Issues and Options Document

London Southend Airport

Representation ID: 37056

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.9 London Southend Airport
Paragraph6.113 ECC support the need for improvements to services on the rail line, the importance of the bus services and the need to encourage the use of public transport to the Airport.
ECC considers greater emphasis should be placed on securing wider sustainable modes of transport (including public transport) and connectivity with London South Airport, as part of a wider sustainable travel and integrated transport package. ECC recommends opportunities should be sought to develop a multi modal interchange for the Airport, to improve accessibility from the Local Bus services, including for example a new bus interchange on the eastern side of the railway line. This would provide an effective multi modal interchange for the Airport, with improved connectivity and realistic sustainable travel option for all users.

Paragraph 6.114 ECC supports the development of the Airport business park and the associated highway and cycling network improvements

Paragraph 6.115 ECC acknowledges the need for investment in the highway / transport network around London Southend Airport and will continue to seek funding through bids to Central Government, SELEP and S106 contributions.
ECC considers there to be a need to promote and encourage a package of sustainable travel options, for residents and businesses to travel sustainably, with the highway improvements referred to also including improvements to bus journey times and bus priority measures, to promote sustainable travel (including buses) as a realistic sustainable travel option. Further contributions through a combination of s106 and S278 and CIL funding should be secured through appropriate new developments to address the sustainable travel agenda when opportunities arise.
Paragraph 6.116 ECC acknowledges and supports the need for transportation improvements to the A127 to facilitate growth within the District and South Essex; and recommend that reference is made to the joint ECC and Southend on Sea BC A127 Route management Strategy entitled A127 Corridor for Growth - An Economic Plan 2014

Paragraph 6.117 Options in relation to London Southend Airport:
A. Retain and update the Core Strategy policy supporting London Southend Airport's growth
B. Retain the existing policy in the Allocations Plan
C. Retain the existing policies in the JAAP
D. Continue to support surface access improvements in and around London Southend Airport

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

ECC recommends that RDC should consider and clarify the "in principle" inter-relationship and compatibility between the JAAP and the new emerging Local Plan. For example, is the intention to incorporate the provisions of the JAAP within the new Local Plan, or will the JAAP continue to be a separate standalone document, subject to its own review?

In respect of Option D, ECC considers that the JAAP clearly sets out the associated access improvements for London Southend Airport, and that this would be appropriate option to address the passenger transport and sustainable travel options, as part of an integrated travel solution. ECC considers there to be a need to actively promote and improve passenger transport provision and connectivity, rather than solely relying on highway improvements to provide benefits for passenger transport, as any additional highway capacity may be absorbed by continual increases in demand by motorists, in the absence of realistic alternative travel options.

Comment

Issues and Options Document

Supporting Tourism and Rural Diversification

Representation ID: 37057

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.10 Supporting Tourism and Rural Diversification

Paragraph 6.121 ECC notes the comments regarding the lack of rural passenger transport services. However, it is of concern that the emphasis for the solution is solely placed on improvements to roads and the cycling network. In order for RDC to improve accessibility to the rural parts of the District, whether for tourism, employment or other reasons, it is considered that the most effective and viable approach would be the development of a District transportation strategy. This would have the benefit of setting out aspirational networks for all sustainable travel options including walking, cycling and passenger transport. There are a range of options that could be considered from traditional timetabled services to demand responsive operation or a combination of services to optimise technology. ECC would wish to engage with RDC to explore the options, which could be of particular value and support for tourism and rural diversification.

ECC considers investment to improve and create new Green Infrastructure such as woodlands, nature reserves and greening town centres would be appropriate and would benefit tourism, through attracting new visitors, and support retail and tourism sectors.

ECC considers transport and accessibility to be vitally important for tourism and investing in the Green infrastructure would provide opportunities to encourage alternative modes such as walking and cycling. This would improve accessibility to green spaces, whether by the distance from home and businesses; or by the creation of green links/greenways including enhancements to the existing Public Rights of Way network (including cycleways). Thus providing alternative traffic free cycling and walking routes, as well as wildlife corridors.

ECC considers that this would need to be developed in partnership with stakeholders including ECC and public transport providers to improve the accessibility of green spaces, to be as easy as possible. ECC would welcome the opportunity to explore this further, as outlined in ECC's response to SO6 above, regarding the proximity of new developments to green space.

Paragraph 6.127 Please amend the reference to "Ultrafast broadband" for the reasons set out in response to Section 6 and paragraphs 6.94, 6.96 and 6.127.

Paragraph 6.128 Options for tourism and rural diversification:

A. Continue to support current defined forms of green tourism and rural diversification as set out in our current policies
B. Expand the current approach to include other forms of rural diversification
C. Do not support rural diversification

ECC Comments

ECC does not consider options A and B to be mutually exclusive. ECC would expect RDC to develop a combination of the options based on evidence and in accordance with the NPPF, and to evolve as part of the overarching economic growth strategy (see paragraphs 6.96 and 6.116 above).

In respect of Option B (rural diversification) ECC supports this option in principle (subject to evidence) to provide an opportunity to retain employment in the first instance which may then lead to creation of new jobs. ECC recommends that the following factors are further explored:

* Accessibility Issues - there is potential to expand the current policy approach to address accessibility issues raised by ECC (paragraph 6.121). ECC recommends further investigation is required in respect of the wider passenger transport improvements to support access to tourism and rural areas, tourism. It is considered that this could include a range from timetables to the "on demand" bus services, as realistic alternatives; which goes beyond improvements to roads and cycle networks.
* Tourism and consideration of the potential benefits of the England Coast Path, and opportunities for tourism and rural diversification including for temporary camp sites if for example there is an increase in events specifically using the coast such as Maldon District's Council annual Saltmarsh 75 event.
* Potential provision for waste management facilities suited to the rural environment (such as anaerobic digestion or composting), as part of rural diversification in accordance with NPPW

ECC recognise that Policy GB2 in the Core Strategy and Policies DM12 and DM13 in the Development Management Plan do not act to constrain the rural diversification opportunities highlighted above and a continuation of this stance may be appropriate, based on evidence.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the NPPF (and the emerging vision and objectives for the draft Local Plan.

Comment

Issues and Options Document

Retail, Leisure and Town Centres

Representation ID: 37058

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SUPPORTING COMMERCIAL DEVELOPMENT (SECTION 7)

SP2.1 Retail, Leisure and Town Centres

Paragraphs 7.12 In respect of the Retail and Leisure Study update 2014, ECC
and 7.17 notes the reference to "catering needs" and recommend that this should also include "A5" fast foot outlets, to avoid clustering and high concentrations of A5 premises within the district. ECC strongly recommends that RDC review the existence and pattern of A5 premises, which can be undertaken using the FEAT tool (http://www.feat-tool.org.uk/), which is a fast food tool which provides details on fast food outlets for districts including A5, fast food retailers. ECC Public Health is aware of the emerging evidence base on high energy foods and obesity, including recent publications from Public Health England for spatial planners on fast food restrictions. ECC Public Health would welcome the opportunity to provide advice and to work with RDC on this matter.

Paragraph 7.20 Options for the district's town centres:
A. Retain current Core Strategy policies
B. Retain current policies in the Rayleigh Centre Area Action Plan
C. Retain current policies in the Rochford Town Centre Area Action Plan
D. Retain current policies in the Hockley Area Action Plan
E. Review the town centre Area Action Plans
F. Do not have policies on town centres

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

As set out in response to paragraph 6.117 in respect of the JAAP, ECC recommends that RDC should consider and clarify the "in principle" inter-relationship and compatibility between these Area Action Plans and new emerging Local Plan. For example, is the intention to incorporate these Area Action Plans into the new Local Plan, or will they be separate standalone Area Action Plans subject to their own reviews?

Comment

Issues and Options Document

Highways Infrastructure

Representation ID: 37059

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

DELIVERING INFRASTRUCTURE (SECTION 8)

SP3.1Highways Infrastructure

Paragraph 8.17 ECC welcomes and supports the references and importance given to the Essex and Southend "A127 A Corridor for Growth - An Economic Plan (2014)" and the need for investment in the highway and transportation network, in accordance with the Essex LTP. ECC will continue to seek funding through bids from central Government, SELEP and S106 contributions as appropriate (CIL?) (as stated in 6.111 above).

ECC can advise that work is progressing on the next phase of the A127 Route Management Strategy, with the Options Appraisal and Strategy Report, in conjunction with the South Essex authorities, the London Borough of Havering, Transport for London and Highways England, to promote the importance of the A127 to facilitate growth across the area. In respect of improvements to the strategic transport network, ECC can confirm that the 'short term' funded transport scheme for the A127/A130 Fairglen Interchange is planned for implementation by 2022/23. ECC is also preparing a Joint A13 Route Management Strategy with Southend on Sea BC and Thurrock BC Highway Authorities.

In moving forward it is considered that RDC's approach to the Highways and Transportation will need to take into account the ASELA South Essex 2050 vision and emerging Infrastructure workstreams and the JSP.

Paragraph 8.18 ECC welcomes the reference to work with ECC as the Highways Authority and neighbouring authorities to promote strategic and more localised improvements to the highways network. ECC will continue to work with RDC on an ongoing basis to ensure these strategic matters are addressed collectively within the respective emerging Local Plans and a wider South Essex Joint Strategic Plan.

Paragraph 8.20 Options for the Local Highway Network:

A. Retain current policies on the local highway network
B. Prioritise local highways and junctions between Rayleigh, Hockley and Rochford (B1013), to support and direct funds to improve the local highway network
C. Prioritise local highways and junctions by upgrading the east to west connection north of Rayleigh, Hockley and Rochford, to support and direct funds to improve the local highway network
D. Do not have a specific policy on the local highway network

ECC Comments

ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options in consultation with ECC as highway and transport authority, based on evidence (including transport modelling) and in accordance with the NPPF.

ECC would anticipate the strategy for the local highways network to be a combined approach as part of an integrated package of transport solutions (including sustainable travel options) and for this to be embedded within the Local Plans' spatial strategy.

As stated in response to SP1.3 and paragraphs 6.46 and 6.113 above, ECC considers greater emphasis should be placed on an integrated transport solution, in accordance with the Essex LTP to move away from the traditional reliance on road improvements, which is only part of the solution. For example, the inclusion and promotion of sustainable modes of travel (in addition to the outcomes of the transport modelling work) would support the community (both residents and businesses) in respect of transport and travel through the main towns and improve rural transport options. There is a need to ensure the appropriate approaches for the local highway network also take into account the requirements and inter-relationship with the wider local and Strategic networks as well as cross boundary issues / impacts.

Strategic Highways Network Transport

Paragraph 8.21 ECC welcome the reference for RDC to work with ECC and Southend BC (as the Highways Authorities) in the development of a transport model for the length of the A127, however please refer to ECC's update on the A127 Route Management Strategy in paragraph 8.17 above.

ECC can advise that the A127 comprises three highway authorities (Southend on Sea, ECC and the London Borough of Havering (LBH)), as such the A127 Route Management Strategy is being extended to incorporate the LBH. Furthermore LBH and the seven south Essex authorities (including ECC) have signed a Statement of Common Ground in respect of the importance of the A127 to facilitate growth.
ECC is engaging with the South Essex authorities in respect of a potential South Essex transport model which would be consistent with ECC's aspirations for an Essex wide model, drawing on the modelling work to date. This will however need to take into account the Highways England modelling information, including for example the Lower Thames Crossing.

ECC can also advise that Highways England would wish to be engaged in emerging Local Plans, to ensure any potential "ripple effect" of development is considered in respect of their transport network, for example the M25, A12 and sections of the A13 within South Essex.

Paragraph 8.21 Options identified for the strategic highway network:
A. Support improvements to the strategic highway network
B. Do not have a specific policy on the strategic highway network

ECC Comments
ECC would expect RDC to prepare a policy approach to the strategic highway network in consultation with ECC as highway and transport authority, based on evidence (including transport modelling) and in accordance with the NPPF.
In respect of Option A, ECC would anticipate the policy for the strategic highways network to be a combined approach as part of an integrated package of transport solutions (including sustainable travel options) and moving away from the traditional reliance on road improvements, which is only part of the solution. This would be in accordance with the Essex Local Transport Plan, and the A127 and emerging A13 Route Management Strategies as set out in response to paragraphs 8.17-21 above, and in response to SP1.3, paragraphs 6.46 and 6.111.
ECC does not support Option B for the reasons stated within the justification; it is considered contrary to the NPPF, the Essex LTP and A127 Route Management Strategy and the emerging vision and strategic objectives in the draft Local Plan.

Comment

Issues and Options Document

Sustainable Travel

Representation ID: 37060

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP3.2 Sustainable Travel

Paragraph 8.22 ECC welcome the desire for a modal shift towards more sustainable ways to travel, given that car use is the dominant mode of transport. ECC recommends there to be a need to change the modal shift in the short term, with greater emphasis placed on promoting alternative travel options (walking, cycling, passenger and public transport) and given greater weight in the Local Plan, to ensure these facilities are planned in now, to enable the options and benefits to be realised during the plan period. Greater emphasis is required on an integrated transport solution, and moving away from the traditional reliance on road improvements, which is only part of the solution.

Paragraph 8.22 ECC notes the reference to the Rayleigh Town Centre AQMA, however recommend this should be expanded to include reference to the National Air Quality Plan published by DEFRA in July 2017 which designates a site on the A127 to the east of Rayleigh Weir.

Paragraph 8.24 ECC welcomes the reference to Public Transport and recognition of the importance and connectivity to the rural areas and cross boundary connections, however there is a need to recognise that Public Transport is of value to everyone (all residents and employers) and not solely to residents who do not have access to private vehicles. There is a need for a change in emphasis, with the principles of alternative sustainable travel and accessibility (including passenger transport) to be embedded within the Local Plans' emerging spatial strategy to deliver the "vision" for the district and modal shift in transport. ECC recommends that RDC actively engages and works with the local transport operators in the District as well as ECC to develop services.

For example, there is the opportunity to explore innovative ways to deliver a more demand led public transport service to broaden accessibility away from the scheduled bus service. It could bring improved frequencies and less complex journeys by being able to be more responsive to demand for specific journeys, and provide quicker interchanges between modes. How this is supported could be explored within the context of paragraph 8.30, and may have potential to form part of the solution to air quality issues identified in paragraph 8.31.

Paragraph 8.27 ECC recommend that reference is made to the Rochford Cycling Action Plan 2018; prepared by Essex Highways and further information on the Essex Cycling Strategies is available here:
http://www.essexhighways.org/getting-around/cycling/cycle-programme.aspx.
Please note for consistency of terminology the references to "Cycle "Storage" within this paragraph should be change to "Cycle "Parking".

Paragraph 8.28 For clarity, ECC recommends that greater references should be made to "cycling" and "cycling networks", to help distinguish the nature of the routes being referred to, for example by inserting "cycle" before "routes to link homes" within this paragraph.

Paragraphs ECC welcomes the reference to the positive role of "Green Infrastructure"
8.27, 8.28 within this section which highlights the high dependency on cars, and that
and 8.32 other sustainable modes of travel should be encouraged.

In respect of the approach to car use, consideration should be given to the provision for charging points for electric cars (see also comments under Renewable Energy Generation). Further consideration is required on the practicality of long term public transport provision with the likely changes in car ownership patterns in 20 years' time, arising from the Government's commitment to ban the sale of new diesel and petrol vehicles from 2040 and responses from the car industry and possible growth in the use of electric vehicles, be it hybrid or pure electric vehicles, with sales projected to increase to around 10% of new vehicles by 2025. The industry anticipate the share of Electric Vehicles will continue to rise and that by 2025 Electric Vehicles will be more affordable than internal combustion vehicles, even without Government subsidies.

The need for and provision of Electric Vehicle charging points should be explored further and ECC's Environment team wish to engage with RDC on this matter, including sharing examples of good practice in emerging and new Local Plans.
Paragraph 8.30 ECC would welcome the opportunity to work closely with RDC on the development and implementation of Travel Plans for all new developments, or extensions to existing businesses, or where the development will have a significant impact on the highway. The ECC Sustainable Travel team would welcome the opportunity to explore this further with RDC and recommend reference is made to ECC's Passenger Transport Strategy - Getting Around In Essex 2015.

Paragraph 8.33 ECC would welcome the opportunity to work with RDC to explore the issues raised (bullet points 1-6) in relation to sustainable travel choices for communities across the district, which could be addressed through the Local Plan. Further consideration is required regarding the role and importance of realistic sustainable travel options to support the growth in the District.

Key issues ECC would like to explore further with RDC include:

Fifth bullet point - ECC considers the proposal to re-route the bus services away from Marked Square in Rochford Town Centre to be unsound. The removal of buses from this key location would be contrary to the principles of sustainable and accessible communities, and the strategic objectives in the Local Plan including the need for a modal shift in transport towards realistic and sustainable travel options for all. For example; if buses could not serve this area then residents would be encouraged to travel by car, adding further traffic to the already congested road network.

Sixth & Seventh bullet point - Further clarification is required on the nature of the issues.

Paragraph 8.34 ECC supports the proposal for setting a more challenging mode share; and would wish to work with RDC to explore and develop these issues and opportunities further within the context of the emerging new Local Plan.

Paragraph 8.35 ECC welcomes the opportunity to work with RDC and partners to explore and help shape new and improved passenger transport options across the District, as part of ongoing "duty to co-operate" engagement in the preparation of the Local Plan.

Paragraph 8.36 ECC consider the reference to SERT, which concerns bus services to be unclear within this paragraph on cycling.

Paragraph 8.37 Options identified to support Sustainable Travel
A. Retain the current policy on public transport
B. Support the development of a rapid public transit system for South Essex
C. Retain the current policy on travel plans
D Lower the threshold to require travel plans to be prepared for schemes under 50 homes
E. Retain the current policy on walking and cycling
F. Do not have policies on sustainable travel

ECC Comments

ECC would expect RDC to develop a combination of options A-E, in consultation with ECC as highway and transport authority, based on evidence and in accordance with the NPPF.

ECC would anticipate the approach to support sustainable travel to be a combination of options, as part of an all-encompassing, integrated package of transport solutions (including highway network improvements) and for this to be embedded within the Local Plans.

ECC recommend RDC has regard to NPPF (section 4 Promoting Sustainable Transport and section 8 Promoting Healthy Communities), the Essex Local Transport Plan, the A127 and emerging A13 Route Management Strategies, ECC's Sustainable Travel Strategy, and evidence (including transport modelling the Cycle Action Plan and South Essex Active Travel programme), and ECC's Passenger Transport Strategy - Getting Around in Essex (2015).

In respect of Option A, ECC considers this to have the potential for greatest advantages to prepare the District for its future transportation needs, including the potential for a more demand- led model, to work alongside scheduled bus and rail services. ECC would anticipate the need to consider this as part of a wider cross boundary engagement, with neighbouring authorities, ECC and transport providers. ECC would welcome the opportunity to engage with RDC on this matter.
In respect of Option D, ECC recommend that the threshold for travel plans is considered further to take into account the thresholds within EPOA Guidance for Health Impact Assessments 2008; where active and sustainable travel is already considered. ECC is currently reviewing the EPOA Guidance for Health Impact Assessments, to ensure it is up to date and relevant. ECC would welcome the opportunity to work with RDC on the development of this aspect within the Local Plan.

In respect of Option E, ECC considers the current approach in policy T6 positively encourages people to travel sustainably.

ECC does not support Option F for the reasons stated in the Justification, it is considered contrary to national policy, the Essex Local Transport Plan, and ECC Passenger Transport Strategy and the emerging vision and strategic objectives of the draft Local Plan.

Comment

Issues and Options Document

Communications Infrastructure

Representation ID: 37061

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP3.3 Communications Infrastructure,

Paragraph 8.43 ECC recommends that reference is made to the BT Openreach policy of providing FTTP connections to any new development of houses over 30 properties, free of charge to the developer. Further information is available on the BT Open reach web link: https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx

This provides the framework for implementation of superfast broadband within new residential developments

Paragraph 8.44 Options identified for communications infrastructure:
A. Retain the existing policy on telecommunications infrastructure
B. Amend the existing policy to include specific reference to improving broadband and mobile coverage
C. Ensure that all commercial and residential developments over a certain threshold are conditioned to deliver appropriate broadband infrastructure
D. Do not have a policy on telecommunications infrastructure

ECC Comments
ECC would expect RDC to develop a combination of options A-C based on evidence and in accordance with the NPPF. ECC would anticipate the strategy for the communication infrastructure to be a combined approach embedded within the Local Plan.

As set out in response to Section 6, paragraphs 6.94, 6.96 and 6.127, ECC recommend all references to the provision of and requirements for future broadband are pre-fixed by "Ultrafast". ECC acknowledge the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby provide longevity in the draft Local Plan and to distinguish the standards for new provision from the "standard broadband" which is not fast enough.

ECC also recommends that reference is made to the BT Openreach policy of providing FTTP connections to any new development of houses over 30 units, free of charge to the developer. Further information is available on the BT Open reach web link: https://www.ournetwork.openreach.co.uk/property-developers/site-registration.aspx
This provides the framework for implementation of superfast broadband within new residential developments.

In respect of Option B, ECC considers this to be a positive approach to develop infrastructure resilience to support the growth ambitions within RDC. ECC recommends that the needs of both residents and businesses are incorporated within the policy requirements for good communication infrastructure provision.

ECC would welcome the opportunity to work with RDC to ensure the latest policies; guidance and evidence are taken into account to inform the principles, strategies and policies and site allocations within the emerging Local Plan.

ECC does not support Option D for the reasons stated in the justification, and considers it to be contrary to the NPPF (paragraphs 42-43) and the emerging vision and strategic objectives of the Local Plan, for example SO9.

Comment

Issues and Options Document

Water and Flood Risk Management

Representation ID: 37062

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP3.4 Water and Flood Management,

Paragraph 8.45 ECC wish to draw RDC's attention to the requirements of NPPF paragraph 100, which requires development in areas at risk from all forms of flooding should be avoided and not just fluvial and coastal flooding. This is in line with national guidance which states:

In plan-making, local planning authorities apply a sequential approach to site selection so that development is, as far as reasonably possible, located where the risk of flooding (from all sources) is lowest, taking account of climate change and the vulnerability of future uses to flood risk. (Paragraph: 001 Reference ID: 7-001-20140306 https://www.gov.uk/guidance/flood-risk-and-coastal-change)
ECC notes that the South Essex Strategic Flood Risk Assessment 2011 is in the process of being updated given the changes to the Environment Agency (EA) climate change allowance.

ECC also recommends that the following guidance and evidence
published since 2011, should be taken into account in the preparation of
the Local Plan:
* EA - Risk of Flooding from Surface Water (RoFSW) maps;
* ECC Sustainable Urban Drainage Design Guide 2016
* ECC Essex SUDS Design Guide 2016;
* South Essex Surface Water Management Plan (2012 and emerging
revision due 2018);
* ECC Developers' Guide to Infrastructure Contributions (2016)

ECC also advises that the following Assessments and Strategies are
currently being updated and once complete should also be taken into
account as part of the Local Plan and Sustainability Appraisals evidence
base:
* The Preliminary Flood Risk Assessment for Essex; and
* The Essex Flood Risk Management Strategy
ECC would welcome the opportunity to work with RDC to ensure the latest
policies; guidance and evidence are taken into account to inform the
principles, strategies and policies and site allocations within the emerging
Local Plan.

Paragraph 8.46 & 8.48 Whilst the preferred intent of management in the Shoreline
Management Plan might be to maintain or upgrade defences along the
coast, there is no guarantee that funding will be available to deliver these
preferred policies. It is therefore appropriate that RDC seeks to secure
funding from development or other sources to potentially allow a funding
contribution towards any coast flood or erosion schemes especially given
the new approach of 'partnership funding' which now applies.

Paragraph 8.47 ECC welcome the positive consideration and approach to locate
& 8.48 development, within the lower flood risk areas, whilst taking into account
climate change, the vulnerability of future uses to flood risk and the impact
on water supply from a changing climate.

Paragraph 8.49 ECC can advise that the South Essex Surface Water Management Plan (2012) is being updated and this includes revisions to the Critical
Drainage Areas. The review is scheduled to be completed in 2018 and
ECC would welcome the opportunity to work with RDC and to provide this
additional information to inform preparation of the Local Plan, in particular
the emerging spatial strategy and the assessment of site allocations.

Paragraph 8.50 In respect of the reference to below and above ground SUDS features,
ECC's requires priority to be given to the provision of above ground
SUDS features (with the exception of soakaways) and that below ground
SUDS features should only be considered acceptable, if it is
demonstrated that above ground SUDS features are not viable. In all
cases ECC would require any features to provide acceptable levels of
water quality treatment/ storage requirements

Paragraph 8.50 & 8.51 ECC welcomes and supports the use of SUDS to alleviate flooding and that it should be incorporated in to new developments, domestic and
commercial. SUDS can provide great opportunity to improve our
environment and, linked with Green Infrastructure, could create a more
balanced and natural ecology in our communities. SUDS can help meet
the growing demands to deliver GI by creating green open spaces which
encourage biodiversity, habitats, wildlife corridors and health and
wellbeing.

Paragraph 8.51 ECC recommend that the emphasis of the statements within this
paragraph are changed, to encourage SUDS on all new developments,
including minor developments, and should not be limited to the major
developments which are subject to statutory consultation with ECC as the
LLFA.

ECC recommend that the last sentence in this paragraph should be
changed to reflect the overall requirements and application of SUDS
design principles, to read as follows:

"In some instances, financial contributions could be sought to improve
surface water drainage infrastructure through a standard CIL charge for
example (considered in detail below)."

Further information is available within the ECC Sustainable Drainage
Systems Design Guide (2016) and ECC will work with RDC on this matter
in the preparation of the Local Plan.

Paragraph 8.53 ECC welcome the positive consideration and approach to locate
development, within the lower flood risk areas, whilst taking into account
climate change, the vulnerability of future uses to flood risk and the impact
on water supply from a changing climate.
ECC recommend that reference is made to the Environment Agency's
revised climate change allowances, further details are available here:
https://www.gov.uk/guidance/flood-risk-assessments-climate-changeallowances

Paragraph 8.56 ECC recommends that new developments should be supported by
infiltration and groundwater testing. Further details are set out within the
ECC Sustainable Drainage Systems Design Guide (2016).

Paragraph 8.58 Options identified to minimise flood risk:
A. Retain the existing flood risk policy for coastal flooding
B. Revise Core Strategy policy ENV3
C. Continue to apply SUDS policies
D. Do not have a policy on flood risk

ECC Comments

ECC would expect RDC to develop a combination of options A-C based on evidence and in accordance with national policy including the NPPF.

ECC will engage with RDC on an ongoing basis in the preparation of the Local Plan to ensure it is based on the most up to date Guidance and evidence including the ECC SUDS guide, the revised South Essex Surface Water Management Plan, as well as the latest EA climate change allowances.
ECC does not support Option D for the reasons stated in the justification, it is considered contrary to national policy (including paragraphs 99-108).

Comment

Issues and Options Document

Renewable Energy Generation

Representation ID: 37063

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP3.5 Renewable Energy Generation

Paragraph 8.62 ECC note and support the reference to the Rayleigh Town Centre Air Quality Action Plan (AQAP) in respect of the need to explore different measures including for example provision for electric vehicles (Electric Charging Points).

Paragraph 8.64 & 8.65 ECC welcome the recognition of the need for charging points in urban centre car parks. ECC is currently preparing a strategy for Electric Vehicles and would welcome the opportunity to work with RDC, including on the need for new policies to promote the provision of Electric Charging Points for new domestic and commercial developments (see paragraphs 8.22-8.37 above). This is required to support the need for this new infrastructure with a variety of Electric Charging Points required to meet the anticipated grown in Electric Vehicles, which could not be solely met by urban car parks.

Paragraph 8.66 Options identified to support renewable energy provision within the district:
A. Retain the current policies on renewable energy
B. Include a specific policy on electric vehicle charging points
C. Do not have a policy on renewable energy

ECC Comments

ECC does not consider these options to be mutually exclusive and would expect
RDC develop a combination options A & B based on evidence and in accordance with the NPPF and other national policy.

In respect of Options A and B, ECC would support a review of the current policies and amendments to ensure they are in accordance with the most up to date evidence (including developments in technology) and national policy and guidance.

ECC consider the policy should be amended to include the provision for Electric Vehicles Charging Points. ECC would welcome the opportunity to explore these requirements further with RDC in the preparation of the local plan, including the policies and infrastructure requirements for the provision of Electric Charging Points, and consideration given to engaging the key stakeholders.

ECC does not support Option C for the reasons stated in the justification, it is considered contrary to national policy and the Essex Local Transport Plan, supporting evidence and the emerging vision for the Local Plan.

Comment

Issues and Options Document

Planning Obligations and Standard Charges

Representation ID: 37064

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP3.6 Planning Obligations and Standard Charges;

Paragraph 8.73 ECC welcome the reference to and identification of the issues raised in respect of the delivery of infrastructure provision associated with a large number of small sites, as set out in ECC's earlier comments in response to paragraph 6.48 (options to provide a realistic strategy for delivering homes).

ECC a statutory authority responsible for the provision of specific infrastructure in support of communities and the preparation of Local Plans, would wish to engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. ECC can also provide details of our policies, strategies, guidance and standards in respect of the delivery of specific infrastructure and the respective levels of growth required, for example:
* the ECC Developers' Guide to Infrastructure Contributions (2016); and
* the Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (2018).

Please be advised that the latter Guide includes changes and updates to ECC's policy for the minimum size and land requirements for new primary and secondary school provision, please also refer to Section 8 below.

ECC can confirm that the issues do arise and that, subject to the scale of development, small schemes may not bring the level of investment required. In essence this reflects the "critical mass" in the scale of development required to enable effective infrastructure and service planning, which it may not be possible to secure with a number of smaller developments given the effect of the CIL Regs (Regulation 123) and restrictions on the pooling of contributions.

Paragraph 8.75 Options for planning obligations and standard charges:
A. Retain the existing policy and provisions in current local plan policy
B. Do not have a policy on planning obligations and standard charges

ECC Comments

ECC would expect RDC to prepare a policy for planning and obligations and standard charge, based on evidence and in accordance with the NPPF.

ECC considers there to be a requirement to retain an appropriate and up to date policy for securing the necessary Planning Obligations and Standard Charges in accordance with the NPPF, the Planning Practice Guidance, the forthcoming changes in national policy on this matter, and the ECC Developers' Guide to Infrastructure Contributions and the recommended 'Infrastructure delivery and impact mitigation' policy set out in Appendix B to the Essex County Council Local and Neighbourhood Planners' Guide to School Organisation (2018). With reference to ECC comments in response to paragraph 6.48 and 8.74 above, the principle of "pooling" restrictions and applying standard charges to smaller sites is not sufficient to meet the substantial levels of investment required to enable the provision of the appropriate infrastructure.

ECC therefore recommends that RDC's existing planning t policy is amended to take into account the latest material considerations and that RDC uses the best practice policy for "Infrastructure delivery and impact mitigation policy' (referred to above) to deal with pooled contributions, and to list any on-site facilities (new schools or extra land to expand existing schools) within the individual housing allocation policies. It is necessary to separately designate land to be allocated for Education use as D1 use class. This is considered necessary to avoid residential hope value being attributed to school land as part of any development viability assessment.

ECC recommends that the use of the best practice policy approach, referred to above is applied to the provision of other specific infrastructure, as outlined in ECC Developers' Guide to Infrastructure Contributions (2016).

ECC would welcome the opportunity to work with RDC on an ongoing basis to develop an effective approach through the preparation of the Local Plan.

Comment

Issues and Options Document

Health and Well-being

Representation ID: 37065

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SUPPORTING HEALTH, COMMUNITY AND CULTURE (SECTION 9)

SP4.1 Health and Well-being;

ECC welcomes and strongly supports the approach taken by RDC regarding health within this section. ECC considers the approach to be very positive towards Public Health and the wider issues of health have been considered and the promotion of Public Health with reference to the NPPF. ECC would welcome the opportunity to work with RDC in the development of this policy in conjunction with their planning and Health and Wellbeing team; and can provide advice on a range of supporting evidence and good practice available to inform the preparation of the local plan. This includes:
* FEAT tool (http://www.feat-tool.org.uk/), which allows authorities identify the various types of food retailers within their districts, including A5, fast food retailers.
* RTPI dementia friendly practice guidance- http://www.rtpi.org.uk/knowledge/practice/dementia-and-town-planning/
* Sports England Active Design- https://www.sportengland.org/media/3426/spe003-active-design-published-october-2015-email-2.pdf
* Public Health England - Health profiles- https://fingertips.phe.org.uk/profile/health-profiles
Paragraph 9.11 Options to promote health and wellbeing:
A. Retain the existing policy in current local plan policy
B. Ensure that land is specifically for healthcare
C. No policy on healthcare needs
D. Build on the existing healthcare policy to address wider health and well-being issues

ECC Comments

ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF.

ECC as a lead advisor for Public Health will engage with RDC on an ongoing basis in the preparation of the Local Plan and Spatial Strategy, especially as the Local Plan progresses to consider specific sites and spatial strategy. ECC can also provide details of its policies, strategies, guidance and standards in respect of the delivery of specific infrastructure and the respective levels of growth required.

In respect of Option D, ECC is supportive of this approach to refresh and build upon the existing health and wellbeing policy and ECC Public Health would welcome the opportunity to work with RDC in the development of this policy in conjunction with their planning and Health and Wellbeing teams.

ECC considers this approach should include greater recognition of the role of the natural environment and Green Infrastructure within the communities' health and wellbeing, including opportunities in preventing and treating ill health, as well as promoting wellness, including greater access and use of green space

ECC does not support Option C, for the reasons stated within the justification, it is considered contrary to national policy, the emerging vision for the Local Plan, ECC's vision for Essex and the revised EDG.