Object
New Local Plan: Spatial Options Document 2021
Representation ID: 37736
Received: 07/08/2021
Respondent: Miss Donna Thresher
Representation Summary:
It is not possible to consider land before considering the infrastructure and current building program that is in progress. The current build program impacts the infrastructure more severely than the council is prepared to recognise and therefore an accurate assessment of infrastructure must be considered fist.
Full text:
It is not possible to consider land before considering the infrastructure and current building program that is in progress. The current build program impacts the infrastructure more severely than the council is prepared to recognise and therefore an accurate assessment of infrastructure must be considered fist.