Comment
Allocations DPD Discussion and Consultation Document
Representation ID: 19948
Received: 30/04/2010
Respondent: Mr David Butcher
The site is not large enough to make a workable industrial site. There would need to be access for large vehicles and this would not be able on the existing roundabout with the A1245 and the A129 in view of the fact that it is blocked morning and evening with existing traffic. Industrial sites also need unlimited working times. Consideration should be made for noise.
The site is not large enough to make a workable industrial site. There would need to be access for large vehicles and this would not be able on the existing roundabout with the A1245 and the A129 in view of the fact that it is blocked morning and evening with existing traffic. Industrial sites also need unlimited working times. Consideration should be made for noise.