Object

Core Strategy Submission Document: Schedule of minor amendments (2011)

Representation ID: 28261

Received: 05/10/2011

Respondent: Colliers International

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Since the last version, the contribution that the South East Ashingdon location will make to the housing supply in the second time period covered by this policy has been removed. In light of the current economic conditions and the need to maintain an adequate supply of housing land, the policy should adopt a flexible approach with regards the timing and release of land for residential development in order to ensure a 5-year housing supply.

Full text:

Although we agree with the general locations and phasing of residential properties over the plan period covered by this policy; we note that since the last version of the document (Core Strategy Submission - Schedule of Changes) the contribution that the South East Ashingdon location will make to the housing supply in the second time period covered by this policy has been removed.

In light of the current economic conditions and the need to maintain an adequate supply of housing land, the policy should adopt a flexible approach with regards the timing and release of land for residential development in order to ensure a 5-year housing supply.

In addition, within the draft National Planning Policy Framework ('NPPF') there is a further requirement that the supply of housing land should make an allowance of at least 20% to ensure choice and competition in the market for land.

The inclusion of 200 dwellings from South East Ashingdon in the period 2015-2021 would equate to the additional 20% of housing land advocated in the draft NPPF.