Issues and Options Document

Search representations

Results for Essex County Council search

New search New search

Comment

Issues and Options Document

Health and Well-being

Representation ID: 37036

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Public Health. ECC welcome and are supportive of the links and inclusion of health and well-being throughout the Issues and Options Report; and offer support to assist the preparation of the Local Plan, for example the development of the health and well-being policy, greater involvement with employment opportunities for local residents; support for skills, training, education and employment opportunities; improvements to air quality.
ECC support and welcomes consideration on phasing and release of affordable housing; use and application of the revised Essex Design Guide, including key concepts for inclusive and adaptable housing (e.g.. dementia friendly principles and social cohesion); housing mix, provision for older people (including care homes) and active design principles including active and sustainable travel principles.
ECC recommend use and reference to the revised Essex Design Guide within the new Local Plan design policies and the supporting text.
ECC wish to work with RDC to provide support and advice in respect of the Health and Well-being policy; policies on "fast food" outlets; Education, Skills and Employment policies and the Good Design policies.

Comment

Issues and Options Document

Health and Well-being

Representation ID: 37037

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Independent Living Support the general approach and inclusion of and reference to ECC's Independent Living Programme for Older People and Adults with Disabilities.

Comment

Issues and Options Document

Protecting and Enhancing our Environment

Representation ID: 37038

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Environment (natural, built and historic), ECC welcomes the broad approaches to protect and enhance the environment, and recommends a more holistic approach and links to the wider objectives of promoting growth and healthy communities, which can be provided through the natural environment, be it green infrastructure for climate change mitigation and adaption, building design and efficiency, creation and accessibility to open spaces, green spaces (including greenways and green corridors). ECC wishes to explore these opportunities and cross benefits further as incorporated within the revised Essex Design Guide (2018) and to ensure the biodiversity and geodiversity evidence base is up to date and consistent with the NPPF.
In respect of the Historic environment further consideration and assessment is required on conservation areas and listed buildings and the archaeological and historic records of designated and non- designated sites. ECC welcomes the opportunity to explore this further with RDC to ensure the evidence base is up to date and consistent with the NPPF.

Sustainability Appraisal ECC considers the SA to be a good example of an initial Regulation 18 'Issues and Options' appraisal, exploring the sustainability considerations of a wide range of strategic options and assessing them to the same level of detail. However, ECC recommends that a number of the options within the SA/SEA are expanded to reflect the ranges in the Issues and Options consultation Report.

Comment

Issues and Options Document

Introduction

Representation ID: 37039

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

4B ECC Detailed Response to the Issues and Options Consultation

INTRODUCTION (SECTION 1)

Paragraph 1.5 ECC recommend that this paragraph is amended to clearly recognise that the Essex Minerals Local Plan 2014 (MLP) and Essex and Southend-on-Sea Waste Local Plan 2017 (WLP) form part of the statutory development plan for Rochford District. The Minerals and Waste Planning Authority (MWPA) is pleased to note that the mineral and waste plans are appropriately referenced further into the plan at relevant sections and shown to have relevance to Rochford, but it may be beneficial to qualify the extent of the Development Plan at the outset.

Paragraph 1.12 ECC welcomes and supports the preparation of a Draft Habitat Regulations Assessment to inform and accompany the preparation of the draft Local Plan

Comment

Issues and Options Document

Introduction

Representation ID: 37040

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

TELL US YOUR VIEWS (SECTION 2)

Next Steps

ECC service areas and functions would wish to work with RDC in the preparation of the Local Plan as it progresses to assess the suggested sites and the selection of preferred sites, with regards to the impact and opportunities on ECC services and infrastructure, to ensure sites selected are sustainable. Details on this are set out in Section 2A above and throughout the response below.
ECC as the MWPA is keen to enter into engagement with RDC with regard to proposed site allocations considered through the Local Plan process. This is to ensure that any future site allocations made by RDC appropriately address mineral and waste safeguarding matters in line with adopted policies. ECC recommend early engagement within the site assessment process, for effective collaboration and consistency across the wider Development Plan. Further details of the policy requirements are set out in the Essex Minerals Local Plan Adopted 2014 and the Essex and Southend-on-Sea Waste Local Plan Adopted 2017 For the avoidance of doubt, the considerations that may arise from the MWPA in relation to these sites would be as informatives only; there is no intention to influence the site assessment process and/or any scoring mechanism designed by RDC.

Comment

Issues and Options Document

Our Economy

Representation ID: 37041

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Our Economy

Paragraph 3.8 ECC recommend that reference is made to the wider rail network and specifically Cross Rail, which connects to the London - Victoria Line at Shenfield and will link to the wider London, and west of London, area.
Paragraphs ECC considers greater emphasis should be placed on the relationship
3.7 - 3.8 and connectivity between the District, Southend, South Essex, Essex and London, including the 2011 data presented in Figures 2 and 3. Whilst the data is of assistance, it is recommended that the mode of transport used to make journeys is also presented. This additional information would be required to inform the base assumptions for likely future modal choice that would arise as a consequence of further development. Equally this could help to demonstrate where the more significant concentration of improvements may be required to promote suitable sustainable cross boundary transport provision, which could affect the levels of car journeys undertaken by encouraging modal shift.
Paragraph 3.12 ECC consider that there is an opportunity to promote the potential benefits / outcomes for the local economy arising from improvements to the transport network, for example greater connectivity for residents and businesses, or an increase in flight destinations served by London Southend Airport.
Paragraph 3.14 ECC recommends the inclusion and reference to the Outer Thames Estuary SPA list of European sites.

Comment

Issues and Options Document

Our Communities

Representation ID: 37042

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Our Communities

Paragraph 3.23 ECC notes that this paragraph seeks to set out the Education provision across the district however there is no reference to either Early Years and Childcare (EYCC) or Special Education Needs (SEN) provision. ECC recommends that EYCC is incorporated and set out in Strategic Priority 4.4 and paragraphs 9.30 to 9.36 and SEN is referred to in Strategic Priority 4.3 and paragraphs 9.17 - 9.29.

Key Community Characteristics
ECC recommends greater recognition is given to the role and contribution of Passenger Transport, in respect of both existing and new provision of services to support the ageing population. ECC wish to explore this further with RDC in the preparation of the Local Plan, to promote an inclusive strategy for existing and new residents.

Comment

Issues and Options Document

Our Spatial Challenges

Representation ID: 37043

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

OUR SPATIAL CHALLENGES (SECTION 4)
ECC General Comment
ECC notes that this section sets out the National and South Essex picture and relationship to London, however it is recommended that this is expanded to provide a specific "county policy context." ECC welcomes the reference to ECC services throughout the document, however the inclusion of a wider "County Policy Context" would provide a clear and strategic policy framework, reflecting two tier context and delivery of ECC services and functions. ECC can provide appropriate supporting text links to relevant ECC policies and strategies. It is also recommended that within the wider context reference is also made to the adjoining Essex authorities outside the "South Essex" area including Maldon DC given the importance of the River Crouch.
ECC recommends that the following ECC policies and strategies are included and referred to within a new "county policy" context and delivery proposals:
* Essex Vision and Priorities 2017/21
* Essex Organisation Strategy, 2017 - 2021
* Economic Plan for Essex (2014)
* Children in Essex get the best start in life 2014-2018.
* People in Essex enjoy good health and wellbeing 2014-2018
* People in Essex have aspirations and achieve their ambitions through education, training and life-long learning 2014-2018
* People in Essex can live independently and exercise choice and control over their lives 2014-2018.
* Essex Transport Strategy, the Local Transport Plan for Essex (June 2011)
* ECC's Passenger Transport Strategy - Getting Around In Essex 2015.
* A127 Corridor for Growth - An Economic Plan 2014
* Essex children and Young People's Strategic Plan 2016 Onwards (2016)
* Essex Early Years and Childcare Strategy 2015-2018
* Commissioning school places in Essex 2017-2022
* Essex County Council Local and Neighbourhood Planners' Guide to School Organisation
* ECC Independent-Living-Programme-Position-Statement October 2016
* ECC Developers' Guide to Infrastructure Contributions (2016)
* Essex Minerals Local Plan Adopted 2014
* Essex and Southend-on-Sea Waste Local Plan Adopted 2017
* ECC Sustainable Urban Drainage Design Guide 2016
* Greater Essex Growth & Infrastructure Framework (2016)
* Superfast Essex Broadband

Comment

Issues and Options Document

National Picture

Representation ID: 37044

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

National Picture

Paragraph 4.3 ECC advises that the SELEP Strategic Economic Plan is now due to be completed during 2018.

Paragraph 4.5 ECC welcomes and is supportive of increasing employment opportunities for the District and would wish to engage with RDC to explore these opportunities further. This is consistent with ECC's Essex Outcomes Framework, through the development of the Essex Economic Growth Strategy and, the Economic Plan for Essex, including South Essex as one of four growth corridor. These corridors collectively form the locations for housing and employment, to secure future growth. These roles are based on location characteristics, local economic history and linkages to surrounding areas. Critically, these corridors will provide a mix of housing, which will allow new and existing residents to stay and develop in the District / County. ECC is a partner of the Association of South Essex Local Authorities (ASELA), which extends beyond the SELEP federated area of South Essex, to include Brentwood BC. ECC supports the emerging 'South Essex 2050 Ambition' for the area and the commencement of a Joint Spatial Plan (JSP) to provide a framework for the future growth ambitions of the area. ECC recommend that the role of ASELA and the emergent JSP is taken into account in the preparation of the Local Plan

ECC can provide additional information on the Essex Growth Commission Report (2017), ECC's Grow on Space study, as well as the specific economic strategies and engagement being developed by ECC and with partners, including OSE, promoting economic growth, regeneration, infrastructure delivery and sustainable new development, and having regard to the National Industrial Strategy.
ECC would welcome the opportunity to provide additional information in respect of the health profiles for the District, to assist with the identification of skills, training and employment opportunities, as well as the development of a health impact assessment process for developments.

ECC also considers there to be an opportunity to explore and promote opportunities in the area for employees and residents, with greater emphasis placed on accessibility and promotion of passenger transport as part of a wider package of transport solutions, and to optimise and improve the current passenger transport accessibility to the area.

Paragraph 4.6 ECC welcomes the reference that "infrastructure is critical to support sustainable economic growth" and the recognition of the need to work with partners, including ECC, under the duty to co-operate, to deliver Strategic and Local infrastructure.

ECC has provided further information throughout this response to inform the preparation of the new Local Plan, as it relates to ECC services and functions, to ensure are appropriately considered within the Local Plan. ECC recognises the need for essential infrastructure to be identified, to support the level of proposed growth within the Issues and Options consultation. ECC has and will continue to work with RDC to identify the appropriate infrastructure requirements and mitigation measures which need to be developed, including the preparation of the Infrastructure Delivery Plan, before the plan progresses to the Preferred Options stage,. This is explored further within the respective strategic priorities, themes and options below.

ECC recommends that RDC refer to the "ECC's Developers' Guide to Infrastructure Contributions" (2016), for details of the necessary contributions required from new development for the provision of essential infrastructure, to inform the ongoing evidence base and the delivery and viability assessments.

Paragraph 4.10 ECC welcomes the reference to minerals and waste as a strategic, cross boundary matter subject to the Duty and ECC is keen to enter into engagement with RDC with regard to proposed site allocations considered through the Local Plan process and that this is undertaken at the site assessment stage of the Local Plan, as referred to above under "Tell Us Your Views".

Paragraph 4.17 ECC recommends that the "Challenge" on how to deliver infrastructure to support new homes should also seek to incorporate new open space Suitable Accessible Natural Greenspace (SANG) as part of new residential developments to avoid recreational impacts on European sites in accordance with the Habitat Regulations. Further details on this aspect are incorporated within the revisions to the Essex Design Guide (revised EDG) to be published February 2018.
Please also refer to ECC comments in respect of paragraph 9.42 (options for Open space and outdoor recreation) and paragraph 10.29 (options for Greenways)

Comment

Issues and Options Document

Our Future Vision

Representation ID: 37045

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

OUR VISION AND OBJECTIVES (SECTION 5)

Draft Vision

Paragraph 5.9 ECC is supportive of the emerging draft vision which is considered in accordance with the NPPF and the three dimensions for sustainable development; and ECC welcomes the inclusion and reference to health.

For instructions on how to use the system and make comments, please see our help guide.