Comment

New Local Plan: Spatial Options Document 2021

Representation ID: 40423

Received: 22/09/2021

Respondent: Essex County Council

Representation Summary:

ECC supports the consideration of biodiversity within the emerging Local Plan, and the protection and enhancement of international, national, and local sites of wildlife and/or geological importance, this should not occur at the expense of the provision of most on-site green infrastructure to secure biodiversity net-gains. It is important to note that Natural England is reviewing existing green infrastructure standards and Green Planning Principles to set a national Green Infrastructure standards framework and the emerging Environment Bill aims to embed an environmental net gains requirement into developments, including housing.

ECC recommends that the emerging Local Plan seeks broader environmental net gain. This approach would allow for wider natural capital benefits to be delivered by developments, such as flood protection, recreation, and improved water and air quality. The PPG keeps GI at the forefront of its approach to delivering net gains for the environment. All developments should demonstrate the environmental net gains, and where there is a net loss from the development seek to secure provision through offsetting.

ECC notes that a new set of standards has been developed by Building with Nature to overcome the perceived and actual complexity of delivering high quality green infrastructure and has won a RTPI Award for Research Excellence. Drawing from evidence and good practice on all aspects of Green Infrastructure – wellbeing, water and wildlife, the standards define high quality green infrastructure at each stage of the development process, from planning and design, through to long-term management and maintenance. It provides a framework of quality standards, an assessment and accreditation service, and national awards. By providing an accreditation at the plan/design stage, Building with Nature also starts to raise confidence in the planning and development sector that can achieve a collective understanding of why green infrastructure matters, and how to deliver it more consistently to accelerate the delivery of new homes and new places.

RDC may also be interested to note that Place Services has published an Essex Biodiversity Validation Checklist, which is updated regularly in light of user feedback and changes to biodiversity legislation and policy, such as the introduction of British Standard 42020:2013: Biodiversity Code of practice for planning and development.

ECC supports the delivery of biodiversity net gain on-site in the first instance. However, it is recognised that this might not always be achievable, and that off-site delivery could provide additional benefits and be used to protect areas of land that are of local natural and wildlife value. Multi-functional, accessible GI should be delivered on all major development sites.

Once the Environment Bill is enacted, a requirement for the development of an Essex Local Nature Recovery Strategy (Essex LNRS) is likely and some partners in Essex are already beginning to consider the mapping which would form part of this. Reference to the LNRS should be made, and it is important there is liaison with ECC, Essex Wildlife Trust, Natural England and the Royal Society for the Protection of Birds as both the Local Plan and the LNRS develop.

In addition to the South Essex Green and Blue Infrastructure Study, ECC recommend the use of the Essex Green Infrastructure Strategy (2020), (see Q 32).

The Essex GI Strategy calls for early collaboration and engagement with all relevant stakeholders, partners, and communities to support the delivery of effective and connected GI. ECC can provide guidance and advice through engagement on the placement, supporting policy and delivery of new GI and the protection of existing GI.

Full text:

ECC Response to Rochford New Local Plan: Spatial Options Consultation July 2021

Thank you for consulting Essex County Council (ECC) on the Rochford New Local Plan: Spatial Options Consultation (SOC) published in July 2021. ECC has engaged with Rochford District Council (RDC) in the preparation of the new Local Plan, and our involvement to date has been proportionate at this early stage of plan preparation, building on the Issues and Options consultation in 2017/18. Once prepared, the new Local Plan will include the required strategies, policies and site proposals to guide future planning across the District, and will replace the current suite of adopted Development Plans up to 2040.

ECC welcomes the opportunity to review and comment on the emerging new Local Plan vision, strategic priorities and objectives, initial growth scenarios, spatial options, thematic themes and ‘Planning for Complete Communities’. As Plan preparation continues, ECC is committed to working with RDC through regular and on-going focussed collaborative discussions to prepare evidence that ensures the preferred spatial strategy, policies and site allocations are sound, viable and deliverable, where future development is aligned to the provision of required local and strategic infrastructure.

A Local Plan can provide a platform from which to secure a sustainable economic, social and environmental future to the benefit of residents, businesses and visitors. A robust long-term strategy will provide a reliable basis on which RDC, ECC and its partners may plan and provide the services and required infrastructure for which they are responsible. To this end, ECC will use its best endeavours to assist on strategic and cross-boundary matters under the duty to cooperate (Duty), including engagement and co-operation with other organisations for which those issues may have relevance.

It is acknowledged that RDC has engaged ECC under the Duty, during the past year, in addition to the joint and regular meetings established with the South Essex authorities, through specific South Essex strategic planning duty to co-operate groups for Members and Officers respectively to explore strategic and cross boundary matters.

ECC interest in the Rochford New Local Plan – spatial options consultation
ECC aims to ensure that local policies and related strategies provide the greatest benefit to deliver a buoyant economy for the existing and future population that lives, works, visits not only in Rochford District, but Essex as a whole. This includes a balance of land-uses to create great places for all communities, and businesses across all sectors; and that the developer funding for the required infrastructure is clear and explicit. As a result, ECC is keen to understand, inform, support and help refine the formulation of the development strategy and policies delivered by LPAs within and adjoining Essex. Involvement is necessary and beneficial because of ECC’s roles as:
a. the highway and transport authority, including responsibility for the delivery of the Essex Local Transport Plan; the lead authority for education including early years and childcare (EYCC), Special Education Needs and Disabilities, and Post 16 education; Minerals and Waste Planning Authority; Lead Local Flood Authority; lead advisors on public health;
and adult social care in relation to the securing the right housing mix which takes account of the housing needs of older people and adults with disabilities;
b. an infrastructure funding partner, that seeks to ensure that development proposed is realistic and does not place an unnecessary (or unacceptable) cost burden on the public purse, and specifically ECC’s Capital Programme;
c. major provider and commissioner of a wide range of local government services throughout the county (and where potential cross boundary impacts need to be considered);
d. Advocate of the Essex Climate Action Commissioner’s (ECAC) Report 2021 Net Zero – Making Essex Carbon Neutral providing advice and recommendations for action on climate change mitigation and adaption including setting planning policies which minimise carbon. This work has been tailored for use in the county of Essex; and
e. involvement through the Association of South Essex Local Authorities (ASELA) and Opportunity South Essex Partnership (OSE), promoting economic development, regeneration, infrastructure delivery and new development throughout the County.

In accordance with the Duty, ECC will contribute cooperatively to the preparation of a new Rochford Local Plan, particularly within the following broad subject areas,
• Evidence base. Guidance with assembly and interpretation of the evidence base both for strategic/cross-boundary projects, for example, education provision and transport studies and modelling, and wider work across South Essex as part of the joint strategic plan.
• ECC assets and services. Where relevant, advice on the current status of assets and services and the likely impact and implications of proposals in the emerging Local Plan for the future operation and delivery of ECC services.
• Sub-regional and broader context. Assistance with identification of relevant information and its fit with broader strategic initiatives, and assessments of how emerging proposals for the District may impact on areas beyond and vice-versa.
• Policy development. Contributions on the relationship of the evidence base with the structure and content of emerging policies and proposals.
• Inter-relationship between Local Plans. Including the Essex Minerals Local Plan (2014) and the Essex and Southend-on-Sea Waste Local Plan (2017).

To achieve this, ECC seeks a formal structure for regular and ongoing engagement with RDC through the next stage of Plan preparation. Of critical importance is the additional evidence required for the site assessment process at both the individual and cumulative level to refine and develop the spatial strategy, which will be informed by the provision of sustainable and deliverable infrastructure and services at the right scale, location and time, for the existing and future residents of Rochford. There are also challenges arising from COVID-19 and how these can be addressed through the Local Plan and the future growth ambitions for London Southend Airport.

Key issues and messages of the ECC response
The ECC requirements are set within the context of national policy and ECC’s organisation plan proposals within “Everyone’s Essex” and commitments for “Renewal, Ambition and Equality” based on ECC’s strategies, policies, objectives and evidence base. The ECC response therefore identifies where we support emerging options and proposals, and where we recommend further work and engagement with ECC in order to refine and inform the “Preferred Options”, the next iteration of the local plan preparation, scheduled for consultation in Spring 2022. The key messages in ECC’s response are summarised below.
1. ECC support RDC preparing a new Local Plan and will assist with the preparation of sound evidence and policies, that plan for long term sustainable infrastructure delivery.
2. It is still too early for ECC to provide detailed comments on the impacts, opportunities and requirements for the full range of ECC infrastructure and services, and additional evidence is required on a range of matters to inform the selection of a preferred strategy and sites, together with supporting policies. It is acknowledged that ECC has engaged with RDC on the preparation of the transport evidence base to date, which has been proportionate to this stage of plan preparation.
3. The preferred strategy and site allocations will need to ensure that the requirements of ECC infrastructure and services are met to secure their sound, viable and sustainable delivery at the right scale, location and time, that is commensurate with housing needs and growth aspirations.
4. This will include engagement with preparing additional evidence, that will include, but is not limited to,
o Transportation modelling (including sustainable transport) to develop a strategy to realise modal shift including analysis of existing active and sustainable travel infrastructure (including bus network and services). In collaboration with ECC, it is recommended that RDC prepare a Local Cycling and Walking Infrastructure Plan (LCWIP).
o Scenario testing for education provision including early years and childcare and the approach to Special Education Needs with Disabilities provision.
o Minerals and waste policy compliant assessments.
o Flood and water management assessments through revised Critical Drainage Areas (CDAs) and revisions to the South Essex Water Management Action Plan.
o Economic need and employment evidence including an up to date Economic Development Needs Assessment to refine the level of economic growth to be planned for.
o ECC will also contribute to the evidence in respect of skills, Adult Social Care, Public Health, climate change, and green and blue infrastructure to that can deliver safer, greener, healthier communities.
o There is also benefit in undertaking a Health Impact Assessment to ensure health and wellbeing is comprehensively considered and integrated into the Local Plan, including a strategic health and wellbeing policy, an area where ECC can advise and assist, and one successfully implemented and included in other plans across Essex.
5. RDC will need to engage and work closely with ECC to inform site selection and the range of preferred sites both individually and cumulatively, having regard to the evidence.
6. Spatial Growth Scenarios – the preferred scenario should meet national policy to deliver housing and other growth requirements; climate change resilience and adaptation; and environmental aspirations of RDC. As a minimum, the standard methodology should be met and any buffer to drive local economic growth or address unmet need from elsewhere is supported but will need to be based on sound evidence.
7. Spatial Strategy Options – the spatial strategy option to proportionately spread growth across the district would not deliver the necessary scale of growth to secure the viable and sustainable delivery of local or strategic infrastructure and services (most notably a secondary school) and would not be supported. Based on the information presented in the SOC, a preferable option is likely to see a combination of the options presented resulting in urban intensification, a focus on main towns, and concentrated growth in one or more locations (resulting in a new neighbourhood the size of a larger village or small town). The option will need to be informed by the evidence base and further site assessments.
8. ECC will need to be involved in any cross boundary development proposals. To this end, Option 3a would need to be delivered in the longer term given current constraints of the strategic road network (Fairglen Interchange) and have regard to emerging proposals and aspirations arising in Basildon and Castle Point Boroughs; and Option 3b will require close and formal working arrangements with Southend-on-Sea Borough Council.
9. It is noted that several of ECC’s comments and observations made in response to the Issues and Options consultation from 2017/18 continue to apply, given the early stages of Plan preparation. We therefore reiterate where important our previous comments and additional points where this is necessary to do so.

The ECC response is set out in table from page 5 onwards and reflects the order of the SOC paper including responses to specific questions; the Integrated Impact Assessment; supporting Topic Papers; and Site Appraisal Paper.

[Due to tabular format of submission, please refer to attached documents for full submission]