Object

Allocations DPD Discussion and Consultation Document

Representation ID: 18633

Received: 27/04/2010

Respondent: mr alistir matthews

Representation Summary:

Until there is proper investment in the infrastructure any major developement in any of these options is unsustainable .Flooding and transport issues are the main problems .Again the parish of Rawreth will be taking a large portion of extra housing being a similiar position to the sites west of Rayleigh ,as a lot of this land is in the parish of Rawreth .Hullbridge should only have to deal with its own natural housing needs and not absorb any new residents.

Full text:

Until there is proper investment in the infrastructure any major developement in any of these options is unsustainable .Flooding and transport issues are the main problems .Again the parish of Rawreth will be taking a large portion of extra housing being a similiar position to the sites west of Rayleigh ,as a lot of this land is in the parish of Rawreth .Hullbridge should only have to deal with its own natural housing needs and not absorb any new residents.