Object
Allocations DPD Discussion and Consultation Document
Representation ID: 18322
Received: 24/04/2010
Respondent: Mrs Jane Gilbert
The sheer scale of this development is out of balance with the current size of Hullbridge. The level of improvements to the local infrastruture would need to be immense and in a time of reduced capacity for public spending, I find it difficult to believe that the required financial resources could be made available. The local infrastructure already creates problems with traffic and drainage in hullbridge and this will certainly increase the problems already experienced by residents.
The sheer scale of this development is out of balance with the current size of Hullbridge. The level of improvements to the local infrastruture would need to be immense and in a time of reduced capacity for public spending, I find it difficult to believe that the required financial resources could be made available. The local infrastructure already creates problems with traffic and drainage in hullbridge and this will certainly increase the problems already experienced by residents.