Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?

Representation ID: 40424

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC recommends that RDC appreciates the key opportunities future Green Space and GI can provide. ECC has produced a GI assets map, highlighting the huge variety of the GI environments within Essex including the RDC area. It is important that the Local Plan identifies key opportunities and seeks to facilitate future community access to GI.

The ECAC Report recommends a nature-based approach to design and GI requirements included in local planning guidance. Developers should be encouraged to implement green procurement standards for construction and there should be engagement and partnership with developers, including the establishment of an Essex Developers’ Group to collaborate and set up exemplars of green construction.

ECCs welcome the focus on Green Blue Infrastructure (GBI), which should be at the heart of the decision making at every stage in the planning process. GBI should be considered at the earliest stage in the planning process and is expected to be incorporated into design guides and masterplans. Local Plan policy should be strongly worded and commitments to positive action and GBI enhancement and protection.
• ECC recommend that the Essex Green Infrastructure Strategy (2020), and supporting standards and resources, should be utilised to support the delivery of a quality green and blue infrastructure network through RDC’s Local Plan, in addition to the South Essex Green and Blue Infrastructure Study . The Essex GI Strategy was prepared by ECC on behalf of the Essex Green Infrastructure Partnership in 2020 (which included RDC), and champions for high quality green space and GBI in Essex. The purpose of this strategy is to take a positive approach to enhance, protect and create an inclusive and integrated network of high-quality GBI in Greater Essex. This will help to create a county-wide understanding of GI, its functions and values, and to identify opportunities for delivering GBI. The strategy aims to enhance the urban and rural environment, through creating connected multi-functional GI that delivers multiple benefits to people and wildlife. Nine principles and standards for the provision, management, and stewardship of GBI have been identified including:
• Evidence-led: the planning, design and delivery of GBI is evidence-led using natural capital and ecosystem service assessments, and GI GIS mapping to ensure appropriate place-based GBI interventions are being implemented and enhanced.
• Early Collaboration and Engagement: there is early collaboration and engagement with all relevant stakeholders, partners and communities to support the delivery of effective and connected GBI.
• Commitment to delivery (via strong policy wording): Policy for GBI is strongly worded with a commitment to positive action(s) as reflected in statutory plans and industry/local guidance and supported by incentives and clear guidance about what success looks like, and
• Stewardship: The long-term management and stewardship plans are identified at the early stage with the necessary funding and monitoring components in place.

ECC has recently consulted on the Essex Green Infrastructure Standards Guidance that has been developed to support policy and decision making in the planning and delivery of multifunctional GI for placemaking and place-keeping. The document brings together existing guidance, examples of good practices and information on how to meet the GI principles and standards. It can help improve planning policy, better frame planning conditions for planning applications and shape project delivery in securing multifunctional GI. This will help to ensure GI delivers multiple benefits and meet towards the political drivers such as climate, health and ecological emergencies and green growth agenda. The Essex GI Standards and Framework and Guidance was developed through a rigorous programme of collaboration and engagement, including the ‘Make Better Policies for Better Placemaking and Place Keeping’ workshops held in 2020. Building upon the national GI Standards Framework trial programme lead by Natural England in relation to the 25 Year Environment Plan and Environment Bill.

It is recommended that the development proposal applies the Building with Nature standards and achieves an accreditation to highlight what ‘good’ looks like at each stage of the GI lifecycle and strengthen the development and demonstrate the development goes beyond the statutory minima, to create places that really deliver for people and wildlife. The Building with Nature Standards has been developed by practitioners and policy makers, academic experts and end-users, and has been tried and tested in multiple schemes from Cornwall to Scotland and is endorsed by Natural England, who is reviewing the current national GI standards. For more information please visit: https://www.buildingwithnature.org.uk/about

Furthermore, in respect of creating “greener” places and to address climate change, there may be a reliance upon specific policies to ensure new developments in the area to create improved canopy cover. This should include a need to justify a requirement for any tree removal in relation to development to ensure that development enhances the tree provision of an area. There is a risk that by using general comments relating to landscape in policies that the requirement for canopy cover may be diminished. Although there is no specific measure of this, options such as a specified replacement for volume of canopy/diameter of tree lost or Urban Greening Factor could encourage better provision within applications.

With regards to Option 3, further clarification is required on the ‘certain’ new developments and why these would be required above other developments to require a higher provision of GBI.

ECC recommend consideration is given to preparation of specific policies, having regard to the scale of development, clarifying the expectation for a development to enhance the provision of trees on a site, and consideration on how the policy would be monitored and managed. It is anticipated that the provision of GBI would be integral requirement within the provision of large scale development sites through a masterplanning approach.

ECC can provide information on the specific location and designation of common land and village greens, that may assist in informing Local Plans.

ECC recognises that there is an opportunity for the emerging Local Plan to include a policy/policies covering the GBI principles and themes that encompasses the value of wider multi-functional GBI for people and wildlife. It provides an opportunity to identify GBI deficiencies, which can be addressed through planning, such as improved connectivity to existing and new green spaces and types of green facilities (e.g. play parks, SuDS) and the provision of new open space as part of development. ECC recognises the importance of ensuring that development contributes to improvements in green space based on community need.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q33. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?

Representation ID: 40425

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC supports the delivery of new regional parklands, within a wider South Essex Estuary Parkland however, this should not be at the expense of GBI delivery and biodiversity net gain on-site. Multi-functional, accessible GBI should be delivered on all major development sites. Consideration will need to be given to any parklands delivery and the ongoing costs associated with management and maintenance.

ECC recommend that the Essex Green Infrastructure Strategy’s (2020) nine principles and standards should underpin the design of district-wide multifunctional GBI from the wider landscape scale network to more local and neighbourhood scales (including green corridors habitat and nature recovery networks). The nine principles and standards identify identifies target measures and indicators to achieve quality and consistency in the provision, management, and stewardship of GBI as an essential part of place-making and place-keeping for the benefit of people and wildlife.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q34. With reference to your preferred Strategy Option, are there opportunities for growth to help deliver new strategic green and blue infrastructure?

Representation ID: 40426

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

As set out above in response to Questions 32-33, ECC would expect development to result in the high delivery of multi-functional GBI and biodiversity net-gain in accordance with relevant policy and guidance.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q35. With reference to the options above, or your own options, how can we address the need for sufficient and accessible community infrastructure through the plan?

Representation ID: 40427

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

Omissions to be addressed
1. ECC recommend that the range of community infrastructure and service identified in the Community Infrastructure section should be expanded to include ECC services as set out in the ECC Developers’ Guide. This is to reflect the community infrastructure required to support the communities and developer contributions will be sought accordingly, and would anticipate their inclusion as previously identified in the 2017 Issues and Options document. ECC can expand on the requirements for libraries, waste management and recycling through the next stage of Plan preparation.

2. Health and Wellbeing – See Q8, this section should be expanded to include reference to the Health and Wellbeing Strategy, which extends beyond the physical provision for healthcare facilities.

Education. The section only focuses on the mainstream (primary and secondary) school provision and should be expanded to reflect the full range full range as set out and applied in accordance with the ECC Developers’ Guide. Including:

• Early Years and Childcare.
ECC plays an active role in ensuring there is sufficient EYCC and that new EYCC facilities are based on the places generated by any new development. The Childcare Act 2006 places a range of duties on local authorities regarding the provision of sufficient, sustainable and flexible childcare. EYCC provision comprise of a range including full day care nurseries, pre-schools, childminders, school run provision, and wrap around care (breakfast, afterschool and holiday clubs).

When calculating the requirement for EYCC provision, consideration is given to the number of houses and flats suitable to accommodate children. ECC welcomes joint working with RDC throughout the whole Plan preparation process to ensure that the emerging Local Plan considers the future EYCC requirements and ensure their funding and timely delivery. Further details are contained in the ECC Developers’ Guide in Section 5.1, page 26. The Childcare Sufficiency Assessment Summary for 2019 has been published, but any future assessment for the RDC new Local Plan will be based on 2020 sufficiency data. ECC will undertake an assessment of requirements arising from the preferred strategy and its specific site allocations. This assessment will consider the number of places generated by individual sites and cumulatively within wards; availability of existing childcare provision in the parish/ward; infrastructure requirements generated in terms of any new 26 place pre-school or 30/56 place nursery be it stand-alone and/or co-located with a new primary school. The estimated cost of new facilities will be identified and expected contribution from allocated sites for inclusion in the IDP and use in viability assessment. It must be stressed that these will be indicative and subject to change at the planning application stage once new details (e.g. housing mix) are provided and to reflect indexation. Where possible, and appropriate, the ‘preferred’ site allocation will be identified to provide the land for a new facility. Depending on scale of development and land ownerships, ECC would seek confirmation in the site policy of requirements for new facilities. For example:
o A new 30/56 place stand-alone early years and childcare nursery on 0.065/0.13 hectares of suitable land allocated for education and childcare use o A new primary school with co-located early years and childcare nursery on 2.1ha of suitable land allocated for education and childcare use
o A new 26 place stand-alone Pre-School on 0.058 hectares of suitable land allocated for education and childcare use.

Subject to the EYCC requirements, ECC’s preference is for EYCC to be co-located with a new primary schools.

EYCC requirements should be included within the Local Plan and assessed as part of the preparation of the Local Plan. ECC will work with RDC on this matter to identify the additional requirements based upon RDC’s proposed housing scenarios, as part of the next steps.

• Primary and Secondary Education
With regards to education, under section 14 of the 1996 Education Act, local authorities must secure sufficient school places to serve their area. The available schools must be sufficient in number, character and equipment to provide all pupils with the opportunity of an appropriate education. Section 2 of the 2006 Education and Inspections Act further places ECC, as the appropriate local authority, under a duty to secure diversity in the provision of schools and increase opportunities for parental choice. Subsequent legislation has also encouraged the development of a more diverse range of education providers, in particular Academy Trusts and Free Schools.

It is essential when preparing the Local Plan that due regard is given to deliver adequate schools places taking into consideration future growth and development throughout the entire plan period. NPPF, paragraph 95 states it is important that a sufficient choice of school places is available to meet the needs of existing and new communities through proactive and positive collaboration to widen choice in education. Plans should give great weight to the need to create, expand or alter schools through the preparation of plans and decisions on applications and work with schools promoters, delivery partners and statutory bodies to identify and resolve key planning issues before applications are submitted.

To meet these duties, ECC acts as a commissioner rather than a provider of new schools and, in order that potential providers may express their interest in running a school, will set out the requirements for the provision needed to serve a new community. However, ECC does deliver new schools if required.

New Secondary Provision - The Sweyne Park School (an Academy) was approved for expansion by from just over 8 forms of entry (248 pupils per year group) to 9 forms of entry (270 pupils per year group), with effect from 1 September 2021. This is in accordance with ECC’s duty to commission sufficient school places, is a net zero carbon expansion, and funded by developer contributions. The Rayleigh area has experienced a sustained rise in the demand for secondary school places recently largely as a result of new housing developments. Latest forecasts indicate continued growth in pupil numbers in the area and additional provision is required to balance future supply and demand for local secondary school places. Further details are available here.

The ECAC Report recommends that all new schools commissioned to be net zero from 2022 and carbon positive from 2030.
As RDC considers future development locations, ECC will need to take into account the availability of school places and, in the absence of sufficient capacity, the feasibility and viability of expanding provision or the need for a development site to provide a new school. In this regard ECC will provide RDC with the necessary evidence to inform these decisions at the appropriate time.

The Education and Skills Funding Agency currently looks to establish two form entry primary schools (420 places), to ensure financial viability. ECC supports this approach and, therefore, when considering new primary school sites an area of 2.1 hectares will usually be sought as a minimum, which includes land required for a co-located 56 place early years and childcare nursery. This is in line with Department for Education guidance set out in Building Bulletin 103. 420 primary aged pupils are the number likely to be generated by approximately 1,400 new houses or a mixed development (houses and flats) of approaching 2,000 dwellings. However, it must be recognised that if suitable existing local schools cannot be expanded, a new school may become necessary to cater for a lower number of new homes.

ECC will look to establish a new secondary school only where demand for six forms of entry has been established (from approximately 4,500 new or existing houses).

In the case of both primary and secondary age groups, the following factors need to be considered when deciding whether a particular development should include land for a school:
• the ability of local schools to expand sufficiently and the impact of a new school on them;
• cumulative impacts with other residential development proposals and the needs of the existing community;
• the viability of the development and the cost of a new school against other solutions;
• the viability of a new school (particularly in the first years); and
• the potential for innovative solutions such as an all-through school (combined primary and secondary) or a split site school (with more than one campus).

ECC may request on occasions that additional land is set aside to future proof the new school site and allow for its potential expansion. Consideration will also need to be given to Special Education Needs (SEND) (where new communities of 2000+ homes), Post 16 and Further Education; and Adult Community Learning. Further details are contained in the ECC Developers’ Guide in Section 5.2, page 30.

ECC has prepared a detailed guide for Planners and Developers to ensure that there is a clear understanding as to what is expected at each stage of Local Plan development process. It is recommended that consideration is given to The Essex County Council Local and Neighbourhood Planners’ Guide to School Organisation. This provides a clear appreciation of what is expected and how ECC can work with RDC in seeking to develop their emerging Local Plan.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q36. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new or improved community infrastructure?

Representation ID: 40428

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

See answers to Q6

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q37. Are there areas in the District that you feel have particularly severe capacity or access issues relating to community infrastructure, including schools, healthcare facilities or community facilities? How can we best address these?

Representation ID: 40429

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC can advise that the closest Essex secondary school for pupils living in the east of the district is King Edmund’s in Rochford. Whilst there are closer schools in SBC area, access to secondary education would be improved if development on a scale sufficient to deliver a new school was approved in or around Great Wakering.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q38. With reference to the options above, or your own options, how do you feel we can best meet our open space and sport facility needs through the plan?

Representation ID: 40430

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC welcome the references to RDC’s active Playing Pitch Strategy (PPS) & Action Plan (November 2018), and their Indoor Built Facilities Strategy (IBF) and Action Plan (November 218). ECC note that through the PPS & IBF Implementation Group, consisting of Active Essex, RDC, Sport England and National Governing Bodies of Sport, that RDC are to engage with each sport to update the existing data, before the Spring 2022

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q39. Are the potential locations for 3G pitch investment the right ones? Are there other locations that we should be considering?

Representation ID: 40431

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC does not seek the schools or school playing pitches to be allocated for community use/public access. There may be potential to consider this in any new school proposals. ECC wish to explore this further with RDC.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q40. Are the listed potential hub sites and key centres the right ones? Are there other locations that we should be considering?

Representation ID: 40432

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC does not seek the schools or school playing pitches to be allocated for community use/public access. There may be potential to consider this in any new school proposals. ECC wish to explore this further with RDC.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

Comment

New Local Plan: Spatial Options Document 2021

Q41. With reference to your preferred Strategy Option, are there opportunities for growth to help deliver improvements to open space or sport facility accessibility or provision?

Representation ID: 40433

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC does not seek the schools or school playing pitches to be allocated for community use/public access. There may be potential to consider this in any new school proposals. ECC wish to explore this further with RDC.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]

For instructions on how to use the system and make comments, please see our help guide.