Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 9233

Received: 08/04/2009

Respondent: CPREssex

Representation Summary:

1.6 Public Safety Zone

Policy LS5 says:
'It is recognised that the current Public Safety Zone for London Southend Airport will need to be reviewed when the runway is extended.'

This review should be carried out before and be part of the planning application.

Full text:

SOUTHEND BOROUGH COUNCIL & ROCHFORD DISTRICT COUNCIL LONDON SOUTHEND AIRPORT & ENVIRONS JOINT AREA ACTION PLAN DEVELOPMENT PLAN DOCUMENT: INITIAL CONSULTATION ON PREFERRED OPTIONS DOCUMENT

Dear Sirs
I enclose the response of the Campaign to Protect Rural Essex to this document. Please confirm receipt.
A hard copy will follow by post.
Thank you

Yours faithfully

John Drake (Director to the Executive Committee)



On behalf of CPREssex