extra regulation), when this doesn't actually allow for any passenger planes that are larger than the current users to land.
c) With perhaps the exception of Luton, every major airport easily accessible from London i.e Gatwick, Stansted, Heathrow and London City itself have expansion plans in the pipeline, as such the need for expansion of Southend as a passenger airport is questionable if not foolhardy.
d) Most recent figures for air travel suggest that this form of transport is actually declining.
It would actually suggest that the freight forwarder Eddie Stobart has an entirely different motive for expanding the airport.
13) Apart from neglecting to place sufficient significance upon the fact that a freight forwarders now own the airport and thus that the expansion will cause increased in cargo shipments in the air and on the ground, I fully support the comments made by Campaign for Protection for Rural Essex (part of CPREngland).
14) The councils have made no mention of the plans to ease road congestion that expansion will undoubtedly bring. I anticipate that you will seek to resurrect the misguided and previously rejected plans to further develop on green belt by building a bypass across Hullbridge, North Rayleigh Hockley and Rochford, just exacerbating the over-development of this area.
Nor is the impact upon rail timetable and whether there is sufficient rolling stock available for the new train service (i.e whether existing commuter carriage availability will be cut to provide airport services) explored.
Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.
1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.
1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.
1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.
1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.
1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.
Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.
Para 3 significant job opportunities - again undefined as to what significant means and what type of jobs are referred to (McJobs)?. Given the competition from the above airports it would require significant, unwelcome further expansion for business to be attracted because of the airport. Businesses decisions are made for reasons unrelated to the airport, yet the report suggests that development would be a major driver for business (but does not say why or what type of business). Southend lost virtually every major office employer since I worked there in the 1980's. Most major insurers and brokers merged and moved out of Victoria Avenue, as did various government departments (due to National government strategy) and BT, this had absolutely nothing to do with the airport and attracting these businessses back will probably have equally little to do with an airport.
Why is the commuter belt aspect of the region completely ignored? Many people commute to work and bring money back to spend locally. Similarly the retirement aspect is also ignored completely. It is questionable whether there is any great need for huge swathes of industry in this part of Essex.
Tourism desination is an absolute joke, the region is overdeveloped and the only tourists would be waiting for a plane to get away.
Para 4 - why is only the airport considered to be a drive for economic development? Holidaymakers pass straight through to their destination and most companies are cutting back on expenses such as business flights and use of technology (video-conferencing etc) renders their need redundant. We can surely only be talking about freight movement????
Again paragraph 4 refers to 'employs a significant number' is non-specific as to quantum or job types. Are you including the airport trading estate? I've shopped there, but I've never flown from Southend, it is totally unrelated and again the document is misleading.
Surprisingly the JAAP refers to a specific document, but gives no clues as to where to find the Rochford Core Strategy Preferred Options Document.
Para 5 - Transport issues are understated and it really does seem rather pointless to even attempt to expand such a small airport and blight the whole area for good for a few weeks in 2012. European visitors would be far better served by train, whilst longer haul flights cannot land on a runway this size.
Para 6 Who sees the airport as important for development and prosperity? Another vague statement dressed as fact. I see it as actually the beginning of a sustained decline in the area as the affluent move away, house prices fall due to noise and congestion from air and road freight and the area goes into, pardon the pun, terminal decline. Again future employment needs take little account of commuting.
2.1
Para 1 The context against which the JAAP is set is now outdated, having been drawn up in time of boom and when it was inconceivable that banking institutions would have to be underwritten by National Government to the extent they now are. The financial pattern of this and other countries have changed fundamentally and it will be a significant time before things get back to normal (over 20 years), loans are no longer freely available and the 'Vision' clearly needs to be re-visited.
Para 2 - refers to quality of life for residents is mentioned, but actually not expanded upon in the report. It is quite clear that expansion of the airport will reduce the quality of life for all but a very few number of residents i.e those fortunate enough to be directly employed in senior positions.
Para 3 - London Southend Airport as a 'major employer' - again an undefined term
. How many people does the airport directly employ (I suspect that many of the jobs are in fact secondary and even if the airport closed work would be taken up by other airports e.g Stansted or London City and the jobs would remain within commutable distance)?
. How many of the jobs are actually in the adjacent business park and in reality unrelated to the airport?
. How many of the jobs will actually be lost upon expansion (e.g those at the flying clubs that are being pushed out, businesses that are forced to close due to congestion etc)?
. How many of the jobs would actually remain if the airport was unaltered?
. Why isn't the spare capacity being used?
. What could be done to improve the spare capacity usage?
. What are the costs/benefits in picking up the spare capacity?
. Why, if the airport is so important, won't it become a success without expansion?
All basic questions the JAAP fails to address.
Para 4 - what is the 'current and emerging policy framework in the area'? again an undefined and meaningless phrase.
Para 5/6 - Southend core strategy - wonderful, what other options were considered and why is Rochford so keen to support this if, as this document so clearly demonstrates, there are so few advantages and so many disadvantages for the area and its residents.
Para 7 to end
Who are/what is Renaissance Southend Regeneration Framework? Another undefined term. How they have arrived at the conclusion it should be a centre for international air services and then contradicted this by saying it would be a 'great place to live' - when it so clearly wouldn't with a huge number of planes flying over head day and night. Rochford Council have a similar objective in making this a great place to live!!! I've lived in the region all my life, with these proposals I have no desire to continue to do so (but my options will be restricted by the resultant slump in house prices the expansion will cause)
Again there is very little mention that most of the towns in the region are actually dormitory towns for London e.g. Rayleigh. The desire to encourage employment is actually questionable on this basis. Higher salaries are always available in the City and vast airport expansion would probably require a significant number of migrant (possibly overseas) workers to fill vacancies.
Hi tech businesses tend to be low scale employers and no examples are given of 'high value employment'. This is pie in the sky aspiration with no basis in fact; it should be only be included in the JAAP if noted as such.
2.2
Para 1 - again refers to unreferenced material, planning documents etc, and it is impossible to know if this has been fairly assessed or just the bits chosen to fit.
The objectives are:
. Creation of sustainable and high value employment and other land uses within the study area; - what is 'high value' and what 'other land' - this is a vague and washy statement requiring amendment.
. Maxamising the economic benefits of a thriving airport and related activity: - is this at all costs?
. Ensuring appropriate improvements in sustainable transport accessibility and facilities; what is appropriate (who decides) and sustainable again undefined what other plans are the Council's proposing to run off the back of airport expansion? the rightly rejected Hullbridge to Rochford bypass???
. Ensuring a high quality environment for residents whether expressed through noise pollution management or protection of green space: what about congestion, air quality from road pollution etc?
. Maximum return on public investment through attracting inward investment; and is this at all costs?
. Efficient use of existing employment land resources. Is this at all costs?
2.3
Economic growth and new jobs. Again no consideration that the area is largely dormitory, no mention of the type of jobs and the fact that the airport expansion could have a negative effect with wealthy moving away and the area actually being an undesirable place to live, spiralling into decline.
Para 2 - Why will it be successful when there is significant competition from Gatwick, Heathrow, London City, Luton and Stansted all of which have better infrastructure and passenger pools as well as expansion plans. The proposed runway extension offers no increase in options for passenger plane access, as it cannot cope with any larger planes than the present runaway, as such the extension should be rejected as it fulfils no purpose.
Passengers will travel on the same planes they do at the moment and no plane is quiet or fuel efficient, especially when you consider that in excess of 20,000 flights per annum will take place (25,000 according to CPRE). It could even be argued that Southend should withhold expansion until plane technology improves to allow even shorter take-off and landing?
Conclusion would be that passenger use is to be secondary to cargo use and that Stobart have little intention of promoting the passenger aspects, except as a means of additional profit to their core operation, the movement of freight.
Fast food access is not possible the speed limit on the A127 is now 50mph for large stretches and is interrupted by numerous sets of traffic lights. Congestion problems will be exacerbated by any increased cargo usage at the airport, which will see the number of vehicles increase. No mention here of closure of Eastwoodbury Lane/A127 Public Safety zone or use of A130 or B1013 all of which will be problematic.
Para 3
Maintenance and repair - this implies that faulty aircraft will be flying over densely populated areas in order to be fixed. Given that the last time Southend had a significant cargo operation a plane crashed on Rayleigh (at night, on the only commercial premises in a residential district) it may be tempting fate to suggest that you are rather chancing residents luck with this proposal.
Restrictions on night flights - again unspecified as to what these will be and how they will be enforced. No consideration to schools, hospices, hospitals, etc etc let alone resident.
Part 4 - award winning, which award and by whom a vague statement. How can this be an enhanced Green Lung - it was built on open fields, it is disingenuous of the council to suggest otherwise, could we not have had a wide open space rather than a confined Country Park?
We've already lost significant open space, including recreational amenities to make way for Tesco's RBS etc and the link road developments. What are the 'quality jobs', undefined term and how is it to be guaranteed that they are for local people - if they are that good surely everyone will want it; again this is a misleading statement and should be withdrawn or amended.
Part 5 - Lets be clear an area for plane spotters and the poor souls living nearby.
Part 3 - Issue 1
Para 1 The railway increases the catchment, but doesn't decrease the competition from other better designed and strategically placed airports, notably Stansted. The rail line doesn't allow locals to access the airport so actually offers no benefit to those in the near vicinity.
Para 2 - Runway size is a constraint; this is not necessarily a bad thing and does give the local authorities an element of control that they relinquished when they sold a 199 year lease. It is actually doubtful that increased runway size makes the runway any more attractive to any operators. Smaller sized airlines are continually going bust and the proposed size does not open the airport to use by any passenger planes that cannot already use the site. The reference to quieter and more fuel efficient are not backed up by any facts. What are we talking about in terms of decibels (residents have little concern about fuel efficiency as this is a trading issue)? It is hardly beneficial if we currently have 50 aircraft flying per day making 150dB of noise each, but expansion leads to 10dB noise reduction per aircraft, but 100 more aircraft taking off every day.
The economic benefit is limited in terms of passenger spend as there is no expansion of the airport facilities and passengers will therefore travel straight through without spending locally.
Again no mention of cargo planes or indeed maintenance/training etc aircraft i.e the flights the council cannot control. I have referred to concerns regarding maintenance and flying of faulty planes in the area.
Issue 2
Para 1 - Excepting that we are talking about a dormitory town (and questioning why large scale employment is so crucial) why is the JAAP considered as the only key to employment and what is the connection to high-tech business. You can't just mention them in the same sentence for them to be connected there has to be a basis in fact and the report (unsurprisingly given that it is bereft of facts) omits to explain the connection. Given that Southend had in the 80's a significant number of office based employers and has now lost most of them, what makes it think that it can attract and retain such employers now? Again no clues as to methodology, only we'll build a big airport and they will come.
Para 2 - Does not make clear where this land is coming from, although it is surely green belt that is being lost, again, in the same area Cherry Orchard Way. Lots of talk about new jobs in business parks, although again nothing to say whether these are actually new to the immediate area or just movement from Hockley (closure of Eldon Way) or indeed other commutable areas in Essex.
Issue 3
Again sustainable is used without meaning. Only noise and air quality are mentioned, although cannot be certain that this will be in relation to road air and rail traffic. No note on water quality, loss of green belt etc. This is not new public open space; areas of open space are being lost and have been lost in the course of the development around notably Cherry Orchard Way and Eastwoodbury Lane.
What are the controls on the airport being considered; are they enforceable (particularly if challenged by the owner) and who will monitor?
What is sustainable transport policy? Again an unexplained term.
This section is undoubtedly unfairly biased and required re-submission.
Issue 4
I understand that the A127 has it's own restrictions on development as per liberal councillor Graham Langley. I would question therefore whether the council's real intention is not to place a bypass through Hullbridge, North Rayleigh, Hockley and Rochford, a plan previously rightly rejected?
i) there is no linkage to public transport and never has been. Deregulation of buses means that these do not link to rail services and the new rail station is not for use by locals. A13, A127 B1013 are already congested, A127 has speed restrictions and Eastwoodbury Lane will be closed and moved.
ii) Locals are forced to use cars due to lack of public transport connections and the fact that the airport rail service will not serve local stations. Bus services are systematically cut e.g 7 & 8 through Hockley and there is no direct link from Liverpool St Rail Line to C2C either by bus or rail. It is nigh on impossible to get people to refuse to use their cars and CPRE statistics show that the vast majority of workers and passengers will always prefer cars to public transport. Luggage and Public Transport do not make a good mix.
iii) What are the new routes - again nothing specifically mentioned, in the short term B1013 already (according to HAAP taking over 15,000 vehicles daily) will be used as a shortcut, increasingly so when the A127 speed cameras start to work and it becomes congested with cargo lorries. Again conclusion is that council will seek to introduce an unwanted bypass through green belt. Essentially the council are creating a problem expanding the airport and seeking to solve it to the detriment of residents with loss of more green belt.
Issue 5
Brickworks - there was I thinking the current policy was to build more houses not demolish existing ones. Another business park is to be built on open space, yet there is little demand for such a park, with vacant units througout both regions, plus Basildon etc. The council are using the flawed plans for Hockley and surrounding areas including the demolishing of Eldon Way to provide a false demand. This is disingenuous and wasteful (i.e not environmentally friendly), why demolish perfectly serviceable existing units just to create new ones? If access is so poor surely this should have been addressed when the bypass was build a few years back, what investigations are taking place into this waste of money?
B1 - again questionable that the demand exists
Area ii b) given the above is actually sensible to move the rugby club to an even more inaccessible spot? Some of these plans would have been more sensible if Southend United Football Stadium had been moved to Warners Bridge site of Southend Rugby Club (floodlights aren't an issue Highbury didn't have pylons), the railway station would have served a dual purpose (and SUFC could have got into Europe!!) The Rugby Club could then have either shared with Westcliff or moved to the site of Fossetts Way new SUFC stadium, more green belt would have been protected and transport links for the football stadium would at least have been maintained, another missed opportunity.
ii c) a green lung, nice that this has been acknowledged, a pokey site between an industrial estate and an airport runway i.e it can't be used for anything else, be honest don't try and dress it up as something it isn't, it is wholly insufficient for the purpose described.
iii) Why is more land being given over, the airport was given away as a freebie (£1) and the local authorities have little control over usage. Keep the land and keep control, allowing the hand over of more land compounds the earlier errors surrounding the 199 year lease.
iv) Identified as inefficient by whom and in what way? Another vacuous, unstabstantiated statement. does the cost of improvement outweight any potential benefit and who is expected to finance this? If units are not fit for purpose then surely it is up to the landlord or tenant to improve them not the taxpayer.
v) Loss of another sports pitch in the area then. We will soon be left with loads of concrete and designated country parks as only green areas, another poor suggestion. Presume East West Corridor will mean a road being built and houses will inevitably follow as the area will be termed 'under-used' within a decade.
vi) 'opportunity sites' - presumably for development? At least this is located next to existing industrial units.
vii) Flying Clubs - all to be kicked out (despite the fact they they do employ people)
viii) opportunity sites - say what you mean development sites, again the JAAP is trying to dress up the unpalatable.
ix) A green buffer a derelict site with a few horses and occasional circus. I hardly feel grateful, this area is currently an eyesore and clearly the report writer as with area ii c) couldn't think of another use. The flying clubs could be retained if the railway line was moved back here!
x) and xi) Loss of yet more amenities for Southend (once home to the largest amateur football league in the country). Demolition and rebuilding of a road that is only a few years old and at last admission that public transport isn't the answer so a park and ride service is required (although this could be omitted forcing passengers to use public transport)!!
4 Policies pg 17
Introduction Para 2 - It is apparently important to put the JAAP into context, but absolutely no attempt by the compiler to do so. It is unreasonable to expect ordinary residents with little or no experience to have to undertake lengthy research of information that the council have. In fact it could be argued that the council withholding this information is a deliberate attempt to prevent opposition, or perhaps just a glaring omission?
Energy saving technology is to be used (save lots of energy reject expansion) and sustainable drainage - what is this, yet another example of poor drafting.
Accepted that the JAAP cannot be looked at without plans for S.E. Essex, but again no clues and why are we restricted to this part of Essex why ignore Stansted and indeed other airport developments that the target passenger pool can use???? Again JAAP is flawed.
Employment allocations
Introduction
Why high scale employment growth? The term isn't explained, what type of employment and what are the employment aspirations. The area has relatively low unemployment, admittedly many people do not work locally, but this is because of the dormitory (and indeed retirement nature of this part of Essex, that the expansion will undermine and ultimately destroy. There is a limited pool of labour and there are no supporting statistics regarding the composition of the current labour pool or the required labour pool, there seems little point in creating jobs that cannot be filled.
Additional floor space - is this purely within the JAAP, what about other plans locally e.g HAAP where floor space is being reduced, meaning businesses are moving and new jobs are not created, just being relocated at the whim of the councils. The JAAP cannot on one hand say that it must be looked at in context and then ignore the context, this document is flawed again.
Upto 4950 jobs, how is this figure arrived at? It is unsubstantiated and unsupported and meaningless. Up to means just that any figure (including a negative) lower than 4950 is up to the JAAP requires amendment (again). In the area - is this the JAAP area, S E Essex? Are they JAAP related jobs and what are they - 'McJobs'? Same applies to the additional 750 jobs in Aviation Way. Non-specific, non factual and misleading.
E1 - another unsubstantiated figure, unclear if the jobs above are included in this figure or not. How do you split the jobs 50/50, who measures this and who is to say whether the airport brought those jobs. Remember a significant number of insurance companies merged in the 1990's and Southend lost jobs as a result, it had little to do with council policy. Just as conceivably an organisation could decide to move to Southend or Rochford, with airport expansion having no bearing on that decision.
E2 - Is this suggesting that in the middle of a recession busineses will have to pay to upgrade, I feel their sights may be elsewhere. No details on the financial contribution are given - how much taxpayer's money will be poured in and, as with the airport sold on at a loss? Are businesses going to be asked to donate or taxed, won't this be a disincentive to relocate?
This requires more detail and a lot more thought from the councils.
E3 - It is not reasonable to expect significant numbers of employees to walk or cycle unless they live very close to the units. Anyone living any distance will have to negotiate extremely busy (and probably busier roads), the cycle paths may well prove to be a waste of money, cause further unnecessary traffic to motor vehicles and should be properly costed.
Again business contributions comments as per E2 above
E4 E7 - No additional comment given rejection of the entire concept
E8 - As above how are job totals arrived at?
Overall comment on how and why businesses will contribute and what will be cost to residents
London Southend Airport
Introduction
Recognised that Airport can provide a boost - recognised by whom? another unsubstantiated and flawed statement.
Agree should have quieter aircraft, but fuel efficiency is a business decision not a local authority one.
Why must these aircraft be 150 seats again not explained?
Will aircraft development not actually catch up with the airport i.e. over the next decade larger aircraft landing on shorter runways (we then have a problem that we've bigger aircraft than the council currently envisage).
Why is the runway set at 1799m (I believe to avoid additional regulation of 1800, + runways)?
Are there any passenger aircraft with a full payload that cannot access at present that but can at 1799m? If so what types, what noise levels.
Expected that use will be passenger - expected by whom? Certainly not me. It is owned by freight forwarders who have stated they 'have found (their) Southern base'. Low Cost Airlines such as Easty Jet have a fleet requiring longer runways that proposed, who is the new airport aimed at?
Para 2 Growth in MRO - this means defective aircraft will be flown in over densely populated areas - the potential for disaster is huge and the council could/should be held accountable if a crash occurs (as it did in the 1980's).
If there is a demand for high skilled jobs, it is unlikely that applicants exist in sufficient number in this area and therefore, we would be reliant on migrant workers.
Whilst it is not considered desirable for the airport to handle large volumes of freight how much control would the council actually have over this? If the owners want to ship freight can they be stopped? If they want to extend the rail line (and Stobarts already have close ties with both Network Rail through Stobart Rail and Tesco's in terms of freight delivery) can they be prevented? If they want to run HGV's and vans in and out what can the council do? This is their core business. I would suggest that the professional businessmen at Stobarts are more than capable of giving amateur councillors the run around when it comes to what the airport will be used for. Local Authorities are very poor at refusing planning changes when business puts through a commercial reason. The first of these will be 'we can't attract viable passenger numbers we need to increase freight movements'. Once the extension is approved it cannot be repealed.
Para 3
Environmental constraints - no clues as to what these are how they are enforced (indeed if they can be) and what penalties are if airport users do no comply (saying sorry won't be enough) - will they pay compensation to individuals, where will the burden of proof lie? JAAP is deficient again.
The JAAP is also deficient in that no map of flight paths, stacking arrangements or noise levels at altitude (CPRE refer to these as noise contour maps). It seems anomalous to let the operator make his own statement, surely, if this extension takes place the council need to set noise levels and dictate to the user? Road noise (either freight or passenger) is completely omitted, as is rail noise.
Currently train services do not run through the night, but do stop near local stations when operating. The airport timetable will have non-stop trains. Additionally no details of freight movements, all of this is a complete omission and a justifies re-issue of the JAAP.
The A127 is an insufficient carriageway in its current form, particularly following the misguided speed reductions. Cycling facilities just take up vehicle space. I understand that there are limitations on the improvements that can be undertaken on the A127 due to it in part running through the Public Safety Zone, where major roads are not permitted, this is sufficient in itself to justify refusal of the proposal.
LS1 - this support of the expansion policy is unexplained. Why are 2 Tory councils supporting a misguided Labour policy, which basically entails concreting over anywhere that votes conservative? Solid reason should be provided for expansion.
LS2 - Permission
. Airport related - how tenuous does the link have to be for permission to be granted? this is yet another vague statement.
. Agreed baseline - this is undecided, does it require constant noise at one site or intermittent noise again far too vague. No details on who determines/measures etc. I will wager that all complaints about noise will be refuted by the operator. What about non-passenger flights, cargo, maintenance, training etc etc.
. Contributes to road infrastructure needs - positively or negatively and to what extent?
. Modal shift - what are the targets how and who measures the movement and who assesses whether the application is actually reasonable.
Again the JAAP is too vague to be meaningful.
LS3 - what sort of statement, what must this include. The JAAP note is meaningless and needs to be more prescriptive.
LS4 - again JAAP should be more prescriptive, this is meaningless.
LS5 - this is a restriction on the usage of residents property - does this contravene human Rights Legislation??
LS6 - Mentioned previously what is justification in passenger terms to increase the runway. Is there actually an advantage to the council and the residents to refuse 1799m, but approve 1800m?
LS7 -
. Times, unacceptable, 2300 is too late; this is some hours after dark in winter and makes no consideration in particular of the disruption that wil be caused to the sleeping pattern of children. Early mornings are also an issue for similar reasons. No mention is made of unscheduled flights and of cargo flights etc etc. The number of flights is not mentioned. If successful no-one will ever have another peaceful weekend.
. Cargo flights - require more restriction than just noise levels. No passenger flights at night (in noise controlled jets), but loads of cargo flights throughout the night using any available aircraft. what about maintenance/testing/training flights etc
. Routing - existing routes aren't shown, what are the plans for future routes. Again the JAAP is not fit for purpose.
. Helicopters - what more or less, operating heights? As these are vertical take off they could surely reach altitude over the airport before moving off?
. Restricted to what - will it pick up maintenance training testing etc?
. Ground running again unspecified JAAP too vague
. Training movements again unspecified JAAP too vague.
Terminal Facilities
PF1 repeats LS7, why? Is there in fact missing information here.
Maintenance repair and Overall
MRO1-3 what is justification for this, as previously stated surely this just increases the danger that the airport poses in a densely populated area. The possibility of contributions from business at the current time are surely fanciful.
Airport Development Zone
What criteria will be used to decide if development supports the airport and why is retail use refused?
Transport
What sorts of contributions are expected? What about the B1013, there is absolutely nothing to stop drivers using this as a cut through, especially given the days and reduced speed limits on A127?
T1 - where is this proposed to run?
T2 - and this?
T3 - why dual this road, unless there are plans to reintroduce the bypass via Hullbridge/Rayleigh/Hockley. Dualling only encouraes further traffic along the over used B1013 via Rayleigh
T4 as T3 this is encouraging traffic away from preferred route of A127
T5 - Loss of public amentities
T6 - there remains little incentive to use anything but a car, no car parking facilities forces the use of public transport - radical but true?
T7/8 - what sort of contribution - inevitably the tax payer will fund the bulk of this and how will the bill be met - wholly by Southend? who decides on contribution?
T9 - these are not provided with the JAAP again an omission
Environment
Introduction, this is not a green lung, the development is taking place on the green lung. already, the developments along and of Cherry Orchard Way have eaten into this and I understand that the development will downgrade further land making it easier to develop the area in the future. The green belt boundary isn't 'reviewed', it is obliterated. This is unacceptable.
Para 3 - what are 'high levels of environmental efficiency?' and 'sustainable drainage' more vacuous statements. These need to be clarified the document is once more deficient.
ENV1 - unacceptable loss of green belt (again) both councils seem to really object to green belt principles and look for any opportunity to develop such sites apparently seeing them as an inconvenience rather than a necessity and a desirable asset.
ENV2 - this is not new - it is open at prsent and it is at best misleading and at worst a downright lie to call it new. The JAAP is once more factually erroneous
ENV3 - as 2 above.
ENV4 - and if no contribution arrives does it happen or does the taxpayer get saddled with the bill? How will contributions be collected, surely this is a tax on new enterprise?
ENV5 not new public space again incorrect
ENV6 - this is constitutes 'no change' presumably because the land is so poorly sighted it is permitted to escape development
5.1 - JAAP provides no idea of what scale of limitations will be i.e. one in 3 units are occupied, how many jobs will result, how many of the contributions will be made.
5.2 - intended to provide detailed information - need more details now, not a washy statement that it is 'intended'. Sorry intended to but didn't get around to it. Should say 'Full details will be provided'.
5.3 You have my views. The report JAAP itself is deficient in factual information and misleading in the extreme. There is a lack of information given to the individual and it is not apparent that the council have advised necessary interested parties e.g RSPB. As such the process is substantially flawed, sufficiently so for the whole of this stage to be delayed whilst the JAAP is re-issued with sufficient information and clarification.
From my understanding of the proposals the councils are to a varying degree being incredibly naive, disengenuous, negligent and as such untrustworthy. Again this is sufficient to warrant review of the JAAP.
I understand that as part of the review process Rochford councillors visited Southampton Airport. I would suggest that although the runway size is comparable, to undertake a visit to an airport that doesn't permit night flights except in extenuating circumstances (max 10 per month 100 a year) and out of season is not going to provide any great insight. Especially given that the European Region Association (ERAA) shows the following freight movements Southend and Southampton in 2008:-
Southend 443 Tonnes reducing 19.6% from 2007
Southampton 264 tonnes reducing 10.5% from 2007
So the two airports are not as comparable as has been suggested especially since freight cargo uses older, noisier (propeller aircraft) rather than those 'quiet' jets for passengers and Southend is now owned by a freight forwarder.
Additionally back in 2002 the DfT recognised the lack of appeal of Southend as a suitable site.

Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 14733

Received: 24/06/2009

Respondent: Mr Peter Symes

Representation Summary:

Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.

Full text:

Please refer to the attached document which lists all concerns with process and lack of information provided by the Councils concerned in respect of the JAAP. Again the demands placed upon objectors are onerous (as with the HAAP), namely the requirement to complete on-line or to file an individual form per objection are unfair and unwarranted. I understand however that this advice is actually waived upon request and as per my conversation with your offices! Attach one report for your attention lising all my issues with the JAAP at this time.
I expect a response to all queries raised.
The Councils have been extremely negligent in their duty to provide sufficient information.
At the present time the proposals are unacceptable in their entirety and there is nothing to suggest my opinion will change. I additionally support the comments made by campaign for protection of rural Essex (England) in their submission.
I am writing to object to the proposals contained within the London Southend Airport and Environs Joint Area Action Plan Preferred Options Dated February 2009.
I have a number of general objections regarding the process, documentation and manner of delivery as well as specific objections to the proposals and list these as follows:-
Flawed Process of Presentation.
1) There was little initial notification to the public of the first stage of consultation or the ramifications of not responding. We appear to have reached stage 2 of the process by default and dictation by the Councils, with stage 1 swept swiftly 'under the carpet' rather than the opportunity given to residents to undertake a considered process of weighing up the options. I do not believe that the majority, or even an adequate portion , of local residents understand the process and the JAAP documents do little to address this. Neighbouring authorities, that are also affected, will have had little input into the process and their residents no understanding of what is going on or what influence they can have. As such the process is flawed and details supplied inadequate. Unless the councils can demonstrate evidence to the contrary.
2) The selection of option three again has been decided adequate consideration of other options.
Whilst Southend Council have at least gone through the motions of offering roadshows to assist understanding RDC appear to have relied solely on advertising.
Notwithstanding this both Councils have failed to provide adequate information within the document, given their support of the proposal it must be concluded that this is a deliberate rather than just a negligent act and again calls into question the whole process.
As a bare minimum the JAAP should include :-
. Existing and post extension flight paths (how these may vary in inclement weather)
. Stacking arrangements in the event of runway closure/delays
. Basic statistics showing likelihood of inclement weather/runway closures and, as such how many times a year stacking arrangements and flight path changes are likely to be implemented and the anticipated number of flights this will affect.
. The types of aircraft able to take off, both before and after the extension (cargo, passenger and 'other')
. The minimum and maximum number of flights permitted (including split between cargo passenger, maintenance, training, testing) and flight times (including scheduled, non-scheduled, charter, training/testing/maintenance)
. The noise levels generated at ground level by the planes at altitudes - a noise map?
. expected plane altitude at say half mile intervals from take off/landing
. expected traffic volume increases (Stobart and other firms lorries and vans) for A127, A130 and B1013 (Rayleigh - Hockley - Rochford Road), as a result of airport expansion and closue of Eastwoodbury Lane
. Expected train timetable changes (including non-scheduled freight movements) and anticipated delays as a result of new passenger trains.
. the fact that the trains for the airport are not going to provide a local service (thus local commuting to the airport by train remains inconvenient)
. confirmation as to whether or not Stobart can apply (and whether or not the councils have any power or inclination to prevent or resist) to make rail freight movements to the airport or the immediate vicinity
. Which jobs are genuine new jobs, type etc and which will be transferred from other parts of the district (and lets not limit ourselves to Rochford and Southend, because undoubtedly Castle Point and Basildon will be affected)
. A summary of the impact of other developments in the area, including redevelopment of Hockley, Stambridge Road, Hawkwell, Daws Heath etc etc. These should be clearly marked on a flight path map also.
. Confirmation of detailed plans for inevitable road expansion schemes that will be required to support increased road traffic. Particularly A127, where proposals incorporate the Public Safety Zone and whether the expansion will be used to push through the unwanted development of a bypass via Hullbridge/North Rayleigh/Hockley and Rochford?
As such I would view this as a basic dereliction of Council duty - failure to inform and ensure that the interests of residents are looked after. I understand also that this may breach the Freedom of Information Act and RDC's own consultation strategy
3) The Councils have apparently selected the least popular option, although conveniently neglected to inform residents as to how or why this decision was arrived at. The only factor that seems to offer any support for their decision is 'increased jobs'. Various figures are quoted all prefixed by the worlds 'upto'. This term is 'up to' is sufficiently vague to mean that any number (including negative ones) below the figure quoted would be deemed a success. As such it has no place in the document as it constitutes mere speculation. Hard facts and details of how conclusions are arrived at are needed.
As such the information provided is surely skewed and the Councils are seemingly abusing their position in recommending the proposal with absolutely no solid evidence to back up the position.
4) The connection of this scheme with other projects in the area, notably a number of house building projects including those mentioned in 2) above, is not made clear Government document PPS12, makes clear reference to :-
Every local planning authority should produce a core strategy which includes :
1) an overall vision which sets out how the area and the places within it should develop;
2) strategic objectives for the area focussing on the key issues to be addressed;
3) a delivery strategy for achieving these objectives. This should set out how much development is intended to happen where, when, and by what means it will be delivered . Locations for strategic development should be indicated on a key diagram; and
4) clear arrangements for managing and monitoring the delivery of the strategy.
Whilst this document is no doubt available somewhere it should be included with the JAAP, since without it the JAAP is not placed in the required context, without clear direction it is impossible to understand how or why this is intended to be part of the core strategy.
Additionally how have residents been consulted on the overal strategy, because if that exercise is flawed - and certainly the desire to build more homes in a densely populated area, whilst simultaneously expanded an airport, demonstrates that it is, then much if not all of the sub-plans such as this area also flawed.
PPS12 also refers to
Period of operation
4.13 The time horizon of the core strategy should be at least 15 years from the date of adoption.
As above there is no clear advices as to where the JAAP fits in the core strategy or where we are in the time horizon. Again the document lacks context, although it even states that it must be read in context, it provides little clue on how to do this.
PP12 also refers to
Statements of Community Involvement:
An SCI should
. Explain clearly the process and methods for community involvement for different types of local development documents and for the different stages of plan preperation. This needs to include details of how the diverse sections of the community are engaged, in particular those groups which have been underrepresented in previous consultation exercises.
. Identify which umbrella organisations and community groups need be involved at different stages of the planning process, with special consideration given to those groups not normally involved.
. Explain the process and appropriate methods for effective community involvement in the determination of planning applications and where appropriate refer to Planning Performance Agreements.
. Include details of the LPA's approach to pre-application discussions.
. Include the LPAs approach to community involvement in planning obligations (S106 agreements).
. Include information on how the SCI will be monitored, evaluated and scrutinised at the local level.
. Include details of where community groups can get more information on the planning process, for example, from Planning Aid and other voluntary organisations.
. Identify how landowner and developer interests will be engaged.
These above items from the PPS demonstrate the assistance that should be given to ordinary residents (and others) in the process. As mentioned by Campaign for Protection Rural Essex a number of organisations should have been consulted including RSPB; Essex Wildlife Trust etc. It is disingenuous and perhaps even negligent of the council not to include these within the Action Plan. Most people have very little experience of dealing with documents such as this and it is only at this late stage in the process (given that we've already passed through stage 1) that RDC and Southend BC have offered even limited advice. Even having read as much as I can in the past few weeks, I (and I am certainly not alone in this) have very little information regarding :- the crucial stages in the process; whether residents can succeed in resisting or changing any aspect of the proposals - RDC really should explain the steps in simple terms. At the moment we seem to progress from one stage to the next with absolutely no guidance. For instance:- I understand from information received from other sources in relation to the airport, that unless I head this document as an objection it is merely treated as a comment. I believe petitions are ignored. I will need to get my wife to make a separate submission in order for her views to be considered, even though we agree. The council seems quite happy to tell people how to make positive comments, but far less inclined to advise on how to object - hardly democracy and clearly demonstrating a deficiency and unfairness in the process, that should be revisited before we move ahead.
PPS12 again
Justification of Core Strategies
4.36 core strategies must be justifiable: they must be:
. founded on a robust and credible evidence base; and
. the most appropriate strategy when considered against the reasonable alternatives.
As above we cannot be sure that the base is robust and credible or indeed the most appropriate when considered against reasonable alternatives, since we don't know how and why the initial alternatives were first selected and then rejected. The JAAP provides no evidence base to affirm that the selection or the process is credible and again the JAAP requires review and re-issue.
If this is the preferred option, what was the basis for selection and will any ideas arising from the consultation be put forward for further consideration? Is it possible (likely) that if decent alternatives are proposed in stage 2 the preferred option will be amended and re-submitted? If not then, again, the process is flawed.
5) The document produced glowingly mentions the positive aspects and underplays the negative - surely the document should be impartial and genuinely enable residents to make up their own mind? Plenty of rhetoric about jobs new businesses etc but no details and certainly no information on the negatives, noise, congestion, loss of property value, decline in overall living standards etc. Basic research reveals Stobart's close ties with Tesco and Network Rail are we going to end up with a huge Tesco distribution centre supporting the airport, similar to their Dudley operation?
While the JAAP includes a brief note that the airport is unsuitable for large scale cargo operation (only a niche operation). The terms 'large-scale' or 'niche' are undefined, will mean different things to different peope and are therefore meaningless in the context of the JAAP, again this requires clarification and re-issue. Notwithstanding this the actual use is surely the decision of the owners and not the councils? Stobart management are already quoted as saying upon the purchase of the airport 'we have found our Southern Base', doesn't really sound like they are planning a limited operation, quite the opposite.
It is also unclear where any 'new' jobs and businesses will come from. Given the proposals and redevelopment of Hockley it is apparent that a number will come from there and therefore aren't really new. Again disingenuous of RDC in relation to the HAAP (and Southend BC not to make this clear in the JAAP that a proportion of jobs at the Airport sites will actually be moved from Hockley)
6) The document itself is devoid of factual information, although admitting that aspects will be supplied later, this itself smacks of a rush job. We find ourselves moved on to a stage from which there is no going back without having the facts adequately presented. It seems that the councils are either negligent in preparation of the facts or trying to hide something.
Development of the airport could bring about a fundamental change to the area, not necessarily for the better and it is in resident's interest for all information to be divulged as soon as possible.
It also uses a number of undefined terms, notably around the word 'sustainable'. It could mean 'long-term use with minimal environmental impact', but it the council are not clear what meaning they are seeking to attach. Equally, there are (source Wilkipedia) different types of sustainability. Economic, Environmental and Sociopolitical, so there is significant room for confusion as to meaning and I'm quite sure most people have no understanding what is meant by sustainability in the context of the JAAP.
7) The council is geared very much to receiving information via the internet, whilst undoubtedy this is cost effective; it is unfair on those residents that do not have internet access, particularly the elderly who make up a significant proportion of the population in the area. It is doubtful therefore that the views obtained will actually be representative of all residents. I note at election time certain parties are very keen to get their voters to polling stations and will provide transport - I wonder how keen those same councillors are to dedicate time and petrol to those residents wishing to get assistance in completing JAAP.
Completion on line is actually quite difficult and near on impossible if you have lengthy comments to make. Again the councils are colluding to dissuade residents from making anything but the briefest of contributiions.
Additionally the representation form states that each objection/comment requires completion of a separate form. Clearly this is actually designed to put people off commenting. Although I understand from a telephone conversation with RDC planning department that the council will accept one form with clearly listed comments. I would have to question whether RDC/Southend BC can actually determine what form objections may take. Again the process appears flawed, as this is biased towards acceptance of JAAP. At best this builds mistrust between residents and the councils as to motive; at worst it is downright dishonest.
The JAAP relies too much on the reader having a detailed knowledge of planning terminology and documentation, mentioning a significant number of undefined, unexplained and unreferenced terms and documents (as mentioned later) and omitting adequate cross-referencing. As such it is an inaccessible, inadequate document not fit for purpose and until it is adequately amended and re-issued the consultation process is flawed.
8) Rochford Council's own Leisure document refers to Rochford being the 'Green Gateway', clearly there is a desire to put a wall up given the amount of building that has occurred in the West of the District - this needs to stop. The local infrastructure cannot cope:-
B1013 is a hugely busy Road already - HAAP refers to 15,000 + vehicles back in 2007 and significant building has taken place since then. If the Airport expansion takes place, and RDC regretfully support this, then further transport issues will arise.
What plans are considered for a major disaster, large aircraft crashing on residential or occupied business property? In the US 7 of the last 8 fatal commercial airline crashes involved regional airlines (BBC 12th May 2009) or indeed hijack, bearing in mind proximity to major centres of population, power stations etc.
What additional policing/customs and immigration officers will be supplied, both at the airport and elsewhere in the region? Not only do illegal immigrants use lorries to access the country (and a cargo terminal will increase the amount of vehicles in this part of Essex), but aircraft have also previously been used (e.g at Stansted). Additionally there are the increased risks associated with drug smuggling, particularly given that criminals may seek to use the nearest available market for contraband. There is also an increased likelihood (with increased vehicles) or road traffic offences, which speed cameras do not address. What additional resources will be provided to the NHS to deal with the upsurge in stress, sleeplessness and associated problems including violence and accidents?
9) No explanation has been given as to why RDC/Southend BC support Government policy (I have asked my local councillors and MP to explain this apparent anomaly) there seems to be no desire to protect the quality of life enjoyed by residents, certainly much of this part of Essex has previously shown (in Government statistics) to be one of the least deprived areas of the country, yet the proposals seem to treat it as though it is one of the most deprived - is this wishful thinking on the part of the compile? As recently as 2006 Southend was calculated to be the best place to retire to.
10) Both Councils are keen to promote the area as a great place to visit yet surely this will be the death knell for tourism, the only visitors will be those waiting for a plane to get away from an overly congested cargo handling centre.
11) There is no clear mention of what controls are able to enforce (and indeed whether they would agree on these). Given the track record of local authorities but locally and countrywide in rejecting and/or enforcing actions against big business and national government e.g totally inability to prevent McDonald's and Tesco building where they like and the fiasco of the change of use of Bullwood Hall prison I rather suspect that if the expansion is approved Stobart's will ride roughshod over any objections from residents irrespective of whether the council's support the residents.
12) No account appears to have been taken of the wider questions regarding airport usage. Aside from the environmental impact, the reduction of carbon emissions etc is supposed to be at the forefront of business, government and local authority strategies, and the JAAP clearly goes contradicts this. Why have the following not been mentioned.
a) Southend is only accessible from the East and North (there is so little to the West it is hardly worth mentioning and is obviously cut off fromt Kent by the Estuary). As such the Pool of passengers it is supposed to be attracting is actually very limited. To the North sits Stansted whilst to the East, London and the various airports accessible from there.
b) Why the runway is being extended to 1799m and not 1800m (something I believe to do with extra regulation), when this doesn't actually allow for any passenger planes that are larger than the current users to land.
c) With perhaps the exception of Luton, every major airport easily accessible from London i.e Gatwick, Stansted, Heathrow and London City itself have expansion plans in the pipeline, as such the need for expansion of Southend as a passenger airport is questionable if not foolhardy.
d) Most recent figures for air travel suggest that this form of transport is actually declining.
It would actually suggest that the freight forwarder Eddie Stobart has an entirely different motive for expanding the airport.
13) Apart from neglecting to place sufficient significance upon the fact that a freight forwarders now own the airport and thus that the expansion will cause increased in cargo shipments in the air and on the ground, I fully support the comments made by Campaign for Protection for Rural Essex (part of CPREngland).
14) The councils have made no mention of the plans to ease road congestion that expansion will undoubtedly bring. I anticipate that you will seek to resurrect the misguided and previously rejected plans to further develop on green belt by building a bypass across Hullbridge, North Rayleigh Hockley and Rochford, just exacerbating the over-development of this area.
Nor is the impact upon rail timetable and whether there is sufficient rolling stock available for the new train service (i.e whether existing commuter carriage availability will be cut to provide airport services) explored.
Specific Areas of the Report
1.1 - Integrate land use, transport and regeneration proposals. Arguably this area is not in need of significant regeneration, the decision seems to have been taken with no investigation of regeneration needs (certainly no evidence is provided) and one might question why redevelopment is actually necessary).
Reference to 'managing growth and change by establishing development and design principles' - where are these, who decides them and what is the decision making progress?
Safeguarding areas and places sensitive to change - surely development of the airport contradicts this, the development includes extensive building in green belt, a definite area sensitive to change.
JAAP is one of a number of DPD's and must apparently be read in conjunction with them, but there are no clues as to which ones or how or where you can find these - again a fundamental failing of the document and the process.
1.2 - Detailed examination, undertaken by whom and what evidence supports this? Although reference is made to such items such as best practice guidance, socio-economic statistics and published data etc - this document is wholly bereft of specific evidence of factual support and this appears to be a deliberate strategy employed by the councils (motive unclear) to prevent such data being challenged i.e the council saying we looked at the data and concluded, but not specifying which data and how they arrived at the conclusion. Surely this is not an open government and seems suspicious if not dishonest and/or negligent.
1.3 - Sustainability Appraisal - a term not fully explained. Apparently stage one required a scoping report, although again this is unexplained and we have no idea of the basis of this. Omission of even a path of reference, let alone an appendix is again a dereliction of duty.
1.4 - The JAAP will provide 'framework' for regeneration and expansion of London Southend'. Leaving aside the fact that Southend is not London (although the way development is going it seems inevitable it will be a suburb, probably this century), it seems decided then we are going to expand the airport. Surely you cannot make this statement, there is a process to go through (even if you are paying lip service), legally this statement is incorrect, as it can only provide a 'suggested framework'.
The JAAP apparently takes into account the current uses, transport, impacts, etc although as I shall make clear later anyone taking the time to read the whole document will realise that it is hopelessly inadequate, merely stating that it takes factors into account but providing no evidence or examples.
Again this paragraph is, at best, misleading and borders on dishonest. It seeks to reassure people that the negative impacts have been taken into account (in fact the opposite appears to be the case) without providing any evidence that they have.
1.5 - Feedback, where was this obtained, who considered it, how did they arrive at the conclusions, who reviews, again a flawed, unsubstantiated statement and process.
1.6 - Paragraph 1 final world 'sustainable' an undefined term within the context of the document.
Future of Transport White Paper (again not provided as an appendix) I understand that this is opposed by a number of environmental Groups and itself needs reviewing given recent changes in the economic climate and the overall downturn in aircraft usage, independent of the recession.
Para 2 - It is hugely questionable as to why Southend Airport requires expansion when, as already mentioned, in passenger terms, it has such a poor catchment area. It is inaccessible from the South due to the Estuary; to the East is the North Sea, to the North a much better sited airport and infrastructure in terms of Stansted, leaving only the West as a population centre. However anyone living to the West has the choice of Gatwick, Heathrow, Stansted, Luton and London City, all, with the possible exception of Luton having expansion planned.
Para 3 significant job opportunities - again undefined as to what significant means and what type of jobs are referred to (McJobs)?. Given the competition from the above airports it would require significant, unwelcome further expansion for business to be attracted because of the airport. Businesses decisions are made for reasons unrelated to the airport, yet the report suggests that development would be a major driver for business (but does not say why or what type of business). Southend lost virtually every major office employer since I worked there in the 1980's. Most major insurers and brokers merged and moved out of Victoria Avenue, as did various government departments (due to National government strategy) and BT, this had absolutely nothing to do with the airport and attracting these businessses back will probably have equally little to do with an airport.
Why is the commuter belt aspect of the region completely ignored? Many people commute to work and bring money back to spend locally. Similarly the retirement aspect is also ignored completely. It is questionable whether there is any great need for huge swathes of industry in this part of Essex.
Tourism desination is an absolute joke, the region is overdeveloped and the only tourists would be waiting for a plane to get away.
Para 4 - why is only the airport considered to be a drive for economic development? Holidaymakers pass straight through to their destination and most companies are cutting back on expenses such as business flights and use of technology (video-conferencing etc) renders their need redundant. We can surely only be talking about freight movement????
Again paragraph 4 refers to 'employs a significant number' is non-specific as to quantum or job types. Are you including the airport trading estate? I've shopped there, but I've never flown from Southend, it is totally unrelated and again the document is misleading.
Surprisingly the JAAP refers to a specific document, but gives no clues as to where to find the Rochford Core Strategy Preferred Options Document.
Para 5 - Transport issues are understated and it really does seem rather pointless to even attempt to expand such a small airport and blight the whole area for good for a few weeks in 2012. European visitors would be far better served by train, whilst longer haul flights cannot land on a runway this size.
Para 6 Who sees the airport as important for development and prosperity? Another vague statement dressed as fact. I see it as actually the beginning of a sustained decline in the area as the affluent move away, house prices fall due to noise and congestion from air and road freight and the area goes into, pardon the pun, terminal decline. Again future employment needs take little account of commuting.
2.1
Para 1 The context against which the JAAP is set is now outdated, having been drawn up in time of boom and when it was inconceivable that banking institutions would have to be underwritten by National Government to the extent they now are. The financial pattern of this and other countries have changed fundamentally and it will be a significant time before things get back to normal (over 20 years), loans are no longer freely available and the 'Vision' clearly needs to be re-visited.
Para 2 - refers to quality of life for residents is mentioned, but actually not expanded upon in the report. It is quite clear that expansion of the airport will reduce the quality of life for all but a very few number of residents i.e those fortunate enough to be directly employed in senior positions.
Para 3 - London Southend Airport as a 'major employer' - again an undefined term
. How many people does the airport directly employ (I suspect that many of the jobs are in fact secondary and even if the airport closed work would be taken up by other airports e.g Stansted or London City and the jobs would remain within commutable distance)?
. How many of the jobs are actually in the adjacent business park and in reality unrelated to the airport?
. How many of the jobs will actually be lost upon expansion (e.g those at the flying clubs that are being pushed out, businesses that are forced to close due to congestion etc)?
. How many of the jobs would actually remain if the airport was unaltered?
. Why isn't the spare capacity being used?
. What could be done to improve the spare capacity usage?
. What are the costs/benefits in picking up the spare capacity?
. Why, if the airport is so important, won't it become a success without expansion?
All basic questions the JAAP fails to address.
Para 4 - what is the 'current and emerging policy framework in the area'? again an undefined and meaningless phrase.
Para 5/6 - Southend core strategy - wonderful, what other options were considered and why is Rochford so keen to support this if, as this document so clearly demonstrates, there are so few advantages and so many disadvantages for the area and its residents.
Para 7 to end
Who are/what is Renaissance Southend Regeneration Framework? Another undefined term. How they have arrived at the conclusion it should be a centre for international air services and then contradicted this by saying it would be a 'great place to live' - when it so clearly wouldn't with a huge number of planes flying over head day and night. Rochford Council have a similar objective in making this a great place to live!!! I've lived in the region all my life, with these proposals I have no desire to continue to do so (but my options will be restricted by the resultant slump in house prices the expansion will cause)
Again there is very little mention that most of the towns in the region are actually dormitory towns for London e.g. Rayleigh. The desire to encourage employment is actually questionable on this basis. Higher salaries are always available in the City and vast airport expansion would probably require a significant number of migrant (possibly overseas) workers to fill vacancies.
Hi tech businesses tend to be low scale employers and no examples are given of 'high value employment'. This is pie in the sky aspiration with no basis in fact; it should be only be included in the JAAP if noted as such.
2.2
Para 1 - again refers to unreferenced material, planning documents etc, and it is impossible to know if this has been fairly assessed or just the bits chosen to fit.
The objectives are:
. Creation of sustainable and high value employment and other land uses within the study area; - what is 'high value' and what 'other land' - this is a vague and washy statement requiring amendment.
. Maxamising the economic benefits of a thriving airport and related activity: - is this at all costs?
. Ensuring appropriate improvements in sustainable transport accessibility and facilities; what is appropriate (who decides) and sustainable again undefined what other plans are the Council's proposing to run off the back of airport expansion? the rightly rejected Hullbridge to Rochford bypass???
. Ensuring a high quality environment for residents whether expressed through noise pollution management or protection of green space: what about congestion, air quality from road pollution etc?
. Maximum return on public investment through attracting inward investment; and is this at all costs?
. Efficient use of existing employment land resources. Is this at all costs?
2.3
Economic growth and new jobs. Again no consideration that the area is largely dormitory, no mention of the type of jobs and the fact that the airport expansion could have a negative effect with wealthy moving away and the area actually being an undesirable place to live, spiralling into decline.
Para 2 - Why will it be successful when there is significant competition from Gatwick, Heathrow, London City, Luton and Stansted all of which have better infrastructure and passenger pools as well as expansion plans. The proposed runway extension offers no increase in options for passenger plane access, as it cannot cope with any larger planes than the present runaway, as such the extension should be rejected as it fulfils no purpose.
Passengers will travel on the same planes they do at the moment and no plane is quiet or fuel efficient, especially when you consider that in excess of 20,000 flights per annum will take place (25,000 according to CPRE). It could even be argued that Southend should withhold expansion until plane technology improves to allow even shorter take-off and landing?
Conclusion would be that passenger use is to be secondary to cargo use and that Stobart have little intention of promoting the passenger aspects, except as a means of additional profit to their core operation, the movement of freight.
Fast food access is not possible the speed limit on the A127 is now 50mph for large stretches and is interrupted by numerous sets of traffic lights. Congestion problems will be exacerbated by any increased cargo usage at the airport, which will see the number of vehicles increase. No mention here of closure of Eastwoodbury Lane/A127 Public Safety zone or use of A130 or B1013 all of which will be problematic.
Para 3
Maintenance and repair - this implies that faulty aircraft will be flying over densely populated areas in order to be fixed. Given that the last time Southend had a significant cargo operation a plane crashed on Rayleigh (at night, on the only commercial premises in a residential district) it may be tempting fate to suggest that you are rather chancing residents luck with this proposal.
Restrictions on night flights - again unspecified as to what these will be and how they will be enforced. No consideration to schools, hospices, hospitals, etc etc let alone resident.
Part 4 - award winning, which award and by whom a vague statement. How can this be an enhanced Green Lung - it was built on open fields, it is disingenuous of the council to suggest otherwise, could we not have had a wide open space rather than a confined Country Park?
We've already lost significant open space, including recreational amenities to make way for Tesco's RBS etc and the link road developments. What are the 'quality jobs', undefined term and how is it to be guaranteed that they are for local people - if they are that good surely everyone will want it; again this is a misleading statement and should be withdrawn or amended.
Part 5 - Lets be clear an area for plane spotters and the poor souls living nearby.
Part 3 - Issue 1
Para 1 The railway increases the catchment, but doesn't decrease the competition from other better designed and strategically placed airports, notably Stansted. The rail line doesn't allow locals to access the airport so actually offers no benefit to those in the near vicinity.
Para 2 - Runway size is a constraint; this is not necessarily a bad thing and does give the local authorities an element of control that they relinquished when they sold a 199 year lease. It is actually doubtful that increased runway size makes the runway any more attractive to any operators. Smaller sized airlines are continually going bust and the proposed size does not open the airport to use by any passenger planes that cannot already use the site. The reference to quieter and more fuel efficient are not backed up by any facts. What are we talking about in terms of decibels (residents have little concern about fuel efficiency as this is a trading issue)? It is hardly beneficial if we currently have 50 aircraft flying per day making 150dB of noise each, but expansion leads to 10dB noise reduction per aircraft, but 100 more aircraft taking off every day.
The economic benefit is limited in terms of passenger spend as there is no expansion of the airport facilities and passengers will therefore travel straight through without spending locally.
Again no mention of cargo planes or indeed maintenance/training etc aircraft i.e the flights the council cannot control. I have referred to concerns regarding maintenance and flying of faulty planes in the area.
Issue 2
Para 1 - Excepting that we are talking about a dormitory town (and questioning why large scale employment is so crucial) why is the JAAP considered as the only key to employment and what is the connection to high-tech business. You can't just mention them in the same sentence for them to be connected there has to be a basis in fact and the report (unsurprisingly given that it is bereft of facts) omits to explain the connection. Given that Southend had in the 80's a significant number of office based employers and has now lost most of them, what makes it think that it can attract and retain such employers now? Again no clues as to methodology, only we'll build a big airport and they will come.
Para 2 - Does not make clear where this land is coming from, although it is surely green belt that is being lost, again, in the same area Cherry Orchard Way. Lots of talk about new jobs in business parks, although again nothing to say whether these are actually new to the immediate area or just movement from Hockley (closure of Eldon Way) or indeed other commutable areas in Essex.
Issue 3
Again sustainable is used without meaning. Only noise and air quality are mentioned, although cannot be certain that this will be in relation to road air and rail traffic. No note on water quality, loss of green belt etc. This is not new public open space; areas of open space are being lost and have been lost in the course of the development around notably Cherry Orchard Way and Eastwoodbury Lane.
What are the controls on the airport being considered; are they enforceable (particularly if challenged by the owner) and who will monitor?
What is sustainable transport policy? Again an unexplained term.
This section is undoubtedly unfairly biased and required re-submission.
Issue 4
I understand that the A127 has it's own restrictions on development as per liberal councillor Graham Langley. I would question therefore whether the council's real intention is not to place a bypass through Hullbridge, North Rayleigh, Hockley and Rochford, a plan previously rightly rejected?
i) there is no linkage to public transport and never has been. Deregulation of buses means that these do not link to rail services and the new rail station is not for use by locals. A13, A127 B1013 are already congested, A127 has speed restrictions and Eastwoodbury Lane will be closed and moved.
ii) Locals are forced to use cars due to lack of public transport connections and the fact that the airport rail service will not serve local stations. Bus services are systematically cut e.g 7 & 8 through Hockley and there is no direct link from Liverpool St Rail Line to C2C either by bus or rail. It is nigh on impossible to get people to refuse to use their cars and CPRE statistics show that the vast majority of workers and passengers will always prefer cars to public transport. Luggage and Public Transport do not make a good mix.
iii) What are the new routes - again nothing specifically mentioned, in the short term B1013 already (according to HAAP taking over 15,000 vehicles daily) will be used as a shortcut, increasingly so when the A127 speed cameras start to work and it becomes congested with cargo lorries. Again conclusion is that council will seek to introduce an unwanted bypass through green belt. Essentially the council are creating a problem expanding the airport and seeking to solve it to the detriment of residents with loss of more green belt.
Issue 5
Brickworks - there was I thinking the current policy was to build more houses not demolish existing ones. Another business park is to be built on open space, yet there is little demand for such a park, with vacant units througout both regions, plus Basildon etc. The council are using the flawed plans for Hockley and surrounding areas including the demolishing of Eldon Way to provide a false demand. This is disingenuous and wasteful (i.e not environmentally friendly), why demolish perfectly serviceable existing units just to create new ones? If access is so poor surely this should have been addressed when the bypass was build a few years back, what investigations are taking place into this waste of money?
B1 - again questionable that the demand exists
Area ii b) given the above is actually sensible to move the rugby club to an even more inaccessible spot? Some of these plans would have been more sensible if Southend United Football Stadium had been moved to Warners Bridge site of Southend Rugby Club (floodlights aren't an issue Highbury didn't have pylons), the railway station would have served a dual purpose (and SUFC could have got into Europe!!) The Rugby Club could then have either shared with Westcliff or moved to the site of Fossetts Way new SUFC stadium, more green belt would have been protected and transport links for the football stadium would at least have been maintained, another missed opportunity.
ii c) a green lung, nice that this has been acknowledged, a pokey site between an industrial estate and an airport runway i.e it can't be used for anything else, be honest don't try and dress it up as something it isn't, it is wholly insufficient for the purpose described.
iii) Why is more land being given over, the airport was given away as a freebie (£1) and the local authorities have little control over usage. Keep the land and keep control, allowing the hand over of more land compounds the earlier errors surrounding the 199 year lease.
iv) Identified as inefficient by whom and in what way? Another vacuous, unstabstantiated statement. does the cost of improvement outweight any potential benefit and who is expected to finance this? If units are not fit for purpose then surely it is up to the landlord or tenant to improve them not the taxpayer.
v) Loss of another sports pitch in the area then. We will soon be left with loads of concrete and designated country parks as only green areas, another poor suggestion. Presume East West Corridor will mean a road being built and houses will inevitably follow as the area will be termed 'under-used' within a decade.
vi) 'opportunity sites' - presumably for development? At least this is located next to existing industrial units.
vii) Flying Clubs - all to be kicked out (despite the fact they they do employ people)
viii) opportunity sites - say what you mean development sites, again the JAAP is trying to dress up the unpalatable.
ix) A green buffer a derelict site with a few horses and occasional circus. I hardly feel grateful, this area is currently an eyesore and clearly the report writer as with area ii c) couldn't think of another use. The flying clubs could be retained if the railway line was moved back here!
x) and xi) Loss of yet more amenities for Southend (once home to the largest amateur football league in the country). Demolition and rebuilding of a road that is only a few years old and at last admission that public transport isn't the answer so a park and ride service is required (although this could be omitted forcing passengers to use public transport)!!
4 Policies pg 17
Introduction Para 2 - It is apparently important to put the JAAP into context, but absolutely no attempt by the compiler to do so. It is unreasonable to expect ordinary residents with little or no experience to have to undertake lengthy research of information that the council have. In fact it could be argued that the council withholding this information is a deliberate attempt to prevent opposition, or perhaps just a glaring omission?
Energy saving technology is to be used (save lots of energy reject expansion) and sustainable drainage - what is this, yet another example of poor drafting.
Accepted that the JAAP cannot be looked at without plans for S.E. Essex, but again no clues and why are we restricted to this part of Essex why ignore Stansted and indeed other airport developments that the target passenger pool can use???? Again JAAP is flawed.
Employment allocations
Introduction
Why high scale employment growth? The term isn't explained, what type of employment and what are the employment aspirations. The area has relatively low unemployment, admittedly many people do not work locally, but this is because of the dormitory (and indeed retirement nature of this part of Essex, that the expansion will undermine and ultimately destroy. There is a limited pool of labour and there are no supporting statistics regarding the composition of the current labour pool or the required labour pool, there seems little point in creating jobs that cannot be filled.
Additional floor space - is this purely within the JAAP, what about other plans locally e.g HAAP where floor space is being reduced, meaning businesses are moving and new jobs are not created, just being relocated at the whim of the councils. The JAAP cannot on one hand say that it must be looked at in context and then ignore the context, this document is flawed again.
Upto 4950 jobs, how is this figure arrived at? It is unsubstantiated and unsupported and meaningless. Up to means just that any figure (including a negative) lower than 4950 is up to the JAAP requires amendment (again). In the area - is this the JAAP area, S E Essex? Are they JAAP related jobs and what are they - 'McJobs'? Same applies to the additional 750 jobs in Aviation Way. Non-specific, non factual and misleading.
E1 - another unsubstantiated figure, unclear if the jobs above are included in this figure or not. How do you split the jobs 50/50, who measures this and who is to say whether the airport brought those jobs. Remember a significant number of insurance companies merged in the 1990's and Southend lost jobs as a result, it had little to do with council policy. Just as conceivably an organisation could decide to move to Southend or Rochford, with airport expansion having no bearing on that decision.
E2 - Is this suggesting that in the middle of a recession busineses will have to pay to upgrade, I feel their sights may be elsewhere. No details on the financial contribution are given - how much taxpayer's money will be poured in and, as with the airport sold on at a loss? Are businesses going to be asked to donate or taxed, won't this be a disincentive to relocate?
This requires more detail and a lot more thought from the councils.
E3 - It is not reasonable to expect significant numbers of employees to walk or cycle unless they live very close to the units. Anyone living any distance will have to negotiate extremely busy (and probably busier roads), the cycle paths may well prove to be a waste of money, cause further unnecessary traffic to motor vehicles and should be properly costed.
Again business contributions comments as per E2 above
E4 E7 - No additional comment given rejection of the entire concept
E8 - As above how are job totals arrived at?
Overall comment on how and why businesses will contribute and what will be cost to residents
London Southend Airport
Introduction
Recognised that Airport can provide a boost - recognised by whom? another unsubstantiated and flawed statement.
Agree should have quieter aircraft, but fuel efficiency is a business decision not a local authority one.
Why must these aircraft be 150 seats again not explained?
Will aircraft development not actually catch up with the airport i.e. over the next decade larger aircraft landing on shorter runways (we then have a problem that we've bigger aircraft than the council currently envisage).
Why is the runway set at 1799m (I believe to avoid additional regulation of 1800, + runways)?
Are there any passenger aircraft with a full payload that cannot access at present that but can at 1799m? If so what types, what noise levels.
Expected that use will be passenger - expected by whom? Certainly not me. It is owned by freight forwarders who have stated they 'have found (their) Southern base'. Low Cost Airlines such as Easty Jet have a fleet requiring longer runways that proposed, who is the new airport aimed at?
Para 2 Growth in MRO - this means defective aircraft will be flown in over densely populated areas - the potential for disaster is huge and the council could/should be held accountable if a crash occurs (as it did in the 1980's).
If there is a demand for high skilled jobs, it is unlikely that applicants exist in sufficient number in this area and therefore, we would be reliant on migrant workers.
Whilst it is not considered desirable for the airport to handle large volumes of freight how much control would the council actually have over this? If the owners want to ship freight can they be stopped? If they want to extend the rail line (and Stobarts already have close ties with both Network Rail through Stobart Rail and Tesco's in terms of freight delivery) can they be prevented? If they want to run HGV's and vans in and out what can the council do? This is their core business. I would suggest that the professional businessmen at Stobarts are more than capable of giving amateur councillors the run around when it comes to what the airport will be used for. Local Authorities are very poor at refusing planning changes when business puts through a commercial reason. The first of these will be 'we can't attract viable passenger numbers we need to increase freight movements'. Once the extension is approved it cannot be repealed.
Para 3
Environmental constraints - no clues as to what these are how they are enforced (indeed if they can be) and what penalties are if airport users do no comply (saying sorry won't be enough) - will they pay compensation to individuals, where will the burden of proof lie? JAAP is deficient again.
The JAAP is also deficient in that no map of flight paths, stacking arrangements or noise levels at altitude (CPRE refer to these as noise contour maps). It seems anomalous to let the operator make his own statement, surely, if this extension takes place the council need to set noise levels and dictate to the user? Road noise (either freight or passenger) is completely omitted, as is rail noise.
Currently train services do not run through the night, but do stop near local stations when operating. The airport timetable will have non-stop trains. Additionally no details of freight movements, all of this is a complete omission and a justifies re-issue of the JAAP.
The A127 is an insufficient carriageway in its current form, particularly following the misguided speed reductions. Cycling facilities just take up vehicle space. I understand that there are limitations on the improvements that can be undertaken on the A127 due to it in part running through the Public Safety Zone, where major roads are not permitted, this is sufficient in itself to justify refusal of the proposal.
LS1 - this support of the expansion policy is unexplained. Why are 2 Tory councils supporting a misguided Labour policy, which basically entails concreting over anywhere that votes conservative? Solid reason should be provided for expansion.
LS2 - Permission
. Airport related - how tenuous does the link have to be for permission to be granted? this is yet another vague statement.
. Agreed baseline - this is undecided, does it require constant noise at one site or intermittent noise again far too vague. No details on who determines/measures etc. I will wager that all complaints about noise will be refuted by the operator. What about non-passenger flights, cargo, maintenance, training etc etc.
. Contributes to road infrastructure needs - positively or negatively and to what extent?
. Modal shift - what are the targets how and who measures the movement and who assesses whether the application is actually reasonable.
Again the JAAP is too vague to be meaningful.
LS3 - what sort of statement, what must this include. The JAAP note is meaningless and needs to be more prescriptive.
LS4 - again JAAP should be more prescriptive, this is meaningless.
LS5 - this is a restriction on the usage of residents property - does this contravene human Rights Legislation??
LS6 - Mentioned previously what is justification in passenger terms to increase the runway. Is there actually an advantage to the council and the residents to refuse 1799m, but approve 1800m?
LS7 -
. Times, unacceptable, 2300 is too late; this is some hours after dark in winter and makes no consideration in particular of the disruption that wil be caused to the sleeping pattern of children. Early mornings are also an issue for similar reasons. No mention is made of unscheduled flights and of cargo flights etc etc. The number of flights is not mentioned. If successful no-one will ever have another peaceful weekend.
. Cargo flights - require more restriction than just noise levels. No passenger flights at night (in noise controlled jets), but loads of cargo flights throughout the night using any available aircraft. what about maintenance/testing/training flights etc
. Routing - existing routes aren't shown, what are the plans for future routes. Again the JAAP is not fit for purpose.
. Helicopters - what more or less, operating heights? As these are vertical take off they could surely reach altitude over the airport before moving off?
. Restricted to what - will it pick up maintenance training testing etc?
. Ground running again unspecified JAAP too vague
. Training movements again unspecified JAAP too vague.
Terminal Facilities
PF1 repeats LS7, why? Is there in fact missing information here.
Maintenance repair and Overall
MRO1-3 what is justification for this, as previously stated surely this just increases the danger that the airport poses in a densely populated area. The possibility of contributions from business at the current time are surely fanciful.
Airport Development Zone
What criteria will be used to decide if development supports the airport and why is retail use refused?
Transport
What sorts of contributions are expected? What about the B1013, there is absolutely nothing to stop drivers using this as a cut through, especially given the days and reduced speed limits on A127?
T1 - where is this proposed to run?
T2 - and this?
T3 - why dual this road, unless there are plans to reintroduce the bypass via Hullbridge/Rayleigh/Hockley. Dualling only encouraes further traffic along the over used B1013 via Rayleigh
T4 as T3 this is encouraging traffic away from preferred route of A127
T5 - Loss of public amentities
T6 - there remains little incentive to use anything but a car, no car parking facilities forces the use of public transport - radical but true?
T7/8 - what sort of contribution - inevitably the tax payer will fund the bulk of this and how will the bill be met - wholly by Southend? who decides on contribution?
T9 - these are not provided with the JAAP again an omission
Environment
Introduction, this is not a green lung, the development is taking place on the green lung. already, the developments along and of Cherry Orchard Way have eaten into this and I understand that the development will downgrade further land making it easier to develop the area in the future. The green belt boundary isn't 'reviewed', it is obliterated. This is unacceptable.
Para 3 - what are 'high levels of environmental efficiency?' and 'sustainable drainage' more vacuous statements. These need to be clarified the document is once more deficient.
ENV1 - unacceptable loss of green belt (again) both councils seem to really object to green belt principles and look for any opportunity to develop such sites apparently seeing them as an inconvenience rather than a necessity and a desirable asset.
ENV2 - this is not new - it is open at prsent and it is at best misleading and at worst a downright lie to call it new. The JAAP is once more factually erroneous
ENV3 - as 2 above.
ENV4 - and if no contribution arrives does it happen or does the taxpayer get saddled with the bill? How will contributions be collected, surely this is a tax on new enterprise?
ENV5 not new public space again incorrect
ENV6 - this is constitutes 'no change' presumably because the land is so poorly sighted it is permitted to escape development
5.1 - JAAP provides no idea of what scale of limitations will be i.e. one in 3 units are occupied, how many jobs will result, how many of the contributions will be made.
5.2 - intended to provide detailed information - need more details now, not a washy statement that it is 'intended'. Sorry intended to but didn't get around to it. Should say 'Full details will be provided'.
5.3 You have my views. The report JAAP itself is deficient in factual information and misleading in the extreme. There is a lack of information given to the individual and it is not apparent that the council have advised necessary interested parties e.g RSPB. As such the process is substantially flawed, sufficiently so for the whole of this stage to be delayed whilst the JAAP is re-issued with sufficient information and clarification.
From my understanding of the proposals the councils are to a varying degree being incredibly naive, disengenuous, negligent and as such untrustworthy. Again this is sufficient to warrant review of the JAAP.
I understand that as part of the review process Rochford councillors visited Southampton Airport. I would suggest that although the runway size is comparable, to undertake a visit to an airport that doesn't permit night flights except in extenuating circumstances (max 10 per month 100 a year) and out of season is not going to provide any great insight. Especially given that the European Region Association (ERAA) shows the following freight movements Southend and Southampton in 2008:-
Southend 443 Tonnes reducing 19.6% from 2007
Southampton 264 tonnes reducing 10.5% from 2007
So the two airports are not as comparable as has been suggested especially since freight cargo uses older, noisier (propeller aircraft) rather than those 'quiet' jets for passengers and Southend is now owned by a freight forwarder.
Additionally back in 2002 the DfT recognised the lack of appeal of Southend as a suitable site.