Object

Allocations DPD Discussion and Consultation Document

Representation ID: 19710

Received: 30/04/2010

Respondent: Mrs Karen Watson

Representation Summary:

Development along Ironwell Lane will create a development link via the built-up end of the Lane to meet the Christmas Tree development at Hawkwell, and lead to coalescence and pressure to fill in between the three roads Hall Road, Ironwell Lane and Rectory Road. Even with the cemetery and pub garden holding back some green space, a continuous town from Rochford to Hockley and Ashingdon is likely to result.

Full text:

Development along Ironwell Lane will create a development link via the built-up end of the Lane to meet the Christmas Tree development at Hawkwell, and lead to coalescence and pressure to fill in between the three roads Hall Road, Ironwell Lane and Rectory Road. Even with the cemetery and pub garden holding back some green space, a continuous town from Rochford to Hockley and Ashingdon is likely to result.