Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
Representation ID: 41634
Received: 20/09/2021
Respondent: SEETEC
• We refer you to our responses under Q6 and Q28:
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
Any [airport] growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
Support
New Local Plan: Spatial Options Document 2021
Q56d. Are there areas that require protecting from development?
Representation ID: 41635
Received: 20/09/2021
Respondent: SEETEC
CFS77, CFS087 and EXP12
Support
New Local Plan: Spatial Options Document 2021
Q57d. Are there areas that require protecting from development?
Representation ID: 41636
Received: 20/09/2021
Respondent: SEETEC
CFS035, CFS084, CFS085 (see Q43 response above)
Support
New Local Plan: Spatial Options Document 2021
Q58d. Are there areas that require protecting from development?
Representation ID: 41637
Received: 20/09/2021
Respondent: SEETEC
CFS041, CFS074, CFS150