Support

Allocations Submission Document

Representation ID: 28808

Received: 25/01/2013

Respondent: Raven Group

Agent: Pomery Planning Consultants

Representation Summary:

Support, respondents have provided some materplans which establish principles and alternative options if required.

Full text:

SER 9 West Great Wakering

The respondent fully supports the allocation SER9, in particular sub-allocation SER9b. The respondent owns the land identified as SER9b, as well as a significant land interests to the south and east of the allocation. In the interest of clarity, the respondent has included an ownership plan within a promotion document attached to these representations.

The wider ownership of land in this area, which includes the Local Wildlife Site (R25 Star Lane Pits), affords the respondent a certain amount of flexibility and opportunity, to not only deliver the new housing area, but also the required employment land, secure the wildlife area and potentially provide new areas of public open space.

Site SER9b
Allocation of this land for new housing is fully supported. The site is ideally located just south of the urban edge with a direct link to Great Wakering, High Street. There are no environmental or other reasons why this land cannot be developed for housing. The land is available, deliverable and fully developable with no impediments.

The site area extends to some 8.5 hectares. The Council anticipates that this site, along with allocation SER9a shall together deliver 250 residential units, plus a flexibility allowance of 5%. The delivery of these units is to be held back, in accordance with Core Strategy Policy H3, until post 2021, unless required in order to be brought forward earlier to maintain a 5 year supply of deliverable housing.

The Council is advised that this land will be maintained in agricultural use until it is required for housing. However, the respondent will adopt a flexible approach to land management so that the land can be made available sooner, if supply does not keep pace with the Council's housing trajectory.

Master Planning
In addition to the allocations for housing on site's SER9, additional allocations for housing and employment land are identified in Great Wakering. These sites, namely BFR1 - Star Lane Industrial Estate and Farmer Brickworks and NEL3 New Employment Land are clustered together and need to be considered jointly.

The respondent has produced some master plans for the area to illustrate the sites in context and to demonstrate indicatively, how the Green Belt release for SER9b could be developed. The master plans are provided within a Promotion Document or they will be provided separately as part these representations, to illustrate specific matters of interest.

Master Plan One
Master Plan One, illustrates how the combined sites could be built out as the Allocations DPD envisages.

The Master Plan illustrates 185 dwellings on allocation SER9b at a density of 22 dwellings per hectare (dph). Whilst the layout is indicative of a likely scheme, it is an 'every house' layout, which incorporates each and every requirement as set out in the submission document. The layout incorporates precisely the amount of semi-natural and formal open space, the required LAPs and LEAPS, as well as stated connectivity requirements and landscape buffers.

The density of 22 dph is considered to be appropriate to the site's context and proximity to the wildlife site. It is also appropriate to the Council's anticipated housing requirements for this area. It is noted that SER9 anticipates 30 dph across both allocations which combine to a total 13.5 hectares. At 30 dph, delivery on a combined SER9 allocation would be 405 units, which is clearly more than envisaged.

At 22 dph, site SER9b as shown on the Master Plan can provide 185 units on approximately 8.5 hectares and SER9a at 4.5 hectares could deliver approximately 100 units, thus a total of 285 units could be achieved. Whilst 285 is more than the 250 envisaged, when one considers the additional 5% and the likelihood of a Core Strategy review, prior to 2021 where some additional housing numbers are likely, then 285 units from these allocations is not unreasonable.

The layout shown on the indicative Master Plans for SER9b, whilst illustrative, incorporates the design requirements set out in the Council's Concept Statement. The principle vehicular access is as required taken from the redevelopment of the Former Brickworks site. At the present time, it is not clear whether the Council has received a suitable layout, as part of the planning application for the Brickworks, which is suitable and capable of serving an additional 185 residential units on SER9b. The respondent has taken advice from Transportation Consultants in relation to alternative access strategies. It is quite possible that some of the site could be served from the High Street or from an access south of the Brickworks. A paper from the respondent's Transport Consultant is attached to these representations, which explores the options.

Star Lane Pits Local Wildlife Site (LOWS)
The LOWS is of course an important resource, which needs to be protected in the long term. The respondent has recently undertaken a Phase One Habitat Survey to assess the site's overall quality and whether these are opportunities to improve its richness through better management. A summary paper is attached to these representations from the respondent's ecologist. The respondent would be willing to develop a better management plan for the wildlife site, which enhances its quality and ensures that it is able to co-exist alongside housing development and thrive in the long term.

Employment Allocation NEL 3
It can be seen on Master Plan One that provision is made for allocation NEL 3 for a new employment site as a green belt release to replace Star Lane Industrial Estate. The new industrial site is accessed as required from a single access/egress onto Star Lane. The site area of 2.5 Ha and its general position have been interpreted from the plan in the Allocations DPD. Provision is also made for pedestrian links between the industrial land and SER9b, which in turn connect with the High Street. The pedestrian link, which is shown to the west of the wildlife site, is through scrub land and spoil heaps from the adjacent former brickworks. This land has no ecological value.

Master Plan Two
Master Plan Two is the same as Master Plan One with respect to the potential treatment of allocation SER9b. However, it has been prepared to illustrate the flexible approach that the respondent can facilitate to ensure that the comprehensive development of the area could be achieved, whilst responding to changes in circumstances.

The respondent has strong reservations in relation to the delivery of new housing on Star Lane Industrial Estate as anticipated by allocation BFR1.

These reservations reflect the site's multiple ownership and mix of freehold and leasehold tenure. It is considered most unlikely that collectively the occupiers of the estate will act as one and choose to relocate. It is also unlikely that NEL3 would be constructed without the industrial units being pre-let.

In the event of the existing industrial estate not being redeveloped when or as anticipated, Master Plan Two illustrates additional housing on north of NEL3 to compensate for the housing not coming forward on the brownfield allocation. This option is just that, an option for the Council to consider if development does not emerge as anticipated. If however the existing industrial site is redeveloped, then the respondent can deliver NEL 3 as required and as illustrated on Master Plan One. If the brownfield development does not come forward as and when anticipated, then alternative provision for housing could be made available as shown on Master Plan Two to maintain a five year housing land supply.

Both Master Plan options also include a significant area of approximately 5.4 Ha of new Public Open Space to the south of the wildlife site. The respondent would welcome a discussion as to the provision of this additional land to meet existing and planned open space needs.

Consultations
During November 2012, the respondent provided Great Wakering Parish Council with a brochure document (enclosed with these representations) which introduce the landowners and tabled two preliminary and basic Master Plans. A briefing meeting was held with the Parish Council on the 28th November 2012, at which the respondent explained the likely approach to the allocations. The Parish Council were responsive to the proposals in principle and raised no fundamental objections. Parish Councillors had some concerns regarding education provision in the village and leisure facilities and it was explained to them that suitable provision would need to be made alongside new housing development through s106 agreements.

The respondent intends to continue an informal dialogue with the Parish Council as proposals evolve.

The plans mentioned have had to be emailed to the Council separately.