Object
Allocations DPD Discussion and Consultation Document
Representation ID: 18740
Received: 28/04/2010
Respondent: Mrs Lyn Hopkins
This site too is on high quality green belt farmland which should be preserved within GB1.
This site affords direct access onto Rawreth Lane which is already full to capacity and would add to the seriously gridlocked situation which occurs on an almost daily basis - traffic already can take over an hour to reach Hullbridge - a journey of 1 mile.
Drainage systems cannot cope with extra housing and the run-off will increase the possibility of flooding - already Watery Lane has been closed twice this year due to 3 foot deep flooding.
This site too is on high quality green belt farmland which should be preserved within GB1.
This site affords direct access onto Rawreth Lane which is already full to capacity and would add to the seriously gridlocked situation which occurs on an almost daily basis - traffic already can take over an hour to reach Hullbridge - a journey of 1 mile.
Drainage systems cannot cope with extra housing and the run-off will increase the possibility of flooding - already Watery Lane has been closed twice this year due to 3 foot deep flooding.