Representation Summary:

To meet the number of new jobs required in the District, if existing employment sites are de-allocated, then additional employment sites will be required. As the supply of employment land within the District is limited, any new sites will require the release of Green Belt land. As these sites will be outside of the existing urban areas, it is unlikely that these sites will be in as sustainable locations as the existing employment sites.

This site has very good accessibility, with links to the road network and close to the train station.

Full text:

To meet the number of new jobs required in the District, if existing employment sites are de-allocated, then additional employment sites will be required. As the supply of employment land within the District is limited, any new sites will require the release of Green Belt land. As these sites will be outside of the existing urban areas, it is unlikely that these sites will be in as sustainable locations as the existing employment sites.

This site has very good accessibility, with links to the road network and close to the train station.