Rochford Core Strategy Development Plan Document - Schedule of Changes
(443) Rochford Core Strategy Development Plan Document - Schedule of Changes
The changes below are expressed either in the conventional
form of strikethrough for deletions and
underlining for additions of text, or by specifying
the change in words in italics.
The page numbers and paragraph numbering below refer to the submission DPD, and do not take account of the deletion or addition of text.
Page | Policy/ Paragraph | Suggested Change | |||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7 | 1.2 |
…will deliver the spatial aspects of the vision set out
in the Sustainable Community Strategy and the Council’s
Corporate Plan, as well as how |
|||||||||||||||||||||||||||||||||||||||||
21 | 1.25 | Delete the paragraph. | |||||||||||||||||||||||||||||||||||||||||
22 | 1.27 |
The strategies at |
|||||||||||||||||||||||||||||||||||||||||
22 | First text box on the page | Delete the text box. | |||||||||||||||||||||||||||||||||||||||||
29 | 2.29 |
The East of England Plan has been revoked. The East of
England Plan Review 2031, which was approved by the
Regional Assembly, submitted to the Secretary of State,
and represents the ‘Option 1 ‘ numbers for Rochford
District, set a housing requirement of 3,800 additional
dwellings between 2011 and 2031. This equates to an
average of 190 dwellings per annum.in a
sustainable manner. |
|||||||||||||||||||||||||||||||||||||||||
29 | 2.31 | The revoked East of England Plan acknowledged that between 2001 and 2006 810 dwellings were completed in the District. Furthermore, between 2006 and 2008 an additional 618 dwellings were developed. | |||||||||||||||||||||||||||||||||||||||||
29 | 2.32 |
The Council are required to ensure there is an adequate
supply of housing for at least 15 years from the date
of adoption, and assuming adoption of the |
|||||||||||||||||||||||||||||||||||||||||
30 | 2.35 | … It also calculates that there is a need for 131 net additionaldwellings per annum to be developed in the District – this represented 52% of the District’s annual housing completion requirement as set out in the East of England Plan (2008). The Thames Gateway South Essex Strategic Housing Market Assessmentnotes the need to ensure that the affordable housing requirements set by localauthorities do not render the delivery of housing economically unviable and recommends local authorities across the housing market area set a requirement for35% of new dwellings to be affordable. | |||||||||||||||||||||||||||||||||||||||||
38 | Objectives |
|
|||||||||||||||||||||||||||||||||||||||||
39 | 4.2 |
|
|||||||||||||||||||||||||||||||||||||||||
39 | 4.3 | Rochford’s allocation is based on meeting current and future needs of the population , balanced with sustainability considerations. Current need encompasses the number of people in the District who are living within a household wanting to move to their own accommodation and form a separate household but are unable to do so (e.g. adult children). Projected need is derived from the supposition that the population will increase from 81,300 in 2007 to 87,000 by 2021. | |||||||||||||||||||||||||||||||||||||||||
39 | 4.4 |
|
|||||||||||||||||||||||||||||||||||||||||
39 | 4.6 |
The 2009 Strategic Housing Land Availability Assessment
(SHLAA) examined thesupply of housing land and, although
identified some capacity from extant permissionsand other
appropriate sites, also ascertained that Green Belt would
have had to be reallocated in order to meet the
requirements of the now revoked East of England
Plan. |
|||||||||||||||||||||||||||||||||||||||||
39,40 | Table |
Delete table and replace with:
|
|||||||||||||||||||||||||||||||||||||||||
42 | Policy H1 | Replace with Appendix CSSC1 | |||||||||||||||||||||||||||||||||||||||||
42 | 4.16 |
In order to |
|||||||||||||||||||||||||||||||||||||||||
42 | 4.17 |
Whilst the Council acknowledge |
|||||||||||||||||||||||||||||||||||||||||
44 | Policy H2 | Replace with Appendix CSSC2 | |||||||||||||||||||||||||||||||||||||||||
44 | Heading |
Extension to residential envelopes |
|||||||||||||||||||||||||||||||||||||||||
44 | 4.24 | In considering the general development locations for post-2026 development, the same issues as for Policy H2 above have been considered, but areas identified for post-2026 development may not be immediately deliverable, or the situation vis-à-vis infrastructure and the impact on existing communities is such that their delivery earlier would not be appropriate. | |||||||||||||||||||||||||||||||||||||||||
44 | 4.25 |
The figures, with an annual average of 190
|
|||||||||||||||||||||||||||||||||||||||||
45 | 4.26 | As with the pre-2026development areas, it is important to note that development coming forward within the areas outlined in Policy H3 will have to conform to the other policies within the Core Strategy. | |||||||||||||||||||||||||||||||||||||||||
45 | 4.27 |
The Council will monitor the provision of housing and
residential development may be allocated within the
general locations prior to 2026 in place of locations
identified in Policy H2, if delivery of the latter is
delayed to the extent that such action is necessary in
order to maintain a five-year housing supply.
|
|||||||||||||||||||||||||||||||||||||||||
45 | Policy H3 | Replace with Appendix CSSC3 | |||||||||||||||||||||||||||||||||||||||||
46 | 4.30 |
… As such, 35%, being the indicative aim for the
|
|||||||||||||||||||||||||||||||||||||||||
49 | 4.46 |
|
|||||||||||||||||||||||||||||||||||||||||
49 | 4.47 |
Given the historically low demand within the District,
provision for any additional pitches post |
|||||||||||||||||||||||||||||||||||||||||
50 | Policy H7 (Para 1) |
The Council will allocate 14 |
|||||||||||||||||||||||||||||||||||||||||
55-57 | Appendix H2 | Replace with CSSC4 | |||||||||||||||||||||||||||||||||||||||||
65 | 6.3 |
|
|||||||||||||||||||||||||||||||||||||||||
66 | 6.6 (line 6-8) |
Previous community involvement exercises have made it
clear to the Council that the District’s residents
consider the protection of the Green Belt to be very
important, as does national |
|||||||||||||||||||||||||||||||||||||||||
82 | 8.34 |
The East of England Plan (2008)
require |
|||||||||||||||||||||||||||||||||||||||||
96 | 9.36 |
Leisure activities have an important role to play in
health, quality of life and the economy. |
|||||||||||||||||||||||||||||||||||||||||
103 | 10.1 |
|
|||||||||||||||||||||||||||||||||||||||||
113 | 11.4 |
In the past, employment allocations for the District were
quantified in terms of the amount of land to be set aside
for employment purposes. |
|||||||||||||||||||||||||||||||||||||||||
117 | 11.20 |
|
|||||||||||||||||||||||||||||||||||||||||
133 | H2 (The 3rd column) |
Extensions to the residential envelope pre-2026
|
|||||||||||||||||||||||||||||||||||||||||
134 | H3 (The 1st column) |
H3 - Extension to residential envelopes |
|||||||||||||||||||||||||||||||||||||||||
134 | H3 (The 2nd column) |
Sites within the identified general locations will not be
allocated for development until |
|||||||||||||||||||||||||||||||||||||||||
134 | H3 (The 3rd column) |
Extensions to the residential envelope |
|||||||||||||||||||||||||||||||||||||||||
134 | H3 (The 4th column, second paragraph onwards) |
As such, some sites may be brought forward from
|
|||||||||||||||||||||||||||||||||||||||||
140 | GB1 (The 4th column) |
…By allocating land for the development the District
|
|||||||||||||||||||||||||||||||||||||||||
141 | URV1 (The 4th column, second paragraph) |
…By allocating land for the development the District
|
Appendix CSSC1
Policy H1 – The efficient use of land for housing
The Council will enable the delivery of 3,800 dwellings between 2011 and 2031, maintaining a rolling five-year supply of 950 dwellings until at least 2026. The Council will prioritise the reuse of previously developed land and ensure the delivery of appropriate sites within existing settlements identified by the Strategic Housing Land Availability Assessment. The Council will seek the redevelopment of Rawreth Lane Industrial Estate, Stambridge Mills and Star Lane Industrial Estate for appropriate alternative uses, including residential development, with alternative employment land allocated in appropriate locations as identified in Policy ED4. Any scheme for the redevelopment of Stambridge Mills must include adequate flood mitigation measures to satisfy the PPS25 exceptions test. Appendix H1 outlines the infrastructure that will be required for the development of newly allocated housing sites. The remaining housing requirement that cannot be delivered through the redevelopment of appropriate previously developed land will be met through extensions to the residential envelopes of existing settlements as outlined in Policies and H2 and H3. Residential development must conform to all policies within the Core Strategy, particularly in relation to infrastructure, and larger sites will be required to be comprehensively planned. In order to protect the character of existing settlements, the Council will resist the intensification of smaller sites within residential areas. Limited infilling will be considered acceptable, and will continue to contribute towards housing supply, provided it relates well to the existing street pattern, density and character of the locality. The Council will encourage an appropriate level of residential intensification within town centre areas, where higher density schemes (75+ dwellings per hectare) may be appropriate. |
Appendix CSSC2
Policy H2 – Extensions to residential envelopes and phasing
The residential envelope of existing settlements will be extended in the areas set out below and indicated on the Key Diagram, to contribute to a fifteen-year supply of housing land from 2011 onwards as follows:
The above figures will be treated as maxima over the fifteen-year period, in order to ensure that the amount of Green Belt land allocated for development is kept to the minimum required. In order to ensure the appropriate phasing of development, and to avoid the premature release of Green Belt land, development specified for 2021-2026 will only be brought forward earlier if:
The specific sites required in each location will be set out in the Allocations Development Plan Document. Development will be managed to ensure a housing delivery trajectory as set out in Appendix H2. Development within the above areas will be required to be comprehensively planned.Appendix H1 outlines the infrastructure that will be required for each residential area, and should be read in conjunction with Policy CLT1. The Council will maintain a flexible approach with regards to the timing of the release of land for residential development to ensure a constant five-year supply of land whilst balancing the need to maintain the Green Belt as far as practicable. |
Appendix CSSC3
Policy H3 – Extension to residential envelopes post-2026
Post-2026, the residential envelope of existing settlements will be extended in the following areas (as indicated on the Key Diagram) to deliver the following approximate number of units post-2026. Prior to this time, Green Belt land within such areas will be retained with the exception of release as per Policy H2, and land safeguarded to meet longer-term development needs.
As part of a flexible plan, monitor and manage approach, and reflecting the figures as maxima, the Council will adjust the numbers on the table in response to changing housing supply requirements. Development within the above areas will be required to be comprehensively planned. A range of other uses and infrastructure (including off-site infrastructure), having regard to the requirements of the Core Strategy, will be required to be developed and implemented in a timely manner alongside housing. Appendix H1 outlines the infrastructure that will be required for each residential area, and should be read in conjunction with Policy CLT1. The Council will monitor the supply and development of housing in the District and may bring forward development in these locations prior to 2026 if required to meet five-year supply requirements, but only if infrastructure to serve such developments is also brought forward earlier. |
Appendix CSSC4
Appendix H2
Breakdown of 2011-2031 housing trajectory by source
Source | Net dwelling completions | |||||||||||||||||||||
2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | 2014-15 | 2015-16 | 2016-17 | 2017-18 | 2018-19 | 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 | 2024-25 | 2025-26 | 2026-27 | 2027-28 | 2028-29 | 2029-30 | 2030-31 | |
Actual Completions 2009-2010 | 86 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Extant permissions | 0 | 57 | 166 | 109 | 56 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Appropriate Brownfield sites identified in SHLAA | 0 | 9 | 20 | 157 | 50 | 125 | 113 | 50 | 136 | 80 | 115 | 75 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Extensions to residential envelopes | 0 | 0 | 0 | 0 | 0 | 50 | 125 | 200 | 225 | 75 | 75 | 95 | 195 | 270 | 200 | 175 | 150 | 250 | 200 | 225 | 175 | 100 |