Support

Allocations DPD Discussion and Consultation Document

Representation ID: 21707

Received: 28/04/2010

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

In order to facilitate the residential units proposed for Ashingdon, it is important that 3 ha of land is made available for the expansion of King Edmund School, in order to accommodate the additional children generated by the new housing.

This option would ensure that the expansion to the school is close to the main school buildings, adjacent to existing residential (to the west), follow an existing field boundary, which would create a defensible Green Belt boundary, and would enable access from Brays Lane.

The proposed residential option (SEA1), would enable the formation of a Greenway (incorporating pedestrian and cycle routes) between the school and the town centre (to the south), improving the accessibility to the school by means other than private car.

Full text:

In order to facilitate the residential units proposed for Ashingdon, it is important that 3 ha of land is made available for the expansion of King Edmund School, in order to accommodate the additional children generated by the new housing.

This option would ensure that the expansion to the school is close to the main school buildings, adjacent to existing residential (to the west), follow an existing field boundary, which would create a defensible Green Belt boundary, and would enable access from Brays Lane.

The proposed residential option (SEA1), would enable the formation of a Greenway (incorporating pedestrian and cycle routes) between the school and the town centre (to the south), improving the accessibility to the school by means other than private car.