Object

Allocations DPD Discussion and Consultation Document

Representation ID: 18671

Received: 28/04/2010

Respondent: Hullbridge Parish Council

Representation Summary:

At Hullbridge Parish Council meeting 19/4/2010 objections were raised: does not give community cohesion, transport infrastructure in sufficient (poor standard of local roads/routes to and from village already at full capacity during rush hour/school run), frequent flooding on the site and Watery Lane, concern on the impact to nearby existing properties with regard to flooding, insufficient infrastructure for sewage, increased vehicles within Hullbridge, potentially insufficient capacity at doctors' surgery, no secondary school in Hullbridge, insufficient facilities in Hullbridge to accommodate such large increase in population, lack of jobs in village which will increase commuter traffic, loss of green belt.

Full text:

At Hullbridge Parish Council meeting 19/4/2010 objections were raised: does not give community cohesion, transport infrastructure in sufficient (poor standard of local roads/routes to and from village already at full capacity during rush hour/school run), frequent flooding on the site and Watery Lane, concern on the impact to nearby existing properties with regard to flooding, insufficient infrastructure for sewage, increased vehicles within Hullbridge, potentially insufficient capacity at doctors' surgery, no secondary school in Hullbridge, insufficient facilities in Hullbridge to accommodate such large increase in population, lack of jobs in village which will increase commuter traffic, loss of green belt.