Object

Allocations Submission Document

Representation ID: 28420

Received: 09/01/2013

Respondent: Mr Michael Livings

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

1. No detailed plans for highway infrastructure have been considered.
2. No detailed examination of the integration of the existing village facilities.
3. On the prevailing existing conditions - no evidence of a workable scheme to alleviate the severe drainage and sewerage issues for the south-west of Hullbridge.

Full text:

1. No detailed plans for highway infrastructure have been considered.
2. No detailed examination of the integration of the existing village facilities.
3. On the prevailing existing conditions - no evidence of a workable scheme to alleviate the severe drainage and sewerage issues for the south-west of Hullbridge.