Option 2a

Showing comments and forms 1 to 30 of 160

Object

Hockley Area Action Plan Options Report

Representation ID: 26544

Received: 27/12/2010

Respondent: Mr Kelvin White

Representation Summary:

whilst i agree with the development of existing brownfield sites, the increase in housing and retail units will encourage additional traffic issues to an already saturated area.

Full text:

whilst i agree with the development of existing brownfield sites, the increase in housing and retail units will encourage additional traffic issues to an already saturated area.

Object

Hockley Area Action Plan Options Report

Representation ID: 26556

Received: 31/12/2010

Respondent: Mr A James

Representation Summary:

A summary would not make sense, please read my full comments.

Full text:

Option 2a. I do not like the look of the proposed new shops and flats. They look like a bland row of characterless council homes. The sorting office area should not be used unless a replacement is built first, as we should not loose jobs unnecessarily. If the sorting office area was used the Junction of Eldon Way and Spa Road should be widened with a roundabout and Eldon way should be used to access a new free shopping car park. This also appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. Something should be included to replace the Foundry area. The area from Walton & Stanton's to Harrison's restaurant should be also be replaced and additional parking provided.

Object

Hockley Area Action Plan Options Report

Representation ID: 26568

Received: 02/01/2011

Respondent: Hockley Residents Association

Representation Summary:

Inappropriate changes and missed opportunities

Full text:

Inappropriate changes and missed opportunities

Support

Hockley Area Action Plan Options Report

Representation ID: 26579

Received: 06/01/2011

Respondent: Mrs Clare Grew

Representation Summary:

I think this scheme represents an overall improvement. The current level of housing in the vicinity is not adequately served by existing facilities. Any improvement to the pedestrian environment in Spa Road is welcomed.

Full text:

I think this scheme represents an overall improvement. The current level of housing in the vicinity is not adequately served by existing facilities. Any improvement to the pedestrian environment in Spa Road is welcomed.

Object

Hockley Area Action Plan Options Report

Representation ID: 26601

Received: 02/01/2011

Respondent: Mr Brian Guyett

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Comment

Hockley Area Action Plan Options Report

Representation ID: 26610

Received: 17/01/2011

Respondent: Rochford District Council

Representation Summary:

(continued) comments formulated in discussion with RDC Community Safety Tean and Essex Police (Rochford) Neighbourhood Specialist Officer.
5. CCTV on top of buildings can act as a deterrent for youths hanging around.They need to be high up so they can't be damaged.Maybe tehre could be a precondition for businesses to have their own CCTV.
6. Leisure uses could encourage youths to teh area. Mix of leisure and industrial uses are ok as long as teh units are secure. (See example Festival Leisure Pk,mixed uses)
7. Area needs to be accessible for Police, have CCTV, be well lit and managed.
(more points on additional sheets)

Full text:

(continued) comments formulated in discussion with RDC Community Safety Tean and Essex Police (Rochford) Neighbourhood Specialist Officer.
5. CCTV on top of buildings can act as a deterrent for youths hanging around.They need to be high up so they can't be damaged.Maybe tehre could be a precondition for businesses to have their own CCTV.
6. Leisure uses could encourage youths to teh area. Mix of leisure and industrial uses are ok as long as teh units are secure. (See example Festival Leisure Pk,mixed uses)
7. Area needs to be accessible for Police, have CCTV, be well lit and managed.
(more points on additional sheets)

Comment

Hockley Area Action Plan Options Report

Representation ID: 26611

Received: 17/01/2011

Respondent: Rochford District Council

Representation Summary:

8. Trees may be a problem-if young/small likely to be snapped.
9. Proposed route from Spa Road north to Eldon Way needs to be visible from Spa Rd - see right throigh. CCTV should also be pointed in right direction e.g on top of retail units to deter youths from gathering. Need to be able to see what people are doing.
10.Would there be drinking premises there?
11.First flr flats above retails units leading onto leisure facilities may cause an issue with noise nuisance.Should NOT be an off licence below etc. Restaurants - good idea because of evening use and provide natural surveillance.
12. Maybe an issue with empty retail units as in other areas which can attract vandalism and flats above can be an issue
13. Undercroft parking to South side of Spa Road may encourage youths to gather if no cars are parked there. A single storey building would be better.
14. Rows of restaurants are better.

Full text:

8. Trees may be a problem-if young/small likely to be snapped.
9. Proposed route from Spa Road north to Eldon Way needs to be visible from Spa Rd - see right throigh. CCTV should also be pointed in right direction e.g on top of retail units to deter youths from gathering. Need to be able to see what people are doing.
10.Would there be drinking premises there?
11.First flr flats above retails units leading onto leisure facilities may cause an issue with noise nuisance.Should NOT be an off licence below etc. Restaurants - good idea because of evening use and provide natural surveillance.
12. Maybe an issue with empty retail units as in other areas which can attract vandalism and flats above can be an issue
13. Undercroft parking to South side of Spa Road may encourage youths to gather if no cars are parked there. A single storey building would be better.
14. Rows of restaurants are better.


Object

Hockley Area Action Plan Options Report

Representation ID: 26613

Received: 17/01/2011

Respondent: Mrs S Clark

Representation Summary:

Inappropriate changes and missed opportunities

Full text:

Inappropriate changes and missed opportunities

Object

Hockley Area Action Plan Options Report

Representation ID: 26618

Received: 17/01/2011

Respondent: Mrs S Clark

Representation Summary:

Car park behind the retail units, reached from Eldon Way with additional retail in the existing car park entrance. Remove 'pinch point' on B1013; flats above existing retail units; and retail unit at the Factory Shop car park. Development of a community centre at Library with flats and retail units, with NONE in Eldon Way. Housing and drop-off to north of Station at Plumberow Ave. Market at Sorting Office. Enhanced station frontage and shop fronts on Spa Road, Main Road and Southend Road with leisure space on Eldon Way. Link through Catholic Church to Spa Road.

Full text:

This option forms the basis of an appropriate plan but does not go far enough but SUPPORT an enhance version as follows (changes outside square brackets):
ROADS - [key priority and subject to viability confirmation]
[Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing]
Improvements to Eldon Way, Station Approach and Plumberow junctions
PARKING
Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd.
[Added on-street parallel parking in Spa Road and] pick-up/drop-off points both sides of Hockley Station.
BUILDING CHANGES
Redevelop shops on South side of Main Road, opposite Potters to remove 'pinch-point- on B1013
Change from retail to housing of Costcutters Parade of shops
[Modernised retail units with 4 flats above Seemore Glass]
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
[Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
ABSOLUTELY OBJECT TO 2 LARGE FORMAT RETAIL UNITS IN ELDON WAY
[Replacement of one industrial building with light industry/offices/parking square on Eldon Way]
[Retail unit near station in Spa Road replaced by house]
Housing on north side of Station along Plumberow Avenue to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site.
Options for undeveloped portion of Foundry Estate to be considered.
GENERAL
[Enhanced station frontage & Pedestrian link to Eldon Way] but care re safety considerations.
[Enhanced shop fronts and street scape Spa Road/Main Road/Southend Road]
[Improved safety, consolidated and new leisure space on Eldon Way]
[Flexible employment opportunities, enhanced frontages to leisure/other buildings on Elson Way]
[New link through Catholic Church from Spa Road to Southend Road.]

Object

Hockley Area Action Plan Options Report

Representation ID: 26624

Received: 18/01/2011

Respondent: Mr Paul Sealey

Representation Summary:

I believe this goes a little bit too far in developing the village, although there are aspects that could be taken forward in the final plan. In particular the loss of the sorting office in the village would mean that people would have to travel further (possibly to Basildon) to collect undelivered latters and packages,would not be able to catch the last post late in the afternoon and have a significant impact on the people that work there.

Full text:

I believe this goes a little bit too far in developing the village, although there are aspects that could be taken forward in the final plan. In particular the loss of the sorting office in the village would mean that people would have to travel further (possibly to Basildon) to collect undelivered latters and packages,would not be able to catch the last post late in the afternoon and have a significant impact on the people that work there.

Support

Hockley Area Action Plan Options Report

Representation ID: 26628

Received: 30/11/2010

Respondent: Mr John French

Representation Summary:

Of the options put forward I was in favour of 2A.

I also feel that a general improvement to the road layout at the Spa junction is better in the first instance than proposals of either traffic lights or one way type ideas for Woodlands. I strongly feel that traffic lights at the junction would make it almost impossible to exit Bramerton Road particularly in the rush hours.

Full text:

I came to the pop in meeting at Greensward school and I thought that a lot more thought had gone into the ideas than previously.
Of the options put forward I was in favour of 2A.
I also feel that a general improvement to the road layout at the Spa junction is better in the first instance than proposals of either traffic lights or one way type ideas for Woodlands. I strongly feel that traffic lights at the junction would make it almost impossible to exit Bramerton Road particularly in the rush hours.

Object

Hockley Area Action Plan Options Report

Representation ID: 26656

Received: 04/01/2011

Respondent: Ms G Yeadell

Representation Summary:

Development and Land uses

Para. 1 Replace Co-op/flats/sorting office-new shops/flats - Object/Comment - I don't like the Co-op building, which replaced good houses, one still there - though threatened under Option 3. Proposed building is an improvement on the present 1960s one, though much too townified. However, as admitted, sites will have to be found to accommodate businesses in the interim. Where does Urban think shops and flats will go during redevelopment? There is again a question of funding - proposals for that don't seem unrealistic.

Full text:

OPTION: SPATIAL OPTION 1

Development and land uses

Para.1: Shop front improvements: Support, only where really needed

Para.2: Replace 2 Main Road - shops, flats: Comment - principle ok, but loss of successful businesses

Para.3: Replace 34-40 Spa Road: Comment - ok as it's not a quality building, but a business will be lost
(Example of serial planning - regenerate every 30 years - so get it right at start or leave alone)

Traffic/parking

Para.1: Consolidate parking rear Co-op-Alldays for more parking: Support - parking needed near shops

Para.2: More parallel on-street parking in Spa Road: Comment - Idea ok, but doubtful - pressure on buses.
Replacing railing with steps is risky. There was once no railing, just 1-step kerb- I fell off it

Para.3: Open west entry to Potters car park: Support

Movement/Public realm

Para.1; Improve station frontage: Object - unnecessary

Para.2-7: Pedestrian links, streetscape, greening, tabletop crossings: Support

OPTION: SPATIAL OPTION 2

Development and land uses

Paras. 1 - 2 Shop front improvement - Support. 2 Main Rd convert shops/flats- Support but business loss

Para. 3: Replace Alldays with new shops/flats: Support

Para. 4: Replace 1 unit in Eldon Way - startup/offices etc, new parking square: Comment -
Parking space essential, but area doesn't need more offices - bank building corner of Woodlands,
Southend Road has plenty, not always full.

Para.5 New leisure space, skating: Comment: Where and Why, has someone offered?

Para.6: Consolidate existing leisure to west of Eldon Way: Comment if it's already there, why problem?

Para.7: Improve frontages of buildings: Support if necessary

Para.8: Consolidate Hockley centre, convert Main Road retail to housing: Support, There were Victorian
houses here, but demolished for shops/flats (so this will remove businesses). Another example of serial planning - regenerate every generation, but never get it right.

Para.9: Redevelop library/GP surgery, new library/health centre plus shops: Object - No further
Space for library; GP surgery spent large sum modernising/refurbishing to get patient provision right. Where is funding coming from? Presumably from housing delivered by the New Homes
Bonus - I hope Urban can trust the Coalition Government. Also money was spent providing the
public loo - so that will go as well! Another case of serial planning - changing with each generation.

Para.10 New home on Spa Road (No.59): Object - This is one of the few period pieces left in Hockley
though unfortunately reduced from semi-detached, to single. Remainder could go on forthcoming redrafted Local List (though Rochford has a way of abolishing List when it obstructs development).
I see there is a tiny bit of parking space - is it that just what Urban propose was recently
refused for parking/traffic problems? Also two businesses will go - Dry cleaners and Sheeds.

Traffic and parking

Paras.1-3: New parking, narrow station roundabout, parking square: Support - for increased parking, but parking really needs to be near shops, viz. as in Option 1 - behind Co-op/Alldays.

Para. 4: Increase parallel on-street parking, Spa Road: Comment - Idea ok, but doubtful - pressure on .
Bus stops and pick up..

Para.5: Open west end Potter's car park - Support with reservations

Movement and Public realm

Para. 1. Station frontage improvement - doesn't need improvement

Paras.2-7 Pedestrian link station-Eldon Way, green link Bramerton Rd-Eldon Way, paving/street improvements Spa/Main/Southend Roads improvements - Support

Para. 8: Enhancing public realm at new combined community centre Southend road: Object -
Irrelevant, as I object to Combined Community Centre for reasons given under Option .

Para. 9: Strengthening link between Spa Road - Eldon Way: Comment unclear what this means

Para. 10: Making green link from Spa to Southend Road via Pius X churchyard: Object - Security
Risk to Church and nearest. Congregation object. Seen as ? meeting point for troublemakers

Para. 11: Enhancing environment, safety in front of existing leisure uses in Eldon Way: Support

OPTION: SPATIAL OPTION 2A

Development and Land uses

Para. 1 Replace Co-op/flats/sorting office-new shops/flats - Object/Comment - I don't like the Co-op building, which replaced good houses, one still there - though threatened under Option 3. Proposed building is an improvement on the present 1960s one, though much too townified. However, as admitted, sites will have to be found to accommodate businesses in the interim. Where does Urban think shops and flats will go during redevelopment? There is again a question of funding - proposals for that don't seem unrealistic.

Para.2: New dwellings on sorting office site: Object - Sorting office is essential locally. Remove that and we will have to travel to Basildon, Chelmsford, Colchester to collect parcels, recorded delivery items. They are busy all day. The Southend one is scheduled to go for a Tesco. These 2 proposals are another example of serial planning over time.

Para.3 Replace 34-40 Spa Road with shops/flats - ok, but loss of business, also ensure flats don't impact bungalows behind.

SPATIAL OPTION 3

Development and Land uses

Para.1: Shopfront improvements Spa/Main/Southend Road - Support only where necessary

Para. 2: Replace shops 2 Main Road, new shop/flats: Support/comment ok but loss of businesses

Para.3: Replace office corner Woodlands/Southend Rd, shops/flats - Object This replaced 17/18C timber, thatched semi-det. cottages, lost to Hockley history. But it is presentable, useful office block. This is another example of serial planning over time. Leave alone.

Para. 4: Replace library/GP centre for combined centre: Object - Another example of serial planning. GP surgery was modernised at much cost. Source of funding questionable.

Para. 5: Replace [? Poor quality building] Southend Rd with shops/houses: Object - This is small single
Storey extension to Edwardian building next door, now a very successful restaurant. The proposed 'homes' area is restaurant carpark. Together with demolition of office block next door, this would finish their business. Incidentally the graph differs from that in Option 2. Is public loo to go as well?

Para. 6: New homes at end of Pius X churchyard - Object - Very cramped area and no parking

Para. 7: Alldays/one Eldon Way building go for start up/public sector offices - Object - removal of some
leisure sites for needless offices. Public sector is reducing and many others work from home. Also Alldays Carpark is needed for public parking.

Para. 8: New leisure space plus skating rink: Object - This is fraction of size of present leisure sites. Has
Someone applied for skating rink?

Para. 9: Replace Co-op with new retail/housing: Object - All this replaced good houses. Now you want to
Remove supermarket and flats - where are they going? Another example of serial planning.

Para.10: New housing replace 2 buildings Eldon Way: Object - a muddle

Para. 11: Eldon Way Clinic to go to Southend Rd community centre, replace with housing: Object -
I already objected to Southend Rd proposal for serial planning, dubious funding, disruption. Clinic
Should stay on site.

Para. 12: New shops replace 34-40 Spa Road - object - pointless to replace a business with another.
At least in Option 2 similar proposal included flats.

Para. 13: New house at 59 Spa Road - Object - This 17-18C former semi-detached cottage (somewhat
reduced. It should go on Local List, though latter apt to get abolished to suit development.

Traffic and Parking

Paras. 1-2: New parking south of station - narrowing roundabout to stop waiting etc - Support

Para. 3: New parking square etc: - parking should be within main shopping centre

Para. 4: Parallel on-street parking - risky - pressure on bus service etc

Para. 5: Shared surface - Spa roundabout - Support

Para. 6: West entry Potters car park: Support

Movement and public realm

Para. 1: Improvements to station frontage - Object - unnecessary. It has a "real front entrance"

Paras. 2-7: Pedestrian link station-Eldon Way; green link Bramerton Rd-Eldon Way; pavking, street
Improvements central Hockley; tree planting, table top crossings Spa/Woodlands Rds
Junctions - support

Para. 8: Public realm, new community centre: Irrelevant as I object to centre as under Options 2, 3

Para. 9: Strengthen link Spa Road-Eldon Way - how?

Para. 10: Enhance environment before existing leisure uses Eldon Way - Thought you were moving them

Para. 11: Improving parking facilities etc at Main Road shops - Support

SPATIAL OPTION 3A

Development land uses etc

New housing north of railway: Support - but single-storey like Plumberow Avenue. ? parking problems
SUMMARY

Much of Options l and 2 is acceptable, but Options 2a and 3, 3a have unsuitable schemes and constitute over development. Urban's introduction refers to "low density nature of Hockley". Naturally - it is a village. Retail Study 2008 referred to in Ch.2 drew attention to lack of larger retail units, but we don't need eg Marks/Spencer, any more than Wakering, Paglesham etc co - there is one in Southend. The Co-op needs competition - unfortunately it replaced several grocers, butchers, greengrocers - what we really need. Study also referred to "..lack of leisure service operators in centre". Firstly we have four successful ones near the centre - Monkey Bizness, C J Bowling, Massive Youth Project, Cully's gym. Being a village we don't need to compete with Southend. There are other activities in the Methodist Church hall.

I note though Hockley is now classified as a District Centre, in Ch.2 this is "..to be reviewed at a later date". Why? Is the council still planning to turn it into a town? One councillor disingenuously said Rochford and Rayleigh AAPs are "finished". In fact officials confirm they will go through the 4 stage process as HAAP will. After the uproar arose when people found out the 2009 HAAP Issues/Options, one wonders if they were put up just as window dressing so Hockley should not think it was 'picked on'.

If you are desperate to provide more (presumably affordable) housing, one or two buildings still empty in Eldon Way site might be converted/rebuilt for that purpose. One or two existing firms might be approached. But bear in mind that even affordable dwellings use cars, which could generate congestion on Spa Road.

Again, one reverts to mistiming of the HAAP consultation - December/January - competing with Christmas and winter. As an example, normally relevant meetings are packed. However only 15 people attended the December one at Greensward - ?why - because road and pavements were sheets of ice. People won't get anywhere with a broken hip. Meeting was 7.30. No buses ran, necessitating walking, sharing the road with traffic. One bus passed, going to "Sorry not in Service". It does seem this mistiming is not accidental. Last year the first HAAP consult was at a reasonable time - Feb. 13 to April 30 2009 - only problem was no - no one knew about it until found out by accident. This time, the District Matters newssheet has good cover for HAAP, but many have apparently not received it.

Object

Hockley Area Action Plan Options Report

Representation ID: 26657

Received: 04/01/2011

Respondent: Ms G Yeadell

Representation Summary:

Development and Land uses

Para.2: New dwellings on sorting office site: Object - Sorting office is essential locally. Remove that and we will have to travel to Basildon, Chelmsford, Colchester to collect parcels, recorded delivery items. They are busy all day. The Southend one is scheduled to go for a Tesco. These 2 proposals are another example of serial planning over time.

Full text:

OPTION: SPATIAL OPTION 1

Development and land uses

Para.1: Shop front improvements: Support, only where really needed

Para.2: Replace 2 Main Road - shops, flats: Comment - principle ok, but loss of successful businesses

Para.3: Replace 34-40 Spa Road: Comment - ok as it's not a quality building, but a business will be lost
(Example of serial planning - regenerate every 30 years - so get it right at start or leave alone)

Traffic/parking

Para.1: Consolidate parking rear Co-op-Alldays for more parking: Support - parking needed near shops

Para.2: More parallel on-street parking in Spa Road: Comment - Idea ok, but doubtful - pressure on buses.
Replacing railing with steps is risky. There was once no railing, just 1-step kerb- I fell off it

Para.3: Open west entry to Potters car park: Support

Movement/Public realm

Para.1; Improve station frontage: Object - unnecessary

Para.2-7: Pedestrian links, streetscape, greening, tabletop crossings: Support

OPTION: SPATIAL OPTION 2

Development and land uses

Paras. 1 - 2 Shop front improvement - Support. 2 Main Rd convert shops/flats- Support but business loss

Para. 3: Replace Alldays with new shops/flats: Support

Para. 4: Replace 1 unit in Eldon Way - startup/offices etc, new parking square: Comment -
Parking space essential, but area doesn't need more offices - bank building corner of Woodlands,
Southend Road has plenty, not always full.

Para.5 New leisure space, skating: Comment: Where and Why, has someone offered?

Para.6: Consolidate existing leisure to west of Eldon Way: Comment if it's already there, why problem?

Para.7: Improve frontages of buildings: Support if necessary

Para.8: Consolidate Hockley centre, convert Main Road retail to housing: Support, There were Victorian
houses here, but demolished for shops/flats (so this will remove businesses). Another example of serial planning - regenerate every generation, but never get it right.

Para.9: Redevelop library/GP surgery, new library/health centre plus shops: Object - No further
Space for library; GP surgery spent large sum modernising/refurbishing to get patient provision right. Where is funding coming from? Presumably from housing delivered by the New Homes
Bonus - I hope Urban can trust the Coalition Government. Also money was spent providing the
public loo - so that will go as well! Another case of serial planning - changing with each generation.

Para.10 New home on Spa Road (No.59): Object - This is one of the few period pieces left in Hockley
though unfortunately reduced from semi-detached, to single. Remainder could go on forthcoming redrafted Local List (though Rochford has a way of abolishing List when it obstructs development).
I see there is a tiny bit of parking space - is it that just what Urban propose was recently
refused for parking/traffic problems? Also two businesses will go - Dry cleaners and Sheeds.

Traffic and parking

Paras.1-3: New parking, narrow station roundabout, parking square: Support - for increased parking, but parking really needs to be near shops, viz. as in Option 1 - behind Co-op/Alldays.

Para. 4: Increase parallel on-street parking, Spa Road: Comment - Idea ok, but doubtful - pressure on .
Bus stops and pick up..

Para.5: Open west end Potter's car park - Support with reservations

Movement and Public realm

Para. 1. Station frontage improvement - doesn't need improvement

Paras.2-7 Pedestrian link station-Eldon Way, green link Bramerton Rd-Eldon Way, paving/street improvements Spa/Main/Southend Roads improvements - Support

Para. 8: Enhancing public realm at new combined community centre Southend road: Object -
Irrelevant, as I object to Combined Community Centre for reasons given under Option .

Para. 9: Strengthening link between Spa Road - Eldon Way: Comment unclear what this means

Para. 10: Making green link from Spa to Southend Road via Pius X churchyard: Object - Security
Risk to Church and nearest. Congregation object. Seen as ? meeting point for troublemakers

Para. 11: Enhancing environment, safety in front of existing leisure uses in Eldon Way: Support

OPTION: SPATIAL OPTION 2A

Development and Land uses

Para. 1 Replace Co-op/flats/sorting office-new shops/flats - Object/Comment - I don't like the Co-op building, which replaced good houses, one still there - though threatened under Option 3. Proposed building is an improvement on the present 1960s one, though much too townified. However, as admitted, sites will have to be found to accommodate businesses in the interim. Where does Urban think shops and flats will go during redevelopment? There is again a question of funding - proposals for that don't seem unrealistic.

Para.2: New dwellings on sorting office site: Object - Sorting office is essential locally. Remove that and we will have to travel to Basildon, Chelmsford, Colchester to collect parcels, recorded delivery items. They are busy all day. The Southend one is scheduled to go for a Tesco. These 2 proposals are another example of serial planning over time.

Para.3 Replace 34-40 Spa Road with shops/flats - ok, but loss of business, also ensure flats don't impact bungalows behind.

SPATIAL OPTION 3

Development and Land uses

Para.1: Shopfront improvements Spa/Main/Southend Road - Support only where necessary

Para. 2: Replace shops 2 Main Road, new shop/flats: Support/comment ok but loss of businesses

Para.3: Replace office corner Woodlands/Southend Rd, shops/flats - Object This replaced 17/18C timber, thatched semi-det. cottages, lost to Hockley history. But it is presentable, useful office block. This is another example of serial planning over time. Leave alone.

Para. 4: Replace library/GP centre for combined centre: Object - Another example of serial planning. GP surgery was modernised at much cost. Source of funding questionable.

Para. 5: Replace [? Poor quality building] Southend Rd with shops/houses: Object - This is small single
Storey extension to Edwardian building next door, now a very successful restaurant. The proposed 'homes' area is restaurant carpark. Together with demolition of office block next door, this would finish their business. Incidentally the graph differs from that in Option 2. Is public loo to go as well?

Para. 6: New homes at end of Pius X churchyard - Object - Very cramped area and no parking

Para. 7: Alldays/one Eldon Way building go for start up/public sector offices - Object - removal of some
leisure sites for needless offices. Public sector is reducing and many others work from home. Also Alldays Carpark is needed for public parking.

Para. 8: New leisure space plus skating rink: Object - This is fraction of size of present leisure sites. Has
Someone applied for skating rink?

Para. 9: Replace Co-op with new retail/housing: Object - All this replaced good houses. Now you want to
Remove supermarket and flats - where are they going? Another example of serial planning.

Para.10: New housing replace 2 buildings Eldon Way: Object - a muddle

Para. 11: Eldon Way Clinic to go to Southend Rd community centre, replace with housing: Object -
I already objected to Southend Rd proposal for serial planning, dubious funding, disruption. Clinic
Should stay on site.

Para. 12: New shops replace 34-40 Spa Road - object - pointless to replace a business with another.
At least in Option 2 similar proposal included flats.

Para. 13: New house at 59 Spa Road - Object - This 17-18C former semi-detached cottage (somewhat
reduced. It should go on Local List, though latter apt to get abolished to suit development.

Traffic and Parking

Paras. 1-2: New parking south of station - narrowing roundabout to stop waiting etc - Support

Para. 3: New parking square etc: - parking should be within main shopping centre

Para. 4: Parallel on-street parking - risky - pressure on bus service etc

Para. 5: Shared surface - Spa roundabout - Support

Para. 6: West entry Potters car park: Support

Movement and public realm

Para. 1: Improvements to station frontage - Object - unnecessary. It has a "real front entrance"

Paras. 2-7: Pedestrian link station-Eldon Way; green link Bramerton Rd-Eldon Way; pavking, street
Improvements central Hockley; tree planting, table top crossings Spa/Woodlands Rds
Junctions - support

Para. 8: Public realm, new community centre: Irrelevant as I object to centre as under Options 2, 3

Para. 9: Strengthen link Spa Road-Eldon Way - how?

Para. 10: Enhance environment before existing leisure uses Eldon Way - Thought you were moving them

Para. 11: Improving parking facilities etc at Main Road shops - Support

SPATIAL OPTION 3A

Development land uses etc

New housing north of railway: Support - but single-storey like Plumberow Avenue. ? parking problems
SUMMARY

Much of Options l and 2 is acceptable, but Options 2a and 3, 3a have unsuitable schemes and constitute over development. Urban's introduction refers to "low density nature of Hockley". Naturally - it is a village. Retail Study 2008 referred to in Ch.2 drew attention to lack of larger retail units, but we don't need eg Marks/Spencer, any more than Wakering, Paglesham etc co - there is one in Southend. The Co-op needs competition - unfortunately it replaced several grocers, butchers, greengrocers - what we really need. Study also referred to "..lack of leisure service operators in centre". Firstly we have four successful ones near the centre - Monkey Bizness, C J Bowling, Massive Youth Project, Cully's gym. Being a village we don't need to compete with Southend. There are other activities in the Methodist Church hall.

I note though Hockley is now classified as a District Centre, in Ch.2 this is "..to be reviewed at a later date". Why? Is the council still planning to turn it into a town? One councillor disingenuously said Rochford and Rayleigh AAPs are "finished". In fact officials confirm they will go through the 4 stage process as HAAP will. After the uproar arose when people found out the 2009 HAAP Issues/Options, one wonders if they were put up just as window dressing so Hockley should not think it was 'picked on'.

If you are desperate to provide more (presumably affordable) housing, one or two buildings still empty in Eldon Way site might be converted/rebuilt for that purpose. One or two existing firms might be approached. But bear in mind that even affordable dwellings use cars, which could generate congestion on Spa Road.

Again, one reverts to mistiming of the HAAP consultation - December/January - competing with Christmas and winter. As an example, normally relevant meetings are packed. However only 15 people attended the December one at Greensward - ?why - because road and pavements were sheets of ice. People won't get anywhere with a broken hip. Meeting was 7.30. No buses ran, necessitating walking, sharing the road with traffic. One bus passed, going to "Sorry not in Service". It does seem this mistiming is not accidental. Last year the first HAAP consult was at a reasonable time - Feb. 13 to April 30 2009 - only problem was no - no one knew about it until found out by accident. This time, the District Matters newssheet has good cover for HAAP, but many have apparently not received it.

Comment

Hockley Area Action Plan Options Report

Representation ID: 26658

Received: 04/01/2011

Respondent: Ms G Yeadell

Representation Summary:

Development and Land uses

Para.3 Replace 34-40 Spa Road with shops/flats - ok, but loss of business, also ensure flats don't impact bungalows behind.

Full text:

OPTION: SPATIAL OPTION 1

Development and land uses

Para.1: Shop front improvements: Support, only where really needed

Para.2: Replace 2 Main Road - shops, flats: Comment - principle ok, but loss of successful businesses

Para.3: Replace 34-40 Spa Road: Comment - ok as it's not a quality building, but a business will be lost
(Example of serial planning - regenerate every 30 years - so get it right at start or leave alone)

Traffic/parking

Para.1: Consolidate parking rear Co-op-Alldays for more parking: Support - parking needed near shops

Para.2: More parallel on-street parking in Spa Road: Comment - Idea ok, but doubtful - pressure on buses.
Replacing railing with steps is risky. There was once no railing, just 1-step kerb- I fell off it

Para.3: Open west entry to Potters car park: Support

Movement/Public realm

Para.1; Improve station frontage: Object - unnecessary

Para.2-7: Pedestrian links, streetscape, greening, tabletop crossings: Support

OPTION: SPATIAL OPTION 2

Development and land uses

Paras. 1 - 2 Shop front improvement - Support. 2 Main Rd convert shops/flats- Support but business loss

Para. 3: Replace Alldays with new shops/flats: Support

Para. 4: Replace 1 unit in Eldon Way - startup/offices etc, new parking square: Comment -
Parking space essential, but area doesn't need more offices - bank building corner of Woodlands,
Southend Road has plenty, not always full.

Para.5 New leisure space, skating: Comment: Where and Why, has someone offered?

Para.6: Consolidate existing leisure to west of Eldon Way: Comment if it's already there, why problem?

Para.7: Improve frontages of buildings: Support if necessary

Para.8: Consolidate Hockley centre, convert Main Road retail to housing: Support, There were Victorian
houses here, but demolished for shops/flats (so this will remove businesses). Another example of serial planning - regenerate every generation, but never get it right.

Para.9: Redevelop library/GP surgery, new library/health centre plus shops: Object - No further
Space for library; GP surgery spent large sum modernising/refurbishing to get patient provision right. Where is funding coming from? Presumably from housing delivered by the New Homes
Bonus - I hope Urban can trust the Coalition Government. Also money was spent providing the
public loo - so that will go as well! Another case of serial planning - changing with each generation.

Para.10 New home on Spa Road (No.59): Object - This is one of the few period pieces left in Hockley
though unfortunately reduced from semi-detached, to single. Remainder could go on forthcoming redrafted Local List (though Rochford has a way of abolishing List when it obstructs development).
I see there is a tiny bit of parking space - is it that just what Urban propose was recently
refused for parking/traffic problems? Also two businesses will go - Dry cleaners and Sheeds.

Traffic and parking

Paras.1-3: New parking, narrow station roundabout, parking square: Support - for increased parking, but parking really needs to be near shops, viz. as in Option 1 - behind Co-op/Alldays.

Para. 4: Increase parallel on-street parking, Spa Road: Comment - Idea ok, but doubtful - pressure on .
Bus stops and pick up..

Para.5: Open west end Potter's car park - Support with reservations

Movement and Public realm

Para. 1. Station frontage improvement - doesn't need improvement

Paras.2-7 Pedestrian link station-Eldon Way, green link Bramerton Rd-Eldon Way, paving/street improvements Spa/Main/Southend Roads improvements - Support

Para. 8: Enhancing public realm at new combined community centre Southend road: Object -
Irrelevant, as I object to Combined Community Centre for reasons given under Option .

Para. 9: Strengthening link between Spa Road - Eldon Way: Comment unclear what this means

Para. 10: Making green link from Spa to Southend Road via Pius X churchyard: Object - Security
Risk to Church and nearest. Congregation object. Seen as ? meeting point for troublemakers

Para. 11: Enhancing environment, safety in front of existing leisure uses in Eldon Way: Support

OPTION: SPATIAL OPTION 2A

Development and Land uses

Para. 1 Replace Co-op/flats/sorting office-new shops/flats - Object/Comment - I don't like the Co-op building, which replaced good houses, one still there - though threatened under Option 3. Proposed building is an improvement on the present 1960s one, though much too townified. However, as admitted, sites will have to be found to accommodate businesses in the interim. Where does Urban think shops and flats will go during redevelopment? There is again a question of funding - proposals for that don't seem unrealistic.

Para.2: New dwellings on sorting office site: Object - Sorting office is essential locally. Remove that and we will have to travel to Basildon, Chelmsford, Colchester to collect parcels, recorded delivery items. They are busy all day. The Southend one is scheduled to go for a Tesco. These 2 proposals are another example of serial planning over time.

Para.3 Replace 34-40 Spa Road with shops/flats - ok, but loss of business, also ensure flats don't impact bungalows behind.

SPATIAL OPTION 3

Development and Land uses

Para.1: Shopfront improvements Spa/Main/Southend Road - Support only where necessary

Para. 2: Replace shops 2 Main Road, new shop/flats: Support/comment ok but loss of businesses

Para.3: Replace office corner Woodlands/Southend Rd, shops/flats - Object This replaced 17/18C timber, thatched semi-det. cottages, lost to Hockley history. But it is presentable, useful office block. This is another example of serial planning over time. Leave alone.

Para. 4: Replace library/GP centre for combined centre: Object - Another example of serial planning. GP surgery was modernised at much cost. Source of funding questionable.

Para. 5: Replace [? Poor quality building] Southend Rd with shops/houses: Object - This is small single
Storey extension to Edwardian building next door, now a very successful restaurant. The proposed 'homes' area is restaurant carpark. Together with demolition of office block next door, this would finish their business. Incidentally the graph differs from that in Option 2. Is public loo to go as well?

Para. 6: New homes at end of Pius X churchyard - Object - Very cramped area and no parking

Para. 7: Alldays/one Eldon Way building go for start up/public sector offices - Object - removal of some
leisure sites for needless offices. Public sector is reducing and many others work from home. Also Alldays Carpark is needed for public parking.

Para. 8: New leisure space plus skating rink: Object - This is fraction of size of present leisure sites. Has
Someone applied for skating rink?

Para. 9: Replace Co-op with new retail/housing: Object - All this replaced good houses. Now you want to
Remove supermarket and flats - where are they going? Another example of serial planning.

Para.10: New housing replace 2 buildings Eldon Way: Object - a muddle

Para. 11: Eldon Way Clinic to go to Southend Rd community centre, replace with housing: Object -
I already objected to Southend Rd proposal for serial planning, dubious funding, disruption. Clinic
Should stay on site.

Para. 12: New shops replace 34-40 Spa Road - object - pointless to replace a business with another.
At least in Option 2 similar proposal included flats.

Para. 13: New house at 59 Spa Road - Object - This 17-18C former semi-detached cottage (somewhat
reduced. It should go on Local List, though latter apt to get abolished to suit development.

Traffic and Parking

Paras. 1-2: New parking south of station - narrowing roundabout to stop waiting etc - Support

Para. 3: New parking square etc: - parking should be within main shopping centre

Para. 4: Parallel on-street parking - risky - pressure on bus service etc

Para. 5: Shared surface - Spa roundabout - Support

Para. 6: West entry Potters car park: Support

Movement and public realm

Para. 1: Improvements to station frontage - Object - unnecessary. It has a "real front entrance"

Paras. 2-7: Pedestrian link station-Eldon Way; green link Bramerton Rd-Eldon Way; pavking, street
Improvements central Hockley; tree planting, table top crossings Spa/Woodlands Rds
Junctions - support

Para. 8: Public realm, new community centre: Irrelevant as I object to centre as under Options 2, 3

Para. 9: Strengthen link Spa Road-Eldon Way - how?

Para. 10: Enhance environment before existing leisure uses Eldon Way - Thought you were moving them

Para. 11: Improving parking facilities etc at Main Road shops - Support

SPATIAL OPTION 3A

Development land uses etc

New housing north of railway: Support - but single-storey like Plumberow Avenue. ? parking problems
SUMMARY

Much of Options l and 2 is acceptable, but Options 2a and 3, 3a have unsuitable schemes and constitute over development. Urban's introduction refers to "low density nature of Hockley". Naturally - it is a village. Retail Study 2008 referred to in Ch.2 drew attention to lack of larger retail units, but we don't need eg Marks/Spencer, any more than Wakering, Paglesham etc co - there is one in Southend. The Co-op needs competition - unfortunately it replaced several grocers, butchers, greengrocers - what we really need. Study also referred to "..lack of leisure service operators in centre". Firstly we have four successful ones near the centre - Monkey Bizness, C J Bowling, Massive Youth Project, Cully's gym. Being a village we don't need to compete with Southend. There are other activities in the Methodist Church hall.

I note though Hockley is now classified as a District Centre, in Ch.2 this is "..to be reviewed at a later date". Why? Is the council still planning to turn it into a town? One councillor disingenuously said Rochford and Rayleigh AAPs are "finished". In fact officials confirm they will go through the 4 stage process as HAAP will. After the uproar arose when people found out the 2009 HAAP Issues/Options, one wonders if they were put up just as window dressing so Hockley should not think it was 'picked on'.

If you are desperate to provide more (presumably affordable) housing, one or two buildings still empty in Eldon Way site might be converted/rebuilt for that purpose. One or two existing firms might be approached. But bear in mind that even affordable dwellings use cars, which could generate congestion on Spa Road.

Again, one reverts to mistiming of the HAAP consultation - December/January - competing with Christmas and winter. As an example, normally relevant meetings are packed. However only 15 people attended the December one at Greensward - ?why - because road and pavements were sheets of ice. People won't get anywhere with a broken hip. Meeting was 7.30. No buses ran, necessitating walking, sharing the road with traffic. One bus passed, going to "Sorry not in Service". It does seem this mistiming is not accidental. Last year the first HAAP consult was at a reasonable time - Feb. 13 to April 30 2009 - only problem was no - no one knew about it until found out by accident. This time, the District Matters newssheet has good cover for HAAP, but many have apparently not received it.

Support

Hockley Area Action Plan Options Report

Representation ID: 26684

Received: 20/01/2011

Respondent: Mr Ken Wickham

Representation Summary:

Option 2 a with modification to include a drop off turn circle for the Northside of the station so that cars and passengers are dispersed quickly during peak times.
Additional use of the Southside area along side the platform for parking with foot and vehicle access through the Foundry Estate to Eldonway Estate.

Full text:

Option 2 a with modification to include a drop off turn circle for the Northside of the station so that cars and passengers are dispersed quickly during peak times.
Additional use of the Southside area along side the platform for parking with foot and vehicle access through the Foundry Estate to Eldonway Estate.

Object

Hockley Area Action Plan Options Report

Representation ID: 26690

Received: 20/01/2011

Respondent: Mrs Jennifer Abbey

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

Inappropriate changes and missed opportunities.

Object

Hockley Area Action Plan Options Report

Representation ID: 26697

Received: 07/01/2011

Respondent: Mr john hayter

Representation Summary:

Option 2a: Object: Inappropriate changes and missed opportunities.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26708

Received: 10/01/2011

Respondent: Mr and Mrs Pearson

Representation Summary:

Inappropriate changes and missed opportunities

Full text:

We wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26715

Received: 12/01/2011

Respondent: Mr B R Walker

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26722

Received: 13/01/2011

Respondent: Seemore Glass

Representation Summary:

I wish to strongly raise an objection to the changes concerning Seemore Glass, in respect of the remodernisation and four flats above. Seemore Glass is a family run business and has been established in Hockley for over 45 years, we have a fantastic reputation in hockley and most of our work comes from recommendations. I feel you have not given any consideration to businesses such as mine and the impact of your proposals to me personally and the customers in hockley and the surrounding areas that we provide an excellent service to. I strongly object to this proposal and in this day and the current climate which we are in feel you putting added stress and worry to us small business owners.

Full text:

I wish to strongly raise an objection to the changes concerning Seemore Glass, in respect of the remodernisation and four flats above. Seemore Glass is a family run business and has been established in Hockley for over 45 years, we have a fantastic reputation in hockley and most of our work comes from recommendations. I feel you have not given any consideration to businesses such as mine and the impact of your proposals to me personally and the customers in hockley and the surrounding areas that we provide an excellent service to. I strongly object to this proposal and in this day and the current climate which we are in feel you putting added stress and worry to us small business owners.

Object

Hockley Area Action Plan Options Report

Representation ID: 26727

Received: 14/01/2011

Respondent: Mrs A Collins

Representation Summary:

Inappropriate changes and missed opportunities

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26734

Received: 14/01/2011

Respondent: mr Bernard Clark

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26741

Received: 17/01/2011

Respondent: Elaine McPhie

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26748

Received: 17/01/2011

Respondent: Mr T Gleadall

Representation Summary:

Similar benefits (and issues) as Option 2 but inappropriate changes including:
Flats above modernised retail units at 34-40 Spa Road would create a 2 storey facility which is not feasible due to the proximity of the houses behind
Disruption to shops and services for a long period during the redevelopment of the supermarket and sorting office area. Shoppers would have to shop outside of Hockley and may not return. Older residents and non-drivers would not be able to cope

Full text:

I wish to register the following objections and comments regarding the above consultation:

Option 1: Object: Insufficient benefits. Although the majority of residents do not want major redevelopment of Hockley centre, Option 1 would be a wasted opportunity to incorporate potential improvements to retail, housing, businesses, healthcare, leisure, parking and road networks without affecting the character of the village.


Option 2: Support but with enhancements. Benefits over Option 1 include:
Retains the village character of Hockley but with some opportunity for retail, housing (including affordable housing), business and leisure development
Provides flexible employment opportunities
Provides additional on and off-street parking in Spa Road, Eldon Way and at Hockley Station (including improved pick-up/drop-off points)
Removal of the first industrial building in Eldon Way allows development of a good size parking area accessed from Eldon Way (safer than current Spa Road entrance/exit), plus modernised office, light industry and leisure facilities. The car park would be suitable for shoppers and staff in Spa Road and Main Road, allowing the car park behind the library to be used primarily for the new community centre and other establishments in Southend Road such as the Old Fire Station and the Catholic Church
Provides consolidated and new leisure facilities in Eldon Way with improved safety features
Provides improved links from Spa Road to Eldon Way, from Spa Road to Southend Road, and from Hockley Station to Eldon Way
Provides new community centre incorporating healthcare and library
Provides the opportunity to change retail units in Main Road to housing, subject to retail performance

Possible enhancements to Option 2 include:
Modernised single storey retail units at 34-40 Spa Road
Relocation of the clinic into the proposed new healthcare centre allowing development of new homes on the current clinic site
Relocation of post collection to the post office allowing development of new homes or retail or a combination of both at the current sorting office site
Some housing development close to Hockley Station

Issues with Option 2 include:
Insufficient improvements at the Spa roundabout to support both HAAP and the Core Strategy
The funding challenge without the support of major housing and supermarket developments:
Public realm improvements
Additional on and off-street parking which is essential to support retail outlets
Removal of first industrial building in Eldon Way to allow developments
Development of the new community centre
The necessary support from landowners
Disruption to shops, businesses, services and traffic flow during development


Option 2a: Object: Similar benefits (and issues) as Option 2 but inappropriate changes including:
Flats above modernised retail units at 34-40 Spa Road would create a 2 storey facility which is not feasible due to the proximity of the houses behind
Disruption to shops and services for a long period during the redevelopment of the supermarket and sorting office area. Shoppers would have to shop outside of Hockley and may not return. Older residents and non-drivers would not be able to cope




Options 3: Object: Over development and inappropriate changes. Option 3 involves major redevelopment in both the shopping and industrial areas, including development of 149 homes and a large supermarket, and is not appropriate for the following reasons:
It changes the character of the village to that of a small town
Inadequate infrastructure to support 149 new homes (and associated vehicles) in terms of school places, healthcare provision, community services, utilities provision, and road networks
Housing includes 80 homes on Eldon Way Industrial Estate against the wishes of local residents and creates additional traffic in Eldon Way
There would be a loss of 2 large Industrial/leisure buildings on Eldon Way Industrial Estate for housing
The large supermarket does not have adequate space for parking and shoppers would have to take trolleys to new parking areas at Hockley station which is not practical and would drive shoppers to supermarkets outside the village that have adjacent on-site parking facilities
Small local shops would not be able to compete with a large supermarket
The sorting office would be taken away and probably combined with Southend or Chelmsford
There would be a disruption to shops and services for a long period during the construction of the supermarket. Shoppers would have to shop outside of Hockley during this period and may not return. Older residents and non-drivers would not be able to cope


Option 3a: Object: Over development and inappropriate changes. Option 3a has similar issues to Option 3 except that the 80 homes on Eldon Way are replaced by 40 homes at the railway sidings and car park in Plumberow Avenue. Although this alternative retains the 2 large Industrial buildings on Eldon Way, there are further issues of additional traffic at Plumberow traffic lights, and homes close to the railway line.


Transport options: Object: Insufficient Highways infrastructure improvements to the key junctions at Spa roundabout, Eldon Way, Station Approach and Plumberow Avenue which need to be determined and in place prior to HAAP or Core Strategy implementation.

Object

Hockley Area Action Plan Options Report

Representation ID: 26754

Received: 20/01/2011

Respondent: R G Chalk

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road


Comment

Hockley Area Action Plan Options Report

Representation ID: 26761

Received: 20/01/2011

Respondent: Mrs Moira Matthews

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

Please find attached my response to your enquiry.

I accept that there has to be some development in Hockley but please do not ignore the overwhelming view of residents that Hockley should not be developed into a town and we would like the village atmosphere to be retained.

I look forward to receiving confirmation of your action taken.

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road




Object

Hockley Area Action Plan Options Report

Representation ID: 26773

Received: 20/01/2011

Respondent: Mr David Dare

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

I/we wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26780

Received: 21/01/2011

Respondent: Mr Les Eldret

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

HAAP Consultation January 2011

I/we wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26787

Received: 13/01/2011

Respondent: Mrs Patricia Dunnage

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

I/we wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 26795

Received: 24/01/2011

Respondent: Mr D Himsley

Representation Summary:

Inappropriate changes and missed opportunities.

Full text:

HAAP Consultation January 2011

I/we wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road