Object

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 7871

Received: 09/04/2009

Respondent: Mrs Ellen Maria O'Hara

Representation Summary:

Southend is an area which is already heavily built up. Where do the emergency landings take place? The air and noise pollution will be a total nightmare for existing residents. Where will all the traffic go? In 1966 the government refused the proposed expansion of runway 15/33 on environmental grounds - surely this argument is even stronger today - we are ALL aware of the environment problems surrounding this!

Full text:

Southend is an area which is already heavily built up. Where do the emergency landings take place? The air and noise pollution will be a total nightmare for existing residents. Where will all the traffic go? In 1966 the government refused the proposed expansion of runway 15/33 on environmental grounds - surely this argument is even stronger today - we are ALL aware of the environment problems surrounding this!