(193) 7. Spatial option 3

Spatial option 3 provides a higher level of intervention in Hockley centre than options 1 and 2, in order to strengthen the uses in the centre, provide new homes in the area and provide greater improvements to the public realm.The key elements of option three can be summarised as:

Development and land uses

  • Providing shop front improvements to the units on the retail stretch of Spa Road and the central sections of Main Road and Southend Road.
  • Replacement of warehouse style building at 2 Main Road with a new shop units and a small number of homes to provide stronger frontage to the historic centre of Hockley.
  • Replacement of the corner building opposite this on Spa Roundabout, to provide stronger frontage to the roundabout and establish new shops and homes.
  • Redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities and shop units fronting Southend Road.
  • Replacement of poor quality building on Southend Road, with retail and homes to the rear
  • Creation of two new homes at the northern end of the churchyard, to provide overlooking and natural surveillance for the pedestrian route through the green space here.
  • Replacement of the Alldays building and one building on Eldon Way with business start-up/public sector offices employment space above shops, fronting onto a small public space.
  • Creation of a new leisure space which could accommodate the potential skating rink in the area, replacing one building in Eldon Way.
  • Replacement of the Somerfield/Co-op buildings and houses, with new retail and homes, fronting onto a small public space.
  • Replacement of two buildings on Eldon Way with new homes, with public realm improvements.
  • New homes to replace the health centre at Eldon Way, with this moving to a new combined community centre on Southend Road.
  • Replacement of poor quality buildings at 34-40 Spa Road, with new retail.
  • A new home on Spa Road, close to the train station.

Traffic and parking

  • Creation of a new parking area on the south side of the train station, for weekday commuters and weekend shoppers, with vehicular drop-off and pick-up points moving from the roundabout to here.
  • Narrowing of the train station roundabout, to prevent waiting here but providing drop-off points next to the station.
  • Creation of a new parking square for short-term parking , fronted by shops and offices.
  • Increasing the amount of parallel on-street parking on Spa Road and providing echelon parking, where space permits.
  • Providing a shared surface at Spa roundabout.
  • Consider the potential to open the western entrance to Potters car park, to help ease congestion at the Spa roundabout. Cars entering and exiting the car park from the west would no longer need to use the roundabout and Spa Road to access the car park, relieving congestion at this point.This would need to be subject to further testing.

Movement and public realm

  • Improvements to the train station frontage and the public realm to provide a real front entrance to the station.
  • Establishing a pedestrian link between the train station and Eldon Way employment area.
  • Enhancing the green pedestrian link between Bramerton Road and Eldon Way.
  • Provide paving and streetscape improvements to the retail core of Hockley, on Spa Road, Main Road and Southend Road to strengthen the presence and profile of the centre.
  • Tree planting along Spa Road and other key areas
  • Providing table-top crossings for pedestrians at secondary road junctions on Spa Road
  • Providing a large table top crossing at the northern end of Woodlands Road, to help create a public space at the Spa roundabout, the historic core to Hockley
  • Enhancing the public realm at the new combined community centre on Southend Road
  • Strengthening the link between Spa Road and Eldon Way
  • Creating a green link between Spa Road and Southend Road, through the churchyard
  • Enhancing the environment and improving safety in front of the existing leisure uses in Eldon Way
  • Improving the parking facilities and public realm at the neighbourhood shops on Main Road, to bring these into the centre and support them commercially.
Option 3C.02 Key
Potential Issues
The scheme requires the removal of an existing building in Eldon Way
The scheme requires the support and cooperation of land owners within the centre
The scheme includes the replacement of the library and health centre with similar uses, which may be challenging to fund
The scheme moves parking access on Spa Road to Eldon Way, which will increase the use of these roads
The scheme has a large number of public realm improvements and lower number of developments, which may prove challenging to finance
The scheme has potential for greater impact on Hockley’s character, though if managed carefully, this could be a positive impact
A larger level of intervention in the centre would need to be carefully phased, to avoid disruption to shops and services during development
Community infrastructure will need to be considered to test whether reasonable number of new homes can be accommodated in Hockley
Benefits
The scheme improves parking capacity and accessibility in the centre
The scheme supports the commercial health of Hockley centre, providing new retail which can complement but not threaten existing retailers
The scheme provides flexible employment space, preserving Eldon Way as an employment and leisure area in option 3a
The scheme provides new leisure space which could accommodate a skating use (currently seeking space in the area) and which connects well with the existing leisure uses
The scheme strengthens community uses in the centre
The scheme has the potential to cross fund public realm improvements in the centre of Hockley
The scheme strengthens links between Spa Road and Eldon Way
The scheme dramatically improves the physical environment at Spa roundabout, the historic core of Hockley
The scheme accommodates new homes in the area, easing pressure on the surrounding Green Belt

(154) Spatial option 3a

Spatial option 3a is very similar to option 3, with a minor difference that new housing is provided to the north of the railway line, along Plumberow Avenue, in order to provide new homes whilst preserving the existing employment space on Eldon Way,This also helps to create a strong northern entrance to the train station. In this option, the leisure uses have been consolidated in one area of Eldon Way as in option 2, to increase safety levels for visitors.


Option 3C.02 Key
Option 3

Axonometric visualisations of option 3

Option 3A

Axonometric visualisations of option 3a

Spa Road round.or
Spa Road round
Option 3 PR

Option 3 public realm investment detail

Detail on the public realm investment is provided on these pages. Distinct areas have been identified which would be likely to come forward either with development areas or as public realm investment projects.The project areas have been lettered and detail on the proposed improvements is set out in the table below.


Site Public realm description Floor area
(Red line area minus road area receiving no new treatment)
A
  • Extension of paving along Main Road and Southend road from Spa Road roundabout.
  • On street parking along Spa Road on paved surface and slight narrowing of Spa Road.
  • Tree planting throughout area.
  • Secondary road treatment at start of Woodlands Road, Bramerton Road and car park entrances.
  • Potential for new street furniture.
  • Shared surface at Spa Road roundabout.
  • Where possible, paving improvements to include areas within private ownership that were excluded from previous improvements.
  • On street parking reconfigured in front of western shops on Main Road with new spaces paved.
5,000
B
  • New paving and shared road surface at entrance to train station.
  • Improvements to footpath linking to Spa Road
700
C
  • New car park
3,350
D
  • Paving improvements along Station Approach including potential pavement widening and tree planting. Roundabout reduced in size to create small green space on approach to station.
715
E
  • Paving improvements along Eldon Way befitting its new mixed residential character.
2,360
F
  • New car park with high quality floor material.
  • New public space facing Spa Road with soft landscaped 'village green'.
2,700
G
  • This is currently private green space owned by the Church, and public access would need to be granted before opening up this area. If consent is granted, there is potential for new footpaths and small scale landscaping to develop a valuable area of public open space within the centre of Hockley.
1,000
H
  • Linking road and pedestrian route to new train station car park
  • Extension of paving along Spa Road linking to improvements to Station Approach.
475
I 490
J
  • Further paving improvements to Spa Road / Greensward Lane.
415
Option 3 DS

Option 3 development site details

Detail on the areas of intervention is provided on these pages. Distinct areas have been identified which would be likely to come forward as development sites.The sites have been numbered and detail on each of these is set out in the table below.

The table below provides an overview of proposed land uses within the option.

Total increase if whole of masterplan delivered
Land use Gross external floor area (sqm) Approx units
Retail normal shops 940 1-2
Retail large shops 1,370 1
Flats 8,210 95
Houses 6,780 54
Offices 3,665 -
Light industry/ attached offices -14,520 (minimum, potentially more offices on upper floors) 20-25
Leisure 3,060 (new build only, does not factor in existing leisure) 3-6 (new build only, does not factor in existing leisure)

Site Existing
use
Proposed
use
Number
of
storeys
Existing areas Proposed areas Site
Area (sqm)
Land use Approx.
no. of
units
Gross
external
floor area
(sqm)
Land use Approx.
no. of
units
Gross
external
floor area
(sqm)
1 2 single storey retail
units
2 retail units with
flats above
3 Retail 2 275 Retail 2 360 700
Flats 4 720
2 Single storey retail Retail with flats
above
2 Retail 4 390 Retail 5 470 750
Flats 5 440
3 Retail units facing Spa
Road, with flats above
main parade. Post sorting
office. Detached house.
Light industry with
associated offices facing
Eldon Way.
Retail with offices above, as
well as some offices on ground
floor. Leisure, including
displaced from site 6. Shops
with flats above, including large
format store.
2 - 3 Light industry
/ offices
6 (3 occupied
by single
operator)
8,400 Retail (large
format)
1 1370 13,010
Retail 11 - 12 1,635 Retail 10 1905
Flats 7 600 Offices 240 people 4565
Sorting office 1 450 Flats 22 1830
House 1 150 Leisure 3 - 6 3060
4 Library and health centre Library and health centre with
flats above and private parking
for flats
2 facing
Southend
Main Road, 3
to rear
Library 1 280 Library 1 355 1,350
Health centre 1 425
Health centre 1 245 Flats 13 1030
5 Single storey retail House 2 Retail 1 45 House 1 170 250
6 Light industry / Leisure Flats and houses 2 Light industry
/ leisure
10 - 15 4970 (building
footprints)
Flats 21 1750 9,185
Houses 36 3810
7 Light industry Flats and houses 2 Light industry 4 1150 Flats 16 1350 3,050
Houses 7 700
10 Health centre Flats and houses 2 Health centre 1 260 Flats 6 480 950
Houses 4 440
11 Rear of church grounds 2 houses 2 N/A N/A N/A Houses 2 270 215
12 Restaurant car park Shops with flats above and
houses
2 N/A N/A N/A Retail 1 130 600
Flats 2 130
Houses 4 380
13 Offices Shops with flats above 2 - 3 Offices - 900 Retail 2 420 920
Flats 13 1080

Option 3A PR

Option 3a public realm investment detail

Detail on the public realm investment is provided on these pages. Distinct areas have been identified which would be likely to come forward either with development areas or as public realm investment projects.The project areas have been lettered and detail on the proposed improvements is set out in the table below.


Site Public realm description Floor area
(Red line area minus road area receiving no new treatment)
A
  • Extension of paving along Main Road and Southend road from Spa Road roundabout.
  • On street parking along Spa Road on paved surface and slight narrowing of Spa Road.
  • Tree planting throughout area.
  • Secondary road treatment at start of Woodlands Road, Bramerton Road and car park entrances.
  • Potential for new street furniture.
  • Shared surface at Spa Road roundabout.
  • Where possible, paving improvements to include areas within private ownership that were excluded from previous improvements.
  • On street parking reconfigured in front of western shops on Main Road with new spaces paved.
5,000
B
  • New paving and shared road surface at entrance to train station.
  • Improvements to footpath linking to Spa Road
700
C
  • New car park
3,350
D
  • Paving improvements along Station Approach including potential pavement widening and tree planting. Roundabout reduced in size to create small green space on approach to station.
715
E
  • Paving improvements along Eldon Way befitting its new mixed residential character.
1,215
F
  • New car park with high quality floor material.
  • New public space facing Spa Road with soft landscaped 'village green'.
2,700
G
  • This is currently private green space owned by the Church, and public access would need to be granted before opening up this area. If consent is granted, there is potential for new footpaths and small scale landscaping to develop a valuable area of public open space within the centre of Hockley.
1,000
H
  • Linking road and pedestrian route to new train station car park
  • Extension of paving along Spa Road linking to improvements to Station Approach.
475
I 490
J
  • Further paving improvements to Spa Road / Greensward Lane.
415
K
  • New station entrance and drop off point
920
L
  • Paving improvements along Eldon Way and new parking spaces. With leisure uses consolidated in the main building to the west, vehicular access no longer needed into the buildings for loading and a wide paved area created between the building and car parking. This is seen as a 'child safety zone'.
1,970
Option 3A DS

Option 3a development site details

Detail on the areas of intervention is provided on these pages. Distinct areas have been identified which would be likely to come forward as development sites.The sites have been numbered and detail on each of these is set out in the table below.

The table below provides an overview of proposed land uses within the option.

Total increase if whole of masterplan delivered
Land use Gross external floor area (sqm) Approx units
Retail normal shops 940 1-2
Retail large shops 1,370 1
Flats 7,150 82
Houses 2,690 25
Offices 3,665 -
Light industry/ attached offices -8,400 -6
Leisure 3,060 (new build only, does not factor in existing leisure) 3-6 (new build only, does not factor in existing leisure)

Site Existing
use
Proposed
use
Number
of
storeys
Existing areas Proposed areas Site
Area (sqm)
Land use Approx.
no. of
units
Gross
external
floor area
(sqm)
Land use Approx.
no. of
units
Gross
external
floor area
(sqm)
1 2 single storey retail
units
2 retail units with
flats above
3 Retail 2 275 Retail 2 360 700
Flats 4 720
2 Single storey retail Retail with flats
above
2 Retail 4 390 Retail 5 470 750
Flats 5 440
3 Retail units facing Spa
Road, with flats above main
parade. Post sorting office.
Detached house. Light
industry with associated
offices facing Eldon Way.
Retail with offices above, as well
as some offices on ground floor.
Leisure, including displaced from site 6. Shops with flats above,
including large format store.
2 - 3 Light industry /
offices
6
(3 occupied by
single operator)
8,400 Retail (large
format)
1 1370 13,010
Retail 11 - 12 1,635 Retail 10 1905
Flats 7 600 Offices 240 people 4565
Sorting office 1 450 Flats 22 1830
House 1 150 Leisure 3 - 6 3060
4 Library and health centre Library and health centre with
flats above and private parking
for flats
2 facing
Southend
Main Road, 3
to rear
Library 1 280 Library 1 355 1,350
Health centre 1 425
Health centre 1 245 Flats 13 1030
5 Single storey retail House 2 Retail 1 45 House 1 170 250
6 1 / 2 storeys of light industry
and leisure
Consolidated leisure uses within
existing refurbished buildings
1 / 2 Light industry /
leisure
8 - 13 4,150 (building
footprint)
Leisure 6 - 10 4,150 (building
footprint)
9,185
8 Railway siding Houses 2 N/A N/A N/A Houses 16 1,560 2,500
9 Surface car park and railway
siding
Flats and new railway station
entrance and drop off
2 N/A N/A N/A Flats 24 2000 3,250
10 Health centre Flats and houses 2 Health centre 1 260 Flats 6 480 950
Houses 4 440
11 Rear of church grounds 2 houses 2 N/A N/A N/A Houses 2 270 215
12 Restaurant car park Shops with flats above and
houses
2 N/A N/A N/A Retail 1 130 600
Flats 2 130
Houses 4 380
13 Offices Shops with flats above 2 - 3 Offices - 900 Retail 2 420 920
Flats 13 1080