Support

Allocations Submission Document

Representation ID: 28718

Received: 24/01/2013

Respondent: Environment Agency

Representation Summary:

General support but suggested minor amendment related to flood risk.

Full text:

We support the concept statement acknowledging:
- That part of the site is within Flood Zone 2 and 3 and that this land should be set aside for public open space. We strongly support this which would address the NPPF requirement for a sequential approach to be applied. A Flood Risk Assessment should support any future planning application to ensure all areas of Flood Zone are correctly identified. You may consider it useful to add this requirement to the policy as a minor amendment;
- SuDS need to be provided and a drainage strategy submitted;
- That capacity in the foul water network will need modelling at the planning application stage due to capacity issues at the pumping station downstream. This issue is acknowledged in your Water Cycle Study so the reference in your allocations DPD is welcomed.