Object
Allocations DPD Discussion and Consultation Document
Representation ID: 18633
Received: 27/04/2010
Respondent: mr alistir matthews
Until there is proper investment in the infrastructure any major developement in any of these options is unsustainable .Flooding and transport issues are the main problems .Again the parish of Rawreth will be taking a large portion of extra housing being a similiar position to the sites west of Rayleigh ,as a lot of this land is in the parish of Rawreth .Hullbridge should only have to deal with its own natural housing needs and not absorb any new residents.
Until there is proper investment in the infrastructure any major developement in any of these options is unsustainable .Flooding and transport issues are the main problems .Again the parish of Rawreth will be taking a large portion of extra housing being a similiar position to the sites west of Rayleigh ,as a lot of this land is in the parish of Rawreth .Hullbridge should only have to deal with its own natural housing needs and not absorb any new residents.