Support

Allocations Submission Document

Representation ID: 28722

Received: 24/01/2013

Respondent: Environment Agency

Representation Summary:

General support but query regarding comments made about Rayleigh WWTW.

Full text:

We support the concept statement acknowledging:
- SuDS need to be provided and a drainage strategy submitted. We also note you have highlighted a localised surface water flooding problem which will need to be addressed in the strategy;
- That you have acknowledged upgrades to the foul water infrastructure network may be required. This issue is acknowledged in your Water Cycle Study so the reference in your allocations DPD is welcomed.

However the text in paragraph 3.184 advises that upgrades at Rayleigh Waste Water Treatment Works (WWTWs) are likely to be required prior to development. Rayleigh WWTWs has had its flow measurements certified so we consider it possible to confirm adequate capacity for the development. We would however suggest you seek clarification on this matter with Anglian Water Services before amending the policy.