Support
London Southend Airport and Environs Joint Area Action Plan Preferred Options
Representation ID: 5797
Received: 27/03/2009
Respondent: Mr T Clark
Representation Summary:
Cycle/Pedestrian pathway connectivity also needed to be planned and provided from the outset.
Full text:
Cycle/Pedestrian pathway connectivity also needed to be planned and provided from the outset.