New Local Plan: Spatial Options Document 2021

Search representations

Results for SEETEC search

New search New search

Support

New Local Plan: Spatial Options Document 2021

Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?

Representation ID: 41624

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Agree

Support

New Local Plan: Spatial Options Document 2021

Q4. Do you agree with the strategic priorities and objectives we have identified?

Representation ID: 41625

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Agree

Comment

New Local Plan: Spatial Options Document 2021

Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?

Representation ID: 41626

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.

We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.

The specific areas of allocations of concern are listed below:

CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12

These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.

Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.

Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:

Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass

As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.

Comment

New Local Plan: Spatial Options Document 2021

Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?

Representation ID: 41627

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.

Comment

New Local Plan: Spatial Options Document 2021

Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?

Representation ID: 41628

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

We refer you to our comments and sites outlined at Q6.

Comment

New Local Plan: Spatial Options Document 2021

Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?

Representation ID: 41629

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085

Comment

New Local Plan: Spatial Options Document 2021

Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?

Representation ID: 41630

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley

Comment

New Local Plan: Spatial Options Document 2021

Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]

Representation ID: 41631

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.

Comment

New Local Plan: Spatial Options Document 2021

Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?

Representation ID: 41632

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

• We refer you to our responses under Q6 and Q28:

We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.


Any [airport] growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.

Comment

New Local Plan: Spatial Options Document 2021

Q52. Are there areas where improvements to transport connections are needed?

Representation ID: 41633

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

• We refer you to our responses under Q6 and Q28:

We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.


Any [airport] growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.

For instructions on how to use the system and make comments, please see our help guide.