Support
Allocations DPD Discussion and Consultation Document
Representation ID: 21710
Received: 28/04/2010
Respondent: Aber Ltd
Agent: Colliers International
Agree with Option CF1 which seeks to protect existing community facilities. If any of these facilities are lost, in order to ensure that there was not a shortfall, it would be necessary to provide replacements and due to the characteristics of the area this would require the loss of areas of Green Belt.
In addition, in order to ensure that the new dwellings do not put unnecessary pressure on the existing community facilities, all the proposed residential allocations should include appropriate facilities (detailed in Appendix H1 of the Core Strategy), to meet the needs of the proposed residents.
Agree with Option CF1 which seeks to protect existing community facilities. If any of these facilities are lost, in order to ensure that there was not a shortfall, it would be necessary to provide replacements and due to the characteristics of the area this would require the loss of areas of Green Belt.
In addition, in order to ensure that the new dwellings do not put unnecessary pressure on the existing community facilities, all the proposed residential allocations should include appropriate facilities (detailed in Appendix H1 of the Core Strategy), to meet the needs of the proposed residents.