Option 3a

Showing comments and forms 121 to 150 of 154

Object

Hockley Area Action Plan Options Report

Representation ID: 27511

Received: 17/01/2011

Respondent: Mrs Maureen Martin

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27518

Received: 21/01/2011

Respondent: Derek Sparrow

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27525

Received: 24/01/2011

Respondent: Susan Measor

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27532

Received: 31/01/2011

Respondent: Mrs B Thorogood

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27539

Received: 01/02/2011

Respondent: Mr and Mrs Marsh

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27546

Received: 02/02/2011

Respondent: Nicola and David Pegg

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27553

Received: 02/02/2011

Respondent: Mrs J Bebbington

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27560

Received: 02/02/2011

Respondent: Mrs J Tong

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27567

Received: 02/02/2011

Respondent: Mr and Mrs Hewitt

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27574

Received: 02/02/2011

Respondent: Paul Tong

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27581

Received: 12/01/2011

Respondent: Mr Michael Nash

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions
Road widening of Spa Road from Co-Op supermarket to railway bridge


Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27591

Received: 20/01/2011

Respondent: Mr and Mrs Atheis

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

We favour Option 2

Object

Hockley Area Action Plan Options Report

Representation ID: 27599

Received: 24/01/2011

Respondent: Mrs J Sheepbush

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

I would like to comment on any re-development to Seemore Glass this would put Seemore Glass and Potters out of business as neither could carry on without their carparks.

Object

Hockley Area Action Plan Options Report

Representation ID: 27608

Received: 25/01/2011

Respondent: KEN POTTER

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Enhanced safety measures to protect existing footpath from vehicles parking at side of Waters and Stanton.


Object

Hockley Area Action Plan Options Report

Representation ID: 27615

Received: 14/01/2011

Respondent: Mr and Mrs Lawrence

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road
Would prefer Eldon Way be made into an amenity/social centre eg doctors, clinic, meeting place etc. Then free up their locations for housing.

Object

Hockley Area Action Plan Options Report

Representation ID: 27623

Received: 27/01/2011

Respondent: Mr and Mrs Riley

Representation Summary:

Inappropriate changes and over development.

Full text:

You will be aware that I do not approve of the strategy of dividing up the Rochford District so that each parish fights its own corner to the detriment of neighbouring parishes. I am more concerned with the long term effect of the Core Strategy Plan in its entirety over the whole area, on future generations.

Until I am assured that the Ministry of Transport, Essex County Council Highways Department, Anglian Water Authority, Essex and Suffolk Water, The Environment Agency, E.C.C. Education and Social Care in the Community, National Health Service Hospital Trusts, Police Authority and Fire Fighting Authority confirm that they have sufficient resources to meet the extra needs and demands of a further 8000 people in this area over the next fifteen years and the motor transport needs that go with this increase in the population, I must question the wisdom of implementing the Core Strategy Expansion Plan in its entirety.

Having regard to the fact that I have not received any meaningful factural response to previous consultation submission and Rochford District Council have now set a closing date of 4.2.2011 for further consultation responses, in the present circumstances I am prepared to make a further objection and support Option 2, as amended by the Hockley Residents Association.

I attach these amendments for your attention and response

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27630

Received: 27/01/2011

Respondent: C Radley

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way

Object

Hockley Area Action Plan Options Report

Representation ID: 27637

Received: 28/01/2011

Respondent: Mr and Mrs Johnson

Representation Summary:

Inappropriate changes and over development.

Full text:

Thank you for your letter dated 30th November 2010, inviting comments upon the proposed options available to be included in this Action Plan. As you are probably aware the Hockley Residents Association have held meetings to consider which options to support and prepared a draft letter supporting their selection of options. I agree with most of their selection, so enclose a copy of their standard letter to the Council, duly signed but would like to add a few personal comments on some of their items, as follows:-

1. Table-top Crossing at Spa Roundabout.

What is a table-top crossing?, is it a pedestrian crossing without beacons or zebra markings?, like the raised area of paving at the east end of West Street, adjacent to Rochford Market Square. If so and it is placed where indicated on page 8 of "Rochford Matters"; then I think it will cause endless traffic congestion unless it is moved 25-30 meters down Woodlands Road. If the crossing is constructed where shown, vehicles wishing to enter Woodlands Road will have to stop on the roundabout when pedestrians are using the crossing, obstructing the flow of through traffic, and vehicles leaving Woodlands Road will stop on the crossing while waiting for a chance to enter the roundabout, obstructing the pedestrians using the crossing.

2. Other roads and parking areas mentioned in HRA's letter.

A consolidated parking area behind the shops on the north-west side of Spa Road would be a great improvement, so long as at least two walk-ways are available between the car park and Spa Road. However I can not see it happening without a lot of compulsory purchase orders and capital investment from the public purse.

3. Housing on north side of Hockley Station along Plumberow Ave.

Does this mean building houses on the Station Car Park, except for a small area left as a drop-off point? If so, this will cause more congestion and street parking in the adjoining area.

Finally, I just hope that the architecture of the new development tones in with the rest of Hockley Village's post-war development.



I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27644

Received: 31/01/2011

Respondent: Mrs F G Connell

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements. Am particularly concerned that beer deliveries to the Spa Pub park on double yellow lines causing traffic holdups at a very busy junction and potential road accidents.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable. The roadway under the railway bridge is very narrow, perhaps pedestrian walkways under the side of the bridge would improve matters.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on north side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
Propose another supermarket, possibly on Eldon Way as the present store (Co-op) is expensive with limited range of goods. With extra housing, demand for everyday groceries will increase, and it would be nice to have a choice without having to travel further afield to Southend/Rayleigh/Rochford etc.
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house. This area, if redeveloped would provide space for about 4 or 6 houses or several flats.
Housing on east side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Initially I favoured a more radical approach, but now realise option 2 is preferable as it would help retain the village atmosphere and is likely to be more affordable.

Object

Hockley Area Action Plan Options Report

Representation ID: 27654

Received: 31/01/2011

Respondent: Mr and Mrs Hart

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Please be aware that whilst improvements to Hockley village are welcome, over development and inappropriate changes are not.

Whilst retail outlets seem to feature in all of the Options, we already have two retail outlets in the centre of Hockley empty. Hockley Electricals and the Grocery have been closed for some considerable time now and the thought of yet more retail units hoping to be filled seem very inappropriate. Before embarking on major redevelopment why not ensure these units are utilized first, then canvass how many new business wish to take up spaces within a village environment.

Comment

Hockley Area Action Plan Options Report

Representation ID: 27668

Received: 01/02/2011

Respondent: Mr A James

Representation Summary:

Option 3a. The new housing is provided to the north of the railway line, along Plumberow Avenue is a good idea but it would increase the traffic at the junction with Greensward Lane. I believe the new northern entrance to the train station is also a good idea.

Full text:

In response to the RDC Hockley Area Action Plan 2 please find my thoughts on these proposals in line with your online numbering system:

1) I would like to retain the village feel but would also like to see some gradual improvements to the village centre. I can not support any of the five proposals but would like to see some of the improvements included within them.

2) I am not against studies but this is the second major study on this subject and each one adds cost to our council tax.

3) Producing a heavy weight document that prevented printing and general distribution and expecting the public to fill in a complicated online response for a second time is an unfair method of consultation. I believe the public now have consultation fatigue and will not respond in sufficient numbers.

4) One of the obvious locations for improvement is the Foundry Estate that is missing from the list.

5) Option 1. This appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. I do not believe the parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. I do not believe table top crossings are a good idea. They will certainly not solve the traffic issues.

6) Option 2. To just replace the Coop funeral parlour and not the other single story buildings in this are does not make sense. Additional offices are not required as there are empty units on the Foundry Estate. Existing shops should not be turned into homes. The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the car park should be taken from Woodlands Road. A new home on Spa Road, close to the train station is unnecessary. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. Potters parking should not be changed especially as parking for flats would be necessary. If a green link walk way was created through the churchyard a crossing should be provided to cross Southend Road at its end.

Option 2a. I do not like the look of the proposed new shops and flats. They look like a bland row of characterless council homes. The sorting office area should not be used unless a replacement is built first, as we should not loose jobs unnecessarily. If the sorting office area was used the Junction of Eldon Way and Spa Road should be widened with a roundabout and Eldon way should be used to access a new free shopping car park. This also appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. Something should be included to replace the Foundry area. The area from Walton & Stanton's to Harrison's restaurant should also be replaced and additional parking provided.

7) Option 3. To replace the relatively modern building opposite Potters that appears to be in current use makes no sense.
The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the car park should only be taken from Woodlands Road. I cannot find the proposed replacement of poor quality building on Southend Road, with retail and homes to the rear. Additional offices are not required as there are empty units on the Foundry Estate. Existing shops should not be turned into homes. The replacement of the Coop is unnecessary. This also appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. A new home on Spa Road, close to the train station is unnecessary. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. Spa Junction should be replaced with modern computer controlled traffic lights with additional lanes. Potters parking should not be changed especially as parking for flats would be necessary. If a green link walk way was created through the churchyard a crossing should be provided to cross Southend Road at its end. The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road.

Option 3a. The new housing is provided to the north of the railway line, along Plumberow Avenue is a good idea but it would increase the traffic at the junction with Greensward Lane. I believe the new northern entrance to the train station is also a good idea.

8) Transport Options. The proposed modified roundabout would improve the situation but from schemes I have experienced of shared junctions I believe they are dangerous and should not be considered at this busy intersection. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the Southend Road car park should only be taken from Woodlands Road. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I believe the new northern entrance to the train station is also a good idea. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. I believe the new northern entrance to the train station is also a good idea. If the sorting office area was used the Junction of Eldon Way and Spa Road should be widened with a roundabout and Eldon way should be used to access a new free shopping car park.

9) Funding & Delivery. In the current financial climate I believe this kind of development will not happen. There seems be little demand for new shops and offices and even the demand for homes is hampered by the restrictions on mortgages. Any new developments would have to be carried out by a major developer who would need to pay for any infrastructure required.

10) To expect the public to make my online response to this document is not a fair request especially as this is the second consultation on this subject. I believe the public now have consultation fatigue and will not respond in sufficient numbers to get a realistic opinion.

Object

Hockley Area Action Plan Options Report

Representation ID: 27677

Received: 04/02/2011

Respondent: Miss S Carter

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Rochford Matters was received in Rayleigh in December but not in Hockley until January (now late to return the questionnaire which had a December date).

However, like a lot of Hockley residents, I moved here some time ago because it was a village and relatively peaceful. Although people need places to live, I do not want Hockley to be saturated by housing and lose its village character.

We have already lost a lot of smaller convenient shops - butchers, fruit and veg, motor trade, (rent too high?) but appreciate others - kitchen/bathroom - craft and very much Potters. More village shops would be appreciated.

As for Coop ex Somerfields, it would have made more sense to adjoin Alldays to Somerfields as suggested to extend facilities and move the parking entrance to Eldon Way and extend the parking instead of pushing consumers out of Hockley to the bigger supermarkets - we didn't need another large funeral directors used by a limited number of people (we already have Stibbards).

Like a lot of Hockley residents, I hope a sensible solution to the problems is reached.

Object

Hockley Area Action Plan Options Report

Representation ID: 27684

Received: 04/02/2011

Respondent: Heather Sirdifield

Representation Summary:

Inappropriate changes and over development.

Full text:

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units - don't agree.
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road - no point, as you would have to walk down to the zebra crossing in Southend Road, to cross over. So may as well walk along Spa Road, past Spa Pub as usual.

Comment

Hockley Area Action Plan Options Report

Representation ID: 27698

Received: 04/02/2011

Respondent: Joan Smith

Representation Summary:

Re options 3 and 3a, it is clear that the footpath will run along the new car park entrance, however what is the proposed access route for the car parks servicing the Indian restaurant, offices and new housing?

Full text:

I would like to raise the following points regarding the proposals for the public car park area in Southend Road:

There does not appear to be any reference to the Public Toilets in the plans, even Option 1 where there are no proposed changes - what has happened to these?

With options 2 and 2a, the proposed layout means that the existing footpath will exit onto Southend Road pavement right between two vehicular access points (for the Indian restaurant and the new car park entrance), opposite the vehicular entrance to the Spa Pub and also where the zebra crossing is - surely this is not a particularly safe proposal for pedestrians? (There is also the entrance to the Old Fire Station building just a few feet away too.)

Re options 3 and 3a, it is clear that the footpath will run along the new car park entrance, however what is the proposed access route for the car parks servicing the Indian restaurant, offices and new housing?

Options 2 and 3 mean that the car park entrance will be relocated nearer to the already very congested mini roundabout, zebra crossing and other existing entrances.

At the moment, the footpath is not defined - what, if any, proposals are being made to define the public footpath?

Why has the proposed change of usage of the retail units on Main Road to Rayleigh (currently Costcutters etc) been dropped from Option 3?

Will the remaining existing buildings be revamped? - the current building on the corner of Bramerton Road is a complete eyesore and desperately needs attention.

The attached sheet shows an identified residential opportunity in the Woodpond Avenue end of the car park - where did this come from as there is no mention of it in the options?

I look forward to the results of the consultation process and hope that the resulting improvements to Hockley will be able to happen sooner rather than later.

Comment

Hockley Area Action Plan Options Report

Representation ID: 27705

Received: 04/02/2011

Respondent: BNP Paribas Real Estate UK

Representation Summary:

The AAP states that "This Option provides a higher level of intervention in Hockley centre than Options 1 and 2, in order to strengthen the uses in the centre, provide new homes in the area and provide greater improvements to the public realm".

Royal Mail's Hockley DO is identified in Option 3 and 3a for a supermarket in conjunction with the adjacent site to the west. On the table on page 53, Royal Mail's Hockley DO is identified as Site 3 as part of the land to the immediate north and west. The land to the north of Royal Mail's site is identified for leisure with the land to the north-west for shops with flats above. The table states that the redevelopment of Royal Mail's site would provide 22 flats totalling 1,830 sq.m of gross external floorspace. We request that the Council clarifies whether Royal
Mail's Hockley DO site is identified in the AAP Option 3 and 3a for a retail supermarket or residential units.

As previously stated, The Hockley DO is a vital operational site and the comments above stand for any potential future redevelopment options.

Full text:


ROYAL MAIL REPRESENTATIONS TO ROCHFORD DISTRICT COUNCIL - HOCKLEY AREA ACTION PLAN OPTIONS REPORT NOVEMBER 2010

INTRODUCTION

We are instructed by Royal Mail Group Limited (Royal Mail) to submit representations to the Hockley Area Action Plan (AAP) Options Report November 2010.

BACKGROUND

Royal Mail formerly Consignia Plc, is the successor to the former statutory corporation, The Post Office. Although its management operates independently, Royal Mail is wholly owned by the Government through the Secretary of State for Business, Innovation and Skills. Its services are regulated by the Postal Services Regulator, Postcomm. Its letters business, Royal Mail is the operator of universal postal service functions through the Royal Mail letter post delivery and
collection services handling letters, postal packets, and high value (registered) packets. Royal Mail Group also operates Parcelforce Worldwide which is a parcels carrier. Post Office Ltd (a wholly owned subsidiary of Royal Mail) operates the national network of post offices and sub post offices.

The United Kingdom letter post business was fully liberalised in January 2006 by Postcomm and Royal Mail now operates in a highly competitive market place. As such, it effectively operates like any other business and is continually seeking to find ways to improve the efficiency of its business (e.g. increased automation) and respond to the changes in communications technology (e.g. email and internet). Put simply, the nature of the mail industry has and continues to change and Royal Mail's real estate needs to respond accordingly.

Royal Mail has a number of sites within the administrative boundary of Rochford District, including Hockley Delivery Office (DO), Eldon Way, Hockley SS5 4AA which falls within the area subject to the Hockley AAP.

REPRESENTATIONS

We set out below representations to the Hockley AAP Options Report, which revisits and updates earlier options developed for the AAP in 2009, in a format that corresponds with the Plan.

HOCKLEY AREA ACTION PLAN

â–  Section 4 - Overarching Framework and Principles

This section sets out the overarching approach for the Hockley AAP. One of the objectives of the AAP is to improve the public realm and pedestrian links. Under 'Approach to the spatial options' the AAP states that "In many cases, planning gain from developments can help to cross fund physical environment improvements nearby, which is particularly useful in a period of limited public funding".

Royal Mail acknowledges new development will create additional demand for infrastructure, services/facilities and public realm improvements. However, we request that any financial contribution towards the provision of such infrastructure, services/facilities and public realm improvements for Hockley is sought in areas where there is an identified need and at a level that ensures that the overall delivery of appropriate development is not compromised i.e. is subject to viability. This request accords with government guidance in Circular 05/05 which states that Section 106 contributions from development sites must be:

(i) relevant to planning;
(ii) necessary to make the proposed development acceptable in planning terms;
(iii) directly related to the proposed development;
(iv) fairly and reasonably related in scale and kind to the proposed development; and
(v) reasonable in all other respects.

â–  Spatial Option 1

This Option is considered to be a 'minimal intervention approach'. The focus is on improvements to pedestrian links, parking and the public realm and shop front improvements along Spa Road, with a small number of poor quality buildings being replace by new shops.

Royal Mail's Hockley DO is not identified for development within Spatial Option 1. Royal Mail support this Option.

â–  Spatial Option 2

This Option provides a slightly higher level of intervention in the centre, in order to strengthen the uses in the centre and provide greater improvements to the public realm.Royal Mail's Hockley DO is not identified for development within Spatial Option 2. However the site located to the immediate north, which abuts the boundary of Royal Mail's Hockley DO is identified for development comprising a new office building and an extension to the car park located to the west.

Royal Mail also support this Option. However should any sites surrounding Royal Mail's Hockley DO be redeveloped it would be vital that any new uses be designed so that they are cognisant of and sensitive to Royal Mail's existing operations.

â–  Spatial Option 2a

This Option is the same as Option 2, however there is a slightly greater level of intervention on Spa Road. The AAP further expands on the proposed development of this Option stating that "the Somerfield/Co-op store and house above these and the post office sorting offices are replaced by new retail units with homes above, which can help to provide quality retail space and strengthen the links between Spa Road and Eldon Way further, with the creation of a new
small public space". Further the AAP states that "additional homes are provided on the site of the sorting office, to help improve the environment here and complement the existing housing opposite on Eldon Way".

Royal Mail's Hockley DO is identified in Option 2a for houses/mews houses and the provision of amenity space.

We note that the figure on page 40 identifies Royal Mail's site, reference 3c, as part of a wider site with the land to the west which is identified for shops with flats above. Further, the table on page 41 indicates that Royal Mail's Hockley DO will provide 6 residential units totalling 700 sq.m of gross external floorspace.

The Hockley DO is a vital operational site. For Royal Mail's Hockley DO to come forward for residential led mixed use development in the future it will be essential to relocate or re-provide Royal Mail's existing operations. However, there are currently no plans or timescales for the relocation/re-provision of Royal Mail's operations. Notwithstanding this it is our opinion that the Hockley DO site presents a good opportunity for a range of uses as part of the redevelopment
of Hockley centre, including large scale and small scale retail, residential, employment uses. Further, to come forward, redevelopment must generate values sufficient to make a relocation viable and attractive to Royal Mail.

â–  Spatial Option 3 and 3a

The AAP states that "This Option provides a higher level of intervention in Hockley centre than Options 1 and 2, in order to strengthen the uses in the centre, provide new homes in the area and provide greater improvements to the public realm".

Royal Mail's Hockley DO is identified in Option 3 and 3a for a supermarket in conjunction with the adjacent site to the west. On the table on page 53, Royal Mail's Hockley DO is identified as Site 3 as part of the land to the immediate north and west. The land to the north of Royal Mail's site is identified for leisure with the land to the north-west for shops with flats above. The table states that the redevelopment of Royal Mail's site would provide 22 flats totalling 1,830 sq.m of gross external floorspace. We request that the Council clarifies whether Royal
Mail's Hockley DO site is identified in the AAP Option 3 and 3a for a retail supermarket or residential units.

As previously stated, The Hockley DO is a vital operational site and the comments above stand for any potential future redevelopment options.

ROYAL MAIL REPRESENTATIONS TO SPATIAL OPTION 2a 3, and 3a

Given the above, we request that the Council includes Royal Mail's Hockley DO site within the emerging Hockley AAP for mixed use development, supported by an appropriate flexible policy requiring the re-provision/relocation of Royal Mail's operations prior to the site's redevelopment. This will ensure that Royal Mail's operations will not be prejudiced and they can continue to comply with their licence issued pursuant to the Postal Services Act 2000, which requires the provision of a 'universal service' for the UK. Furthermore, as a provider of infrastructure, we would promote in such circumstances Royal Mail receiving assistance in their relocation. Further, as previously stated, should any sites surrounding Royal Mail's Hockley DO be redeveloped it would be vital that any new uses be designed so that they are cognisant of and sensitive to Royal Mail's existing operations.

This request accords with:

â–  Para 10 of Planning Policy Statement 3 (PPS3): Housing states that the planning system should deliver "a flexible, responsive supply of land - managed in a way that makes efficient and effective use of land, including re-use of previously-developed land, where appropriate";
â–  Para 36 of PPS3 which states that "in support of its objective of creating mixed and sustainable communities, the Government's policy is to ensure that housing is developed in suitable locations which offer a range of community facilities and with good access to jobs, key services and infrastructure. This should be achieved by making effective use of land, existing infrastructure and available public and private investment";
â–  Planning Policy Statement 4 (PPS4): Planning for Sustainable Economic Development. PPS4 details that Local Planning Authorities (LPAs) should plan positively and proactively to encourage economic development, in line with the principles of sustainable development. In particular, PPS4 states that LPAs should develop flexible policies which are able to respond to economic change and notes the need for co-ordination with infrastructure and housing
provision; and
â–  Policy EC.2 (b) of PPS4 which states that LPAs should "supports existing business sectors,
taking account of whether they are expanding or contracting ...";
â–  Policy EC.2 (d) of PPS4 which states that LPAs should "seeks to make the most efficient and effective use of land, prioritising previously developed land which is suitable for re-use" including town centres.

We reserve the right to amend or supplement these representations at a later date if necessary. We would therefore be grateful if you could acknowledge receipt of our representations and advise as to the next stage of public consultation for the Hockley AAP. Further, Royal Mail would welcome the opportunity to take part in the stakeholder engagement as part of the development of the Hockley AAP.

Please do not hesitate to contact me on the above contact details should you have any queries.

We look forward to hearing from you in response to the above.

Comment

Hockley Area Action Plan Options Report

Representation ID: 27709

Received: 04/02/2011

Respondent: BNP Paribas Real Estate UK

Representation Summary:

Given the above, we request that the Council includes Royal Mail's Hockley DO site within the emerging Hockley AAP for mixed use development, supported by an appropriate flexible policy requiring the re-provision/relocation of Royal Mail's operations prior to the site's redevelopment. This will ensure that Royal Mail's operations will not be prejudiced and they can continue to comply with their licence issued pursuant to the Postal Services Act 2000, which requires the provision of a 'universal service' for the UK. Furthermore, as a provider of infrastructure, we would promote in such circumstances Royal Mail receiving assistance in their relocation. Further, as previously stated, should any sites surrounding Royal Mail's Hockley DO be redeveloped it would be vital that any new uses be designed so that they are cognisant of and sensitive to Royal Mail's existing operations.

This request accords with:

â–  Para 10 of Planning Policy Statement 3 (PPS3): Housing states that the planning system should deliver "a flexible, responsive supply of land - managed in a way that makes efficient and effective use of land, including re-use of previously-developed land, where appropriate";
â–  Para 36 of PPS3 which states that "in support of its objective of creating mixed and sustainable communities, the Government's policy is to ensure that housing is developed in suitable locations which offer a range of community facilities and with good access to jobs, key services and infrastructure. This should be achieved by making effective use of land, existing infrastructure and available public and private investment";
â–  Planning Policy Statement 4 (PPS4): Planning for Sustainable Economic Development. PPS4 details that Local Planning Authorities (LPAs) should plan positively and proactively to encourage economic development, in line with the principles of sustainable development. In particular, PPS4 states that LPAs should develop flexible policies which are able to respond to economic change and notes the need for co-ordination with infrastructure and housing
provision; and
â–  Policy EC.2 (b) of PPS4 which states that LPAs should "supports existing business sectors,
taking account of whether they are expanding or contracting ...";
â–  Policy EC.2 (d) of PPS4 which states that LPAs should "seeks to make the most efficient and effective use of land, prioritising previously developed land which is suitable for re-use" including town centres.

Full text:


ROYAL MAIL REPRESENTATIONS TO ROCHFORD DISTRICT COUNCIL - HOCKLEY AREA ACTION PLAN OPTIONS REPORT NOVEMBER 2010

INTRODUCTION

We are instructed by Royal Mail Group Limited (Royal Mail) to submit representations to the Hockley Area Action Plan (AAP) Options Report November 2010.

BACKGROUND

Royal Mail formerly Consignia Plc, is the successor to the former statutory corporation, The Post Office. Although its management operates independently, Royal Mail is wholly owned by the Government through the Secretary of State for Business, Innovation and Skills. Its services are regulated by the Postal Services Regulator, Postcomm. Its letters business, Royal Mail is the operator of universal postal service functions through the Royal Mail letter post delivery and
collection services handling letters, postal packets, and high value (registered) packets. Royal Mail Group also operates Parcelforce Worldwide which is a parcels carrier. Post Office Ltd (a wholly owned subsidiary of Royal Mail) operates the national network of post offices and sub post offices.

The United Kingdom letter post business was fully liberalised in January 2006 by Postcomm and Royal Mail now operates in a highly competitive market place. As such, it effectively operates like any other business and is continually seeking to find ways to improve the efficiency of its business (e.g. increased automation) and respond to the changes in communications technology (e.g. email and internet). Put simply, the nature of the mail industry has and continues to change and Royal Mail's real estate needs to respond accordingly.

Royal Mail has a number of sites within the administrative boundary of Rochford District, including Hockley Delivery Office (DO), Eldon Way, Hockley SS5 4AA which falls within the area subject to the Hockley AAP.

REPRESENTATIONS

We set out below representations to the Hockley AAP Options Report, which revisits and updates earlier options developed for the AAP in 2009, in a format that corresponds with the Plan.

HOCKLEY AREA ACTION PLAN

â–  Section 4 - Overarching Framework and Principles

This section sets out the overarching approach for the Hockley AAP. One of the objectives of the AAP is to improve the public realm and pedestrian links. Under 'Approach to the spatial options' the AAP states that "In many cases, planning gain from developments can help to cross fund physical environment improvements nearby, which is particularly useful in a period of limited public funding".

Royal Mail acknowledges new development will create additional demand for infrastructure, services/facilities and public realm improvements. However, we request that any financial contribution towards the provision of such infrastructure, services/facilities and public realm improvements for Hockley is sought in areas where there is an identified need and at a level that ensures that the overall delivery of appropriate development is not compromised i.e. is subject to viability. This request accords with government guidance in Circular 05/05 which states that Section 106 contributions from development sites must be:

(i) relevant to planning;
(ii) necessary to make the proposed development acceptable in planning terms;
(iii) directly related to the proposed development;
(iv) fairly and reasonably related in scale and kind to the proposed development; and
(v) reasonable in all other respects.

â–  Spatial Option 1

This Option is considered to be a 'minimal intervention approach'. The focus is on improvements to pedestrian links, parking and the public realm and shop front improvements along Spa Road, with a small number of poor quality buildings being replace by new shops.

Royal Mail's Hockley DO is not identified for development within Spatial Option 1. Royal Mail support this Option.

â–  Spatial Option 2

This Option provides a slightly higher level of intervention in the centre, in order to strengthen the uses in the centre and provide greater improvements to the public realm.Royal Mail's Hockley DO is not identified for development within Spatial Option 2. However the site located to the immediate north, which abuts the boundary of Royal Mail's Hockley DO is identified for development comprising a new office building and an extension to the car park located to the west.

Royal Mail also support this Option. However should any sites surrounding Royal Mail's Hockley DO be redeveloped it would be vital that any new uses be designed so that they are cognisant of and sensitive to Royal Mail's existing operations.

â–  Spatial Option 2a

This Option is the same as Option 2, however there is a slightly greater level of intervention on Spa Road. The AAP further expands on the proposed development of this Option stating that "the Somerfield/Co-op store and house above these and the post office sorting offices are replaced by new retail units with homes above, which can help to provide quality retail space and strengthen the links between Spa Road and Eldon Way further, with the creation of a new
small public space". Further the AAP states that "additional homes are provided on the site of the sorting office, to help improve the environment here and complement the existing housing opposite on Eldon Way".

Royal Mail's Hockley DO is identified in Option 2a for houses/mews houses and the provision of amenity space.

We note that the figure on page 40 identifies Royal Mail's site, reference 3c, as part of a wider site with the land to the west which is identified for shops with flats above. Further, the table on page 41 indicates that Royal Mail's Hockley DO will provide 6 residential units totalling 700 sq.m of gross external floorspace.

The Hockley DO is a vital operational site. For Royal Mail's Hockley DO to come forward for residential led mixed use development in the future it will be essential to relocate or re-provide Royal Mail's existing operations. However, there are currently no plans or timescales for the relocation/re-provision of Royal Mail's operations. Notwithstanding this it is our opinion that the Hockley DO site presents a good opportunity for a range of uses as part of the redevelopment
of Hockley centre, including large scale and small scale retail, residential, employment uses. Further, to come forward, redevelopment must generate values sufficient to make a relocation viable and attractive to Royal Mail.

â–  Spatial Option 3 and 3a

The AAP states that "This Option provides a higher level of intervention in Hockley centre than Options 1 and 2, in order to strengthen the uses in the centre, provide new homes in the area and provide greater improvements to the public realm".

Royal Mail's Hockley DO is identified in Option 3 and 3a for a supermarket in conjunction with the adjacent site to the west. On the table on page 53, Royal Mail's Hockley DO is identified as Site 3 as part of the land to the immediate north and west. The land to the north of Royal Mail's site is identified for leisure with the land to the north-west for shops with flats above. The table states that the redevelopment of Royal Mail's site would provide 22 flats totalling 1,830 sq.m of gross external floorspace. We request that the Council clarifies whether Royal
Mail's Hockley DO site is identified in the AAP Option 3 and 3a for a retail supermarket or residential units.

As previously stated, The Hockley DO is a vital operational site and the comments above stand for any potential future redevelopment options.

ROYAL MAIL REPRESENTATIONS TO SPATIAL OPTION 2a 3, and 3a

Given the above, we request that the Council includes Royal Mail's Hockley DO site within the emerging Hockley AAP for mixed use development, supported by an appropriate flexible policy requiring the re-provision/relocation of Royal Mail's operations prior to the site's redevelopment. This will ensure that Royal Mail's operations will not be prejudiced and they can continue to comply with their licence issued pursuant to the Postal Services Act 2000, which requires the provision of a 'universal service' for the UK. Furthermore, as a provider of infrastructure, we would promote in such circumstances Royal Mail receiving assistance in their relocation. Further, as previously stated, should any sites surrounding Royal Mail's Hockley DO be redeveloped it would be vital that any new uses be designed so that they are cognisant of and sensitive to Royal Mail's existing operations.

This request accords with:

â–  Para 10 of Planning Policy Statement 3 (PPS3): Housing states that the planning system should deliver "a flexible, responsive supply of land - managed in a way that makes efficient and effective use of land, including re-use of previously-developed land, where appropriate";
â–  Para 36 of PPS3 which states that "in support of its objective of creating mixed and sustainable communities, the Government's policy is to ensure that housing is developed in suitable locations which offer a range of community facilities and with good access to jobs, key services and infrastructure. This should be achieved by making effective use of land, existing infrastructure and available public and private investment";
â–  Planning Policy Statement 4 (PPS4): Planning for Sustainable Economic Development. PPS4 details that Local Planning Authorities (LPAs) should plan positively and proactively to encourage economic development, in line with the principles of sustainable development. In particular, PPS4 states that LPAs should develop flexible policies which are able to respond to economic change and notes the need for co-ordination with infrastructure and housing
provision; and
â–  Policy EC.2 (b) of PPS4 which states that LPAs should "supports existing business sectors,
taking account of whether they are expanding or contracting ...";
â–  Policy EC.2 (d) of PPS4 which states that LPAs should "seeks to make the most efficient and effective use of land, prioritising previously developed land which is suitable for re-use" including town centres.

We reserve the right to amend or supplement these representations at a later date if necessary. We would therefore be grateful if you could acknowledge receipt of our representations and advise as to the next stage of public consultation for the Hockley AAP. Further, Royal Mail would welcome the opportunity to take part in the stakeholder engagement as part of the development of the Hockley AAP.

Please do not hesitate to contact me on the above contact details should you have any queries.

We look forward to hearing from you in response to the above.

Object

Hockley Area Action Plan Options Report

Representation ID: 27714

Received: 01/02/2011

Respondent: Nicky Prideaux

Representation Summary:

Inappropriate changes and over development.

Full text:

HAAP Consultation January 2011

I wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Object

Hockley Area Action Plan Options Report

Representation ID: 27721

Received: 14/01/2011

Respondent: Mr and Mrs Wilhelmy

Representation Summary:

Inappropriate changes and over development.

Full text:

We wish to register the following objections regarding the above consultation:

Chapter 4. Overarching Frame work: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements.

Option 1: Object: Insufficient benefits.

Option 2a: Object: Inappropriate changes and missed opportunities.

Options 3: Object: Inappropriate changes and over development.

Options 3a: Object: Inappropriate changes and over development.

Chapter 8. Transport options: Object: Previous consultations have made clear that highways infrastructure improvements to the key junctions at: Spa roundabout; Eldon Way; Station Approach and Plumberow need to be determined as a precursor to any redevelopment. Insufficient attention has been paid to these key requirements and the sketch proposals provided have not been researched and may not be viable.

Option 2: Object: This option forms the basis of an appropriate plan but does not go far enough but support an enhanced version as follows (changes in italics):

Roads (key priority and subject to viability confirmation)

Improvements to Spa Roundabout e.g. Slip lanes or Table top crossing
Improvements to Eldon Way, Station Approach, and Plumberow junctions

Parking:

Added/Consolidated parking square behind shops on west side of Spa Road reached via Eldon Way and (if possible) Bramerton Rd
Added on-street parallel parking in Spa Road and pick-up/drop-off points both sides of Hockley Station

Building changes

Redevelop shops on Southside of Main Road, opposite Potters, to remove 'pinch -point' on B1013
Change from retail to housing at Costcutters Parade of shops
Modernised retail units with 4 flats above Seemore Glass
Modernised retail units with 2 added retail units at Factory Shop/Car park area (to remain single storey)
Redevelop Co-Op Undertakers etc and extend to join existing shops either side, removing access roads creating additional Retail
Community centre with library/health centre/shops at current library location with 13 flats and 2 retail units
2 large format retail units in Eldon Way (delete from proposals)
Replacement of one industrial building with light industry/ offices/ parking square on Eldon Way
Retail unit near station in Spa Road replaced by house
Housing on north side of Station along Plumberow Ave, to include railway drop-off point
Retail option (possibly a market) to be considered for Sorting Office site
Options for undeveloped portion of Foundry Estate to be considered.

General

Enhanced station frontage & Pedestrian link to Eldon Way (but care re safety considerations)
Enhanced shop fronts, paving and streetscape Spa Road / Main Road / Southend Road
Improved safety, consolidated and new leisure space on Eldon Way
Flexible employment opportunities, enhanced frontages to leisure/other buildings on Eldon Way
New link through Catholic Church from Spa Road to Southend Road

Comment

Hockley Area Action Plan Options Report

Representation ID: 27732

Received: 01/02/2011

Respondent: Mr A James

Representation Summary:

Option 3a. The new housing is provided to the north of the railway line, along Plumberow Avenue is a good idea but it would increase the traffic at the junction with Greensward Lane. I believe the new northern entrance to the train station is also a good idea.

Full text:

In response to the RDC Hockley Area Action Plan 2 please find my thoughts on these proposals in line with your online numbering system:

1) I would like to retain the village feel but would also like to see some gradual improvements to the village centre. I can not support any of the five proposals but would like to see some of the improvements included within them.

2) I am not against studies but this is the second major study on this subject and each one adds cost to our council tax.

3) Producing a heavy weight document that prevented printing and general distribution and expecting the public to fill in a complicated online response for a second time is an unfair method of consultation. I believe the public now have consultation fatigue and will not respond in sufficient numbers.

4) One of the obvious locations for improvement is the Foundry Estate that is missing from the list.

5) Option 1. This appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. I do not believe the parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. I do not believe table top crossings are a good idea. They will certainly not solve the traffic issues.

6) Option 2. To just replace the Coop funeral parlour and not the other single story buildings in this are does not make sense. Additional offices are not required as there are empty units on the Foundry Estate. Existing shops should not be turned into homes. The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the car park should be taken from Woodlands Road. A new home on Spa Road, close to the train station is unnecessary. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. Potters parking should not be changed especially as parking for flats would be necessary. If a green link walk way was created through the churchyard a crossing should be provided to cross Southend Road at its end.

Option 2a. I do not like the look of the proposed new shops and flats. They look like a bland row of characterless council homes. The sorting office area should not be used unless a replacement is built first, as we should not loose jobs unnecessarily. If the sorting office area was used the Junction of Eldon Way and Spa Road should be widened with a roundabout and Eldon way should be used to access a new free shopping car park. This also appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. Something should be included to replace the Foundry area. The area from Walton & Stanton's to Harrison's restaurant should also be replaced and additional parking provided.

7) Option 3. To replace the relatively modern building opposite Potters that appears to be in current use makes no sense.
The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the car park should only be taken from Woodlands Road. I cannot find the proposed replacement of poor quality building on Southend Road, with retail and homes to the rear. Additional offices are not required as there are empty units on the Foundry Estate. Existing shops should not be turned into homes. The replacement of the Coop is unnecessary. This also appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. A new home on Spa Road, close to the train station is unnecessary. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. Spa Junction should be replaced with modern computer controlled traffic lights with additional lanes. Potters parking should not be changed especially as parking for flats would be necessary. If a green link walk way was created through the churchyard a crossing should be provided to cross Southend Road at its end. The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road.

Option 3a. The new housing is provided to the north of the railway line, along Plumberow Avenue is a good idea but it would increase the traffic at the junction with Greensward Lane. I believe the new northern entrance to the train station is also a good idea.

8) Transport Options. The proposed modified roundabout would improve the situation but from schemes I have experienced of shared junctions I believe they are dangerous and should not be considered at this busy intersection. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the Southend Road car park should only be taken from Woodlands Road. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I believe the new northern entrance to the train station is also a good idea. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. I believe the new northern entrance to the train station is also a good idea. If the sorting office area was used the Junction of Eldon Way and Spa Road should be widened with a roundabout and Eldon way should be used to access a new free shopping car park.

9) Funding & Delivery. In the current financial climate I believe this kind of development will not happen. There seems be little demand for new shops and offices and even the demand for homes is hampered by the restrictions on mortgages. Any new developments would have to be carried out by a major developer who would need to pay for any infrastructure required.

10) To expect the public to make my online response to this document is not a fair request especially as this is the second consultation on this subject. I believe the public now have consultation fatigue and will not respond in sufficient numbers to get a realistic opinion.

Comment

Hockley Area Action Plan Options Report

Representation ID: 27744

Received: 01/02/2011

Respondent: Ms S James

Representation Summary:

Option 3a. The new housing is provided to the north of the railway line, along Plumberow Avenue is a good idea but it would increase the traffic at the junction with Greensward Lane. I believe the new northern entrance to the train station is also a good idea.

Full text:

My Response to the RDC HAAP

In response to the RDC Hockley Area Action Plan 2 please find my thoughts on these proposals in line with your online numbering system:

1) I would like to retain the village feel but would also like to see some gradual improvements to the village centre. I can not support any of the five proposals but would like to see some of the improvements included within them.

2) I am not against studies but this is the second major study on this subject and each one adds cost to our council tax.

3) Producing a heavy weight document that prevented printing and general distribution and expecting the public to fill in a complicated online response for a second time is an unfair method of consultation. I believe the public now have consultation fatigue and will not respond in sufficient numbers.

4) One of the obvious locations for improvement is the Foundry Estate that is missing from the list.

5) Option 1. This appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. I do not believe the parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. I do not believe table top crossings are a good idea. They will certainly not solve the traffic issues.

6) Option 2. To just replace the Coop funeral parlour and not the other single story buildings in this are does not make sense. Additional offices are not required as there are empty units on the Foundry Estate. Existing shops should not be turned into homes. The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the car park should be taken from Woodlands Road. A new home on Spa Road, close to the train station is unnecessary. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. Potters parking should not be changed especially as parking for flats would be necessary. If a green link walk way was created through the churchyard a crossing should be provided to cross Southend Road at its end.

Option 2a. I do not like the look of the proposed new shops and flats. They look like a bland row of characterless council homes. The sorting office area should not be used unless a replacement is built first, as we should not loose jobs unnecessarily. If the sorting office area was used the Junction of Eldon Way and Spa Road should be widened with a roundabout and Eldon way should be used to access a new free shopping car park. This also appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. Something should be included to replace the Foundry area. The area from Walton & Stanton's to Harrison's restaurant should also be replaced and additional parking provided.

7) Option 3. To replace the relatively modern building opposite Potters that appears to be in current use makes no sense.
The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the car park should only be taken from Woodlands Road. I cannot find the proposed replacement of poor quality building on Southend Road, with retail and homes to the rear. Additional offices are not required as there are empty units on the Foundry Estate. Existing shops should not be turned into homes. The replacement of the Coop is unnecessary. This also appears to replace existing single story shops near the Factory Shop with single story shops. I believe a recent proposal to use the Factory Shop car park for a takeaway food outlet has already been turned down in the planning stage. A new home on Spa Road, close to the train station is unnecessary. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. Spa Junction should be replaced with modern computer controlled traffic lights with additional lanes. Potters parking should not be changed especially as parking for flats would be necessary. If a green link walk way was created through the churchyard a crossing should be provided to cross Southend Road at its end. The proposed redevelopment of the existing library and health centre to provide a new combined community centre with library and health facilities should not be squeezed into the area allocated and should not include shops in this area. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road.

Option 3a. The new housing is provided to the north of the railway line, along Plumberow Avenue is a good idea but it would increase the traffic at the junction with Greensward Lane. I believe the new northern entrance to the train station is also a good idea.

8) Transport Options. The proposed modified roundabout would improve the situation but from schemes I have experienced of shared junctions I believe they are dangerous and should not be considered at this busy intersection. Consideration should be given to include and replace the Indian restaurant area and the shop opposite Walton & Stanton's to bring the building line back from the road for Spa Junction improvements. The shops opposite Walton & Stanton's should be replaced with homes not shops and should be accessed only from Woodlands Road. This junction should be replaced with modern computer controlled traffic lights with additional lanes. The access to the Southend Road car park should only be taken from Woodlands Road. The creation of a new parking area on the south side of the train station, for weekday commuters is a good idea but I do not believe it will be used by weekend shoppers. The vehicular drop-off and pick-up points should not be in the car park but at the station. Maybe the seating area at the side of Kilnfield House could be utilized. I believe the new northern entrance to the train station is also a good idea. I do not believe the parallel parking proposals are practical and the width of Spa Road should not reduce with trees planted close to shops. I believe the new northern entrance to the train station is also a good idea. If the sorting office area was used the Junction of Eldon Way and Spa Road should be widened with a roundabout and Eldon way should be used to access a new free shopping car park.

9) Funding & Delivery. In the current financial climate I believe this kind of development will not happen. There seems be little demand for new shops and offices and even the demand for homes is hampered by the restrictions on mortgages. Any new developments would have to be carried out by a major developer who would need to pay for any infrastructure required.

10) To expect the public to make my online response to this document is not a fair request especially as this is the second consultation on this subject. I believe the public now have consultation fatigue and will not respond in sufficient numbers to get a realistic opinion.