Object

Allocations DPD Discussion and Consultation Document

Representation ID: 21581

Received: 28/04/2010

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

Both Options SH3 & SH4 would involve development to the south of Rectory Road extending the settlement boundary into the open countryside, contrary to PPG2.

Options SH1 & SH2 are the preferred options in this location as they are contained to the north of Rectory Road, within the existing settlement, and would result in a more compact solution. However, part of SH1 (northern part), is at risk of flooding; this area should be excluded from the residential development.

Full text:

Both Options SH3 & SH4 would involve development to the south of Rectory Road extending the settlement boundary into the open countryside, contrary to PPG2.

Options SH1 & SH2 are the preferred options in this location as they are contained to the north of Rectory Road, within the existing settlement, and would result in a more compact solution. However, part of SH1 (northern part), is at risk of flooding; this area should be excluded from the residential development.