Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?

Representation ID: 41624

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Agree

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Support

New Local Plan: Spatial Options Document 2021

Q4. Do you agree with the strategic priorities and objectives we have identified?

Representation ID: 41625

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Agree

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?

Representation ID: 41626

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.

We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.

The specific areas of allocations of concern are listed below:

CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12

These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.

Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.

Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:

Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass

As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?

Representation ID: 41627

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?

Representation ID: 41628

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

We refer you to our comments and sites outlined at Q6.

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?

Representation ID: 41629

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?

Representation ID: 41630

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]

Representation ID: 41631

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?

Representation ID: 41632

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

• We refer you to our responses under Q6 and Q28:

We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.


Any [airport] growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150

Comment

New Local Plan: Spatial Options Document 2021

Q52. Are there areas where improvements to transport connections are needed?

Representation ID: 41633

Received: 20/09/2021

Respondent: SEETEC

Representation Summary:

• We refer you to our responses under Q6 and Q28:

We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.


Any [airport] growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.

Full text:

Seetec – Introductory Comments
With our head office in the Rochford district, we are one of the UK’s largest employee owned businesses, employing over 2,000 people and committed to building our history of service.
We help people in the UK and Ireland to increase their social and economic stake in society. We do this by providing skills, training and support services that people need to reach and exceed their ambitions, creating positive change for the communities we serve
Our aim has always been to change lives for the better. Founded more than 35 years ago as a small charity, we first taught IT skills to 30 unemployed young people at a former primary school in Hockley. From these humble beginnings, we now help hundreds of thousands of people find work, learn new skills and take ownership over their lives.
We understand the needs of the people we support. As employee owners, we now want to drive further improvements and continue to generate enduring positive outcomes for the people and communities we service.
As a B-Corp organisation we are business committed to social value by reducing inequality, working toward lower levels of poverty, a healthier environment, stronger communities and the creation of high quality jobs with dignity and purpose.
We care passionately about the District, its environment, open spaces, heritage and sustainable living. Our business has made a long term contribution to the District and this response is intended to reflect our on-going ambition to make Rochford district a first class place for health & wellbeing, work, learning and leisure. The choices the Council makes over the next 35 years will be key to this ambition.

Consultation Representations
Our responses and representations to the questions from the above consultation are set our below. We have replied to some specific questions and used cross references where appropriate to avoid duplication.
• Introduction
o
 Q3. Do you agree that we should develop a range of separate visions for each of our settlements to help guide decision-making?
Agree
 Q4. Do you agree with the strategic priorities and objectives we have identified?
Agree
• Strategy Options
 Q6. Which of the identified strategy options do you consider should be taken forward in the Plan?
We prefer taking forward Option 4 Balanced Combination with the following comments, preferences and concerns regarding risks.
In general, the preference is for a ‘selective’ ‘Strategy Option 4’ approach by combining Strategy Option 1 Urban Intensification; Option 2 Urban Extensions and Option 3a Concentrated Growth in the west of Rayleigh. This would need to be in specific sites and it will be easier to quantify for housing targets if we were to identify sites that we would not support.
We would not support Option 3b North of Southend and 3c Focused East of Rochford and the land allocations from Rochford to Hockley in the 2017 Strategic Housing and Employment Land Availability as well as some other sites in Lower Hockley and Rayleigh. These are transport infrastructure and risk related objections whilst there are others that negatively impacting heritage, character and setting.
The specific areas of allocations of concern are listed below:
CFS035 land west of Rochford hall 1.25 hectares
CFS041 Lee valley farm 2.54ha
CfS074 land south of Mount Bovers Lane 14.22ha
Cfs077 land north of Great Wheatley’s Road 7.5ha
CFS084 land south of hall road 7.16
CFS085 land west and north of Hall Road 2.22
CFS087 land between Western Road and Weir Farm Road 3.08
CFS121 land north of A127 38.48
CFS150 land on the north side of Victor Gardens 1.73
EXP12 land adjacent 44 Great Wheatley Road 0.12
These will exacerbate the B1013 ‘rat run’ causing huge congestion and comprised emergency evacuation with the potential risk of:
• global warming repeating ‘1950’s scale flooding’ in South East Essex,
• nuclear contamination (Bradwell) and
• airport / rail disaster.
Any development must be matched by adequate transport solutions. Until this document is available then it is difficult for consultees to make informed representations and the Council to make evidence based decisions. The whole approach is somewhat ‘chicken and egg’. The transport solution should be the first document given the historic challenges and earlier consultation responses. Once this is available, the context of spatial options can be evaluated on sound evidence as community and population safety will be of paramount concern.
Assuming there is no radical bypass, which we would not support anyway given the intrusion into Crouch Valley conservation, solutions must be found to the key rail bridges and Rayleigh Weir underpass. These are high risk pinch points for local population and egress in particular:
Rochford Bridge / Hall Road
Hockley Bridges (Greensward Lane & Church Road)
Rayleigh station (London Road)
A127 Weir underpass
As a minimum, solutions must be found to these bottle-necks - widening the bridge underpasses, flyovers etc. If certain developments were to go ahead, flooding and the increased congestion of Options 3a, 3b and the proposed allocations along B1013 will potentially lock-in and lock-out population from their homes, shops, work and living in safe communities.
• Employment and Jobs
 Q28. With reference to the options listed above, or your own options, how do you feel we can best manage the Airport’s adaptations and growth through the planning system?
Any growth must be contingent on the transport infrastructure comments in this representation, without this future growth is limited. In addition, it is important for quality of living that night flights are stopped and pollution and noise controls are enhanced.
• Green and Blue Infrastructure
 Q32. With reference to the options above, or your own options, how do you feel we can best deliver a quality green and blue infrastructure network through the plan?
We refer you to our comments and sites outlined at Q6.
• Heritage
 Q43. With reference to the options listed in this section, or your own options, how do you feel we can best address heritage issues through the plan?
Remove allocations that threaten the key heritage sites in the District e.g. CFS035, CFS084, CFS085
 Q45. Are there any buildings, spaces or structures that should be protected for their historic, cultural or architectural significance? Should these be considered for inclusion on the Local List of non-designated assets?
Grade 1 Rochford Hall and setting.
Rochford Conservation Zone
Crouch Valley
• Town Centres and Retail
 Q48. With reference to Figures 38, 39 and 40, do you agree with existing town centre boundaries and extent of primary and secondary shopping frontages in Rayleigh, Rochford and Hockley? If not, what changes would you make? [Please state reasoning]
As regard Hockley town centre we have previously stated our preference to develop an imaginative town setting that brings Hockley Woods into the town e.g. shop ‘timber’ facades, woodland street furniture etc thus celebrating the setting of Hockley in its ancient woodlands and Spa.
• Transport and Connectivity
• We refer you to our responses under Q6 and Q28

 Q51. With reference to the options above, or your own options, how do you feel we can best address our transport and connectivity needs through the plan?
We refer you to our responses under Q6 and Q28
 Q52. Are there areas where improvements to transport connections are needed?
We refer you to our responses under Q6 and Q28
 Q53. With reference to your preferred Strategy Option, are there opportunities for growth to deliver new transport connections, such as link roads or rapid transit? What routes and modes should these take? [walking, cycling, rail, bus, road etc.]
We refer you to our responses under Q6 and Q28

• Planning for Complete Communities

Rayleigh
 Q56d. Are there areas that require protecting from development?
CFS77, CFS087 and EXP12
Rochford and Ashingdon
 Q57d. Are there areas that require protecting from development?
CFS035, CFS084, CFS085 (see Q43 response above)
Hockley & Hawkwell
See representations at Q48
 Q58d. Are there areas that require protecting from development?
CFS041, CFS074, CFS150