Support

Allocations Submission Document

Representation ID: 28721

Received: 24/01/2013

Respondent: Environment Agency

Representation Summary:

We support the concept statement acknowledging:
- SuDS need to be provided and a drainage strategy submitted;
- That capacity in the foul water network will need modelling at the planning application stage due to sewer flooding downstream. This issue is acknowledged in your Water Cycle Study so the reference in your allocations DPD is welcomed.

Full text:

We support the concept statement acknowledging:
- SuDS need to be provided and a drainage strategy submitted;
- That capacity in the foul water network will need modelling at the planning application stage due to sewer flooding downstream. This issue is acknowledged in your Water Cycle Study so the reference in your allocations DPD is welcomed.