Support

New Local Plan: Spatial Options Document 2021

Representation ID: 37886

Received: 12/08/2021

Respondent: Mr Samuel Martin

Representation Summary:

Option 4 - if done right appears to capture the positives of options whilst mitigating the risks of others.

Option 1 is logical to use what we have existing but if done too much could put extra burden to infrastructure. This is why I think supplementing it with Option 2/3 to ensure we have the growth needed whilst increasing the infrastructure required makes Option 4 the best option.

It is the most complex but the most forward looking of the options.

Full text:

Option 4 - if done right appears to capture the positives of options whilst mitigating the risks of others.

Option 1 is logical to use what we have existing but if done too much could put extra burden to infrastructure. This is why I think supplementing it with Option 2/3 to ensure we have the growth needed whilst increasing the infrastructure required makes Option 4 the best option.

It is the most complex but the most forward looking of the options.