Object
Allocations DPD Discussion and Consultation Document
Representation ID: 19400
Received: 29/04/2010
Respondent: Mr Michael Howard
Options NLR 1, NLR2, NLR3, NLR4, NLR5
The infrastructrue and amenities are barely adequate to cope with the current volume of development in this area.
Traffic congestion from A1245/London Road almost reaches gridlock on a regular basis further development would make it even more hazardous.
This land is designated green belt if built upon it would leave a very small area of green belt which would be impossible to defend against any future development.
Part of the development area is a known flood plain, to provide and maintain adequate defences against flooding would be a long term and expensive commitment.
Options NLR 1, NLR2, NLR3, NLR4, NLR5
The infrastructrue and amenities are barely adequate to cope with the current volume of development in this area.
Traffic congestion from A1245/London Road almost reaches gridlock on a regular basis further development would make it even more hazardous.
This land is designated green belt if built upon it would leave a very small area of green belt which would be impossible to defend against any future development.
Part of the development area is a known flood plain, to provide and maintain adequate defences against flooding would be a long term and expensive commitment.