Allocations DPD Discussion and Consultation Document

Representation ID: 19400

Received: 29/04/2010

Respondent: Mr Michael Howard

Representation Summary:

Options NLR 1, NLR2, NLR3, NLR4, NLR5
The infrastructrue and amenities are barely adequate to cope with the current volume of development in this area.

Traffic congestion from A1245/London Road almost reaches gridlock on a regular basis further development would make it even more hazardous.

This land is designated green belt if built upon it would leave a very small area of green belt which would be impossible to defend against any future development.

Part of the development area is a known flood plain, to provide and maintain adequate defences against flooding would be a long term and expensive commitment.

Full text:

Options NLR 1, NLR2, NLR3, NLR4, NLR5
The infrastructrue and amenities are barely adequate to cope with the current volume of development in this area.

Traffic congestion from A1245/London Road almost reaches gridlock on a regular basis further development would make it even more hazardous.

This land is designated green belt if built upon it would leave a very small area of green belt which would be impossible to defend against any future development.

Part of the development area is a known flood plain, to provide and maintain adequate defences against flooding would be a long term and expensive commitment.