Object

Allocations DPD Discussion and Consultation Document

Representation ID: 19941

Received: 30/04/2010

Respondent: Mr David Butcher

Representation Summary:

The site is not large enough to make an industrial site. There would need to be access for large vehicles and this would not be possible on the existing A129 in view of the fact that it is blocked morning and evening with existing traffic. Industrial sites also need unlimited working times.

Full text:

The site is not large enough to make an industrial site. There would need to be access for large vehicles and this would not be possible on the existing A129 in view of the fact that it is blocked morning and evening with existing traffic. Industrial sites also need unlimited working times.