Issues and Options Document

Drafting our Strategic Objectives

Representation ID: 37046

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

Strategic priorities

1. The homes and jobs needed in the area
2. Provision of retail, leisure and other commercial development
3. Provision of infrastructure, including transport, digital, flood risk, coastal management, minerals and energy
4. Provision of Health, security, community and cultural infrastructure and other local facilities, including EYCC, Education and Youth Facilities
5. Climate Change and Environmental protection and mitigation

It is noted that the Strategic Objectives in support of Strategic Priorities 1, 2, 4 and 5, do not refer to or recognise the role of sustainable transport to deliver these Strategic Priorities. ECC recommends further consideration is given to incorporate the principles of sustainable transport and travel within the new Local Plan in accordance with the Essex Local Transport Plan.

Strategic Objectives

SP1 The homes and jobs needed in the area

SO1 ECC support the objective to facilitate the delivery of sufficient, high quality and sustainable homes, combined with SO6 for all homes and commercial buildings to be built to the highest attainable quality, design and sustainability standards.
SO3 ECC welcomes the positive move towards supporting sustainable travel, however this only refers to improvements for new developments, whereas opportunities should be sought to overcoming existing shortfalls in sustainable connectivity.
SO5 ECC is supportive to the inclusion of skills, training, education and employment, and ECC Public Health would welcome the opportunity to work with RDC to explore the employment opportunities for residents. ECC considers that this could be included and assessed as part of the Health Impact Assessment process for developments, skills, training and employment opportunities.
ECC recommends this Strategic Objective amended to specifically refer to EYCC provision alongside the provision of good schools.
SO6 ECC support the objective for all homes and commercial buildings to be built to the highest attainable quality, design and sustainability standards in combination with SO1.
ECC recommends ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. ECC can provide examples, where distance standards have been applied to protect and promote an accessible network of green space, including for example the Bristol Parks and Green Space Strategy 2008, with walking distance/ time to parks and green space. https://www.bristol.gov.uk/policies-plans-strategies/bristol-parks-and-green-space-strategy .
This would provide a cross over benefit between a number of the Strategic Priorities including SP1 (SO1 and 6); SP3 (SO 9 and 11), and SP4 (SO15 and 16).

SP 2 Provision of retail, leisure and other commercial development

SO 8 ECC suggest the objective should include accessibility to services and green spaces.

SP3 Provision of infrastructure, including transport, digital, flood risk, coastal management, minerals and energy

SO 9 ECC recommends that the reference to "broadband" is replaced by "Ultrafast Broadband". ECC acknowledges the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby providing longevity to Local Plan policy and distinguishing new provision from the "standard broadband" which is not considered fast enough. This should be applied throughout the document

SO 9 & 11 ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. Please refer to ECC's comments to SO6 above and the Bristol Parks and Green Space Strategy example.

SO11 ECC support this Strategic Objective which also supports "air quality".

SO12 ECC welcomes the reference to 'encouraging adherence to the waste hierarchy' and making 'best use of mineral deposits' but considers that these statements could be afforded slightly more clarity. Supporting the waste hierarchy and ensuring a sustainable use of minerals requires that existing facilities and infrastructure are safeguarded to ensure that they are able to continue to make their planned contribution to the mineral and waste strategies operating in the County. Whilst already covered by MLP Policy S8 and WLP Policy 2, it is considered beneficial for this to be incorporated into the Rochford LP objectives. ECC suggests amendments to SO12 as follows:

"SO12: To plan for effective waste management by encouraging adherence to the waste hierarchy, working with Essex County Council to make best use of mineral deposits resources and mineral and waste facilities, including safeguarding resources and infrastructure, supporting renewable energy generation and energy efficiency as part of all new homes and commercial premises developed, as well as supporting efficient water use."

The requirement to safeguard mineral development is recognised in paragraph 10.21 and therefore the proposed modification is in accordance with that recognition. There is however no similar recognition for waste facilities, which the proposed modification to Strategic Objective 12 would then cover.

SO13 ECC can advise that any new plans for coastal change management should also involve the other partners of the Essex Coastal Forum, given that the Forum has the responsibility for policy changes to the Essex and South Suffolk Shoreline Management Plan

SP4 Provision of Health, security, community and cultural infrastructure and other local facilities, including EYCC, Education and Youth Facilities

SO15 ECC supports this strategy, which is supportive of the England Coast Path being created by Natural England, to be subsequently implemented by Essex Highways, for the economic and health benefits of the community and is consistent with the other Strategic Objectives.

SO 15 ECC support this strategy which would also support air quality, but should be amended to specifically include reference to "air quality".

SO 15 & 16 ECC recommends that these strategic objectives should also include consideration for new housing and commercial development to have reasonable access to green spaces. Please refer to ECC's comments to SO6 above and the Bristol Parks and Green Space Strategy example.

SP5 Climate Change and Environmental protection and mitigation

SO19 ECC supports the inclusion of this objective and strategic priorities for conservation and enhancements for the natural environment which is considered to be in accordance with NPPF (paragraph 156), however ECC recommends that the objectives should be further amended, to include policies which seek to minimise the impacts to biodiversity in accordance with paragraph 117 of the NPPF. Please refer to ECC in paragraph 10.1 below for further details on this matter.

SO22 ECC welcomes the objective, however recommend that "Green (and Blue) Infrastructure" is specifically referenced within the objective to read as follows:
"To mitigate and adapt to the forecasted impacts of climate change, including the water environment, air quality, biodiversity, flooding and green and blue infrastructure, support more efficient use of energy and natural resources and facilitate an increase in the use of renewable and low carbon energy facilities."
This is considered necessary to recognise the important role of this infrastructure for climate change mitigation and adaption, through micro-climate control, water management (SUDS), air quality, carbon sequestration and reduce biodiversity loss, which in turn strengthens communities through improved health and wellbeing and building resilience.

Comment

Issues and Options Document

Introduction

Representation ID: 37047

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

DELIVERING HOMES & JOBS (SECTION 6)

ECC General Comments

ECC recommend all references to the provision and requirements for future broadband are prefaced by "Ultrafast". ECC acknowledges the current rollout programme is "Superfast Broadband", however it is recommended that the draft new Local Plan should refer to "Ultrafast Broadband" to reflect the Government's next roll out initiative, thereby providing longevity to Local Plan policy and distinguishing new provision from the "standard broadband" which is not considered fast enough, this also applies to paragraph 6.127.

Paragraph 6.4 ECC notes that Green infrastructure is only mentioned in its wider District context. However, due to the rural nature of the district ECC would recommend that localised Green Infrastructure (GI) design principles are incorporated as part of a proposed housing development, specifically large developments such as Garden Communities and Urban Extensions. The would be in accordance with the NPPF and the Core Planning Principles on conserving and enhancing the natural environment, including the following statement in Paragraph 114 that Local Planning Authorities should "Set out a strategic approach in their Local Plans, planning positively for the creation, protection, enhancement and management of networks of biodiversity and green infrastructure."
ECC recommends that this principle is also incorporated within Strategic Priority SP5.2 to protect, manage and enhance important habitats, nature conservation areas, geo-diversity and greenways

Comment

Issues and Options Document

Need for Market, Affordable and Specialist Homes

Representation ID: 37048

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.1 Need for Market, Affordable and Specialist Homes

Paragraph 6.30 Options on how to meet Objectively Assessed Need for housing:
A. Seek to provide as much for the district as possible, subject to environmental constraints;
B. Work with neighbouring authorities to ensure housing need across the South Essex strategic housing market is effectively met; or
C. Consider a policy requirement to deliver a percentage of new market homes on schemes to be available to residents on a first come basis first-served basis for a limited period of time

ECC Comments

Options A-C: ECC does not consider these options as presented to be mutually exclusive and would expect RDC to explore all options (and combinations) when planning to meet housing need. ECC would anticipate that RDC would seek to comply with the "Mechanism for the Consideration of Unmet Housing Need", as endorsed by the Essex Planning Officers Associations in September 2017, which comprises all Local Planning authorities within Greater Essex (including RDC)

Affordable Homes

Paragraph 6.31 Options for the affordable housing threshold:
A. Reduce the threshold for provision a part of a scheme (potentially in line with emerging national policy);
B. Retain the current threshold for the provision of affordable homes as part of a development scheme;
C. Do not have a policy threshold for the provision of affordable homes (potentially rely on emerging national policy and guidance to set the minimum threshold)

ECC Comments

ECC does not consider Options A and B, as presented to be mutually exclusive and would expect a combination of options to support the delivery of affordable housing within the district. ECC considers that additional sensitivity analysis of the thresholds would be appropriate to ensure they are effective and viable.
ECC recommend that consideration is given to the phasing and release of affordable homes on new development sites. This would enable the affordable homes provision to be both inclusive and adaptable throughout the life-course and further details are incorporated within the revised EDG. This is a key concept within the EDG to incorporate wider design feature such as dementia friendly principles (as promoted by the RTPI) and ECC's Independent Living Programme both of which should be considered. Furthermore the location of properties within new developments should seek to ensure social cohesion within the communities, including the reduction of social isolation (in accordance with NPPF paragraph 50).

ECC recommend that further consideration is given to locational "accessibility" in the provision of affordable housing. For example, to ensure the affordable housing provision is located with good passenger transport and a range of sustainable travel modes, to ensure social inclusion. This is to minimise the risk of a broad spread of affordable housing in low numbers located in relatively inaccessible areas, with limited to no potential to secure improvements in passenger transport provision. Further details are available within ECC's "Passenger Transport Strategy - Getting Around In Essex" (2015).

In respect of identification of "key worker homes" and supporting the needs of healthcare providers ECC considers that this could also be addressed via within the provision of affordable homes. .ECC recommends RDC engage with healthcare employers on their current workforce strategies so as to support recruitment and retention of healthcare staff. ECC would welcome the opportunity to assist with this stakeholder engagement.

ECC does not support Option C for the reasons stated within the justification, it is considered contrary to the NPPF (paragraph 50, third bullet 3) where authorities are required to set policies, where there is an identified need for affordable housing and the emerging vision and strategic objectives of the draft Local Plan, for example SO2 "To plan for the mix of homes needed to support our current and future residences, in particular viably addressing affordability issues and supporting our again population "
Paragraph 6.32 Options for the proportion of affordable homes to be provided:
D. Retain the current affordable homes requirement of 35% where a scheme meets the threshold, subject to viability;
E. Increase the proportion of homes that we require developers to provide as affordable housing, subject to viability

ECC Comments

Options D-E: ECC does not consider these options as presented to be mutually exclusive and would expect a consistent approach to be developed in principle, to support the delivery of the appropriate proportion of affordable housing, based on robust evidence ECC consider additional sensitivity analysis of the thresholds would be appropriate to ensure they are effective and viable.

Please refer to ECC's comments to paragraphs 6.30-6.31 above, which equally apply to these options. For example ECC recommend that consideration is given to the phasing and release of affordable homes on new development sites. This would enable the affordable homes provision to be socially inclusive and adaptable, as set out in the revised EDG, which now includes wider design features such as dementia friendly principles, to ensure social cohesion within the communities, including the reduction of social isolation for specialist housing, and including independent living units for older people and adults with disabilities.

ECC consider the provision of specialist housing including ECC's Independent Living Programme for Older People and Adults with Disabilities, to be within the definition of "affordable housing" and it should be included within the appropriate housing mix (see paragraph 6.33 below).

Homes for Older People and Adults with Disabilities

Paragraph 6.33 Options for the Provision of Homes for Older People and Adults with Disabilities:
A. Continue the current approach to applications for specialist homes - on an ad hoc basis as applications are received based on available evidence
B. Include a policy on housing mix which requires the provision of specialist homes, such as wheelchair accessibility (part M Category 3), independent living units, sheltered and extra-care housing, over a certain threshold.

ECC Comments

ECC welcomes the acknowledgement of and reference to ECC's Independent Living (IL) Programmes for Older People and Adults with Disabilities to support the provision of specialist housing, based on evidence and in accordance with the NPPF and national policy.

ECC supports a revised version of Option B, to ensure the positive provision of specialist housing to meet the needs of residents, in accordance with ECC's strategies, guidance and evidence including:
* ECC's IL Programmes for Older People and Adults with Disabilities , for the respective demand and need for units across Essex by district, for example the IL Position Statement for Older People (2016) identified a shortfall of 129 units (19 rental and 110 ownership) required in the District for the period 2015 and 2020
* ECC Developers' Guide to Infrastructure Contributions (2016) (for securing the appropriate funds) and regard to the revised EDG for appropriate locational and design guidance

ECC can provide updates on the demand and need for IL units for both Older People and Adults with Disabilities, and would welcome the opportunity to engage with RDC, on an ongoing basis to ensure the most up to date information is available to inform and shape the preparation of the Local Plan.

Comment

Issues and Options Document

Delivering our Need for Homes

Representation ID: 37049

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.2 Care Homes

Paragraph 6.35 ECC welcomes the reference to and ongoing engagement with ECC and would wish to maintain this engagement to inform the requirements and provision within the preparation of the Local Plan

Paragraph 6.36 Options for providing care homes in the district:
A. Continue the current approach to applications for specialist homes - on an ad hoc basis as applications are received based on available evidence.
B. Include a policy on housing mix which requires the provision of specialist homes, such as wheelchair accessibility (part M Category 3), independent living units, sheltered and extra-care housing, over a certain threshold

ECC Comments

Options A-B: ECC would anticipate combination of options (including the option in paragraphs 6.30-6.35) to support and ensure the appropriate mix of provision including care homes in accordance with the NPPF and based on evidence.
ECC recommend that consideration is given to the need to ensure provision is accessible, appropriate and inclusive to ensure integration within the community and has regard to the health and social care requirement a set out in the revised EDG and the details set out above in response to Paragraph 6.33, options for the provision of specialist housing.

ECC would welcome the opportunity to engage with RDC on these matters further to ensure the preparation of a legally compliance, effective and sound local plan.

Comment

Issues and Options Document

Delivering our Need for Homes

Representation ID: 37050

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.3. Delivering our Need for Homes

ECC General Comment

The Issues and Options within this section provide a clear overview of the key planning issues facing the District and what the new Local Plan should address in respect of meeting the needs for homes. However, it is recommended that further consideration should be given to the following.
* Infrastructure provision and funding. The new Local Plan should ensure there are clear policies for the full provision, enhancement and funding of infrastructure arising from planned development. Mechanisms include planning obligations, the use of a Community Infrastructure Levy (CIL), and the ability to negotiate specific contractual obligations for major strategic sites, in accordance with the Garden City principles defined by the Town and Country Planning Association (or subsequent updated guidance) and wider definition of sustainable development outlined in the NPPF. This will ensure the delivery of sustainable development in accordance with the NPPF, including the three dimensions to achieve sustainable development (paragraphs 6 -10), the presumption in favour of sustainable development (paragraph 14) and the 12 core planning principles (paragraph 17).

At the heart of the NPPF is a presumption in favour of sustainable development. For plan-making this means local planning authorities should positively seek opportunities to meet the development needs of their area, and Local Plans should boost significantly the supply of housing to ensure the full objectively assessed needs for housing over the plan period. The NPPF includes the delivery of sufficient community and cultural facilities and services to meet local needs as a core planning principle.

There is a clear expectation that local authorities should make provision for funding for new school places from Section 106 contributions and CIL. ECC alone does not have the capital resources to fund the construction of early years' and child care places, primary schools or secondary schools. There appears to be a view developing that the provision of sufficient school places is the sole responsibility of ECC assisted by the DfE in the form of 'basic need' funding, as the District and Borough councils are not the local education authority. The expectation is that the DfE will fund any shortfall in school places that result from large new housing developments.

ECC wish to draw attention to paragraph 72 of the NPPF, which states 'The Government attaches great importance to ensuring that a sufficient choice of school places is available to meet the needs of existing and new communities.' ECC does not view financial contributions for education as optional. If this is the case then there will be no DfE and or ECC funding available, to provide all the school places required as a result of a growing school population and the need to create additional school places to meet the needs generated by new housing developments. ECC recommends that it is made clear in the new Local Plan that there is a requirement for financial contributions from developers to fund the full additional early years and childcare, primary and secondary school pupil places (including post 16) generated from new development to ensure that new housing developments are sustainable in terms of educational and childcare provision. ECC considers that this would accord with NPPF paragraph 72 and reiterates the requirements in the ECC Local and Neighborhood Planners' Guide to School Organisation and the ECC Developers' Guide to Infrastructure Contributions (2016). Further information on this issue is provided later in this response.
ECC welcomes the recognition that infrastructure is critical to support sustainable growth and to make sure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future and the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. ECC wishes to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas.
* Flooding and its impact on development. This is broadly mentioned but will significantly influence future development locations. The main river and surface water flood risk areas should be clearly identified and the new Local Plan should provide appropriate policies in relation to flood risk. ECC is the Lead Local Flood Authority for surface water management and is revising the South Essex Surface Water Management Plan (SWMP) taking into account the recent changes in the EA's Climate Change Allowances. ECC recommends the provision of sustainable drainage systems (SuDS) and the revised SWMP as part of new development. Further information on this issue is provided later in this response.
* Broadband. While highlighted in the document, ECC recommend that "broadband" is distinguished from other telecommunications infrastructure, and specified in policy as a necessary infrastructure requirement for new development.. This will support relevant strategic and local objectives relating to economic growth particularly in rural Rochford. This will have a wider impact on growth and productivity, as increased broadband coverage will support businesses and attract investment to Essex. It also has the potential to increase opportunities for home-working and remote-working, reducing the demand on travel networks at peak periods. The importance is demonstrated by recent census returns which show that the biggest change in journey to work patterns in the last 20 years has actually been the increase in people working from home.

* Minerals and Waste provision and safeguarding requirements (please see section 2 "Tells Us Your views).

It is recommended that the above policy requirements are considered when preparing the new Local Plan and developing the overarching spatial strategy. Further information is provided below and in Sections 7 - 11.

Paragraph 6.46 ECC welcomes the positive recognition and importance placed on reducing inequalities and improving congestion levels, by ensuring the provision of new homes will include a variety of modal travel options. ECC recommends engagement and close working with ECC's Sustainable Travel Team and raising awareness of the local cycle action plans which also include some infrastructure elements

ECC recommends greater emphasis is placed on the creation of and access to more sustainable travel options within new developments, including connectivity to existing settlements for both housing and employment.

Paragraph 6.48 Options to provide a realistic strategy for delivering new homes:
A. Increase density within the existing residential area - which would require an amendment to our current density policy
B. Increase density on allocated residential sites
C. Several small extensions to the existing residential area
D. A number of fewer larger extensions to the existing residential area
E. A new settlement

ECC Comments

ECC does not consider these options as presented to be mutually exclusive. ECC would anticipate the Spatial Strategy to be developed with a range or combination of the options, based on evidence and in accordance with the NPPF and in particular the overarching principles of the NPPF.

ECC recommends that consideration is given to the wider "duty to co-operate" in emerging national policy (housing white paper) requiring local authorities (including RDC and ECC) to place greater emphasis on the development of Joint Strategic Priorities to address strategic cross boundary planning matters. The formation of ASELA to develop the South Essex 2050 vision with a set of strategic priorities and JSP will provide the context for RDC to consider the requirements of the South Essex Strategic Housing Market Area and to explore whether there are any unmet housing needs within the area.

ECC welcomes the recognition that infrastructure is critical to support sustainable growth and to make sure RDC has the right infrastructure, at the right time, to accommodate the new jobs and homes needed in the future, and the acknowledgement of ECC's role in the provision of Local and Strategic infrastructure. ECC wishes to be proactively engaged with the assessment of the spatial options and site allocations, given the importance of infrastructure provision and funding to the Draft Plan, which will vary for each spatial option and site allocations, given their respective individual and cumulative infrastructure requirements, generating their own, individual and cumulative impacts and opportunities on the delivery of ECC service areas.

ECC considers that any large scale housing developments will need to include appropriate infrastructure such as schools, community facilities and improvements to the roads. In contrast, a larger proportion of small scale or piecemeal developments are less likely to secure funding for the necessary infrastructure requirements. Furthermore infrastructure provision is likely to have a major impact on the phasing, delivery and viability of development(s) and this would need to be considered as part of the overall strategy.

ECC recommend consideration is given to the cumulative scale of development required to secure the necessary supporting infrastructure and the mechanisms available to secure developer contributions (be it S106 contributions, pooling of contributions or via the Community Infrastructure Levy). ECC consider this to be essential in the preparation of a new local plan, to ensure it complies with the legal duty to co-operate, meets the tests of soundness and is effective, viable and deliverable. ECC expect RDC to prepare a sound and deliverable Local Plan, having regard to the available levels and sources of investment available to deliver the supporting infrastructure.

ECC recommends consideration is also given to the respective infrastructure funding streams available to deliver and implement strategic infrastructure, be it the ECC Developers' Guide to Contributions, the Opportunity South Essex Partnership, the South Essex Local Enterprise Partnership, and Government Departments/agencies, such as the Department for Transport agencies, as well as changes in the national policy and legislation for the S106 and CIL.

ECC can advise in principle, that subject to the scale of the development being considered, Option E may have the potential to bring forward the level of investment needed to provide significant improvement to the highway and transportation infrastructure. However, in the absence of a location or scale for any new settlement ECC cannot recommend its preference for Option E over and above any other options put forward. Again, subject to the scale of development the other options including smaller size settlements may not bring the level of investment required. In essence this reflects the "critical mass" in the scale of development required to enable effective infrastructure and service planning, which it may not be possible to secure with a number of smaller developments given the effect of the CIL Regulations (Regulation 123) and the restrictions on pooling contributions.

Comment

Issues and Options Document

Good Mix of Homes

Representation ID: 37051

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.4 Good Mix of Homes

Paragraph 6.58 Options identified in relation to the broad approach for considering the type and size of new homes:
A. Retain the current policy on types of homes, which takes a flexible, market-driven approach to types
B. Include specific reference to the size and types of homes referred to the South Essex SHMA
C. Continue to require new homes to meet the National Technical Housing Standards - nationally described space standards
D. Do not adopt specific policy on the mix of homes

ECC Comments

ECC would anticipate a strategy to be developed based on evidence and in accordance with the NPPF. Please refer to ECC's comments in response to the options in paragraphs 6.30 - 6.36 above paragraph 11.5 below which are considered relevant to this option.

ECC does not support Option D for the reasons stated in the justification, it is considered contrary to the NPPF (paragraph 50) and the emerging vision and objectives of the draft Local Plan, for example SO2 (as referred to in response to paragraph 6.31 above).

Comment

Issues and Options Document

Gypsy, Travellers and Travelling Showpeople

Representation ID: 37052

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.5 Gypsy, Travellers and Travelling Showpeople

Paragraph 6.78 Option identified to meet the needs of Gypsies and Travellers:
A. Retain the current criteria-based policy (Core Strategy policy H7)
B. Retain the current allocated site (Allocations Plan policy GT1)
C. Allocate a number of smaller Gypsy and Traveller pitches / sites to meet needs
D. Consider a mobile home policy for those no longer falling within the Gypsy and Traveller definition
E. Prepare a more detailed criteria-based policy
F. Do not have a policy on Gypsy and Traveller provision
ECC Comments
ECC does not consider these options to be mutually exclusive. ECC would expect RDC to develop a combination of options based on evidence and in accordance with the NPPF and the Planning Policy for Traveller sites 2015 (PPTS), requiring an inclusive approach for all gypsies and travellers, both members of the travelling and settled communities.

ECC would anticipate provision to be made for travellers who meet the planning definition, may be meet the definition or do not met the definition to be in accordance the Greater Essex Gypsy, Traveller and Travelling Showpeople Accommodation Assessment 2016-2033 (GTAA) published in January 2018.
Furthermore ECC would anticipate the emerging strategy and emerging policy to take into account the Transit Recommendations within the Essex GTAA prepared by EOPA and considered to be a strategic cross boundary issue for the Greater Essex authorities.

Comment

Issues and Options Document

Houseboats and Liveaboards

Representation ID: 37053

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.6 Houseboats and Liveaboards

Paragraph 6.82 ECC welcome and support the commitment to work with other neighbouring authorities and relevant bodies such as the Marine Management Organisation (MMO), Natural England (NE) and the Environment Agency (EA). ECC and partners would be able to assist in monitoring and the assessment of impacts arising from the proposed approach to Houseboats and Liveaboards. This could include identifying an appropriate scale / limit for the number of houseboats that could be permitted to moor in a particular area.

Paragraph 6.83 ECC considers the statement regarding the extent of land use planning control "to only extend as far as the mean high tide" to be incorrect and should be amended. ECC can advise that Land Use planning control extends to Low Water Mark, whilst the Marine Planning system extends to High Water Spring Tide, therefore there is an overlap of the 2 planning systems in the intertidal area. This correction also provides an opportunity to work with the MMO in developing evidence and an emerging policy.

Paragraph 6.84 ECC considers further exploration of the infrastructure requirements is necessary, in addition to the reference to the need for provision of toilets for houseboats with a permanent mooring, and to also include the infrastructure provision required for boats which are moored temporarily. It is important that the boats do not discharge waste into the marine environment and hence they would need to be equipped with holding tanks and to use pump out facilities to discharge this type of waste appropriately.
Paragraph 6.86 Options to address the mooring of houseboats in the district:
A. Retain the existing policy
B. Amend the existing policy to strengthen criteria
C. Allocate specific areas of coastline where such uses may be acceptable
D. Amend the definition in the Development Management Plan

ECC Comments

ECC would anticipate a strategy to be developed based on evidence and in accordance with the NPPF and other national policy. ECC considers additional evidence and engagement is required, and recommend that this is explored further with EPOA and / or Essex Coastal Forum.

ECC welcome the consideration of the need for a policy on houseboats/ liveboards as part of the review of the current polices to ensure they are based on the most up to date evidence. This would be appropriate given the growth in occupation and experiences elsewhere in the country (especially in London) where living on a boat is proving to be an attractive proposal, and in certain areas demand has outstripped available mooring. Whilst it may be a lifestyle choice for many, the result is an increasing number of houseboats across the Essex coast, especially in areas commutable to London.

Comment

Issues and Options Document

Meeting Business Needs

Representation ID: 37054

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.7 Meeting Business Needs;

Paragraph 6.87 ECC recommends consideration is given to the contribution made by the environmental / Green Infrastructure (GI) to provide a network of multi-functional high quality green spaces and other environmental features, which together deliver multiple environmental, social and economic benefits. ECC can provide advice and evidence from the findings of a Forestry Commission report on the economic value of Green Infrastructure, to overcome barriers to businesses, whilst improving people's quality of life, health and wellbeing, which is available here:
https://www.forestry.gov.uk/pdf/nweeconomicbenefitsofgiinvestigating.pdf/$file/nweeconomicbenefitsofgiinvestigating.pdf

Paragraph 6.92 ECC notes the emerging Local Plan seeks to facilitate a diverse, modernised economy providing high value employment, and supports this aspiration. Paragraph 6.105 states that the Economic Development Needs Topic Paper 2017 advocates employment land increases to primarily facilitate B1 and B2 uses. Whilst ECC does not object to this, it is considered important to ensure that any strategy seeking to grow the economy does not preclude opportunities for waste management, with such facilities often being sited on industrial / employment land. Whilst, waste related developments are employers in their own right, economic activity generates waste, and a cost effective, local waste solution supports economic development across the spectrum. It is recognised that there is nothing in the Issues and Options consultation that indicates such opportunities would be precluded, and indeed ECC notes the role that Rawreth and Star Lane industrial estates play in this regard, but ECC as the MWPA welcomes the opportunity to make this point. It is requested that reference is made to supporting appropriate 'sui generis' uses when defining appropriate use classes on employment land.

Paragraph 6.94 Please amend the reference to "Ultrafast broadband" for the reasons set out in response to Section 6 and paragraphs 6.96 and 6.127.

Paragraph 6.96 ECC supports this statement and the need for improvements to the highway networks / sustainable travel choices to support businesses and economic growth; and to enable people to work in the local area.

Paragraph 6.96 Options to support employment and economic growth in the district
A. Continue to support employment growth within the current employment growth policy
B. Update the current employment growth policy to include reference to broadband
C. Update the current employment growth policy to further support new businesses at each stage of their lifecycle - in particular to reflect the need for grow-on space
D. Include specific reference in the current employment growth policy to tourism; and
E. Include specific reference to supporting sustainable travel options and promoting highways improvements

ECC Comments

ECC would expect all of the options to contribute to RDC meeting its need for employment and economic growth; and would expect RDC to prepare a sound and legally compliant Local Plan, based on evidence and in accordance with the NPPF.
ECC welcomes proposals to ensure the protection and provision of suitable employment land and appropriate uses within the District, with the pre-eminence of the importance of London Southend Airport to the economy whilst seeking opportunities for rural diversification, tourism, retail, leisure, town centres, to meeting the life cycle of business needs including "Grow on Space" and development of skills and training opportunities.

ECC welcomes and supports the importance and economic role played by London Southend Airport as international gateway and the A127 corridor and London-Southend Victoria railway line for connectivity with South Essex, the rest of Essex and London. A key priority will be to enable investment in infrastructure and economic growth (for example the A127 including passenger transport; ultrafast broadband) as well as developing options to support the alignment of skill provision to meet the local needs in accordance with the Economic Plan for Essex (2014) and the Government's Industrial Strategy as are being explored by the ASELA through the Industrial Strategy workstream and the preparation of the JSP. The provision of jobs and infrastructure to support economic growth will be essential, including the need to provide social, physical and green infrastructure.

ECC recommends consideration is given to the role and contribution of waste related developments as employers in their own right, economic activity generates waste, and a cost effective, local waste solution supports economic development across the spectrum. ECC recommends the inclusion and reference to 'sui generis' uses when defining appropriate use classes on employment land (see paragraph 6.92 above and 6.105 below).

In respect of Option B and the reference to Broadband, ECC acknowledge the importance of this infrastructure to support economic growth. Please refer to ECC's comments in response to paragraph 8.44 and the options for communication and broadband provision, as well as the references above to "Ultrafast" broadband.

In respect of Option C, ECC welcomes and supports the reference to the ECC "Grow on space" report 2017 and its findings seeking to address the lifecycle needs of businesses. This is also consistent with the Essex Economic Commission.

In respect of option D and the references to rural diversification and tourism ECC considers the development and promotion of the Essex Coast Path could provide opportunities for the local economy. ECC considers there is a need to have regard to the role and contribution of the environment and in particular investment in Green Infrastructure to attract new businesses and opportunities which will help to create employment, including for example regeneration projects which together can deliver multiple environmental, social and economic benefits. Further details and examples are set out in response to paragraph 4.6 above.

In respect of Option E, ECC supports the need for a range of highways and sustainable transport improvements to existing employment areas, including London Southend Airport and the airport business park and will continue to seek funding through bids to central Government, SELEP and S106 contributions, as set out in response to SP1.3 (ECC general comment) above and Paragraph 6.48.
As explained, ECC would anticipate the inclusion and promotion of sustainable modes of travel to support the community (both residents and businesses) to be embedded in the emerging strategy in conjunction with other options, to support employment and to deliver the wider principles in the emerging vision and spatial strategy, in accordance with the Essex LTP, Economic Plan for Essex and the A127 Corridor for Growth An Economic Plan. Please also refer to ECC comments regarding Highway Infrastructure in section 8.

Comment

Issues and Options Document

Need for Jobs

Representation ID: 37055

Received: 06/03/2018

Respondent: Essex County Council

Representation Summary:

SP1.8 Need for Jobs;

Paragraph ECC notes that the emerging Local Plan seeks to facilitate a diverse,
6.105 modernised economy providing high value employment. This aspiration is supported. Paragraph 6.105 states that the Economic Development Needs Topic Paper 2017 advocates employment land increases to primarily facilitate B1 and B2 uses. Again, this is not objected to but it is important that any strategy seeking to grow the economy does not preclude opportunities for waste management, with such facilities often being sited on industrial / employment land. As explained in response to paragraph 6.92 & 6.96 above regarding waste management developments as employers in their own right ECC recommends that reference is made to supporting appropriate 'sui generis' uses when defining appropriate use classes on employment land.

Paragraph 6.111 Options to support economic growth in the district over the next 20 years:

A. Develop specific policies for each employment site to protect certain uses
B. Reconsider the allocation of Rawreth and Star Lane industrial estates back to employment
C. Review new employment land allocations that do not have planning permission
D. Retain current strategy and allocate additional employment land
E. Promote improvements to quality of building stock and intensification of existing sites
F. Strengthen policy stance on access improvements
G. Do not have a policy on employment land

ECC Comments

ECC does not consider these options to be mutually exclusive and would expect RDC to develop a policy based on evidence and in accordance with the NPPF and the National Planning Policy for Waste 2014 (NPPW).

ECC would expect all of the options A-F to contribute to RDC meeting its need for economic growth, taking into account ECC's comments in respect of Paragraph 6.96 above to support employment and economic growth in the district. ). ECC would expect a Rochford Employment Land Review to be prepared and for the following evidence to be taken into account -, the South Essex Economic Development Needs Assessment; the Governments Industrial Strategy, SELEPs Economic Plan, OSE economic objectives, Thames Estuary Commission, the Economic Plan for Essex and ASELA's emerging South Essex 2050 vision and emerging industrial strategy workstream and JSP.