New Local Plan: Spatial Options Document 2021

Search representations

Results for Taylor Wimpey search

New search New search

Support

New Local Plan: Spatial Options Document 2021

Q58b. With reference to Figure 46 and your preferred Strategy Option, do you think any of the land edged blue should be made available for any of the following uses?

Representation ID: 43782

Received: 22/09/2021

Respondent: Taylor Wimpey

Agent: Anas Makda

Representation Summary:

As mentioned in answer to Question 6, Taylor Wimpey supports following a strategy that allows growth in all settlements across the District, including Hockley and Hawkwell, at a level that is appropriate to the sustainability of each settlement. Hockley and Hawkwell is identified within the adopted Core Strategy (2011) as a
Tier 1 settlement, and the current Spatial Options Document proposes Hockley (including Hawkwell) as a Tier 2 settlement below only Rayleigh. This is
commensurate with the settlement being one of the most sustainable in the District, and its ability to support additional housing. It is clear that Hockley and
Hawkwell are eminently sustainable, as illustrated on Figure 43 which shows that residents are within walking distances of the range of services and facilities that
are available.
[see attached document for image]

For this site in particular, the following range of services and facilities are located close to the site, as further expanded within the accompanying Sustainability
Appraisal (Appendix D):
[see attached document for table showing accessibility from site to key destinations and facilities]

Hockley Train Station is also located just 1.5km / 20-minutes walking distance to the north.

Hockley, which is in close proximity to the site, supports a further range of local retail and employment opportunities.

On this basis, Taylor Wimpey strongly supports the 'allocation' of site reference CFS074 for up to 400 new homes and significant green infrastructure as illustrated
below. The site is also capable of contributing towards appropriate on-site or offsite social / physical infrastructure if further evidence demonstrates a need for such infrastructure.
[see attached document for masterplan of site]

Site Deliverability
The suitability and benefits of this site have been comprehensively presented in previous submissions to the Local Plan-making process, including in
representations to the Regulation 18 Issues and Options Consultation in 2018. This submission was accompanied by technical input and Taylor Wimpey are committed
to working collaboratively with the Council to ensure the timely delivery of the proposed allocation. The following seeks to further reiterate the deliverability and
suitability of the site for residential development in response to the 'scoring' of the site in the RDC Site Appraisal Paper (2021) as presented below. The scores given follow a scale as replicated in the figure below
[see attached document for screenshot of site appraisal criteria]

Drainage
[see attached document for screenshot of site appraisal scores]
The site is located within Flood Zone 1 (lowest risk) as defined by the Environment Agency. The site is therefore considered sequentially preferable for residential development in flood risk terms, and the score of 5 (best performing) is agreed with.

The score of 2 for 'critical drainage risk' appears to have been informed by a highlevel view of the surface water flood risk for the site. Mapping on the Environment
Agency long term flood risk website illustrates that the central valley of the site is associated with low to medium risk of flooding from surface water, with some areas
on the eastern boundary and areas within the western half of the site being associated with low to high risk of flooding from surface water.
[see attached document for screenshot on EA surface flood risk map]

However, this is a matter that can be suitably addressed through any future planning application, which would be supported by a surface water drainage strategy incorporating Sustainable Urban Drainage Systems (SuDS). The Illustrative Landscape and Ecological Masterplan (Appendix B) illustrates how the
matter of surface water flood risk can be mitigated, through the inclusion of SuDS basins and swales through the centre of the site where the valley is located. The
location and design of the basins and swales will be subject to further detailed drainage assessment, however it is considered that a scheme can be designed that
effectively mitigates the risk of surface water flooding.

Green Belt and Landscape Impact
[see attached document for screenshot of site appraisal criteria]

The site is located within the Green Belt, albeit being directly adjacent to the existing settlement edge of Hawkwell. It is acknowledged that the Green Belt
designation carries significant weight as a material consideration, with the NPPF being clear that Green Belt boundaries should only be altered in exceptional
circumstances (paragraph 140). The site is also located within the Upper Roach Valley Landscape character area which seeks to protect a ‘green lung’ and landscapes of value (noting it also aims to promote recreation).

As explored earlier, Rochford District is highly constrained with limited opportunities to accommodate sufficient levels of growth outside the Green Belt.
The evidence base produced by the Council indicates there are not sufficient nonGreen Belt sites available to meet local housing needs. The Urban Capacity Study
(2020) found that urban sites may deliver between 3,300 and 5,000 sites over 10-15 years. The Council has identified the need for a minimum of 7,200 new homes to be delivered over the Local Plan period, and at least 10,800 homes when a buffer is applied and the potential to accommodate unmet need from neighbouring authorities is taken into account, as Taylor Wimpey considers is required.
Furthermore, the most sustainable sites that are going to be available for potential allocation and development will be within the Green Belt, as the settlements identified in the settlement hierarchy as being the most sustainable and capable of accommodating new growth lie within the Metropolitan Green Belt.

There will be harm associated with the release of Green Belt land. However, the inherent shortfall in brownfield land available for development and the ability of Green Belt land to delivery sustainable patterns of development provides, in our view, the exceptional circumstances required to amend the Green Belt boundary.
The Green Belt Study (2020) prepared by the Council concludes (the Stage 1 Assessment) by stating at paragraph 3.39 that other than a few pockets of Green
Belt, the majority of the assessed land continues to serve the Green Belt purposes well.

It is noted here that our 2018 submissions included an independent Green Belt Assessment of the site which concluded that the site makes limited or no contribution to four of the Green Belt purposes, except for purpose 3 'safeguarding the countryside from encroachment' to which it was considered a partial contribution is made. Taylor Wimpey considers this appraisal remains valid and the value of this site to the Green Belt is limited and that any harm arising from its removal from the Green Belt would also be limited.

Notwithstanding this, paragraph 3.39 of the Green Belt Study (2020) does go on to state that the most sustainable sites for potential allocation may be located in areas that make a strong contribution to the Green Belt purposes. The contribution that a site makes must therefore be weighed against other relevant factors that
determine the suitability of a site for development, such as the existence (or lack thereof) of site-specific constraints, proximity to sustainable settlements and
transport connectivity.

A Landscape and Visual Appraisal, including Green Belt Appraisal (Appendix B), has been prepared to accompany these representations. The report considers the landscape and visual constraints the site is subject to, based on the potential impacts arising from the proposed development. This appraisal has in turn informed the creation of an Illustrative Landscape Masterplan, which demonstrates that a residential scheme that is led by robust landscape principles can be created that will be 'physically contained and have clear defensible boundaries', as well as make 'a positive contribution to the recreational aspects of the landscape in respect of the Upper Roach Valley.' A significant area of open space is proposed on the western half of the site (far in excess of policy requirements) which will further
contain the built form to remain in line with the existing extension of the settlement edge into the landscape.

With the implementation of the proposed landscape strategy, which will be formulated further as detailed design takes place, to create an appropriately designed residential scheme, the Appraisal demonstrates that the site would have only limited landscape and visual effects at a localised level and that such impacts can successfully be avoided or reduced through appropriate mitigation. The proposed inclusion of substantially improved areas of local green and blue infrastructure in addition to open greenspace will also allow the creation of a defensible Green Belt boundary, limiting the risk of additional 'sprawl' as well as creating an appropriate interface between the settlement edge and the wider
countryside.

Consequently, development of site CFS074 would complement the character of the wider landscape context and enhance the function of the Upper Roach Valley's as
a 'green lung' through the District. Any limited impacts can be mitigated and enhanced through the proposed landscaping strategy, with recreational benefits
arising from the proposed green infrastructure which will provide new health and wellbeing outcomes for existing and future residents of Hawkwell. An appropriate,
robust and enduring boundary to the Green Belt can therefore be created.

As such, the low scores given on Green Belt and Landscape Impact by the RDC Site Appraisal are challenged for the reasons set out above and should not preclude consideration of the site for allocation. Notwithstanding this, the discussion on other factors in answer to question 58b clearly demonstrates the suitability and sustainability of the site; this must be weighed against the potential harm caused to the Green Belt and in our opinion provides sufficient reason for further consideration of this site in later Local Plan stages.

Biodiversity
[see attached document for screenshot of site appraisal criteria]
Taylor Wimpey supports the scores given to the site relating to biodiversity. A Preliminary Ecological Appraisal has been undertaken which confirms that that the site is of limited ecological interest.

The proposed strategy set out in the Illustrative Landscape and Ecology Masterplan would therefore have the benefit of providing a measurable improvement of habitat and biodiversity net gain on the site.

The site itself is not covered by any statutory habitat designations. However, the site is located close to the Hockley Woods SSSI which is a nationally designated
ancient woodland. While development of the site would not result in any direct impacts on the SSSI, there is the potential for indirect impacts through additional
recreational pressure resulting from new residents. The site proposes to provide a significant amount of greenspace on the site, which will effectively mitigate the
recreational pressure that might otherwise be generated on surrounding environmental designations.

Heritage
[see attached document for screenshot of site appraisal criteria]
The scores relating to heritage are not considered to be accurate. A Heritage Statement has been prepared (Appendix E) which contains an assessment of potential impacts arising from the proposed development on the historic environment. In terms of archaeology, a review of the available recorded data indicates that there are unlikely to be any below ground remains which are of
historical interest. The potential for significant archaeological remains from any historical period is considered to be low. The score relating to impact on
archaeology should therefore be a 5 (i.e. best performing), as any potential impacts can be comfortably mitigated by way of a planning condition at the planning
application stage, which would control development of the site until the desktop findings have been confirmed through further investigation.

In terms of built heritage, there are a few Grade II listed buildings in the vicinity of the site but only two that may be impacted by the proposed development. The
Grade II listed Sweynes Farmhouse is located north-east of the site, however it is considered the site does not contribute to the significance of this asset and is not
a constraint to development of the site. The Grade II listed Mount Bovers is located to the west and a small part of the site was historically associated with the function of the heritage asset. To preserve the significance of the listed building, it is therefore proposed that a setback is maintained in the western part of the site, with an associated enhancement of vegetation on the north-western boundaries. As the emerging masterplan for this site proposes the retention of the entirety of the western half of the site as open greenspace with significant new planting, this setback will be comfortably provided for and maintained and it is considered that there will be no impact on this designated heritage asset. The score relating to built
heritage should therefore be at least a 4 (better performing).

Sustainability
[see attached document for screenshot of site appraisal criteria]
The scores relating to the sustainability of the site are broadly agreed with, although a Sustainability Appraisal (Appendix D) has been prepared which refutes
the scores given on some elements, as will be explored below.

The existing bus stops are located close to the site boundary on Main Road and Hall Road, at most around 10 minutes' walk for homes located furthest from the Hall
Road bus stop – with most homes being located at a much closer distance. Given the close proximity and convenient access to bus stops the score should be a 5
(best performing).

Similarly, the score for access to bus services is currently too low and should be at least a 4 (moderate positive). The no.8 bus service provides a regular and frequent service (every 30 minutes) on a weekday, allowing convenient access towards Hockley Town Centre, Rayleigh, Southend-on-Sea and Great Wakering. This bus service provision also means the score for access to town centre should be at least a 4 (moderate positive) rather than 1 (negative), as Hockley town centre is very accessible from the site, if not by bus then also by walking and/or cycling.

Other bus services are also available, and whilst less frequent they provide travel options to other settlements. There are bus shelters available for 3 of the 4 closest bus stops to the site, with the potential for improvements to be made to encourage use of the bus services.

The bus services available include providing travel to Hockley train station, which is otherwise around 20 minutes' walk from the site. This is considered to offer good access, making travel by train to settlements further afield or for commuting a feasible option. Indeed, the station provides frequent and regular trains towards
Southend Victoria and London Liverpool Street. The score for access to train services should be at least a 5 (positive).

The score of a 5 for access to walking infrastructure is strongly supported; the site is extremely well-connected and as the evidence within the Spatial Options Document illustrates there are plenty of opportunities to walk to everyday services and facilities within Hawkwell or even to Hockley centre. The footways are of a good quality and attractive, being safe and traversable. The score of 3 (moderately performing) for cycling is accepted, as while the roads in the vicinity of the site are suitable for cycling to local facilities, there is no formal infrastructure that can be utilised to encourage cyclists with less confidence.

The relevance of the scoring for access to the strategic road network is not clear. The A127 and A130 are accessible from the site, and are of a similar distance from the current site as they are from elsewhere in the district. The sustainability of the site lessens the reliance on the strategic road network. Furthermore, this is a
residential scheme where trips for day-to-day needs will be made locally – the SRN is not as significant as it would be for an employment scheme.

Turning to the scores given for access to facilities such as primary school, healthcare and any other centre (in this instance Hockley centre). The scores given are broadly agreed with as they acknowledge the sustainability of the site given the close proximity of these services. It should be acknowledged however that
certain services within Hockley centre such as the Co-Op (Supermarket), Pharmacy and Post Office are very close to the site (around 10 minutes' walk) and could
therefore be given a score of 5 (best performing). Similarly, the Practice Hawkwell (health centre) is also around a 10-15 minutes' walk from the site and could also be given a score of 5 (best performing) rather than a 4 (moderate positive).

With respect to the secondary school, the closest is Greensward Academy which is up to 30 minutes' walk or 10 minutes' cycle from the site. However, the journey
can also be made by bus in around 11 minutes (not accounting for waiting time). This is considered to be relatively normal travel times for a secondary school, where journeys are made independently by older children by bike, bus or walking. The score of 1 should therefore be at least a 4 (moderate positive) to reflect this.

Turning finally to employment, the score of 2 (moderate negative) is contested. Firstly, there has been a noticeable shift to homeworking which means there is less need for reliance to be placed on workers needing to be close to their place of employment. Nevertheless, there are employment sites located in the north of
Hockley within an accessible distance from the site and regular train services into London from Hockley Station as highlighted above, and this score should therefore
be upgraded to 4 (moderate positive).

In summary, these representations expand upon previously made submissions to demonstrate that Land south of Mount Bovers Lane, Hawkwell, is capable of
delivering a residential development in a sustainable and accessible location. Exceptional circumstances exist for the Local Plan to release land from the Green Belt, and the evidence submitted demonstrates development of this site will not adversely harm the Green Belt and a sensitively designed landscape-led scheme will help to mitigate and enhance the local landscape and deliver biodiversity net gain, alongside recreational improvements and the associated health and wellbeing outcomes this brings for existing and future residents. The District, and Hockley (including Hawkwell) in particular, has a pressing housing need and
affordability issue, which the delivery of this site can contribute significantly towards addressing. The site is capable of being delivered in the early stages of the
new Local Plan period, and Taylor Wimpey is willing to collaborate closely with the Council to ensure this can be achieved.

Site Availability
The site remains under single ownership and comprises managed agricultural land on the southern edge of Hawkwell. There are no legal constraints to the availability of the land for development.

The landowner is willing to make the site available for development and the site is under option and being promoted by Taylor Wimpey, one of the UK’s largest housebuilders, through the emerging Local Plan in addition to engaging with local stakeholders as part of this process.

The expertise offered by Taylor Wimpey ensures that subject to the removal of the current Green Belt designation through the Local Plan-making process, that the site will be available for development immediately and capable of delivering new homes in the early part of the New Local Plan.

Site Viability
The site will be expected to contribute to the provision of infrastructure, through a variety of mechanisms, including Section 106 and Section 278 Agreements, Community Infrastructure Levy (CIL) and appropriate Planning Conditions, provided such conditions are necessary and relevant to the proposed development and also where Planning Obligations are:
i) Necessary to make the development acceptable in planning terms;
ii) Directly related to the development; and
iii) Fairly and reasonably related in scale and kind to the development.

The full Infrastructure requirements in relation to this site are as yet unknown but will be set out within RDC’s forthcoming ‘Infrastructure Delivery Plan’.

The site comprises managed agricultural land (i.e. Greenfield land) and accordingly, it is not anticipated that there will be any abnormal costs associated with the
development of this site as may be expected on previously developed (brownfield) land.

As such, and subject to further ongoing site investigations and review of RDC’s Infrastructure Delivery Plan, CIL, Local Plan Viability Assessments and emerging Planning Policy wording once finalised, which will provide further details with regards to likely infrastructure requirements arising from the development of the site, it is to be anticipated that the site will be capable of delivering the Council’s emerging policies, including with regards to Affordable Housing provision.

For instructions on how to use the system and make comments, please see our help guide.