Support

Rochford Core Strategy Development Plan Document - Schedule of Changes

Representation ID: 26295

Received: 18/11/2010

Respondent: Aber Ltd

Agent: Colliers International

Representation Summary:

H3

In addition, to the general location of development been articulated within the Allocations Development Plan Document, in accordance with the requirement of PPS3 these sites have also been delineated on the key diagram.

This approach is consistent with the need to maintain flexibility in order to ensure certainty to
the delivery of the 15-year supply, particularly if any of the locations identified in the period
post 2026 need to be brought forward in order to maintain the 5 year supply. This may
require the release of land from the Green Belt ahead of the development of all the sites in
Policy H2.

Full text:

H3

In addition, to the general location of development been articulated within the Allocations Development Plan Document, in accordance with the requirement of PPS3 these sites have also been delineated on the key diagram.

This approach is consistent with the need to maintain flexibility in order to ensure certainty to
the delivery of the 15-year supply, particularly if any of the locations identified in the period
post 2026 need to be brought forward in order to maintain the 5 year supply. This may
require the release of land from the Green Belt ahead of the development of all the sites in
Policy H2.