Support
London Southend Airport and Environs Joint Area Action Plan Submission Document
Representation ID: 32321
Received: 10/04/2013
Respondent: London Southend Airport
Representation Summary:
Item iii in the text before this policy notes the longer term necessity to build more capacity into the network with an east-west link. It is suggested that, to ensure consistency in the plan, this is identified on the Proposals Map by an arrow head pointing eastwards from the roundabout at the end of St Laurence Way
Full text:
Item iii in the text before this policy notes the longer term necessity to build more capacity into the network with an east-west link. It is suggested that, to ensure consistency in the plan, this is identified on the Proposals Map by an arrow head pointing eastwards from the roundabout at the end of St Laurence Way