Object
Hockley Area Action Plan Submission Document
Representation ID: 28562
Received: 20/01/2013
Respondent: Mr A James
Legally compliant? No
Sound? No
Duty to co-operate? Not specified
Representation Summary:
Comments: These costings seem on the low side especially the Spa roundabout upgrade, which I believe would be in the order of £1 m alone. Nothing has been allowed for the bottle neck under the railway bridge. I therefore believe this proposal to be unsound.
Full text:
Comments: These costings seem on the low side especially the Spa roundabout upgrade, which I believe would be in the order of £1 m alone. Nothing has been allowed for the bottle neck under the railway bridge. I therefore believe this proposal to be unsound.