Object
London Southend Airport and Environs Joint Area Action Plan Preferred Options
Representation ID: 7871
Received: 09/04/2009
Respondent: Mrs Ellen Maria O'Hara
Southend is an area which is already heavily built up. Where do the emergency landings take place? The air and noise pollution will be a total nightmare for existing residents. Where will all the traffic go? In 1966 the government refused the proposed expansion of runway 15/33 on environmental grounds - surely this argument is even stronger today - we are ALL aware of the environment problems surrounding this!
Southend is an area which is already heavily built up. Where do the emergency landings take place? The air and noise pollution will be a total nightmare for existing residents. Where will all the traffic go? In 1966 the government refused the proposed expansion of runway 15/33 on environmental grounds - surely this argument is even stronger today - we are ALL aware of the environment problems surrounding this!