Allocations DPD Discussion and Consultation Document

Search representations

Results for CPREssex search

New search New search

Object

Allocations DPD Discussion and Consultation Document

Option SH1

Representation ID: 19331

Received: 29/04/2010

Respondent: CPREssex

Representation Summary:

Although this site would be less damaging to the Green Belt it would impact on the area as a whole. The roads in the area cannot cope with the current requirements, especially the Ashingdon Road.

Full text:

Although this site would be less damaging to the Green Belt it would impact on the area as a whole. The roads in the area cannot cope with the current requirements, especially the Ashingdon Road.

Object

Allocations DPD Discussion and Consultation Document

Option SH2

Representation ID: 19342

Received: 29/04/2010

Respondent: CPREssex

Representation Summary:

This site may be good for the Green Belt but damaging to the area as a whole. Traffic movement would be a huge problem.

Full text:

This site may be good for the Green Belt but damaging to the area as a whole. Traffic movement would be a huge problem.

Object

Allocations DPD Discussion and Consultation Document

Option EA1

Representation ID: 19352

Received: 29/04/2010

Respondent: CPREssex

Representation Summary:

Any site in this area will erode the green belt. However, the Ashingdon Road is already full to capacity.

Full text:

Any site in this area will erode the green belt. However, the Ashingdon Road is already full to capacity.

Object

Allocations DPD Discussion and Consultation Document

Option EA2

Representation ID: 19361

Received: 29/04/2010

Respondent: CPREssex

Representation Summary:

This site has implications for traffic on Ashingdon Road.

Full text:

This site has implications for traffic on Ashingdon Road.

Object

Allocations DPD Discussion and Consultation Document

South West Hullbridge 500 dwellings (250 between 2015 and 2021, and 250 post 2021)

Representation ID: 19363

Received: 29/04/2010

Respondent: CPREssex

Representation Summary:

Hullbridge is a Community that has evolved and is a large village with a village atmosphere. 500 housing will change this Community and put pressure on the current infrastructure. The road network cannot cope with rush hour traffic now. Any person needing emergency treatment will have to be sure to be ill and need an ambulance out of the rush hour.

Full text:

Hullbridge is a Community that has evolved and is a large village with a village atmosphere. 500 housing will change this Community and put pressure on the current infrastructure. The road network cannot cope with rush hour traffic now. Any person needing emergency treatment will have to be sure to be ill and need an ambulance out of the rush hour.

Object

Allocations DPD Discussion and Consultation Document

South Canewdon 60 dwellings

Representation ID: 19371

Received: 29/04/2010

Respondent: CPREssex

Representation Summary:

.

Full text:

Canewdon has had its fair share of development, but this would be a step too far. CPRE would like to object to any development in this Village highlighting the following:

The area proposed lies in an area of Green Belt, and it is Al agricultural land.
There is very little public transport so the already unsuitable roads will be under even greater pressure
In addition, Canewdons' roads are used recreactionally by many people. Walkers. runners, cyclist and horseriders. It is an area where people from the surrounding areas come to enjoy being in the Countyside and walk the paths, perhaps train for long distance runs etc.

For instructions on how to use the system and make comments, please see our help guide.