Object
Allocations DPD Discussion and Consultation Document
Representation ID: 17697
Received: 02/04/2010
Respondent: Mr Philip Downs
I cannot see how the village would cope with all these new buildings,Watery lane floods,the fields do flood,we dont have the drainage inplace to cope for these new homes,the schools are not big enough,the side roads would be a race track. The main traffic flows out of Hullbridge is towards Rayleigh and I cannot see how the road will cope with 500 new homes.It needs nore consideration to the infrastructures that already dont work!
I cannot see how the village would cope with all these new buildings,Watery lane floods,the fields do flood,we dont have the drainage inplace to cope for these new homes,the schools are not big enough,the side roads would be a race track. The main traffic flows out of Hullbridge is towards Rayleigh and I cannot see how the road will cope with 500 new homes.It needs nore consideration to the infrastructures that already dont work!