Representation ID: 28770
Received: 24/01/2013
Respondent: Anglian Water Services Ltd
3.14 There is a foul sewer crossing the site that requires a 4 metre easement either side of the pipe and could effect the developmment of the site . This existing public sewer should be located in highway or public open space and should not be located in privare gardens. If this is not possible, AW will consider an application under Section 185 Water Industry Act 1991 to divert the sewer ( this would be at the developers expense).
3.17 Support the requirement for sustainable urban drainage systems
3.14 There is a foul sewer crossing the site that requires a 4 metre easement either side of the pipe and could effect the developmment of the site . This existing public sewer should be located in highway or public open space and should not be located in privare gardens. If this is not possible, AW will consider an application under Section 185 Water Industry Act 1991 to divert the sewer ( this would be at the developers expense).
3.17 Support the requirement for sustainable urban drainage systems