Representation Summary:

We support the concept statement acknowledging:
- SuDS need to be provided and a drainage strategy submitted;
- That capacity in the foul water network will need modelling at the planning application stage due to downstream sewer flooding events. This issue is acknowledged in your Water Cycle Study so the reference in your allocations DPD is welcomed;
- That a management plan is required given the proximity of the site to a Local Wildlife Site.

Full text:

We support the concept statement acknowledging:
- SuDS need to be provided and a drainage strategy submitted;
- That capacity in the foul water network will need modelling at the planning application stage due to downstream sewer flooding events. This issue is acknowledged in your Water Cycle Study so the reference in your allocations DPD is welcomed;
- That a management plan is required given the proximity of the site to a Local Wildlife Site.