Object
London Southend Airport and Environs Joint Area Action Plan Preferred Options
Representation ID: 4834
Received: 03/03/2009
Respondent: Mr Ian Towler
Representation Summary:
This further degrades green land and if the airport is successful will require expansion.
Full text:
This further degrades green land and if the airport is successful will require expansion.