Q5.3 Are there any other scenarios which you feel have not been considered?

Showing comments and forms 1 to 30 of 51

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1032

Received: 10/07/2008

Respondent: Mr A James

Representation Summary:

Replacing the airport with the 4,600 homes that Rochford are required to build by 2021.

Full text:

Replacing the airport with the 4,600 homes that Rochford are required to build by 2021.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1078

Received: 14/07/2008

Respondent: Mr G P Nicholls

Representation Summary:

With time limits and the amounmt that needs to be done, I believe it will not be done in time for the 2012 Olympics, because of last two decades of failed promises ie the existing terminal etc looks on appearance like a cash&carry.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1099

Received: 14/07/2008

Respondent: Mrs S R Lawrence

Representation Summary:

We used to live in the Gatwick Airport flight path, we were not unduly bothered by the noise. This airport is very quiet, covers a large area of land, wouldn't like to see it developed for housing.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1113

Received: 14/07/2008

Respondent: T J Cole

Representation Summary:

We are interested in the airport with regards to flights to South of France and Spain. We are not interested in comercial flights which will be of an environmental noise nuisance and would strongly oppose such ideas.

Full text:

I enclose a print out which shows my search of your web address (via Google) was unsuccessful. So I cannot make any assessment of the various scenarios you have put together.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1118

Received: 14/07/2008

Respondent: Mrs E Cuthbert

Representation Summary:

Good luck for the future of the airport, I support you in whatever happens, wish you every success for the future

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1128

Received: 14/07/2008

Respondent: Mr James Crabb

Representation Summary:

This is a real opportunity for the whole of South Essex and should be seized with both hands.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1139

Received: 14/07/2008

Respondent: Mr C E Wheeler

Representation Summary:

We must progress and move with the times in view of the present state of the country, Southend will need new jobs.

I am 71 years old we must progress to survive or suffer the consequences.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1147

Received: 14/07/2008

Respondent: D Bailey

Representation Summary:

Looking forward to being able to use our airport

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1163

Received: 14/07/2008

Respondent: Mr E Johnson

Representation Summary:

(2012) In my opinion, the Olympic Games is short lived and has little bearing on the proposed plans. However, European travel and jobs can benefit greatly and improve the community. There will be greater terrosrist risks also!

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1174

Received: 15/07/2008

Respondent: B G Spaull

Representation Summary:

I would like to see an active airport as it used to be in the 1950's. Failing this I can see the area would be a developers dream for housing and industry.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1193

Received: 15/07/2008

Respondent: Mr & Mrs R Brown

Representation Summary:

Southend airport should serve Europe. Make it Southend not deadend!

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1196

Received: 15/07/2008

Respondent: Mr M Dillon

Representation Summary:

The worst case scenario I can see is that the objectors win the day, the airport becomes uneconomic and is sold of for a major housing development. Immediately we will have most of the downsides with no gain.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1208

Received: 15/07/2008

Respondent: Mr D Wright

Representation Summary:

Get Southend Airport up an running for 2012 Olympic Games.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1272

Received: 21/07/2008

Respondent: Mr A Franklin

Representation Summary:

IThe idea of a diversionary route for Eastwoodbury Lane is not my choice. I would support the retention of the existing route with an underpass for the extended runway. This option has already been suggested in the local press.

Full text:

Thank you for your letter of the 9th July 2008 regarding your consultation programme. I have no access to the website so I cannot view the four scenarios but instread, I am writing this short letter to you.

My views are as follows:-

I think the railway station is essential and should have been built years ago. I hope it will be for the use of everybody and not just airport passengers.

The idea of a diversionary route for Eastwoodbury Lane is not my choice. I would support the retention of the existing route with an underpass for the extended runway. This option has already been suggested in the local press.

I am in support of the Airport and wish to see it prosper. I hope there will be a demand for the additional services which you aim to provide. My concern is not to change the appearance of the surrounding area anymore than can be helped.

With good wishes

Object

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1300

Received: 21/07/2008

Respondent: Mr Clifford Haddy

Representation Summary:

Yes - move away from the airport scenario.

Full text:

Yes - move away gftrom the airport scenario.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1337

Received: 22/07/2008

Respondent: MR J GRANGER

Representation Summary:

An underpass for Eastwoodbury lane is if econmically viable a good one. But it would probaly a lengthy build.
There is no point in turning an area into housing when the land being used will result in a loss of a minimum 1500 jobs.

Full text:

An underpass for Eastwoodbury lane is if econmically viable a good one. But it would probaly a lengthy build.
There is no point in turning an area into housing when the land being used will result in a loss of a minimum 1500 jobs.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1358

Received: 23/07/2008

Respondent: Mr K Sanders

Representation Summary:

yes, closure of the airport and the land put to greater benefit of the wider community (i.e. housing)

Full text:

yes, closure of the airport and the land put to greater benefit of the wider community (i.e. housing)

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1397

Received: 25/07/2008

Respondent: Mr David Taylor

Representation Summary:

Build a Southend by-pass road along the route of the runway

Full text:

Build a Southend by-pass road along the route of the runway

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1476

Received: 23/07/2008

Respondent: Mrs Shirley Fricker

Representation Summary:

It must work for the local community and their consent. My granddaughter helped me fill this form in as this is her future 15yrs.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1484

Received: 23/07/2008

Respondent: Mr L Burles

Representation Summary:

Southend Airport has more potential on offer to the customer and business person, and to airlines alike being closer to europe than many other regional airports in the east of england.

Object

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1501

Received: 28/07/2008

Respondent: Mr Gary Congram

Representation Summary:

There are no scenarios in which I would support delvelopment of the airport. In this current economic climate with fuel prices not likely to drop in the immediate future and with airlines stopping flights instead of increasing and the government backing the development of the 4th terminal at Heathrow it appears to me that investing in this scheme is throwing money at a business that is going to be in decline. We should be looking at scenarios of using the land like the Heath buildings etc., that are available and attract new business's that are greener.

Full text:

There are no scenarios in which I would support delvelopment of the airport. In this current economic climate with fuel prices not likely to drop in the immediate future and with airlines stopping flights instead of increasing and the government backing the development of the 4th terminal at Heathrow it appears to me that investing in this scheme is throwing money at a business that is going to be in decline. We should be looking at scenarios of using the land like the Heath buildings etc., that are available and attract new business's that are greener.

Support

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1583

Received: 30/07/2008

Respondent: Renaissance Southend

Representation Summary:

High Growth Option in Scenario 3 has opportunity to expand airport operations/accommodate economic growth, through expansion of industrial/business cluster around the airport. High growth scenario is based on expansion of commercial flight that requires extension of runway. Scenario 2b "Medium Growth/Aviation Cluster" also has opportunity to grow airport operation through expansion of commercial flights/growth of aviation cluster around airport, through incremental approach. There may be opportunity to create hybrid option (mix of growth scenarios) design to deliver accelerated growth over medium term, giveing confidence to potential airline operators to consider LSA as viable destination withbenefit of improved access to London.

Full text:

The High Growth Option set out in Scenario 3 has the opportunity to expand the airport operations and accommodate future economic growth, through the expansion of the industrial/business cluster around the airport. The high growth scenario is based on the expansion of the airport for commercial flight that requires the extension of the runway. Scenario 2b "Medium Growth - Aviation Cluster" also has the opportunity to grow the airport operation through expansion of commercial flights and growth the aviation cluster around the airport, through a more incremental approach. There may be an opportunity to create a hybrid option that is mix of these growth scenarios design to deliver an accelerated growth over a medium term that gives confidence to potential airline operators to consider London Southend Airport as viable destination that has the benefit of improved access to the City.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1700

Received: 31/07/2008

Respondent: Mr Andrew Allen

Representation Summary:

Consider reuse the existing airport site for other purposes that would make a greater contribution to the local economy if the current airport function is not economically viable/beneficial.

Full text:

Consider reuse the existing airport site for other purposes that would make a greater contribution to the local economy if the current airport function is not economically viable/beneficial.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1718

Received: 01/08/2008

Respondent: Chris Levey

Representation Summary:

closure of the airport, this could then be used for low density housing and green space

Full text:

closure of the airport, this could then be used for low density housing and green space

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1770

Received: 02/08/2008

Respondent: Mrs Hilary Davison

Representation Summary:

Expansion of Maintenance, Repair and Overhaul operations within area (iii) Land at end of Aviation Way
2. Accept that the prevailing road and rail infrastructure is inadequate and cannot easily be enhanced to accommodate an international airport.
Look at a regional airport on the lines of Newquay initially and engage with fixed based operators to plot the way forward with an agreed plan over say 20 years
Ensure that the plan covers both inward and outward passengers to support local needs in air travel requirements and as part of the promotion of Southend and its locality for the tourist industry

Full text:

Southend Airport and Environs Joint Area Action Plan consultation (JAAP)

Response from Hilary Davison

2.1 Are the assets of the JAAP area fully reported and understood?
No. Rochford Hundred Golf Course And Rochford Tennis Club are not recorded

2.2 Are there any important assets missing from the assessment?
No

3.1 Do you agree with the overall vision for the JAAP?
Yes

3.2 Do the objectives set out cover the key requirements from the area?
Yes But with following amendments
b) Insert local regional after thriving
c) add to end are in place before any expansion of the airport and other areas of the JAAP.
d) remove whether; change or for and

3.3 Are there any other objectives that might help to guide the selection of the preferred option/options and JAAP?
Major public and private transport infrastructure improvements
To protect & enhance biodiversity issues within the area covered and those outside that may be affected by the JAAP area

4.1 What do you see as the role of London Southend Airport in the future?
1. Provide air transport and aviation related industries
2. To secure regeneration to enable it to reach its potential to function as a local regional airport (SBC Core Strategy, Objective SO11)
More on Newquay model expending to Norwich model with required infrastructure. Catering for the niche UK market bringing more passengers in and out and increasing the tourist market.Destinations to N & Central Europe. Thereafter look to northern and central continent, CI and Ireland targeting 'short break market'
3. Act as a driver for the economy

4.2 How can the airport best be developed to drive and support the local economy?
Airport expansion along with economic/business improvements work best as a package. It should be consequential to, and not specifically be the driver.

4.3 What role should the JAAP play in supporting wider employment growth in the sub-region?
JAAP to act as facilitator for both authorities to work together for the regeneration of the area

4.4 Is the area suitable for significant growth in employment?
Yes - But must consider whether growth in employment will create added vehicle movements & therefore an increase in air pollution & road congestion.
Major trunk road improvements vital

4.5 Will the area be attractive to investors?
Yes, if high or medium airport growth options are chosen; if leisure acvtivities are included and better tranportation is in place.

4.6 Are there additional options to consider?
Yes probable detrimental effect of relocation of existing businesses from other business parks in the vicinity causing displacement of labour and run down of other sites e.g. Progress Road, Purdeys Way and Sutton Road

4.7 Should the Green Belt be considered for revision? If so, how should it be revised?
Only the green belt within the airport perimeter should be revised and then only in accordance with airport expansion and safety issues The Area ii(a) should be considered for use for permitted expansion of Aviation Way Business Park (i.e.10acres[4.05h) only) within Green Belt Area as is the Old Brickworks
OR that only those areas be taken out of Green Belt designation

4.8 What enhancements to the environment and amenity of the area should be made? What are the priority areas?
General recreational enhancements for all the population, such as a Nature Park. To be funded out of Developers Contributions and Country Park be extended to take in all Green Belt land between Southend & Rochford
(2) Extra care and vigilance to prevent industrial waste polluting Eastwood Brook. This has been a problem in the past and probably will after expansion of industrial area

4.9 What do you see as the greatest potential impact of development in the JAAP and how can it be mitigated?
Carbon and aviation fuel emissions and noise pollution - Create a 20 year airport expansion plan with improved transportation included.
Have proper consultations with fixed based operators
Mitigation by restricting the types of aircraft used and restricting night flying

4.10 What do you consider to be the transport priorities for the JAAP?
Firstly, identify the cachment area targeted for airport passengers and the other component parts of the JAAP area and consider the new and improved roads required.
There is no conceivable answer to road improvements for the maximum number of passenger numbers considered in the JAAP
Road linkage to central Southend and to the west to be put in place before airport developments take place
As the number of passengers increases then consideration given to extra trains specifically for Southend Airport to and from London.

4.11 How can a shift from car use to other modes of transport be achieved?
Implementation of a travel plan for airport staff and businesses on the airport Park and Rde schemes with shuttle buses to/from the airport
Expensive parking fees at the airport and surrounding roads (with residents' permits)
Much improved local bus services to/from all local areas.

4.12 Do you agree with the proposed areas for change?
No

4.13 Are there any areas that should be added or removed? Why?
Remove
(ii) Agricultural land north of Aviation Way Business Park except :i (old brickworks)
ii(a) (10acres actually on the north side of Aviation Way itself, for limited development only)
iic (buffer zone)
(v) Agricultural land south of airport boundary, currently cricket pitch, agricultural land and private allotments, unless reserved for recreational purposes

5.1 Which is your preferred scenario for the future of the Southend Airport area
Replace with Medium Growth 2b Aviation Cluster

5.2 How could your preferred scenario be further enhanced?
By not revising any Green Belt except what lies within the airport boundary and i + iia + iic
A better mix of leisure inc. theme parks, office and light engineering

5.3 Are there any other scenarios which you feel have not been considered? Expansion of Maintenance, Repair and Overhaul operations within area (iii) Land at end of Aviation Way
2. Accept that the prevailing road and rail infrastructure is inadequate and cannot easily be enhanced to accommodate an international airport.
Look at a regional airport on the lines of Newquay initially and engage with fixed based operators to plot the way forward with an agreed plan over say 20 years
Ensure that the plan covers both inward and outward passengers to support local needs in air travel requirements and as part of the promotion of Southend and its locality for the tourist industry

Object

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1824

Received: 05/08/2008

Respondent: Mrs Meryl Price

Representation Summary:

The other scenario which seems to have been overlooked is to create affordable housing and recreational facilities for the populous.This will not only create more much needed housing but employment for the masses.

Full text:

The other scenario which seems to have been overlooked is to create affordable housing and recreational facilities for the populous.This will not only create more much needed housing but employment for the masses.

Object

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1829

Received: 05/08/2008

Respondent: Mrs Meryl Price

Representation Summary:

Why do we need another "LONDON" airport when we have four others within an hour or less drive,with cheaper landing fees,so Southend Airport will be more expensive to fly from any way.What about the "carbon footprints" the increase in air traffic will produce,we are supposed to be cutting down on them.

Full text:

Why do we need another "LONDON" airport when we have four others within an hour or less drive,with cheaper landing fees,so Southend Airport will be more expensive to fly from any way.What about the "carbon footprints" the increase in air traffic will produce,we are supposed to be cutting down on them.

Support

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1931

Received: 06/08/2008

Respondent: Essex Chambers of Commerce

Representation Summary:

All scenarios have been considered.

Full text:

All scenarios have been considered.

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 1974

Received: 06/08/2008

Respondent: Mr Ian Syers

Representation Summary:

By finally recognising that Southend Airport represents the past not the future, and redeveloping it for purposes benefitting most residents of SE Essex rather than the few selfish people wanting to take their pleasure to the detriment of others and at the cost of contributing significantly to global warming. The uses I have proposed are residential, business, retail and leisure ( the airport buildings and taxiway would be far better site for a football stadium than Fossett's Farm).

Full text:

By finally recognising that Southend Airport represents the past not the future, and redeveloping it for purposes benefitting most residents of SE Essex rather than the few selfish people wanting to take their pleasure to the detriment of others and at the cost of contributing significantly to global warming. The uses I have proposed are residential, business, retail and leisure ( the airport buildings and taxiway would be far better site for a football stadium than Fossett's Farm).

Comment

London Southend Airport & Environs Joint Area Action Plan Issues & Options Paper

Representation ID: 2027

Received: 07/08/2008

Respondent: Mr Jeffrey Pacey

Representation Summary:

No

Full text:

No