Object
New Local Plan: Spatial Options Document 2021
Representation ID: 39513
Received: 22/09/2021
Respondent: Amherst Homes Ltd
No – achieving current build regulations and energy standards at M4(2), M4(3) and BREEAM Very Good is extremely challenging from a build perspective using current methods common in the UK. Until build technology catches up with the energy efficiency requirements of new build properties, increased efficiency measures will be challenging to achieve.
No – achieving current build regulations and energy standards at M4(2), M4(3) and BREEAM Very Good is extremely challenging from a build perspective using current methods common in the UK. Until build technology catches up with the energy efficiency requirements of new build properties, increased efficiency measures will be challenging to achieve.