Q57d. Are there areas that require protecting from development?
Representation ID: 40497
Received: 22/09/2021
Respondent: Southend-on-Sea Borough Council
Yes. In considering the identified option 3b: concentrated growth north of Southend any future development scheme that may be justified as constituting exceptional circumstances and sustainable development should be carefully planned so as to avoid the coalescence of the
Rochford with Southend.
Dear Sir/Madam
Rochford District New Local Plan: Spatial Options: Consultation Paper 2021
Thank you for providing the opportunity for Southend Borough Council (SBC) to comment on
the above consultation plan. Set out below are officer level comments that relate principally
to cross-boundary issues and potential strategic scale developments.
SBC and Rochford District Council (RDC) should continue to co-operate on cross-boundary
issues, including through the Rochford and Southend Member Working Group and via the
Association of South Essex Local Authorities (ASELA).
The effectiveness of joint working between the two authorities should continue to be
documented and as we continue to work together under the duty to co-operate, Statements
of Common Ground should be prepared and agreed in line with Government guidance.
General Approach
The Borough Council broadly welcomes the publication of the Consultation Paper and its
general approach to setting out the potential options for meeting Rochford District’s future
development needs, whilst delivering sustainable development and protecting the local
environment. Given Southend Borough’s acute challenge in finding sufficient land within the
Borough to meet its own development needs, it also particularly welcomes the recognition of
the importance of liaising with neighbouring local authorities to ensure wider cross-boundary
issues and development needs are fully addressed.
Coordination of Plans
SBC would wish to emphasise the crucial ongoing importance of coordinating the
preparation of the Rochford New Local Plan with the Southend New Local Plan, which has
reached a similar stage of consultation (the Southend New Local Plan also currently being
out to public consultation at a second Regulation 18 stage, ‘Refining the options’).
Progressing the plans in a collaborative, coordinated and timely manner will be essential to
the effective and sustainable planning for this part of south-east Essex.
As was identified in consultation paper, where it summarises feedback from the Rochford
New Local Plan Issues and Options Document (December 2017 – March 2018), ‘an
infrastructure-first approach to planning is required as there are existing issues with
infrastructure capacity’. (Rochford Local Plan Spatial Options Consultation Paper, page 102)
In seeking to meet future development needs for this part of south-east Essex, it will be
essential that infrastructure provision, particularly in relation to transport, is planned in such a
way to ensure that infrastructure improvements are clearly identified, are realistic and
achievable. In our view, this requires an effective coordinated, sub-regional and cross-
boundary approach, both through our inputs to ongoing ASELA work and through continued
duty of co-operate cross-boundary arrangements.
Question 1 (page 21): Are there any other technical evidence studies that you feel the
Council needs to prepare to inform its new Local Plan, other than those listed in this section?
- Given the number of important strategic cross-boundary issues already recognized
between our two authorities (e.g. housing needs, employment needs, transport
infrastructure, environmental protection, strategic green infrastructure provision,
climate change mitigation/adaption, the future of London Southend Airport etc.), we
strongly advocate that both authorities must continue to work closely together on the
preparation of evidence studies and other technical work to support our plan making.
Draft Strategic Priorities and Objectives (pages 40 – 43)
Question 4: Do you agree with the strategic priorities and objectives we have identified? Is
there anything missing from the strategic priorities or objectives that you feel needs to be
included? – Inclusion of reference to a new Country Park facility north-east of
Southend should be considered and potentially included as part of Strategic
Objective 15.
It has long been an ambition to deliver a new Country Park facility to the north-east of
Southend, as identified in the adopted Southend Core Strategy. If enabled through our local
plans, it would complement similar facilities at Hadleigh Castle and Cherry Orchard and
provide a much needed addition to informal recreation opportunities for the residents of and
visitors to south east Essex.
It is therefore recommended that the words ‘including a new Country Park facility to the
north-east of Southend’ are inserted after the word ‘coastline’. The revised Strategic
Objective would then read as follows:
‘To protect and enhance leisure, sport, recreation and community facilities and to support the
delivery of a multi-functional green infrastructure network across our district and along the
coastline including a new Country Park facility to the north-east of Southend, connecting to
neighbouring areas in South Essex and beyond, to promote healthy and active lifestyles, and
improve physical and mental health and well-being into old age’.
Growth Scenarios (pages 46 – 50)
The ‘Southend New Local Plan - Refining the Options’ consultation document (2021) sets
out that Southend is unable to meet all identified housing needs, as calculated using the
Government’s Standard Methodology, up to 2040. Even if Southend’s remaining Green Belt
was developed there would be a calculated shortfall of around 4,000 new homes. This rises
to around 9,000 new homes if Green Belt land within Southend Borough is not developed.
It is therefore appropriate that Rochford District Council should continue to explore the
options within its area to accommodate a level of housing development which is higher than
necessary to meet its own housing needs (as calculated by Government’s Standard
Methodology), so it is able to consider the potential, and possibly address at least some of
the unmet housing need evident from plan preparation to date in Southend, in line with the
requirements of Government policy.
Spatial Strategy Options (pages 51 to 62)
Question 6: Which of the identified strategy options do you consider should be taken
forward in the Plan? - Strategy Option 4 Balanced Combination. (Strategy Options listed
in footnote 1 below)
It is our view that Strategy Option 4: Balanced Combination, appears to offer the most
appropriate strategic approach, balancing Strategy Option 1 and 3. This option appears to
provide the best opportunity to provide sustainable communities that afford the critical mass
needed to secure transformational new infrastructure whilst seeking to make the best
possible use of existing brownfield sites. It also allows for a continuous supply of
development land to come forward over the plan period.
In supporting this approach, it is recognized that as part of Strategy Option 4, Strategy
Option 1: Urban Intensification must take priority and every effort should be made to ensure
new economic and housing growth is being optimized where this would lead to sustainable
development within urban areas (i.e. the use of brownfield land) before looking at
development in the Green Belt.
Subject to Green Belt considerations, the Borough Council welcomes the identification of
Option 3a: concentrated growth west of Rayleigh and Option 3b: concentrated growth north
of Southend within the consultation as possible sites for comprehensive development noting
that may provide the potential critical mass for achieving infrastructure improvements.
It should be noted that land west of Rayleigh is well served by the strategic highway network
(A130 and A127) whilst land to the north of Southend is less so. The potential for this option
to come forward well served by the strategic highway network would be dependent therefore
on a coordinated and planned approach with land to the south in Southend Borough and the
provision of a new highway and sustainable transport link partly on land within Rochford
District.
The consultation document also omits to note that Option 3c, concentrated growth to the
east of Rochford, would also be strongly dependent on new highway provision to the east of
Rochford, the existing Ashingdon Road being of an inadequate capacity to cope with the
increase in transport movements.
In this respect Figure 23 (Sustainability Appraisal of Strategy Options (AECOM, 2021))
which identifies Options 3a, 3b, 3c and 4 as providing a positive return in terms of transport
and movement is misleading.
Rochford District Council and Southend Borough Council would need to co-operate
effectively to explore the potential opportunity of comprehensive development to the north of
Southend (Option 3b) if this option were to be considered further. This joint work can then
inform both Councils’ next stage of plan making.
Any growth in this location is well placed to meet some of Southend’s unmet housing need,
however, if it were to come forward it must deliver significant new infrastructure which
ensures it’s development is sustainable and delivers advantages to neighbouring
communities, including neighbourhoods in Southend, which could benefit for example from
the close proximity of new accessible parkland, education, community and leisure facilities
delivered as part of development in this locality. It is also crucial that any development
provides for the additional road, active travel and public transport capacity necessary to
serve the development and mitigate fully any impacts which might arise.
A comprehensive development in this area appears to include most of the land necessary to
deliver the new road links necessary to facilitate development within both authority areas
and provide relief to the existing network. Development of this scale also has greater
potential to deliver the level of development finance required to help provide for those links.
SBC would not support development to the east of Rochford or south of river Roach without
significant mitigation and transport improvements both within Rochford District and Southend
Borough. SBC has delivered a rolling program of junction improvements along the A127 over
the last 20 years, however further improvements to increase capacity at pinch points are
likely to be required to facilitate growth. There are however constraints in increasing capacity
along the A127 given its urban context. As such, both Councils, along with Essex County
Council should explore strategic transport opportunities and funding mechanisms, including
a potential new link road/ sustainable transport corridor to the north of Southend, the option
of a new transport hub at Southend Airport Railway Station with improved access and further
improvements along the A127.
Strategy Option 2: Urban Extensions is unlikely to deliver the required transport
improvements necessary to facilitate accommodate the growth in trips on the network within
this area.
Spatial Themes
Question 8: Are there any key spatial themes that you feel we have missed or that require
greater emphasis? – Yes. Transport and Connectivity.
As a general rule, all the themes listed are self-contained in that they relate to specific
sites/areas of land and uses of land. The exception is ‘Transport and Connectivity’.
Transport infrastructure provision has a wider impact that relates to a range of transport
modes and is cross-boundary and sub-regional in its impact. As such the theme is
considered to require greater emphasis in the Plan.
Climate Change and Resilient Environments (pages 65 – 68)
Questions 9, 11 and 12 relating to whether a sequential approach to flood risk should be
taken, for development to source a percentage of their energy from low carbon and
renewable sources, and the provision of higher energy efficiency standards are supported.
Question 10: Do you agree that the Coastal Protection Belt and Upper Roach Valley should
be protected from development that would be harmful to their landscape character? – Yes.
These areas also provide important areas for informal recreation for the residents of southeast Essex including Southend.
Place Making and Design (pages 69 – 72)
Question 16a: Do you consider that new design guides, codes or masterplans should be
created alongside the new local plan? – Yes.
Question 16b: If yes, do you think it is more appropriate to have a single design guide/code
for the whole District, or to have design guides/codes/masterplans for individual settlements
or growth areas? – To have design guides/masterplans for individual growth areas.
It will be essential that any identified concentrated growth sites (Options 3a and 3b) are
planned and designed individually so that the sites can be effectively planned in a
sustainable manner that takes into full account their setting and local environment and
provides for well-designed places and spaces.
Employment and Jobs (pages 84 – 90)
Question 25: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new employment facilities or improvements to existing employment
facilities? – Yes, land north of Temple Farm Industrial Estate.
Land north of the existing Temple Farm Industrial Estate provides the opportunity for an
extension of the estate to meet future employment needs as part of strategy option 3b:
concentrated growth north of Southend.
Future of London Southend Airport (pages 91 – 93)
Question 28: With reference to the options (listed as footnote 2 below), or your own options,
how do you feel we can best manage the Airport’s adaptations and growth through the
planning system?
SBC is currently consulting on options within its Local Plan ‘Refining the Plan Options’
document on how to continue to plan for London Southend Airport and would welcome
continued co-operation with RDC to ensure an effective policy framework remains up-to-date
to manage future development at the Airport, this could include consistent policies included
within respective Local Plans. It is crucial that any future growth that is facilitated, if that is
indeed the right course of action, should fully consider the environmental impacts of that
growth. It should also be noted that the existing planning permission allows a level of growth
beyond the level of operations being experienced pre-Covid, in 2019 and that level of
operation was in itself leading to local complaints associated with aircraft noise, airport
operations, on street car parking locally and night-flying in particular.
Green and Blue Infrastructure (pages 98 – 101)
Question 33: Do you agree that the central woodlands arc and island wetlands, shown on
Figure 32 are the most appropriate areas for new regional parklands? Are there any other
areas that should be considered or preferred? – Yes. See comments relating to question
34 below.
Question 34: With reference to your preferred Strategy Option, are there opportunities for
growth to help deliver new strategic green and blue infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers clear
opportunities to deliver new accessible green space including the provision of a new subregional scale Country Park facility aligning with the River Roach and incorporating land
within flood Zone 2 (Figure 8). A new Country Park in this location would provide informal
countryside opportunities to the benefit of residents within the eastern peninsula of southeast Essex and would complement the facilities at Hadleigh Castle Country Park and Cherry
Orchard Jubilee Country Park and the broader South Essex Regional Park concept.
Community Infrastructure (pages 102 – 105)
Question 36: With reference to your preferred strategy option, are there opportunities for
growth to deliver new or improved community infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for a range of community infrastructure, including new school, leisure and health
facilities.
Transport and Connectivity (pages 123 – 126)
Question 51: With reference to the options (listed as footnote 3 below), or your own options,
how do you feel we can best address our transport and connectivity needs through the plan?
All four options need to be pursued as part of an integrated approach in partnership
with South Essex Local Authorities, Essex County Council and the Government.
As stated in the Rochford Local Plan consultation document: ‘it is clear that a more
ambitious approach is required to connectivity if we are to keep growing.’ A step change in
improving connectivity and accessibility is needed to accommodate growth if the local
economy is to remain attractive to investors, and highway congestion and air quality issues
are to be addressed.
The plan needs to recognise that significant volumes of traffic that have their origin or
destination in Rochford District will utilise highways within Southend Borough, particularly the
A127. A coordinated partnership approach to infrastructure provision is therefore essential.
The Rochford Local Plan should seek to ensure that the approval of any large development
proposals are subject to infrastructure triggers where developments are not permitted to
proceed until such time as the necessary infrastructure is committed. Individual development
sites cannot continue to be treated in isolation, the cumulative impact of development
schemes has and will continue to have significant impacts on the existing highway
infrastructure, which has impacts beyond Rochford District.
Question 52: Are there any areas where improvements to transport connections are
needed? What could be done to help improve connectivity in these areas?
Yes. A comprehensive integrated partnership approach to improving transport
connections is required across the whole sub-region.
Question 53: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new transport connections, such as link roads or rapid transit? What routes
and modes should these take?
Yes. Option 3b: concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend appears to offer the
potential to provide for improved transport connectivity. Such a development scheme would
be dependent on the provision of a new link road from east Southend to the A127 via
Warners Bridge, utilising land within the administrative district of Rochford, as well as a new
transport hub at Southend Airport Train Station.
Any such link road should also give consideration to the potential for a Rochford bypass to
the east of the town particularly if Option 3c: concentrated growth to the east of Rochford
were to be taken forward. This could provide the first phase in a potential opportunity to
deliver an outer strategic highway route linking to the A130 between Rayleigh and
Hullbridge.
Planning for Complete Communities
• Rayleigh (pages 133 – 134)
Question 56b: With reference to Figure 44 and your preferred strategy option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3a: concentrated growth west of
Rayleigh.
The identified option of seeking concentrated growth west of Rayleigh offers the potential to
meet a variety of housing needs, mixed use developments and community infrastructure.
• Rochford and Ashingdon (pages 136 – 137)
Question 57e: Do you agree that the local green spaces shown on Figure 45 hold local
significance? Are there any other open spaces that hold particular local significance? Yes.
Edwards Hall Park
Edwards Hall Park serves the informal recreational needs of residents of Eastwood in
Southend Borough and provides an important pedestrian/equestrian gateway into the Cherry
Orchard Jubilee Country Park.
Question 57d: Are there any areas that require protecting from development? Why these
areas? Yes.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the coalescence of the
Rochford with Southend.
Wakerings and Barling (pages 142 – 143)
Question 59b: With reference to Figure 47 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
provision of public open green space.
Question 59d: Are there any areas that require protecting from development? Why these
areas? Yes. Preventing the direct coalescence of Great Wakering/Little Wakering with
Southend.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the direct coalescence
of the Great and Little Wakering with Southend.
Stonebridge and Sutton (pages 160 – 161)
Question 64b: With reference to Figure 53 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
public open green space.
Other Minor Comments
There are one or two typing and cartographical errors in the consultation document as
follows:
- Page 65 last paragraph, the third sentence is incomplete.
- Page 98 Figure 32: Map of Key Green and Blue Infrastructure Assets includes
land within the Southend Borough south of Great and Little Wakering. This should be
deleted from the map.
- Page 135 Figure 45: Map of Rochford and Ashingdon
should read Figure 44: Map of Rayleigh. In addition, the blue horizontal lines
defined on the map are not interpreted in the key.
Kind Regards
Mark Sheppard
Team Leader Strategic Planning
Southend Borough Council
_________________________________________________________________
Footnotes
Footnote 1: Page 51 summarises the 4 strategy options as follows:
• Strategy Option 1: Urban Intensification
• Strategy Option 2: Urban Extensions
- » Option 2a: Focused on main towns
- » Option 2b: Dispersed to all settlements based on Settlement Hierarchy
• Strategy Option 3: Concentrated growth
- » Option 3a: Focused west of Rayleigh
- » Option 3b: Focused north of Southend
- » Option 3c: Focused east of Rochford
• Strategy Option 4: Balanced Combination
Footnote 2: Question 28 refers – Options for planning for the future of London Southend
Airport (page 93)
Given the ongoing uncertainty surrounding the impact of Covid-19 on the aviation industry, it is not
currently possible to identify precise land use requirements for the airport’s growth. Nevertheless,
there are considered to be a number of options available relating to planning for the future of London
Southend Airport. These are:
1. To work alongside Southend-on-Sea Borough Council to prepare a new joint Area Action Plan, or
masterplan, alongside each authority’s respective new Local Plan, that contains a consistent policy
approach to managing the Airport’s long-term growth ambitions
2. To work alongside Southend-on-Sea Borough Council to ensure that policies contained within both
authority’s respective Local Plans maintain a consistent policy approach, as far as is practicable, to
managing the Airport’s long-term growth ambitions
3. To prepare a new Area Action Plan, or masterplan, to manage the Airport’s long-term growth
ambitions, with suitable partner engagement but without the status of a statutory document
4. To continue to make decisions based on the existing JAAP for the time being, but to consider
developing a new Area Action Plan, or masterplan, after the new Local Plan is adopted or when the
need arises
Footnote 3: Question 51 refers – Options for addressing Transport and Connectivity (page 125)
Non-exclusive options for addressing transport and connectivity through the plan are to:
1. Embed a sustainable movement hierarchy into the plan to ensure sustainable modes of transport
are prioritised in favour of private vehicles
2. Prepare an Infrastructure Delivery Plan alongside the plan to ensure new development delivers
meaningful improvements to transport networks, including to cycling, walking, public transport and
road
3. Prepare a Local Walking and Cycling Infrastructure Plan or Cycling Delivery Plan alongside the
plan to identify and deliver specific improvements to our walking and cycling networks, including
costed schemes highlighted in the Rochford Cycling Action Plan
4. Work with Government, Highways England, Essex County Council and neighbouring local
authorities to deliver meaningful new transport options, such as rapid transit solutions and a long-term
solution to the A12
Support
New Local Plan: Spatial Options Document 2021
Q59b. With reference to Figure 47 and your preferred Strategy Option, do you think any of the land edged blue should be made available for any of the following uses?
Representation ID: 40498
Received: 22/09/2021
Respondent: Southend-on-Sea Borough Council
Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential to provide for improved community infrastructure, transport and access improvements and provision of public open green space.
Dear Sir/Madam
Rochford District New Local Plan: Spatial Options: Consultation Paper 2021
Thank you for providing the opportunity for Southend Borough Council (SBC) to comment on
the above consultation plan. Set out below are officer level comments that relate principally
to cross-boundary issues and potential strategic scale developments.
SBC and Rochford District Council (RDC) should continue to co-operate on cross-boundary
issues, including through the Rochford and Southend Member Working Group and via the
Association of South Essex Local Authorities (ASELA).
The effectiveness of joint working between the two authorities should continue to be
documented and as we continue to work together under the duty to co-operate, Statements
of Common Ground should be prepared and agreed in line with Government guidance.
General Approach
The Borough Council broadly welcomes the publication of the Consultation Paper and its
general approach to setting out the potential options for meeting Rochford District’s future
development needs, whilst delivering sustainable development and protecting the local
environment. Given Southend Borough’s acute challenge in finding sufficient land within the
Borough to meet its own development needs, it also particularly welcomes the recognition of
the importance of liaising with neighbouring local authorities to ensure wider cross-boundary
issues and development needs are fully addressed.
Coordination of Plans
SBC would wish to emphasise the crucial ongoing importance of coordinating the
preparation of the Rochford New Local Plan with the Southend New Local Plan, which has
reached a similar stage of consultation (the Southend New Local Plan also currently being
out to public consultation at a second Regulation 18 stage, ‘Refining the options’).
Progressing the plans in a collaborative, coordinated and timely manner will be essential to
the effective and sustainable planning for this part of south-east Essex.
As was identified in consultation paper, where it summarises feedback from the Rochford
New Local Plan Issues and Options Document (December 2017 – March 2018), ‘an
infrastructure-first approach to planning is required as there are existing issues with
infrastructure capacity’. (Rochford Local Plan Spatial Options Consultation Paper, page 102)
In seeking to meet future development needs for this part of south-east Essex, it will be
essential that infrastructure provision, particularly in relation to transport, is planned in such a
way to ensure that infrastructure improvements are clearly identified, are realistic and
achievable. In our view, this requires an effective coordinated, sub-regional and cross-
boundary approach, both through our inputs to ongoing ASELA work and through continued
duty of co-operate cross-boundary arrangements.
Question 1 (page 21): Are there any other technical evidence studies that you feel the
Council needs to prepare to inform its new Local Plan, other than those listed in this section?
- Given the number of important strategic cross-boundary issues already recognized
between our two authorities (e.g. housing needs, employment needs, transport
infrastructure, environmental protection, strategic green infrastructure provision,
climate change mitigation/adaption, the future of London Southend Airport etc.), we
strongly advocate that both authorities must continue to work closely together on the
preparation of evidence studies and other technical work to support our plan making.
Draft Strategic Priorities and Objectives (pages 40 – 43)
Question 4: Do you agree with the strategic priorities and objectives we have identified? Is
there anything missing from the strategic priorities or objectives that you feel needs to be
included? – Inclusion of reference to a new Country Park facility north-east of
Southend should be considered and potentially included as part of Strategic
Objective 15.
It has long been an ambition to deliver a new Country Park facility to the north-east of
Southend, as identified in the adopted Southend Core Strategy. If enabled through our local
plans, it would complement similar facilities at Hadleigh Castle and Cherry Orchard and
provide a much needed addition to informal recreation opportunities for the residents of and
visitors to south east Essex.
It is therefore recommended that the words ‘including a new Country Park facility to the
north-east of Southend’ are inserted after the word ‘coastline’. The revised Strategic
Objective would then read as follows:
‘To protect and enhance leisure, sport, recreation and community facilities and to support the
delivery of a multi-functional green infrastructure network across our district and along the
coastline including a new Country Park facility to the north-east of Southend, connecting to
neighbouring areas in South Essex and beyond, to promote healthy and active lifestyles, and
improve physical and mental health and well-being into old age’.
Growth Scenarios (pages 46 – 50)
The ‘Southend New Local Plan - Refining the Options’ consultation document (2021) sets
out that Southend is unable to meet all identified housing needs, as calculated using the
Government’s Standard Methodology, up to 2040. Even if Southend’s remaining Green Belt
was developed there would be a calculated shortfall of around 4,000 new homes. This rises
to around 9,000 new homes if Green Belt land within Southend Borough is not developed.
It is therefore appropriate that Rochford District Council should continue to explore the
options within its area to accommodate a level of housing development which is higher than
necessary to meet its own housing needs (as calculated by Government’s Standard
Methodology), so it is able to consider the potential, and possibly address at least some of
the unmet housing need evident from plan preparation to date in Southend, in line with the
requirements of Government policy.
Spatial Strategy Options (pages 51 to 62)
Question 6: Which of the identified strategy options do you consider should be taken
forward in the Plan? - Strategy Option 4 Balanced Combination. (Strategy Options listed
in footnote 1 below)
It is our view that Strategy Option 4: Balanced Combination, appears to offer the most
appropriate strategic approach, balancing Strategy Option 1 and 3. This option appears to
provide the best opportunity to provide sustainable communities that afford the critical mass
needed to secure transformational new infrastructure whilst seeking to make the best
possible use of existing brownfield sites. It also allows for a continuous supply of
development land to come forward over the plan period.
In supporting this approach, it is recognized that as part of Strategy Option 4, Strategy
Option 1: Urban Intensification must take priority and every effort should be made to ensure
new economic and housing growth is being optimized where this would lead to sustainable
development within urban areas (i.e. the use of brownfield land) before looking at
development in the Green Belt.
Subject to Green Belt considerations, the Borough Council welcomes the identification of
Option 3a: concentrated growth west of Rayleigh and Option 3b: concentrated growth north
of Southend within the consultation as possible sites for comprehensive development noting
that may provide the potential critical mass for achieving infrastructure improvements.
It should be noted that land west of Rayleigh is well served by the strategic highway network
(A130 and A127) whilst land to the north of Southend is less so. The potential for this option
to come forward well served by the strategic highway network would be dependent therefore
on a coordinated and planned approach with land to the south in Southend Borough and the
provision of a new highway and sustainable transport link partly on land within Rochford
District.
The consultation document also omits to note that Option 3c, concentrated growth to the
east of Rochford, would also be strongly dependent on new highway provision to the east of
Rochford, the existing Ashingdon Road being of an inadequate capacity to cope with the
increase in transport movements.
In this respect Figure 23 (Sustainability Appraisal of Strategy Options (AECOM, 2021))
which identifies Options 3a, 3b, 3c and 4 as providing a positive return in terms of transport
and movement is misleading.
Rochford District Council and Southend Borough Council would need to co-operate
effectively to explore the potential opportunity of comprehensive development to the north of
Southend (Option 3b) if this option were to be considered further. This joint work can then
inform both Councils’ next stage of plan making.
Any growth in this location is well placed to meet some of Southend’s unmet housing need,
however, if it were to come forward it must deliver significant new infrastructure which
ensures it’s development is sustainable and delivers advantages to neighbouring
communities, including neighbourhoods in Southend, which could benefit for example from
the close proximity of new accessible parkland, education, community and leisure facilities
delivered as part of development in this locality. It is also crucial that any development
provides for the additional road, active travel and public transport capacity necessary to
serve the development and mitigate fully any impacts which might arise.
A comprehensive development in this area appears to include most of the land necessary to
deliver the new road links necessary to facilitate development within both authority areas
and provide relief to the existing network. Development of this scale also has greater
potential to deliver the level of development finance required to help provide for those links.
SBC would not support development to the east of Rochford or south of river Roach without
significant mitigation and transport improvements both within Rochford District and Southend
Borough. SBC has delivered a rolling program of junction improvements along the A127 over
the last 20 years, however further improvements to increase capacity at pinch points are
likely to be required to facilitate growth. There are however constraints in increasing capacity
along the A127 given its urban context. As such, both Councils, along with Essex County
Council should explore strategic transport opportunities and funding mechanisms, including
a potential new link road/ sustainable transport corridor to the north of Southend, the option
of a new transport hub at Southend Airport Railway Station with improved access and further
improvements along the A127.
Strategy Option 2: Urban Extensions is unlikely to deliver the required transport
improvements necessary to facilitate accommodate the growth in trips on the network within
this area.
Spatial Themes
Question 8: Are there any key spatial themes that you feel we have missed or that require
greater emphasis? – Yes. Transport and Connectivity.
As a general rule, all the themes listed are self-contained in that they relate to specific
sites/areas of land and uses of land. The exception is ‘Transport and Connectivity’.
Transport infrastructure provision has a wider impact that relates to a range of transport
modes and is cross-boundary and sub-regional in its impact. As such the theme is
considered to require greater emphasis in the Plan.
Climate Change and Resilient Environments (pages 65 – 68)
Questions 9, 11 and 12 relating to whether a sequential approach to flood risk should be
taken, for development to source a percentage of their energy from low carbon and
renewable sources, and the provision of higher energy efficiency standards are supported.
Question 10: Do you agree that the Coastal Protection Belt and Upper Roach Valley should
be protected from development that would be harmful to their landscape character? – Yes.
These areas also provide important areas for informal recreation for the residents of southeast Essex including Southend.
Place Making and Design (pages 69 – 72)
Question 16a: Do you consider that new design guides, codes or masterplans should be
created alongside the new local plan? – Yes.
Question 16b: If yes, do you think it is more appropriate to have a single design guide/code
for the whole District, or to have design guides/codes/masterplans for individual settlements
or growth areas? – To have design guides/masterplans for individual growth areas.
It will be essential that any identified concentrated growth sites (Options 3a and 3b) are
planned and designed individually so that the sites can be effectively planned in a
sustainable manner that takes into full account their setting and local environment and
provides for well-designed places and spaces.
Employment and Jobs (pages 84 – 90)
Question 25: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new employment facilities or improvements to existing employment
facilities? – Yes, land north of Temple Farm Industrial Estate.
Land north of the existing Temple Farm Industrial Estate provides the opportunity for an
extension of the estate to meet future employment needs as part of strategy option 3b:
concentrated growth north of Southend.
Future of London Southend Airport (pages 91 – 93)
Question 28: With reference to the options (listed as footnote 2 below), or your own options,
how do you feel we can best manage the Airport’s adaptations and growth through the
planning system?
SBC is currently consulting on options within its Local Plan ‘Refining the Plan Options’
document on how to continue to plan for London Southend Airport and would welcome
continued co-operation with RDC to ensure an effective policy framework remains up-to-date
to manage future development at the Airport, this could include consistent policies included
within respective Local Plans. It is crucial that any future growth that is facilitated, if that is
indeed the right course of action, should fully consider the environmental impacts of that
growth. It should also be noted that the existing planning permission allows a level of growth
beyond the level of operations being experienced pre-Covid, in 2019 and that level of
operation was in itself leading to local complaints associated with aircraft noise, airport
operations, on street car parking locally and night-flying in particular.
Green and Blue Infrastructure (pages 98 – 101)
Question 33: Do you agree that the central woodlands arc and island wetlands, shown on
Figure 32 are the most appropriate areas for new regional parklands? Are there any other
areas that should be considered or preferred? – Yes. See comments relating to question
34 below.
Question 34: With reference to your preferred Strategy Option, are there opportunities for
growth to help deliver new strategic green and blue infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers clear
opportunities to deliver new accessible green space including the provision of a new subregional scale Country Park facility aligning with the River Roach and incorporating land
within flood Zone 2 (Figure 8). A new Country Park in this location would provide informal
countryside opportunities to the benefit of residents within the eastern peninsula of southeast Essex and would complement the facilities at Hadleigh Castle Country Park and Cherry
Orchard Jubilee Country Park and the broader South Essex Regional Park concept.
Community Infrastructure (pages 102 – 105)
Question 36: With reference to your preferred strategy option, are there opportunities for
growth to deliver new or improved community infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for a range of community infrastructure, including new school, leisure and health
facilities.
Transport and Connectivity (pages 123 – 126)
Question 51: With reference to the options (listed as footnote 3 below), or your own options,
how do you feel we can best address our transport and connectivity needs through the plan?
All four options need to be pursued as part of an integrated approach in partnership
with South Essex Local Authorities, Essex County Council and the Government.
As stated in the Rochford Local Plan consultation document: ‘it is clear that a more
ambitious approach is required to connectivity if we are to keep growing.’ A step change in
improving connectivity and accessibility is needed to accommodate growth if the local
economy is to remain attractive to investors, and highway congestion and air quality issues
are to be addressed.
The plan needs to recognise that significant volumes of traffic that have their origin or
destination in Rochford District will utilise highways within Southend Borough, particularly the
A127. A coordinated partnership approach to infrastructure provision is therefore essential.
The Rochford Local Plan should seek to ensure that the approval of any large development
proposals are subject to infrastructure triggers where developments are not permitted to
proceed until such time as the necessary infrastructure is committed. Individual development
sites cannot continue to be treated in isolation, the cumulative impact of development
schemes has and will continue to have significant impacts on the existing highway
infrastructure, which has impacts beyond Rochford District.
Question 52: Are there any areas where improvements to transport connections are
needed? What could be done to help improve connectivity in these areas?
Yes. A comprehensive integrated partnership approach to improving transport
connections is required across the whole sub-region.
Question 53: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new transport connections, such as link roads or rapid transit? What routes
and modes should these take?
Yes. Option 3b: concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend appears to offer the
potential to provide for improved transport connectivity. Such a development scheme would
be dependent on the provision of a new link road from east Southend to the A127 via
Warners Bridge, utilising land within the administrative district of Rochford, as well as a new
transport hub at Southend Airport Train Station.
Any such link road should also give consideration to the potential for a Rochford bypass to
the east of the town particularly if Option 3c: concentrated growth to the east of Rochford
were to be taken forward. This could provide the first phase in a potential opportunity to
deliver an outer strategic highway route linking to the A130 between Rayleigh and
Hullbridge.
Planning for Complete Communities
• Rayleigh (pages 133 – 134)
Question 56b: With reference to Figure 44 and your preferred strategy option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3a: concentrated growth west of
Rayleigh.
The identified option of seeking concentrated growth west of Rayleigh offers the potential to
meet a variety of housing needs, mixed use developments and community infrastructure.
• Rochford and Ashingdon (pages 136 – 137)
Question 57e: Do you agree that the local green spaces shown on Figure 45 hold local
significance? Are there any other open spaces that hold particular local significance? Yes.
Edwards Hall Park
Edwards Hall Park serves the informal recreational needs of residents of Eastwood in
Southend Borough and provides an important pedestrian/equestrian gateway into the Cherry
Orchard Jubilee Country Park.
Question 57d: Are there any areas that require protecting from development? Why these
areas? Yes.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the coalescence of the
Rochford with Southend.
Wakerings and Barling (pages 142 – 143)
Question 59b: With reference to Figure 47 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
provision of public open green space.
Question 59d: Are there any areas that require protecting from development? Why these
areas? Yes. Preventing the direct coalescence of Great Wakering/Little Wakering with
Southend.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the direct coalescence
of the Great and Little Wakering with Southend.
Stonebridge and Sutton (pages 160 – 161)
Question 64b: With reference to Figure 53 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
public open green space.
Other Minor Comments
There are one or two typing and cartographical errors in the consultation document as
follows:
- Page 65 last paragraph, the third sentence is incomplete.
- Page 98 Figure 32: Map of Key Green and Blue Infrastructure Assets includes
land within the Southend Borough south of Great and Little Wakering. This should be
deleted from the map.
- Page 135 Figure 45: Map of Rochford and Ashingdon
should read Figure 44: Map of Rayleigh. In addition, the blue horizontal lines
defined on the map are not interpreted in the key.
Kind Regards
Mark Sheppard
Team Leader Strategic Planning
Southend Borough Council
_________________________________________________________________
Footnotes
Footnote 1: Page 51 summarises the 4 strategy options as follows:
• Strategy Option 1: Urban Intensification
• Strategy Option 2: Urban Extensions
- » Option 2a: Focused on main towns
- » Option 2b: Dispersed to all settlements based on Settlement Hierarchy
• Strategy Option 3: Concentrated growth
- » Option 3a: Focused west of Rayleigh
- » Option 3b: Focused north of Southend
- » Option 3c: Focused east of Rochford
• Strategy Option 4: Balanced Combination
Footnote 2: Question 28 refers – Options for planning for the future of London Southend
Airport (page 93)
Given the ongoing uncertainty surrounding the impact of Covid-19 on the aviation industry, it is not
currently possible to identify precise land use requirements for the airport’s growth. Nevertheless,
there are considered to be a number of options available relating to planning for the future of London
Southend Airport. These are:
1. To work alongside Southend-on-Sea Borough Council to prepare a new joint Area Action Plan, or
masterplan, alongside each authority’s respective new Local Plan, that contains a consistent policy
approach to managing the Airport’s long-term growth ambitions
2. To work alongside Southend-on-Sea Borough Council to ensure that policies contained within both
authority’s respective Local Plans maintain a consistent policy approach, as far as is practicable, to
managing the Airport’s long-term growth ambitions
3. To prepare a new Area Action Plan, or masterplan, to manage the Airport’s long-term growth
ambitions, with suitable partner engagement but without the status of a statutory document
4. To continue to make decisions based on the existing JAAP for the time being, but to consider
developing a new Area Action Plan, or masterplan, after the new Local Plan is adopted or when the
need arises
Footnote 3: Question 51 refers – Options for addressing Transport and Connectivity (page 125)
Non-exclusive options for addressing transport and connectivity through the plan are to:
1. Embed a sustainable movement hierarchy into the plan to ensure sustainable modes of transport
are prioritised in favour of private vehicles
2. Prepare an Infrastructure Delivery Plan alongside the plan to ensure new development delivers
meaningful improvements to transport networks, including to cycling, walking, public transport and
road
3. Prepare a Local Walking and Cycling Infrastructure Plan or Cycling Delivery Plan alongside the
plan to identify and deliver specific improvements to our walking and cycling networks, including
costed schemes highlighted in the Rochford Cycling Action Plan
4. Work with Government, Highways England, Essex County Council and neighbouring local
authorities to deliver meaningful new transport options, such as rapid transit solutions and a long-term
solution to the A12
Support
New Local Plan: Spatial Options Document 2021
Q59d. Are there areas that require protecting from development? Why these areas? [Please state reasoning]
Representation ID: 40499
Received: 22/09/2021
Respondent: Southend-on-Sea Borough Council
Yes. Preventing the direct coalescence of Great Wakering/Little Wakering with Southend. In considering the identified option 3b: concentrated growth north of Southend any future development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the direct coalescence of the Great and Little Wakering with Southend.
Dear Sir/Madam
Rochford District New Local Plan: Spatial Options: Consultation Paper 2021
Thank you for providing the opportunity for Southend Borough Council (SBC) to comment on
the above consultation plan. Set out below are officer level comments that relate principally
to cross-boundary issues and potential strategic scale developments.
SBC and Rochford District Council (RDC) should continue to co-operate on cross-boundary
issues, including through the Rochford and Southend Member Working Group and via the
Association of South Essex Local Authorities (ASELA).
The effectiveness of joint working between the two authorities should continue to be
documented and as we continue to work together under the duty to co-operate, Statements
of Common Ground should be prepared and agreed in line with Government guidance.
General Approach
The Borough Council broadly welcomes the publication of the Consultation Paper and its
general approach to setting out the potential options for meeting Rochford District’s future
development needs, whilst delivering sustainable development and protecting the local
environment. Given Southend Borough’s acute challenge in finding sufficient land within the
Borough to meet its own development needs, it also particularly welcomes the recognition of
the importance of liaising with neighbouring local authorities to ensure wider cross-boundary
issues and development needs are fully addressed.
Coordination of Plans
SBC would wish to emphasise the crucial ongoing importance of coordinating the
preparation of the Rochford New Local Plan with the Southend New Local Plan, which has
reached a similar stage of consultation (the Southend New Local Plan also currently being
out to public consultation at a second Regulation 18 stage, ‘Refining the options’).
Progressing the plans in a collaborative, coordinated and timely manner will be essential to
the effective and sustainable planning for this part of south-east Essex.
As was identified in consultation paper, where it summarises feedback from the Rochford
New Local Plan Issues and Options Document (December 2017 – March 2018), ‘an
infrastructure-first approach to planning is required as there are existing issues with
infrastructure capacity’. (Rochford Local Plan Spatial Options Consultation Paper, page 102)
In seeking to meet future development needs for this part of south-east Essex, it will be
essential that infrastructure provision, particularly in relation to transport, is planned in such a
way to ensure that infrastructure improvements are clearly identified, are realistic and
achievable. In our view, this requires an effective coordinated, sub-regional and cross-
boundary approach, both through our inputs to ongoing ASELA work and through continued
duty of co-operate cross-boundary arrangements.
Question 1 (page 21): Are there any other technical evidence studies that you feel the
Council needs to prepare to inform its new Local Plan, other than those listed in this section?
- Given the number of important strategic cross-boundary issues already recognized
between our two authorities (e.g. housing needs, employment needs, transport
infrastructure, environmental protection, strategic green infrastructure provision,
climate change mitigation/adaption, the future of London Southend Airport etc.), we
strongly advocate that both authorities must continue to work closely together on the
preparation of evidence studies and other technical work to support our plan making.
Draft Strategic Priorities and Objectives (pages 40 – 43)
Question 4: Do you agree with the strategic priorities and objectives we have identified? Is
there anything missing from the strategic priorities or objectives that you feel needs to be
included? – Inclusion of reference to a new Country Park facility north-east of
Southend should be considered and potentially included as part of Strategic
Objective 15.
It has long been an ambition to deliver a new Country Park facility to the north-east of
Southend, as identified in the adopted Southend Core Strategy. If enabled through our local
plans, it would complement similar facilities at Hadleigh Castle and Cherry Orchard and
provide a much needed addition to informal recreation opportunities for the residents of and
visitors to south east Essex.
It is therefore recommended that the words ‘including a new Country Park facility to the
north-east of Southend’ are inserted after the word ‘coastline’. The revised Strategic
Objective would then read as follows:
‘To protect and enhance leisure, sport, recreation and community facilities and to support the
delivery of a multi-functional green infrastructure network across our district and along the
coastline including a new Country Park facility to the north-east of Southend, connecting to
neighbouring areas in South Essex and beyond, to promote healthy and active lifestyles, and
improve physical and mental health and well-being into old age’.
Growth Scenarios (pages 46 – 50)
The ‘Southend New Local Plan - Refining the Options’ consultation document (2021) sets
out that Southend is unable to meet all identified housing needs, as calculated using the
Government’s Standard Methodology, up to 2040. Even if Southend’s remaining Green Belt
was developed there would be a calculated shortfall of around 4,000 new homes. This rises
to around 9,000 new homes if Green Belt land within Southend Borough is not developed.
It is therefore appropriate that Rochford District Council should continue to explore the
options within its area to accommodate a level of housing development which is higher than
necessary to meet its own housing needs (as calculated by Government’s Standard
Methodology), so it is able to consider the potential, and possibly address at least some of
the unmet housing need evident from plan preparation to date in Southend, in line with the
requirements of Government policy.
Spatial Strategy Options (pages 51 to 62)
Question 6: Which of the identified strategy options do you consider should be taken
forward in the Plan? - Strategy Option 4 Balanced Combination. (Strategy Options listed
in footnote 1 below)
It is our view that Strategy Option 4: Balanced Combination, appears to offer the most
appropriate strategic approach, balancing Strategy Option 1 and 3. This option appears to
provide the best opportunity to provide sustainable communities that afford the critical mass
needed to secure transformational new infrastructure whilst seeking to make the best
possible use of existing brownfield sites. It also allows for a continuous supply of
development land to come forward over the plan period.
In supporting this approach, it is recognized that as part of Strategy Option 4, Strategy
Option 1: Urban Intensification must take priority and every effort should be made to ensure
new economic and housing growth is being optimized where this would lead to sustainable
development within urban areas (i.e. the use of brownfield land) before looking at
development in the Green Belt.
Subject to Green Belt considerations, the Borough Council welcomes the identification of
Option 3a: concentrated growth west of Rayleigh and Option 3b: concentrated growth north
of Southend within the consultation as possible sites for comprehensive development noting
that may provide the potential critical mass for achieving infrastructure improvements.
It should be noted that land west of Rayleigh is well served by the strategic highway network
(A130 and A127) whilst land to the north of Southend is less so. The potential for this option
to come forward well served by the strategic highway network would be dependent therefore
on a coordinated and planned approach with land to the south in Southend Borough and the
provision of a new highway and sustainable transport link partly on land within Rochford
District.
The consultation document also omits to note that Option 3c, concentrated growth to the
east of Rochford, would also be strongly dependent on new highway provision to the east of
Rochford, the existing Ashingdon Road being of an inadequate capacity to cope with the
increase in transport movements.
In this respect Figure 23 (Sustainability Appraisal of Strategy Options (AECOM, 2021))
which identifies Options 3a, 3b, 3c and 4 as providing a positive return in terms of transport
and movement is misleading.
Rochford District Council and Southend Borough Council would need to co-operate
effectively to explore the potential opportunity of comprehensive development to the north of
Southend (Option 3b) if this option were to be considered further. This joint work can then
inform both Councils’ next stage of plan making.
Any growth in this location is well placed to meet some of Southend’s unmet housing need,
however, if it were to come forward it must deliver significant new infrastructure which
ensures it’s development is sustainable and delivers advantages to neighbouring
communities, including neighbourhoods in Southend, which could benefit for example from
the close proximity of new accessible parkland, education, community and leisure facilities
delivered as part of development in this locality. It is also crucial that any development
provides for the additional road, active travel and public transport capacity necessary to
serve the development and mitigate fully any impacts which might arise.
A comprehensive development in this area appears to include most of the land necessary to
deliver the new road links necessary to facilitate development within both authority areas
and provide relief to the existing network. Development of this scale also has greater
potential to deliver the level of development finance required to help provide for those links.
SBC would not support development to the east of Rochford or south of river Roach without
significant mitigation and transport improvements both within Rochford District and Southend
Borough. SBC has delivered a rolling program of junction improvements along the A127 over
the last 20 years, however further improvements to increase capacity at pinch points are
likely to be required to facilitate growth. There are however constraints in increasing capacity
along the A127 given its urban context. As such, both Councils, along with Essex County
Council should explore strategic transport opportunities and funding mechanisms, including
a potential new link road/ sustainable transport corridor to the north of Southend, the option
of a new transport hub at Southend Airport Railway Station with improved access and further
improvements along the A127.
Strategy Option 2: Urban Extensions is unlikely to deliver the required transport
improvements necessary to facilitate accommodate the growth in trips on the network within
this area.
Spatial Themes
Question 8: Are there any key spatial themes that you feel we have missed or that require
greater emphasis? – Yes. Transport and Connectivity.
As a general rule, all the themes listed are self-contained in that they relate to specific
sites/areas of land and uses of land. The exception is ‘Transport and Connectivity’.
Transport infrastructure provision has a wider impact that relates to a range of transport
modes and is cross-boundary and sub-regional in its impact. As such the theme is
considered to require greater emphasis in the Plan.
Climate Change and Resilient Environments (pages 65 – 68)
Questions 9, 11 and 12 relating to whether a sequential approach to flood risk should be
taken, for development to source a percentage of their energy from low carbon and
renewable sources, and the provision of higher energy efficiency standards are supported.
Question 10: Do you agree that the Coastal Protection Belt and Upper Roach Valley should
be protected from development that would be harmful to their landscape character? – Yes.
These areas also provide important areas for informal recreation for the residents of southeast Essex including Southend.
Place Making and Design (pages 69 – 72)
Question 16a: Do you consider that new design guides, codes or masterplans should be
created alongside the new local plan? – Yes.
Question 16b: If yes, do you think it is more appropriate to have a single design guide/code
for the whole District, or to have design guides/codes/masterplans for individual settlements
or growth areas? – To have design guides/masterplans for individual growth areas.
It will be essential that any identified concentrated growth sites (Options 3a and 3b) are
planned and designed individually so that the sites can be effectively planned in a
sustainable manner that takes into full account their setting and local environment and
provides for well-designed places and spaces.
Employment and Jobs (pages 84 – 90)
Question 25: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new employment facilities or improvements to existing employment
facilities? – Yes, land north of Temple Farm Industrial Estate.
Land north of the existing Temple Farm Industrial Estate provides the opportunity for an
extension of the estate to meet future employment needs as part of strategy option 3b:
concentrated growth north of Southend.
Future of London Southend Airport (pages 91 – 93)
Question 28: With reference to the options (listed as footnote 2 below), or your own options,
how do you feel we can best manage the Airport’s adaptations and growth through the
planning system?
SBC is currently consulting on options within its Local Plan ‘Refining the Plan Options’
document on how to continue to plan for London Southend Airport and would welcome
continued co-operation with RDC to ensure an effective policy framework remains up-to-date
to manage future development at the Airport, this could include consistent policies included
within respective Local Plans. It is crucial that any future growth that is facilitated, if that is
indeed the right course of action, should fully consider the environmental impacts of that
growth. It should also be noted that the existing planning permission allows a level of growth
beyond the level of operations being experienced pre-Covid, in 2019 and that level of
operation was in itself leading to local complaints associated with aircraft noise, airport
operations, on street car parking locally and night-flying in particular.
Green and Blue Infrastructure (pages 98 – 101)
Question 33: Do you agree that the central woodlands arc and island wetlands, shown on
Figure 32 are the most appropriate areas for new regional parklands? Are there any other
areas that should be considered or preferred? – Yes. See comments relating to question
34 below.
Question 34: With reference to your preferred Strategy Option, are there opportunities for
growth to help deliver new strategic green and blue infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers clear
opportunities to deliver new accessible green space including the provision of a new subregional scale Country Park facility aligning with the River Roach and incorporating land
within flood Zone 2 (Figure 8). A new Country Park in this location would provide informal
countryside opportunities to the benefit of residents within the eastern peninsula of southeast Essex and would complement the facilities at Hadleigh Castle Country Park and Cherry
Orchard Jubilee Country Park and the broader South Essex Regional Park concept.
Community Infrastructure (pages 102 – 105)
Question 36: With reference to your preferred strategy option, are there opportunities for
growth to deliver new or improved community infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for a range of community infrastructure, including new school, leisure and health
facilities.
Transport and Connectivity (pages 123 – 126)
Question 51: With reference to the options (listed as footnote 3 below), or your own options,
how do you feel we can best address our transport and connectivity needs through the plan?
All four options need to be pursued as part of an integrated approach in partnership
with South Essex Local Authorities, Essex County Council and the Government.
As stated in the Rochford Local Plan consultation document: ‘it is clear that a more
ambitious approach is required to connectivity if we are to keep growing.’ A step change in
improving connectivity and accessibility is needed to accommodate growth if the local
economy is to remain attractive to investors, and highway congestion and air quality issues
are to be addressed.
The plan needs to recognise that significant volumes of traffic that have their origin or
destination in Rochford District will utilise highways within Southend Borough, particularly the
A127. A coordinated partnership approach to infrastructure provision is therefore essential.
The Rochford Local Plan should seek to ensure that the approval of any large development
proposals are subject to infrastructure triggers where developments are not permitted to
proceed until such time as the necessary infrastructure is committed. Individual development
sites cannot continue to be treated in isolation, the cumulative impact of development
schemes has and will continue to have significant impacts on the existing highway
infrastructure, which has impacts beyond Rochford District.
Question 52: Are there any areas where improvements to transport connections are
needed? What could be done to help improve connectivity in these areas?
Yes. A comprehensive integrated partnership approach to improving transport
connections is required across the whole sub-region.
Question 53: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new transport connections, such as link roads or rapid transit? What routes
and modes should these take?
Yes. Option 3b: concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend appears to offer the
potential to provide for improved transport connectivity. Such a development scheme would
be dependent on the provision of a new link road from east Southend to the A127 via
Warners Bridge, utilising land within the administrative district of Rochford, as well as a new
transport hub at Southend Airport Train Station.
Any such link road should also give consideration to the potential for a Rochford bypass to
the east of the town particularly if Option 3c: concentrated growth to the east of Rochford
were to be taken forward. This could provide the first phase in a potential opportunity to
deliver an outer strategic highway route linking to the A130 between Rayleigh and
Hullbridge.
Planning for Complete Communities
• Rayleigh (pages 133 – 134)
Question 56b: With reference to Figure 44 and your preferred strategy option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3a: concentrated growth west of
Rayleigh.
The identified option of seeking concentrated growth west of Rayleigh offers the potential to
meet a variety of housing needs, mixed use developments and community infrastructure.
• Rochford and Ashingdon (pages 136 – 137)
Question 57e: Do you agree that the local green spaces shown on Figure 45 hold local
significance? Are there any other open spaces that hold particular local significance? Yes.
Edwards Hall Park
Edwards Hall Park serves the informal recreational needs of residents of Eastwood in
Southend Borough and provides an important pedestrian/equestrian gateway into the Cherry
Orchard Jubilee Country Park.
Question 57d: Are there any areas that require protecting from development? Why these
areas? Yes.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the coalescence of the
Rochford with Southend.
Wakerings and Barling (pages 142 – 143)
Question 59b: With reference to Figure 47 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
provision of public open green space.
Question 59d: Are there any areas that require protecting from development? Why these
areas? Yes. Preventing the direct coalescence of Great Wakering/Little Wakering with
Southend.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the direct coalescence
of the Great and Little Wakering with Southend.
Stonebridge and Sutton (pages 160 – 161)
Question 64b: With reference to Figure 53 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
public open green space.
Other Minor Comments
There are one or two typing and cartographical errors in the consultation document as
follows:
- Page 65 last paragraph, the third sentence is incomplete.
- Page 98 Figure 32: Map of Key Green and Blue Infrastructure Assets includes
land within the Southend Borough south of Great and Little Wakering. This should be
deleted from the map.
- Page 135 Figure 45: Map of Rochford and Ashingdon
should read Figure 44: Map of Rayleigh. In addition, the blue horizontal lines
defined on the map are not interpreted in the key.
Kind Regards
Mark Sheppard
Team Leader Strategic Planning
Southend Borough Council
_________________________________________________________________
Footnotes
Footnote 1: Page 51 summarises the 4 strategy options as follows:
• Strategy Option 1: Urban Intensification
• Strategy Option 2: Urban Extensions
- » Option 2a: Focused on main towns
- » Option 2b: Dispersed to all settlements based on Settlement Hierarchy
• Strategy Option 3: Concentrated growth
- » Option 3a: Focused west of Rayleigh
- » Option 3b: Focused north of Southend
- » Option 3c: Focused east of Rochford
• Strategy Option 4: Balanced Combination
Footnote 2: Question 28 refers – Options for planning for the future of London Southend
Airport (page 93)
Given the ongoing uncertainty surrounding the impact of Covid-19 on the aviation industry, it is not
currently possible to identify precise land use requirements for the airport’s growth. Nevertheless,
there are considered to be a number of options available relating to planning for the future of London
Southend Airport. These are:
1. To work alongside Southend-on-Sea Borough Council to prepare a new joint Area Action Plan, or
masterplan, alongside each authority’s respective new Local Plan, that contains a consistent policy
approach to managing the Airport’s long-term growth ambitions
2. To work alongside Southend-on-Sea Borough Council to ensure that policies contained within both
authority’s respective Local Plans maintain a consistent policy approach, as far as is practicable, to
managing the Airport’s long-term growth ambitions
3. To prepare a new Area Action Plan, or masterplan, to manage the Airport’s long-term growth
ambitions, with suitable partner engagement but without the status of a statutory document
4. To continue to make decisions based on the existing JAAP for the time being, but to consider
developing a new Area Action Plan, or masterplan, after the new Local Plan is adopted or when the
need arises
Footnote 3: Question 51 refers – Options for addressing Transport and Connectivity (page 125)
Non-exclusive options for addressing transport and connectivity through the plan are to:
1. Embed a sustainable movement hierarchy into the plan to ensure sustainable modes of transport
are prioritised in favour of private vehicles
2. Prepare an Infrastructure Delivery Plan alongside the plan to ensure new development delivers
meaningful improvements to transport networks, including to cycling, walking, public transport and
road
3. Prepare a Local Walking and Cycling Infrastructure Plan or Cycling Delivery Plan alongside the
plan to identify and deliver specific improvements to our walking and cycling networks, including
costed schemes highlighted in the Rochford Cycling Action Plan
4. Work with Government, Highways England, Essex County Council and neighbouring local
authorities to deliver meaningful new transport options, such as rapid transit solutions and a long-term
solution to the A12
Support
New Local Plan: Spatial Options Document 2021
Q65b. With reference to Figure 53 and your preferred Strategy Option, do you think any of the land edged blue should be made available for any of the following uses?
Representation ID: 40500
Received: 22/09/2021
Respondent: Southend-on-Sea Borough Council
Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential to provide for improved community infrastructure, transport and access improvements and public open green space.
Dear Sir/Madam
Rochford District New Local Plan: Spatial Options: Consultation Paper 2021
Thank you for providing the opportunity for Southend Borough Council (SBC) to comment on
the above consultation plan. Set out below are officer level comments that relate principally
to cross-boundary issues and potential strategic scale developments.
SBC and Rochford District Council (RDC) should continue to co-operate on cross-boundary
issues, including through the Rochford and Southend Member Working Group and via the
Association of South Essex Local Authorities (ASELA).
The effectiveness of joint working between the two authorities should continue to be
documented and as we continue to work together under the duty to co-operate, Statements
of Common Ground should be prepared and agreed in line with Government guidance.
General Approach
The Borough Council broadly welcomes the publication of the Consultation Paper and its
general approach to setting out the potential options for meeting Rochford District’s future
development needs, whilst delivering sustainable development and protecting the local
environment. Given Southend Borough’s acute challenge in finding sufficient land within the
Borough to meet its own development needs, it also particularly welcomes the recognition of
the importance of liaising with neighbouring local authorities to ensure wider cross-boundary
issues and development needs are fully addressed.
Coordination of Plans
SBC would wish to emphasise the crucial ongoing importance of coordinating the
preparation of the Rochford New Local Plan with the Southend New Local Plan, which has
reached a similar stage of consultation (the Southend New Local Plan also currently being
out to public consultation at a second Regulation 18 stage, ‘Refining the options’).
Progressing the plans in a collaborative, coordinated and timely manner will be essential to
the effective and sustainable planning for this part of south-east Essex.
As was identified in consultation paper, where it summarises feedback from the Rochford
New Local Plan Issues and Options Document (December 2017 – March 2018), ‘an
infrastructure-first approach to planning is required as there are existing issues with
infrastructure capacity’. (Rochford Local Plan Spatial Options Consultation Paper, page 102)
In seeking to meet future development needs for this part of south-east Essex, it will be
essential that infrastructure provision, particularly in relation to transport, is planned in such a
way to ensure that infrastructure improvements are clearly identified, are realistic and
achievable. In our view, this requires an effective coordinated, sub-regional and cross-
boundary approach, both through our inputs to ongoing ASELA work and through continued
duty of co-operate cross-boundary arrangements.
Question 1 (page 21): Are there any other technical evidence studies that you feel the
Council needs to prepare to inform its new Local Plan, other than those listed in this section?
- Given the number of important strategic cross-boundary issues already recognized
between our two authorities (e.g. housing needs, employment needs, transport
infrastructure, environmental protection, strategic green infrastructure provision,
climate change mitigation/adaption, the future of London Southend Airport etc.), we
strongly advocate that both authorities must continue to work closely together on the
preparation of evidence studies and other technical work to support our plan making.
Draft Strategic Priorities and Objectives (pages 40 – 43)
Question 4: Do you agree with the strategic priorities and objectives we have identified? Is
there anything missing from the strategic priorities or objectives that you feel needs to be
included? – Inclusion of reference to a new Country Park facility north-east of
Southend should be considered and potentially included as part of Strategic
Objective 15.
It has long been an ambition to deliver a new Country Park facility to the north-east of
Southend, as identified in the adopted Southend Core Strategy. If enabled through our local
plans, it would complement similar facilities at Hadleigh Castle and Cherry Orchard and
provide a much needed addition to informal recreation opportunities for the residents of and
visitors to south east Essex.
It is therefore recommended that the words ‘including a new Country Park facility to the
north-east of Southend’ are inserted after the word ‘coastline’. The revised Strategic
Objective would then read as follows:
‘To protect and enhance leisure, sport, recreation and community facilities and to support the
delivery of a multi-functional green infrastructure network across our district and along the
coastline including a new Country Park facility to the north-east of Southend, connecting to
neighbouring areas in South Essex and beyond, to promote healthy and active lifestyles, and
improve physical and mental health and well-being into old age’.
Growth Scenarios (pages 46 – 50)
The ‘Southend New Local Plan - Refining the Options’ consultation document (2021) sets
out that Southend is unable to meet all identified housing needs, as calculated using the
Government’s Standard Methodology, up to 2040. Even if Southend’s remaining Green Belt
was developed there would be a calculated shortfall of around 4,000 new homes. This rises
to around 9,000 new homes if Green Belt land within Southend Borough is not developed.
It is therefore appropriate that Rochford District Council should continue to explore the
options within its area to accommodate a level of housing development which is higher than
necessary to meet its own housing needs (as calculated by Government’s Standard
Methodology), so it is able to consider the potential, and possibly address at least some of
the unmet housing need evident from plan preparation to date in Southend, in line with the
requirements of Government policy.
Spatial Strategy Options (pages 51 to 62)
Question 6: Which of the identified strategy options do you consider should be taken
forward in the Plan? - Strategy Option 4 Balanced Combination. (Strategy Options listed
in footnote 1 below)
It is our view that Strategy Option 4: Balanced Combination, appears to offer the most
appropriate strategic approach, balancing Strategy Option 1 and 3. This option appears to
provide the best opportunity to provide sustainable communities that afford the critical mass
needed to secure transformational new infrastructure whilst seeking to make the best
possible use of existing brownfield sites. It also allows for a continuous supply of
development land to come forward over the plan period.
In supporting this approach, it is recognized that as part of Strategy Option 4, Strategy
Option 1: Urban Intensification must take priority and every effort should be made to ensure
new economic and housing growth is being optimized where this would lead to sustainable
development within urban areas (i.e. the use of brownfield land) before looking at
development in the Green Belt.
Subject to Green Belt considerations, the Borough Council welcomes the identification of
Option 3a: concentrated growth west of Rayleigh and Option 3b: concentrated growth north
of Southend within the consultation as possible sites for comprehensive development noting
that may provide the potential critical mass for achieving infrastructure improvements.
It should be noted that land west of Rayleigh is well served by the strategic highway network
(A130 and A127) whilst land to the north of Southend is less so. The potential for this option
to come forward well served by the strategic highway network would be dependent therefore
on a coordinated and planned approach with land to the south in Southend Borough and the
provision of a new highway and sustainable transport link partly on land within Rochford
District.
The consultation document also omits to note that Option 3c, concentrated growth to the
east of Rochford, would also be strongly dependent on new highway provision to the east of
Rochford, the existing Ashingdon Road being of an inadequate capacity to cope with the
increase in transport movements.
In this respect Figure 23 (Sustainability Appraisal of Strategy Options (AECOM, 2021))
which identifies Options 3a, 3b, 3c and 4 as providing a positive return in terms of transport
and movement is misleading.
Rochford District Council and Southend Borough Council would need to co-operate
effectively to explore the potential opportunity of comprehensive development to the north of
Southend (Option 3b) if this option were to be considered further. This joint work can then
inform both Councils’ next stage of plan making.
Any growth in this location is well placed to meet some of Southend’s unmet housing need,
however, if it were to come forward it must deliver significant new infrastructure which
ensures it’s development is sustainable and delivers advantages to neighbouring
communities, including neighbourhoods in Southend, which could benefit for example from
the close proximity of new accessible parkland, education, community and leisure facilities
delivered as part of development in this locality. It is also crucial that any development
provides for the additional road, active travel and public transport capacity necessary to
serve the development and mitigate fully any impacts which might arise.
A comprehensive development in this area appears to include most of the land necessary to
deliver the new road links necessary to facilitate development within both authority areas
and provide relief to the existing network. Development of this scale also has greater
potential to deliver the level of development finance required to help provide for those links.
SBC would not support development to the east of Rochford or south of river Roach without
significant mitigation and transport improvements both within Rochford District and Southend
Borough. SBC has delivered a rolling program of junction improvements along the A127 over
the last 20 years, however further improvements to increase capacity at pinch points are
likely to be required to facilitate growth. There are however constraints in increasing capacity
along the A127 given its urban context. As such, both Councils, along with Essex County
Council should explore strategic transport opportunities and funding mechanisms, including
a potential new link road/ sustainable transport corridor to the north of Southend, the option
of a new transport hub at Southend Airport Railway Station with improved access and further
improvements along the A127.
Strategy Option 2: Urban Extensions is unlikely to deliver the required transport
improvements necessary to facilitate accommodate the growth in trips on the network within
this area.
Spatial Themes
Question 8: Are there any key spatial themes that you feel we have missed or that require
greater emphasis? – Yes. Transport and Connectivity.
As a general rule, all the themes listed are self-contained in that they relate to specific
sites/areas of land and uses of land. The exception is ‘Transport and Connectivity’.
Transport infrastructure provision has a wider impact that relates to a range of transport
modes and is cross-boundary and sub-regional in its impact. As such the theme is
considered to require greater emphasis in the Plan.
Climate Change and Resilient Environments (pages 65 – 68)
Questions 9, 11 and 12 relating to whether a sequential approach to flood risk should be
taken, for development to source a percentage of their energy from low carbon and
renewable sources, and the provision of higher energy efficiency standards are supported.
Question 10: Do you agree that the Coastal Protection Belt and Upper Roach Valley should
be protected from development that would be harmful to their landscape character? – Yes.
These areas also provide important areas for informal recreation for the residents of southeast Essex including Southend.
Place Making and Design (pages 69 – 72)
Question 16a: Do you consider that new design guides, codes or masterplans should be
created alongside the new local plan? – Yes.
Question 16b: If yes, do you think it is more appropriate to have a single design guide/code
for the whole District, or to have design guides/codes/masterplans for individual settlements
or growth areas? – To have design guides/masterplans for individual growth areas.
It will be essential that any identified concentrated growth sites (Options 3a and 3b) are
planned and designed individually so that the sites can be effectively planned in a
sustainable manner that takes into full account their setting and local environment and
provides for well-designed places and spaces.
Employment and Jobs (pages 84 – 90)
Question 25: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new employment facilities or improvements to existing employment
facilities? – Yes, land north of Temple Farm Industrial Estate.
Land north of the existing Temple Farm Industrial Estate provides the opportunity for an
extension of the estate to meet future employment needs as part of strategy option 3b:
concentrated growth north of Southend.
Future of London Southend Airport (pages 91 – 93)
Question 28: With reference to the options (listed as footnote 2 below), or your own options,
how do you feel we can best manage the Airport’s adaptations and growth through the
planning system?
SBC is currently consulting on options within its Local Plan ‘Refining the Plan Options’
document on how to continue to plan for London Southend Airport and would welcome
continued co-operation with RDC to ensure an effective policy framework remains up-to-date
to manage future development at the Airport, this could include consistent policies included
within respective Local Plans. It is crucial that any future growth that is facilitated, if that is
indeed the right course of action, should fully consider the environmental impacts of that
growth. It should also be noted that the existing planning permission allows a level of growth
beyond the level of operations being experienced pre-Covid, in 2019 and that level of
operation was in itself leading to local complaints associated with aircraft noise, airport
operations, on street car parking locally and night-flying in particular.
Green and Blue Infrastructure (pages 98 – 101)
Question 33: Do you agree that the central woodlands arc and island wetlands, shown on
Figure 32 are the most appropriate areas for new regional parklands? Are there any other
areas that should be considered or preferred? – Yes. See comments relating to question
34 below.
Question 34: With reference to your preferred Strategy Option, are there opportunities for
growth to help deliver new strategic green and blue infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers clear
opportunities to deliver new accessible green space including the provision of a new subregional scale Country Park facility aligning with the River Roach and incorporating land
within flood Zone 2 (Figure 8). A new Country Park in this location would provide informal
countryside opportunities to the benefit of residents within the eastern peninsula of southeast Essex and would complement the facilities at Hadleigh Castle Country Park and Cherry
Orchard Jubilee Country Park and the broader South Essex Regional Park concept.
Community Infrastructure (pages 102 – 105)
Question 36: With reference to your preferred strategy option, are there opportunities for
growth to deliver new or improved community infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for a range of community infrastructure, including new school, leisure and health
facilities.
Transport and Connectivity (pages 123 – 126)
Question 51: With reference to the options (listed as footnote 3 below), or your own options,
how do you feel we can best address our transport and connectivity needs through the plan?
All four options need to be pursued as part of an integrated approach in partnership
with South Essex Local Authorities, Essex County Council and the Government.
As stated in the Rochford Local Plan consultation document: ‘it is clear that a more
ambitious approach is required to connectivity if we are to keep growing.’ A step change in
improving connectivity and accessibility is needed to accommodate growth if the local
economy is to remain attractive to investors, and highway congestion and air quality issues
are to be addressed.
The plan needs to recognise that significant volumes of traffic that have their origin or
destination in Rochford District will utilise highways within Southend Borough, particularly the
A127. A coordinated partnership approach to infrastructure provision is therefore essential.
The Rochford Local Plan should seek to ensure that the approval of any large development
proposals are subject to infrastructure triggers where developments are not permitted to
proceed until such time as the necessary infrastructure is committed. Individual development
sites cannot continue to be treated in isolation, the cumulative impact of development
schemes has and will continue to have significant impacts on the existing highway
infrastructure, which has impacts beyond Rochford District.
Question 52: Are there any areas where improvements to transport connections are
needed? What could be done to help improve connectivity in these areas?
Yes. A comprehensive integrated partnership approach to improving transport
connections is required across the whole sub-region.
Question 53: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new transport connections, such as link roads or rapid transit? What routes
and modes should these take?
Yes. Option 3b: concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend appears to offer the
potential to provide for improved transport connectivity. Such a development scheme would
be dependent on the provision of a new link road from east Southend to the A127 via
Warners Bridge, utilising land within the administrative district of Rochford, as well as a new
transport hub at Southend Airport Train Station.
Any such link road should also give consideration to the potential for a Rochford bypass to
the east of the town particularly if Option 3c: concentrated growth to the east of Rochford
were to be taken forward. This could provide the first phase in a potential opportunity to
deliver an outer strategic highway route linking to the A130 between Rayleigh and
Hullbridge.
Planning for Complete Communities
• Rayleigh (pages 133 – 134)
Question 56b: With reference to Figure 44 and your preferred strategy option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3a: concentrated growth west of
Rayleigh.
The identified option of seeking concentrated growth west of Rayleigh offers the potential to
meet a variety of housing needs, mixed use developments and community infrastructure.
• Rochford and Ashingdon (pages 136 – 137)
Question 57e: Do you agree that the local green spaces shown on Figure 45 hold local
significance? Are there any other open spaces that hold particular local significance? Yes.
Edwards Hall Park
Edwards Hall Park serves the informal recreational needs of residents of Eastwood in
Southend Borough and provides an important pedestrian/equestrian gateway into the Cherry
Orchard Jubilee Country Park.
Question 57d: Are there any areas that require protecting from development? Why these
areas? Yes.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the coalescence of the
Rochford with Southend.
Wakerings and Barling (pages 142 – 143)
Question 59b: With reference to Figure 47 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
provision of public open green space.
Question 59d: Are there any areas that require protecting from development? Why these
areas? Yes. Preventing the direct coalescence of Great Wakering/Little Wakering with
Southend.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the direct coalescence
of the Great and Little Wakering with Southend.
Stonebridge and Sutton (pages 160 – 161)
Question 64b: With reference to Figure 53 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
public open green space.
Other Minor Comments
There are one or two typing and cartographical errors in the consultation document as
follows:
- Page 65 last paragraph, the third sentence is incomplete.
- Page 98 Figure 32: Map of Key Green and Blue Infrastructure Assets includes
land within the Southend Borough south of Great and Little Wakering. This should be
deleted from the map.
- Page 135 Figure 45: Map of Rochford and Ashingdon
should read Figure 44: Map of Rayleigh. In addition, the blue horizontal lines
defined on the map are not interpreted in the key.
Kind Regards
Mark Sheppard
Team Leader Strategic Planning
Southend Borough Council
_________________________________________________________________
Footnotes
Footnote 1: Page 51 summarises the 4 strategy options as follows:
• Strategy Option 1: Urban Intensification
• Strategy Option 2: Urban Extensions
- » Option 2a: Focused on main towns
- » Option 2b: Dispersed to all settlements based on Settlement Hierarchy
• Strategy Option 3: Concentrated growth
- » Option 3a: Focused west of Rayleigh
- » Option 3b: Focused north of Southend
- » Option 3c: Focused east of Rochford
• Strategy Option 4: Balanced Combination
Footnote 2: Question 28 refers – Options for planning for the future of London Southend
Airport (page 93)
Given the ongoing uncertainty surrounding the impact of Covid-19 on the aviation industry, it is not
currently possible to identify precise land use requirements for the airport’s growth. Nevertheless,
there are considered to be a number of options available relating to planning for the future of London
Southend Airport. These are:
1. To work alongside Southend-on-Sea Borough Council to prepare a new joint Area Action Plan, or
masterplan, alongside each authority’s respective new Local Plan, that contains a consistent policy
approach to managing the Airport’s long-term growth ambitions
2. To work alongside Southend-on-Sea Borough Council to ensure that policies contained within both
authority’s respective Local Plans maintain a consistent policy approach, as far as is practicable, to
managing the Airport’s long-term growth ambitions
3. To prepare a new Area Action Plan, or masterplan, to manage the Airport’s long-term growth
ambitions, with suitable partner engagement but without the status of a statutory document
4. To continue to make decisions based on the existing JAAP for the time being, but to consider
developing a new Area Action Plan, or masterplan, after the new Local Plan is adopted or when the
need arises
Footnote 3: Question 51 refers – Options for addressing Transport and Connectivity (page 125)
Non-exclusive options for addressing transport and connectivity through the plan are to:
1. Embed a sustainable movement hierarchy into the plan to ensure sustainable modes of transport
are prioritised in favour of private vehicles
2. Prepare an Infrastructure Delivery Plan alongside the plan to ensure new development delivers
meaningful improvements to transport networks, including to cycling, walking, public transport and
road
3. Prepare a Local Walking and Cycling Infrastructure Plan or Cycling Delivery Plan alongside the
plan to identify and deliver specific improvements to our walking and cycling networks, including
costed schemes highlighted in the Rochford Cycling Action Plan
4. Work with Government, Highways England, Essex County Council and neighbouring local
authorities to deliver meaningful new transport options, such as rapid transit solutions and a long-term
solution to the A12
Comment
New Local Plan: Spatial Options Document 2021
Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
Representation ID: 40502
Received: 22/09/2021
Respondent: Southend-on-Sea Borough Council
Page 98 Figure 32: Map of Key Green and Blue Infrastructure Assets includes land within the Southend Borough south of Great and Little Wakering. This should be
deleted from the map
Dear Sir/Madam
Rochford District New Local Plan: Spatial Options: Consultation Paper 2021
Thank you for providing the opportunity for Southend Borough Council (SBC) to comment on
the above consultation plan. Set out below are officer level comments that relate principally
to cross-boundary issues and potential strategic scale developments.
SBC and Rochford District Council (RDC) should continue to co-operate on cross-boundary
issues, including through the Rochford and Southend Member Working Group and via the
Association of South Essex Local Authorities (ASELA).
The effectiveness of joint working between the two authorities should continue to be
documented and as we continue to work together under the duty to co-operate, Statements
of Common Ground should be prepared and agreed in line with Government guidance.
General Approach
The Borough Council broadly welcomes the publication of the Consultation Paper and its
general approach to setting out the potential options for meeting Rochford District’s future
development needs, whilst delivering sustainable development and protecting the local
environment. Given Southend Borough’s acute challenge in finding sufficient land within the
Borough to meet its own development needs, it also particularly welcomes the recognition of
the importance of liaising with neighbouring local authorities to ensure wider cross-boundary
issues and development needs are fully addressed.
Coordination of Plans
SBC would wish to emphasise the crucial ongoing importance of coordinating the
preparation of the Rochford New Local Plan with the Southend New Local Plan, which has
reached a similar stage of consultation (the Southend New Local Plan also currently being
out to public consultation at a second Regulation 18 stage, ‘Refining the options’).
Progressing the plans in a collaborative, coordinated and timely manner will be essential to
the effective and sustainable planning for this part of south-east Essex.
As was identified in consultation paper, where it summarises feedback from the Rochford
New Local Plan Issues and Options Document (December 2017 – March 2018), ‘an
infrastructure-first approach to planning is required as there are existing issues with
infrastructure capacity’. (Rochford Local Plan Spatial Options Consultation Paper, page 102)
In seeking to meet future development needs for this part of south-east Essex, it will be
essential that infrastructure provision, particularly in relation to transport, is planned in such a
way to ensure that infrastructure improvements are clearly identified, are realistic and
achievable. In our view, this requires an effective coordinated, sub-regional and cross-
boundary approach, both through our inputs to ongoing ASELA work and through continued
duty of co-operate cross-boundary arrangements.
Question 1 (page 21): Are there any other technical evidence studies that you feel the
Council needs to prepare to inform its new Local Plan, other than those listed in this section?
- Given the number of important strategic cross-boundary issues already recognized
between our two authorities (e.g. housing needs, employment needs, transport
infrastructure, environmental protection, strategic green infrastructure provision,
climate change mitigation/adaption, the future of London Southend Airport etc.), we
strongly advocate that both authorities must continue to work closely together on the
preparation of evidence studies and other technical work to support our plan making.
Draft Strategic Priorities and Objectives (pages 40 – 43)
Question 4: Do you agree with the strategic priorities and objectives we have identified? Is
there anything missing from the strategic priorities or objectives that you feel needs to be
included? – Inclusion of reference to a new Country Park facility north-east of
Southend should be considered and potentially included as part of Strategic
Objective 15.
It has long been an ambition to deliver a new Country Park facility to the north-east of
Southend, as identified in the adopted Southend Core Strategy. If enabled through our local
plans, it would complement similar facilities at Hadleigh Castle and Cherry Orchard and
provide a much needed addition to informal recreation opportunities for the residents of and
visitors to south east Essex.
It is therefore recommended that the words ‘including a new Country Park facility to the
north-east of Southend’ are inserted after the word ‘coastline’. The revised Strategic
Objective would then read as follows:
‘To protect and enhance leisure, sport, recreation and community facilities and to support the
delivery of a multi-functional green infrastructure network across our district and along the
coastline including a new Country Park facility to the north-east of Southend, connecting to
neighbouring areas in South Essex and beyond, to promote healthy and active lifestyles, and
improve physical and mental health and well-being into old age’.
Growth Scenarios (pages 46 – 50)
The ‘Southend New Local Plan - Refining the Options’ consultation document (2021) sets
out that Southend is unable to meet all identified housing needs, as calculated using the
Government’s Standard Methodology, up to 2040. Even if Southend’s remaining Green Belt
was developed there would be a calculated shortfall of around 4,000 new homes. This rises
to around 9,000 new homes if Green Belt land within Southend Borough is not developed.
It is therefore appropriate that Rochford District Council should continue to explore the
options within its area to accommodate a level of housing development which is higher than
necessary to meet its own housing needs (as calculated by Government’s Standard
Methodology), so it is able to consider the potential, and possibly address at least some of
the unmet housing need evident from plan preparation to date in Southend, in line with the
requirements of Government policy.
Spatial Strategy Options (pages 51 to 62)
Question 6: Which of the identified strategy options do you consider should be taken
forward in the Plan? - Strategy Option 4 Balanced Combination. (Strategy Options listed
in footnote 1 below)
It is our view that Strategy Option 4: Balanced Combination, appears to offer the most
appropriate strategic approach, balancing Strategy Option 1 and 3. This option appears to
provide the best opportunity to provide sustainable communities that afford the critical mass
needed to secure transformational new infrastructure whilst seeking to make the best
possible use of existing brownfield sites. It also allows for a continuous supply of
development land to come forward over the plan period.
In supporting this approach, it is recognized that as part of Strategy Option 4, Strategy
Option 1: Urban Intensification must take priority and every effort should be made to ensure
new economic and housing growth is being optimized where this would lead to sustainable
development within urban areas (i.e. the use of brownfield land) before looking at
development in the Green Belt.
Subject to Green Belt considerations, the Borough Council welcomes the identification of
Option 3a: concentrated growth west of Rayleigh and Option 3b: concentrated growth north
of Southend within the consultation as possible sites for comprehensive development noting
that may provide the potential critical mass for achieving infrastructure improvements.
It should be noted that land west of Rayleigh is well served by the strategic highway network
(A130 and A127) whilst land to the north of Southend is less so. The potential for this option
to come forward well served by the strategic highway network would be dependent therefore
on a coordinated and planned approach with land to the south in Southend Borough and the
provision of a new highway and sustainable transport link partly on land within Rochford
District.
The consultation document also omits to note that Option 3c, concentrated growth to the
east of Rochford, would also be strongly dependent on new highway provision to the east of
Rochford, the existing Ashingdon Road being of an inadequate capacity to cope with the
increase in transport movements.
In this respect Figure 23 (Sustainability Appraisal of Strategy Options (AECOM, 2021))
which identifies Options 3a, 3b, 3c and 4 as providing a positive return in terms of transport
and movement is misleading.
Rochford District Council and Southend Borough Council would need to co-operate
effectively to explore the potential opportunity of comprehensive development to the north of
Southend (Option 3b) if this option were to be considered further. This joint work can then
inform both Councils’ next stage of plan making.
Any growth in this location is well placed to meet some of Southend’s unmet housing need,
however, if it were to come forward it must deliver significant new infrastructure which
ensures it’s development is sustainable and delivers advantages to neighbouring
communities, including neighbourhoods in Southend, which could benefit for example from
the close proximity of new accessible parkland, education, community and leisure facilities
delivered as part of development in this locality. It is also crucial that any development
provides for the additional road, active travel and public transport capacity necessary to
serve the development and mitigate fully any impacts which might arise.
A comprehensive development in this area appears to include most of the land necessary to
deliver the new road links necessary to facilitate development within both authority areas
and provide relief to the existing network. Development of this scale also has greater
potential to deliver the level of development finance required to help provide for those links.
SBC would not support development to the east of Rochford or south of river Roach without
significant mitigation and transport improvements both within Rochford District and Southend
Borough. SBC has delivered a rolling program of junction improvements along the A127 over
the last 20 years, however further improvements to increase capacity at pinch points are
likely to be required to facilitate growth. There are however constraints in increasing capacity
along the A127 given its urban context. As such, both Councils, along with Essex County
Council should explore strategic transport opportunities and funding mechanisms, including
a potential new link road/ sustainable transport corridor to the north of Southend, the option
of a new transport hub at Southend Airport Railway Station with improved access and further
improvements along the A127.
Strategy Option 2: Urban Extensions is unlikely to deliver the required transport
improvements necessary to facilitate accommodate the growth in trips on the network within
this area.
Spatial Themes
Question 8: Are there any key spatial themes that you feel we have missed or that require
greater emphasis? – Yes. Transport and Connectivity.
As a general rule, all the themes listed are self-contained in that they relate to specific
sites/areas of land and uses of land. The exception is ‘Transport and Connectivity’.
Transport infrastructure provision has a wider impact that relates to a range of transport
modes and is cross-boundary and sub-regional in its impact. As such the theme is
considered to require greater emphasis in the Plan.
Climate Change and Resilient Environments (pages 65 – 68)
Questions 9, 11 and 12 relating to whether a sequential approach to flood risk should be
taken, for development to source a percentage of their energy from low carbon and
renewable sources, and the provision of higher energy efficiency standards are supported.
Question 10: Do you agree that the Coastal Protection Belt and Upper Roach Valley should
be protected from development that would be harmful to their landscape character? – Yes.
These areas also provide important areas for informal recreation for the residents of southeast Essex including Southend.
Place Making and Design (pages 69 – 72)
Question 16a: Do you consider that new design guides, codes or masterplans should be
created alongside the new local plan? – Yes.
Question 16b: If yes, do you think it is more appropriate to have a single design guide/code
for the whole District, or to have design guides/codes/masterplans for individual settlements
or growth areas? – To have design guides/masterplans for individual growth areas.
It will be essential that any identified concentrated growth sites (Options 3a and 3b) are
planned and designed individually so that the sites can be effectively planned in a
sustainable manner that takes into full account their setting and local environment and
provides for well-designed places and spaces.
Employment and Jobs (pages 84 – 90)
Question 25: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new employment facilities or improvements to existing employment
facilities? – Yes, land north of Temple Farm Industrial Estate.
Land north of the existing Temple Farm Industrial Estate provides the opportunity for an
extension of the estate to meet future employment needs as part of strategy option 3b:
concentrated growth north of Southend.
Future of London Southend Airport (pages 91 – 93)
Question 28: With reference to the options (listed as footnote 2 below), or your own options,
how do you feel we can best manage the Airport’s adaptations and growth through the
planning system?
SBC is currently consulting on options within its Local Plan ‘Refining the Plan Options’
document on how to continue to plan for London Southend Airport and would welcome
continued co-operation with RDC to ensure an effective policy framework remains up-to-date
to manage future development at the Airport, this could include consistent policies included
within respective Local Plans. It is crucial that any future growth that is facilitated, if that is
indeed the right course of action, should fully consider the environmental impacts of that
growth. It should also be noted that the existing planning permission allows a level of growth
beyond the level of operations being experienced pre-Covid, in 2019 and that level of
operation was in itself leading to local complaints associated with aircraft noise, airport
operations, on street car parking locally and night-flying in particular.
Green and Blue Infrastructure (pages 98 – 101)
Question 33: Do you agree that the central woodlands arc and island wetlands, shown on
Figure 32 are the most appropriate areas for new regional parklands? Are there any other
areas that should be considered or preferred? – Yes. See comments relating to question
34 below.
Question 34: With reference to your preferred Strategy Option, are there opportunities for
growth to help deliver new strategic green and blue infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers clear
opportunities to deliver new accessible green space including the provision of a new subregional scale Country Park facility aligning with the River Roach and incorporating land
within flood Zone 2 (Figure 8). A new Country Park in this location would provide informal
countryside opportunities to the benefit of residents within the eastern peninsula of southeast Essex and would complement the facilities at Hadleigh Castle Country Park and Cherry
Orchard Jubilee Country Park and the broader South Essex Regional Park concept.
Community Infrastructure (pages 102 – 105)
Question 36: With reference to your preferred strategy option, are there opportunities for
growth to deliver new or improved community infrastructure? – Yes. Option 3b:
concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for a range of community infrastructure, including new school, leisure and health
facilities.
Transport and Connectivity (pages 123 – 126)
Question 51: With reference to the options (listed as footnote 3 below), or your own options,
how do you feel we can best address our transport and connectivity needs through the plan?
All four options need to be pursued as part of an integrated approach in partnership
with South Essex Local Authorities, Essex County Council and the Government.
As stated in the Rochford Local Plan consultation document: ‘it is clear that a more
ambitious approach is required to connectivity if we are to keep growing.’ A step change in
improving connectivity and accessibility is needed to accommodate growth if the local
economy is to remain attractive to investors, and highway congestion and air quality issues
are to be addressed.
The plan needs to recognise that significant volumes of traffic that have their origin or
destination in Rochford District will utilise highways within Southend Borough, particularly the
A127. A coordinated partnership approach to infrastructure provision is therefore essential.
The Rochford Local Plan should seek to ensure that the approval of any large development
proposals are subject to infrastructure triggers where developments are not permitted to
proceed until such time as the necessary infrastructure is committed. Individual development
sites cannot continue to be treated in isolation, the cumulative impact of development
schemes has and will continue to have significant impacts on the existing highway
infrastructure, which has impacts beyond Rochford District.
Question 52: Are there any areas where improvements to transport connections are
needed? What could be done to help improve connectivity in these areas?
Yes. A comprehensive integrated partnership approach to improving transport
connections is required across the whole sub-region.
Question 53: With reference to your preferred Strategy Option, are there opportunities for
growth to deliver new transport connections, such as link roads or rapid transit? What routes
and modes should these take?
Yes. Option 3b: concentrated growth north of Southend.
The identified option of seeking concentrated growth north of Southend appears to offer the
potential to provide for improved transport connectivity. Such a development scheme would
be dependent on the provision of a new link road from east Southend to the A127 via
Warners Bridge, utilising land within the administrative district of Rochford, as well as a new
transport hub at Southend Airport Train Station.
Any such link road should also give consideration to the potential for a Rochford bypass to
the east of the town particularly if Option 3c: concentrated growth to the east of Rochford
were to be taken forward. This could provide the first phase in a potential opportunity to
deliver an outer strategic highway route linking to the A130 between Rayleigh and
Hullbridge.
Planning for Complete Communities
• Rayleigh (pages 133 – 134)
Question 56b: With reference to Figure 44 and your preferred strategy option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3a: concentrated growth west of
Rayleigh.
The identified option of seeking concentrated growth west of Rayleigh offers the potential to
meet a variety of housing needs, mixed use developments and community infrastructure.
• Rochford and Ashingdon (pages 136 – 137)
Question 57e: Do you agree that the local green spaces shown on Figure 45 hold local
significance? Are there any other open spaces that hold particular local significance? Yes.
Edwards Hall Park
Edwards Hall Park serves the informal recreational needs of residents of Eastwood in
Southend Borough and provides an important pedestrian/equestrian gateway into the Cherry
Orchard Jubilee Country Park.
Question 57d: Are there any areas that require protecting from development? Why these
areas? Yes.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the coalescence of the
Rochford with Southend.
Wakerings and Barling (pages 142 – 143)
Question 59b: With reference to Figure 47 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
provision of public open green space.
Question 59d: Are there any areas that require protecting from development? Why these
areas? Yes. Preventing the direct coalescence of Great Wakering/Little Wakering with
Southend.
In considering the identified option 3b: concentrated growth north of Southend any future
development scheme that may be justified as constituting exceptional circumstances and
sustainable development should be carefully planned so as to avoid the direct coalescence
of the Great and Little Wakering with Southend.
Stonebridge and Sutton (pages 160 – 161)
Question 64b: With reference to Figure 53 and your preferred Strategy Option, do you think
any of the promoted sites should be made available for any of the following uses (housing,
commercial, community infrastructure)? Yes. Option 3b: concentrated growth north of
Southend.
The identified option of seeking concentrated growth north of Southend offers the potential
to provide for improved community infrastructure, transport and access improvements and
public open green space.
Other Minor Comments
There are one or two typing and cartographical errors in the consultation document as
follows:
- Page 65 last paragraph, the third sentence is incomplete.
- Page 98 Figure 32: Map of Key Green and Blue Infrastructure Assets includes
land within the Southend Borough south of Great and Little Wakering. This should be
deleted from the map.
- Page 135 Figure 45: Map of Rochford and Ashingdon
should read Figure 44: Map of Rayleigh. In addition, the blue horizontal lines
defined on the map are not interpreted in the key.
Kind Regards
Mark Sheppard
Team Leader Strategic Planning
Southend Borough Council
_________________________________________________________________
Footnotes
Footnote 1: Page 51 summarises the 4 strategy options as follows:
• Strategy Option 1: Urban Intensification
• Strategy Option 2: Urban Extensions
- » Option 2a: Focused on main towns
- » Option 2b: Dispersed to all settlements based on Settlement Hierarchy
• Strategy Option 3: Concentrated growth
- » Option 3a: Focused west of Rayleigh
- » Option 3b: Focused north of Southend
- » Option 3c: Focused east of Rochford
• Strategy Option 4: Balanced Combination
Footnote 2: Question 28 refers – Options for planning for the future of London Southend
Airport (page 93)
Given the ongoing uncertainty surrounding the impact of Covid-19 on the aviation industry, it is not
currently possible to identify precise land use requirements for the airport’s growth. Nevertheless,
there are considered to be a number of options available relating to planning for the future of London
Southend Airport. These are:
1. To work alongside Southend-on-Sea Borough Council to prepare a new joint Area Action Plan, or
masterplan, alongside each authority’s respective new Local Plan, that contains a consistent policy
approach to managing the Airport’s long-term growth ambitions
2. To work alongside Southend-on-Sea Borough Council to ensure that policies contained within both
authority’s respective Local Plans maintain a consistent policy approach, as far as is practicable, to
managing the Airport’s long-term growth ambitions
3. To prepare a new Area Action Plan, or masterplan, to manage the Airport’s long-term growth
ambitions, with suitable partner engagement but without the status of a statutory document
4. To continue to make decisions based on the existing JAAP for the time being, but to consider
developing a new Area Action Plan, or masterplan, after the new Local Plan is adopted or when the
need arises
Footnote 3: Question 51 refers – Options for addressing Transport and Connectivity (page 125)
Non-exclusive options for addressing transport and connectivity through the plan are to:
1. Embed a sustainable movement hierarchy into the plan to ensure sustainable modes of transport
are prioritised in favour of private vehicles
2. Prepare an Infrastructure Delivery Plan alongside the plan to ensure new development delivers
meaningful improvements to transport networks, including to cycling, walking, public transport and
road
3. Prepare a Local Walking and Cycling Infrastructure Plan or Cycling Delivery Plan alongside the
plan to identify and deliver specific improvements to our walking and cycling networks, including
costed schemes highlighted in the Rochford Cycling Action Plan
4. Work with Government, Highways England, Essex County Council and neighbouring local
authorities to deliver meaningful new transport options, such as rapid transit solutions and a long-term
solution to the A12