Object
London Southend Airport and Environs Joint Area Action Plan Preferred Options
Representation ID: 13274
Received: 15/05/2009
Respondent: Mr Richard Postlethwaite
Representation Summary:
The entire consultation process appears to be deliberately difficult for the majority of residents to access. If the proposal to extend the runway is allowed to proceed then it will inevitably lead to lengthy and expensive legal action to stop it.
Full text:
The entire consultation process appears to be deliberately difficult for the majority of residents to access. If the proposal to extend the runway is allowed to proceed then it will inevitably lead to lengthy and expensive legal action to stop it.