Comment

London Southend Airport and Environs Joint Area Action Plan Preferred Options

Representation ID: 10568

Received: 11/05/2009

Respondent: Renaissance Southend

Representation Summary:

Renaissance Southend has concerns that unless strictly controlled this 10,000sqm may compete directly with potential B1 schemes for the town centre to the detriment of town centre regeneration. The phasing and criteria for the release of this land for B1 development require further examination.

Full text:

Renaissance Southend has concerns that unless strictly controlled this 10,000sqm may compete directly with potential B1 schemes for the town centre to the detriment of town centre regeneration. The phasing and criteria for the release of this land for B1 development require further examination.