London Southend Airport and Environs Joint Area Action Plan Preferred Options

Ended on the 15 May 2009

(114) 6. Timetable - Your Views

6.1 The process for preparing the JAAP

As a statutory Development Plan Document, the JAAP is being prepared in accordance with regulations set by Central Government. The process and the proposed timescale are set out below.

1. Issues and Options 24 June 2008 - 8 August 2008 Consultation on Issues and Options Report. Supporting documentation to include Evidence Base Report and Sustainability Appraisal

image001

2. Preferred Option 16 February 2009 - 15 May 2009 Consultation on the preferred strategy that will form the JAAP

image001

3. Submission Document May/June 2009 Approved by both Councils

image001

4. Pre-submission consultation June/July 2009 Statutory consultation prior to submission of the plan

image001

4. Submission to Secretary of State July 2009 Final draft document submitted to the Secretary of State

image001

5. Examination in Public and Adoption Subject to timescale set by The Planning Inspectorate

The first stage in the process has been completed following an intensive period of research and analysis and extensive public consultation. A JAAP Evidence Report has been published, together with a Sustainability Appraisal (SA).

The initial SA Scoping Report was consulted on in the early part of 2008 and formed the basis for the Sustainability Appraisal that accompanied the Issues and Options report.

We now want your views on this Preferred Options Report to feed into the final submission version of the JAAP. A further period of public consultation will be undertaken in conjunction with the publication of the submission plan.

6.2 Sending in Your Views

The feedback received from this consultation will play an important role in the preparation of the final version of the JAAP.

An online facility has been created that enables comments to be submitted quickly and easily, as well as providing the respondent with instant confirmation of receipt. The facility can be found at the web address below:

http://rochford.jdi-consult.net/jaap/

Views may be submitted by clicking on the pen symbol next to the subject heading on which you wish to comment. Before you submit comments for the first time you will need to register on the system. This is a simple process requiring a valid email address. If you are registered on Rochford District Council's online consultation system you can use the same login and do not need to re-register.

We recognise that not everyone has access to the Internet and that it is important that no-one is excluded from participating. If you wish to submit your views but are unable to do so online, please contact your respective Council's representative who will explain how:

Rochford District Council
Sam Hollingworth 01702 318102

Southend-on-Sea Borough Council
Debee Skinner 01702 215408

The consultation period will last until 5pm on 15 May 2009